4-Consent of Surety-Change Order.pdf.pdf
PDF 648 KB Posted
- Solicitation number
- IFB-26-00413
- Issued by
- Hillsborough County, Florida
About this file
This is a Consent of Surety to Change Order form used by Hillsborough County, Florida for construction contracts. The document serves as formal acknowledgment by a surety company that it consents to modifications of an existing contract between the county and a contractor principal. The form allows for changes to the contract amount (increases or decreases), extension of completion dates, and corresponding adjustments to performance and payment bonds. The document requires execution by an authorized representative of the surety company and notarization before a Florida notary public in Hillsborough County. Specific fields include spaces for the change order number, contract title, contractor name, surety identification, agent information, dollar amount of change, calendar days for deadline extension, and date of execution.
This form is a standard template document that does not contain substantive contract terms, pricing information, or project-specific details. Rather, it functions as a procedural instrument requiring surety company acknowledgment and legal verification through notarization. The form was last revised on March 9, 2020, and applies to Hillsborough County construction contracts, including the Columbus Drive Bridge #105504 Painting and Repair project, a 100-year-old swing bridge rehabilitation involving painting, truss repairs, and swing-span stop assembly installation. No pricing, bid amounts, or specific financial terms appear in this document, as it is designed for use only after contract award and when change orders become necessary during project execution.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSENT OF SURETY TO CHANGE ORDER
CONTRACT TITLE:
CONTRACTOR (PRINCIPAL):
SURETY:
AGENT:
The SURETY does hereby acknowledge and agree to Change Order No. to the above referenced contract with Hillsborough County, the contract amount
(increasing/decreasing) by $ , and/or extending the completion date by ( ) calendar days. The SURETY further acknowledges that the performance bond and/or payment bond furnished under the aforementioned contract is accordingly changed to reflect the change in contract amount, and/or time included in Change Order No. .
This Consent is dated this day of , 20 .
SURETY:
BY: (SEAL)
Authorized Signature
-OR-
BY: (SEAL)
As Attorney in Fact (Attach Power of Attorney)
Printed Name
STATE OF FLORIDA
COUNTY OF HILLSBOROUGH
The foregoing instrument was acknowledged before me by means of physical presence or online notarization this ___ day of ____________, 20___, __________________________ by (Name of person)
________________________ for _________________________________________________.
(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)
(Signature of Notary Public)
(Print, Type, or Stamp Name of Notary Public)
Personally Know OR Produced Identification
Type of Identification Produced __________________
Revised 03.09.2020
File details come from the government source that posted it. Updated .