4 BID FORM.doc

DOC document 111 KB Posted

Attached to
Paving Project
Solicitation number
PE-77081-NONST-2026-000000009
Issued by
Dooly County, Georgia

About this file

This is a Bid Form and Instructions to Bidders document for Elbert County, Georgia, regarding a road construction project involving the resurfacing and improvement of Ernest Brown Road, Limo Road, and Owens Road. Bidders must submit sealed bids addressed to Elbert County at 45 Forest Avenue, Elberton, GA 30635, with envelopes clearly marked with the project name. All bid forms must be completed in ink with unit prices and total amounts, and all required certifications must be fully executed at submission. The contract term is 180 consecutive calendar days from the Notice to Proceed, with liquidated damages assessed at $500 per day for each day beyond the completion date. The County will award the contract to the responsive, responsible bidder whose bid is in the best interest of the Owner, with alternates potentially awarded at the County's discretion within 10 days after Notice to Proceed. Bidders are required to examine the project site and must be thoroughly familiar with all Contract Documents and addenda prior to submission.

Bidders must submit balanced bids in which unit prices reasonably reflect the value of each item considering prevailing labor, material, and equipment costs, with unbalanced or conditional bids subject to rejection. Responsible bidders must maintain a permanent place of business, demonstrate adequate construction experience and equipment resources, and possess sufficient financial strength to meet contract obligations. All work must conform to Georgia Department of Transportation Standard Specifications for Construction of Roads and Bridges. The Contractor must maintain Worker's Compensation and Employer's Liability insurance of at least $1,000,000, Comprehensive General Liability insurance of at least $1,000,000 per occurrence, and Automobile Liability insurance of at least $500,000 per occurrence. Additionally, the Contractor must comply with the Georgia Drug-Free Workplace Act, the Georgia Security and Immigration Compliance Act, and the Occupational Safety and Health Act, with a Certificate of Insurance naming Elbert County as the Certificate Holder required prior to contract award.

View the file

Other files

File Type Posted
2 Invitation to Bid.doc DOC document
5 ROADWAY TYPICAL ASPH.docx DOCX document
3 Instruction to Bidder.doc DOC document
6 SEC 400.pdf PDF
5_E ss109.pdf PDF
5 SPECIAL PROVISIONS FOR FDR_ERNEST BROWN RD.docx DOCX document
Security and Immigration AFfidavit.doc DOC document
i_9 2027.pdf PDF
AGREEMENT.doc DOC document
6 SEC 652.pdf PDF
5_C ss107.pdf PDF
5_D ss108.pdf PDF
6 SEC 162_165.pdf PDF
6 SEC 315.pdf PDF
5 SPECIAL PROVISION.docx DOCX document
5 ROADWAY TYPICAL ASPH_ERNEST BROWN RD (1).docx DOCX document
E_verify affidavit.pdf PDF
BID BOND.doc DOC document
5_F 150.pdf PDF
5 PROJECT MAP.pdf PDF
5_A104.pdf PDF
Corporate Certification.doc DOC document
5_B ss105.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00100-10

ADVANCE \D 1.80

Instructions to Bidders

PRIVATE

ADVANCE \D 2.10ADVANCE \D 10.50

SECTION 00100

Instructions to Bidders

PRIVATE

1.01

CONTRACT DOCUMENTS

A.

The Contract Documents include the Contract Agreement, Advertisement for Bids, Instructions to Bidders, Contractor's Bid (including all documentation accompanying the Bid and any post‑Bid documentation required by the Owner prior to the Notice of Award), Bonds, all Special Conditions, General Conditions, Supplementary Conditions, Specifications, Drawings, and addenda, together with written amendments, change orders, field orders and the Engineer's written interpretations and clarifications issued in accordance with the General Conditions on or after the date of the Contract Agreement.

B.

Shop drawing submittals reviewed in accordance with the General Conditions, geotechnical investigations and soils reports, and drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site, are not Contract Documents.

C.

The Contract Documents shall define and describe the complete work to which they relate.

1.02

DEFINITIONS

Where the following words or the pronouns used in their stead occur herein, they shall have the following meaning:

1.

"Owner" shall mean the Elbert County, Georgia, party of the first part to the Contract Agreement, or its authorized and legal representatives.

2.

"Engineer" shall mean the County Engineer or his representative.

3.

"Contractor" shall mean the party of the second part to the Contract Agreement or the authorized and legal representative of such party.

4.

"Work" and "Project" shall mean the entire completed construction required to be furnished under the Contract Documents.

5.

"Contract Time" shall mean 180 consecutive calendar days as provided in the Contract Agreement for completion of the Project, to be computed from the date of the Notice to Proceed.

6.

"Liquidated Damages" shall mean the sum of $500.00 which the Bidder agrees to pay for each consecutive calendar day beyond the completion date for the Project as defined in these Specifications. Liquidated Damages will end upon written notification from the Owner of final acceptance of the Project.

7.

"Products" shall mean materials or equipment permanently incorporated into the Project.

8.

"Provide" shall mean to furnish and install.

9.

"Balanced Bid" shall mean a Bid in which each of the unit prices and total amount bid for each of the listed items reasonably reflects the value of that item with regard to the entire job considering the prevailing cost of labor, material and equipment in the relevant market. A Bid is unbalanced when, in the opinion of the Owner, any unit prices or total amounts bid on any of the listed items do not reasonably reflect such values.

