19-Attachment C Specific Provisions.pdf

PDF 131 KB Posted

Attached to
Columbus Drive Bridge #105504 Painting and Repair
Solicitation number
IFB-26-00413
Issued by
Hillsborough County, Florida

About this file

This document contains specific provisions for a bridge painting and repair project managed by the Hillsborough County Board of County Commissioners for Bridge #105504 (Columbus Drive over the Hillsborough River), a 100-year-old swing bridge in Florida. The project scope includes painting, truss member repairs, and installation of a swing-span stop assembly. Key provisions require contractors to submit a construction schedule with their bid indicating periods when the bridge will be shut down, provide a minimum of six weeks' advance notice to both the County and City of Tampa prior to any road or river traffic interruption, and comply with U.S. Coast Guard requirements including notification at least 30 working days before placing floating equipment in the channel. Additionally, contractors must coordinate with the U.S. Coast Guard regarding any river traffic shutdowns and provide temporary bridge-opening systems (crane, tugboat, or approved equivalent) if the bridge system is inoperable for more than two hours, with costs included in the Maintenance of Traffic pay item.

All metal products incorporated into the project must be tested and certified by an approved private testing laboratory prior to use, with acceptance reports provided to the Construction Engineer before installation. Any work items and associated costs not directly compensated by a specific bid item shall be prorated and included in the applicable bid item, and failure to follow this procedure constitutes grounds for bid rejection. The solicitation established a 0% Small Business Enterprise (SBE) subcontractor participation goal.

View the file

Other files

File Type Posted
16-Attachment B Permits.pdf PDF
9-Insurance Certificate.doc.doc DOC document
27-Payment Bond.doc DOC document
2-Allowance Authorization Release Form.pdf.pdf PDF
14-Attachment F SuppSpec Complete (with Attachments A, B, C).pdf PDF
11-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
8-Change Order Form.pdf.pdf PDF
15-Attachment G TSP-T468 SS.pdf PDF
20-Attachment B ProjectLocationMap.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
18-Attachment D Coating Condition Assessment 2025 Report.pdf PDF
7-Consent of Surety to Final Payment.pdf.pdf PDF
26-Agreement - Construction - Stand Alone.docx.docx DOCX document
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
17-Attachment F Insurance Requirements.pdf PDF
29-1. IFB-26-00413 Contract Terms and Conditions.pdf PDF
25-Bid Bond.doc.doc DOC document
22-Attachment G TSP-T465 SS.pdf PDF
3-Application for Payment.pdf.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
4-Consent of Surety-Change Order.pdf.pdf PDF
6-Subcontractors Statement of Satisfaction.pdf.pdf PDF
28-Performance Bond.doc DOC document
21-Attachment A Hillsborough County (4x6) Construction Sign Specs 202507.pdf PDF
23-Attachment E Plans SS StrPlan.pdf PDF
24-Attachment H Insurance Requirements.pdf PDF
10-Substitute W9 Form.pdf.pdf PDF
5-Payment Assistance (SBE Set-Aside).pdf.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIP # 69677604

Bridge # 105504 Columbus Dr over Hillsborough River Painting

SPECIFIC PROVISIONS

SP-1.01 BID ITEMS:

It is the intent of these Contract Documents that any items of work and all costs for which compensation is not directly provided by a bid item but are incidental to various project items of work, shall be prorated and included in the bid item for which they are required. Failure of the Contractor to follow this procedure shall be basis for rejection of its bid.

SP-1.02 PAY ITEM NOTES – (See NOTES in PLANS)

SP-2.01 U.S. COAST GUARD REQUIREMENTS:

The Contractor shall request authorization from the Coast Guard Captain of the Port, Tampa, telephone (813) 323-8422 at least thirty (30) working days in advance of placing floating equipment or floating turbidity barriers within the channel so that navigational interests may be advised accordingly. Indicate size of floating equipment and unobstructed horizontal clearance available for the safe passage of navigation. All floating equipment shall be marked in accordance with U.S. Coast Guard Navigation

Rules dated 23 December 1989 and shall be well removed from the channel when not engaged in construction activities.

Contractor shall contact the U.S. Coast Guard to coordinate any river traffic shutdown due to bridge closing and shall notify the U.S. Coast Guard in advance, as required, and shall coordinate with the Engineer any traffic shutdown, whether road vehicles or river boats, with a minimum of six (6) weeks notice to coordinate other agencies requirements.

Contractor shall provide a crane, tugboat, or equal system approved by the Engineer, to open the bridge during the periods that the bridge system is inoperable for more than two (2) hours. The cost of such temporary measures shall be included in the non-FDOT

Pay Item Maintenance of Traffic.

SP-2.02 BRIDGE TRAFFIC INTERRUPTION:

The Contractor shall give the COUNTY and City of Tampa a minimum of six (6) weeks notice prior to any road or river traffic interruption and meet the U.S. Coast

Guard requirements of SP-2.01.

The Contractor shall have all materials and equipment required during switchover or the traffic shutdown at the site and approved by the Engineer prior to shutting down the bridge.

The Contractor shall submit a construction schedule with his bid, indicating the periods of time that the bridges will be shutdown.

SP -3.01 FLOATING TURBIDITY BARRIER – NOT APPLICABLE

CIP # 69677604

Bridge # 105504 Columbus Dr over Hillsborough River Painting

SPECIFIC PROVISIONS

SP-4.01 METAL PRODUCTS:

All metal products incorporated into the project must be tested by and found to conform to applicable specifications by an approved private testing laboratory prior to use on the project. These acceptance reports must also be made available to the Construction

Engineer and to be placed in its office file prior to use on the project.

SP-5.01 (Reserved for future use.)

SP-6.01 (Reserved for future use.)

SP-7.01 (Reserved for future use.)

SP-8.01 (Reserved for future use.)