This is an Addendum #001 to a construction solicitation issued by the State of Utah Division of Facilities Construction and Management (DFCM) for the Southwest Technical College Kanab Shop Mechanical Upgrade project (#26066270). The project involves removing two existing evaporative cooling units and replacing them with two new packaged, ground-mounted rooftop units, along with providing a new exhaust system to bring the shop into compliance with current code. The addendum, dated October 2, 2025, modifies the original bidding documents issued on August 8, 2025, and is mandatory for all prequalified mechanical contractors to acknowledge upon bid submission. Key clarifications addressed in the addendum include specifications for salvaging existing radiant heaters, coordinating fire alarm tie-ins with Mountain Alarm, providing a new propane kit for the air handlers, patching wall penetrations and roofing openings using DFCM-approved contractors, removing and capping existing radiant heater vents, and confirming ground placement of RTUs rather than roof placement.
The addendum further clarifies that rooftop unit orientation may be reconfigured by contractor request through Request for Information (RFI) without added cost or change orders, and that ductwork may be run on the exterior of the building with appropriate insulation as an alternative to the original plan. The existing facility utilizes propane gas service and is equipped with a Mountain Alarm fire alarm system (FACP) to which new equipment must coordinate. A significant specification change eliminates the requirement for building management system controls (spec section 230900), replacing it with local thermostat and sensor-only control due to the facility's lack of an existing building management system. The construction cost estimate for the project is $114,956.00, with bidding limited to contractors prequalified under DFCM Stage I Prequalification as of the solicitation date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DFCM Addendum Cover Page, 2.26.2026
DFCM Addendum #001
Reference: SWTECH Kanab Shop Mechanical Upgrade DFCM Project #26066270 U3P Event #CR27014
Date: August 25, 2026
To: Prequalified Mechanical Contractors
From: The Division of Facilities Construction and Management
Note: This Addendum shall be included as part of the Contract Documents. Items in this Addendum apply to all drawings and specification sections whether referenced or not involving the portion of the work added, deleted, modified, or otherwise addressed in the Addendum. Bidders are required to acknowledge receipt of this Addendum when their bid is submitted. Failure to do so may subject the Bidder to disqualification.
Addendum Items
Solicitation Schedule Changes: There are no changes to the Solicitation Schedule in this addendum.
DFCM Addendum Items: N/A
Click to enter text Click to enter text Click to enter text
A/E Addendum Items: A/E Addendum # 001- Dated 10/02/2025 Click to enter text
Total Attached Pages: 2
ADDENDUM #1
Project Name: Kanab SWATC RTUs
DFCM Project #: 26066270
From: WHW Engineering LLC 733 West 9000 South Sandy, Utah 84070 Phone (801) 466-4021
To: All Bidding Contractors Addendum No: 1
Date: 10.02.25
This Addendum forms and becomes a part of the Contract Documents and modifies the original Bidding Documents dated 08/08/25 as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.
This Addendum consists of 2 page(s).
I. QUESTIONS AND ANSWERS:
a. Does the facility want to keep the existing radiant heaters after they are removed?
1. Yes, salvage the heaters back to the owner.
b. Will the new RTUs need to tie into the existing fire alarm?
1. Yes, please coordinate with Mountain Alarm for tie-in.
c. What type of gas is serving the building?
1. The existing gas is propane. Please provide new propane kit to serve new air handlers.
d. If the existing wall penetrations are not used will they need to be patched?
1. Yes, plan on coordinating with facilities for their preferred way to patch aluminum siding.
e. Is the roof standing seam?
1. The existing roofing material is SL-16 over 7/16” O.S.B. over 30# felt.
f. Will the existing domestic water serving the existing evaporative coolers be removed?
1. Yes, the intent is to remove the domestic water piping back to the existing main and cap.
g. What manufacture is the FACP?
1. Mountain Alarm.
h. Is the roof under warranty? Is there a specific company we need to work with for patches?
1. The roof is not under warranty. Any roofing contractor on the state’s pre-approved roofing contractor list is acceptable.
i. Do the existing radiant heater vents need to be capped or completely removed and patched?
1. The existing vents need to be removed and the existing penetrations will need to be patched by DFCM approved roofing contractor.
j. Could the RTUs be placed on the roof rather then the ground as drawn?
1. The RTUs will need to be located on the ground.
k. Can you get us the alarm system people so we can get pricing to tie into our units
1. Mountain Alarm is the current alarm company for the facility.
l. The plan shows the duct immediately going through the wall then up inside the tool coral. Can you clarify if that's the way you want the new supply and return ran or if this is to be run on the outside of the building then penetrate the wall to where we will need to insulated the duct up 16' AFF?
1. Contractor may re-configure the orientation of the rooftop units via
RFI and approval of the engineer. This may be done without added cost or change orders to the project.
II. Changes to Specifications:
a. The existing building does not have a building management system. Please disregard spec section 230900. The new equipment will be controlled by local thermostats and sensors only.
PRIOR APPROVALS
THE FOLLOWING ITEMS, AS SUBMITTED, ARE CONSIDERED, IN GENERAL AND IN NAME ONLY, AS EQUAL TO THOSE ITEMS SPECIFIED. THIS REVIEW DOES NOT RELIEVE THE CONTRACTOR OR SUPPLIER OF THE RESPONSIBILITY OF CONFORMING TO THE DRAWINGS AND SPECIFICATIONS, NOR DOES IT RELIEVE THE CONTRACTOR OF THE REQUIREMENTS OF THE SPECIFICATIONS FOR COORDINATION WITH OTHER TRADES. ALL DIMENSIONS SHALL BE CONFIRMED AND CORRELATED AT THE JOBSITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS AND THE SUITABILITY OF “EQUAL” PRODUCTS FOR THE SPECIFIED APPLICATION.
Description Manufacturer