1.03

PREPARATION AND EXECUTION OF BID

Each Bid must be prepared to represent that it is based solely upon the materials and equipment specified in the Contract Documents.

Each Bid must be submitted on the Bid forms which are attached to the Contract Documents. All blank spaces for Bid prices, both words and figures, must be filled in, in ink. In case of discrepancy, the amount shown in words will govern. All required enclosed certifications must be fully completed and executed when submitted.

Each Bid must be submitted in a sealed envelope, addressed to the Owner. Each sealed envelope containing a Bid must be plainly marked on the outside as, "Bid for ERNEST BROWN RD (FDR&RESURFACE), LIMO RD AND OWENS RD.”

D.

The Bidder shall provide The Bidder’s Name and Address on the outside of the sealed envelope.

E.

Any Bid submitted which does not contain the above information on the outside of the sealed envelope will not be opened and will be returned to the Bidder.

F. If forwarded by mail, the sealed envelope containing the Bid must be enclosed in another envelope addressed to the Owner at Elbert County Attn: County Administrator, 45 Forest Avenue, Elberton, GA 30635.

G.

Any and all Bids not meeting the aforementioned criteria for Bid submittal may be declared non‑responsive and subsequently returned to the Bidder.

H.

The Contractor, in signing a Bid on the whole or any portion of the Project, shall conform to the following requirements:

Bids which are not signed by the individuals making them shall have attached thereto a power of attorney evidencing authority to sign the Bid in the name of the person for whom it is signed.

Bids which are signed for a partnership shall be signed by all of the partners or by an attorney‑in‑fact. If a Bid is signed by an attorney‑in‑fact, there should be attached to the Bid a power of attorney executed by the partners evidencing authority to sign the Bid.

Bids which are signed for a corporation shall have the correct corporate name thereof and the signature of the president or other authorized officer of the corporation manually written below the corporate name following the wording "By ". Corporation seal shall also be affixed to the Bid.

4.

The Bidder shall complete, execute, and submit all documents which are attached to these Contract Documents.

1.04

METHOD OF BIDDING

The unit or lump sum price for each of the several items in the Bid of each Bidder shall include its pro rata share of overhead and profit so that the sum of the products, obtained by multiplying the quantity shown for each item by the unit price, represents the total Bid. Any Bid not conforming to this requirement may be rejected. Additionally, Unbalanced Bids will be subject to rejection. Conditional Bids will not be accepted. The special attention of all Bidders is called to this provision, for should conditions make it necessary to revise the quantities, no limit will be fixed for such increased or decreased quantities nor extra compensation allowed.

1.05

BID MODIFICATIONS

Bid modification by telegraphic communication will not be allowed.

1.06

RECEIPT AND OPENING OF BIDS

The Owner may consider a minor irregularity in any Bid not prepared and submitted in accordance with the provisions hereof and may waive any minor irregularities or reject any and all Bids. Any Bid may be withdrawn prior to the above scheduled time for the opening of Bids or authorized postponement thereof. Any Bid received after the time and date specified shall not be opened.

1.07

SUBCONTRACTS

The Bidder is specifically advised that any person, firm, or other party to whom it is proposed to award a subcontract under this Contract must be disclosed to and must be acceptable to the Owner.

1.08

CONDITIONS OF THE PROJECT

Each Bidder must be informed fully of the conditions relating to the construction of the Project and the employment of labor thereon. Failure to do so will not relieve a successful Bidder of the obligation to furnish all material and labor necessary to carry out the provisions of the Contract. Insofar as possible, the Contractor, in carrying out the work, must employ such methods or means as will not cause any interruption of or interference with the work of any other Contractor.

The Bidder is advised to examine the location of the Project and to be informed fully as to its conditions; the conformation of the ground; the character, quality and quantity of the products needed preliminary to and during the prosecution of the work; the general and local conditions and all other matters which can in any way affect the work to be done under the Contract. Failure to examine the site will not relieve the successful Bidder of an obligation to furnish all products and labor necessary to carry out the provisions of the Contract.

The Bidder shall notify the Owner of the date and time Bidder proposes to examine the location of the Project. The Bidder shall confine examination to the specific areas designated for the proposed construction, including easements and public right‑of‑ways. If, due to some unforeseen reason, the Owner's proceedings for obtaining the proposed construction site (including easements), have not been completed, the Bidder may enter the site only with the express consent of the property owner. The Bidder is solely responsible for any damages caused by examination of the site.

1.09

NOTICE OF SPECIAL CONDITIONS

If any special federal, state, county, or County laws, municipal ordinances, and the rules and regulations of any authorities having jurisdiction over construction of the Project, enclosed, herein referred to, or applicable by law to the Project, conflict with requirements of the Contract Documents, then the most stringent requirement prevails. All work shall be in accordance with Georgia Department of Transportation Standard Specifications for Construction of Roads and Bridges, latest edition.

The contract shall be completed in a total construction time of One hundred and Eighty (180) consecutive calendar days.

1.10

OBLIGATION OF BIDDER

By submission of a Bid, each Bidder warrants that Bidder has inspected the site and has read and is thoroughly familiar with the Contract Documents (including all addenda). The failure or omission of any Bidder to examine any form, instrument or document shall in no way relieve any Bidder from any obligation in respect to the Bid.

1.11

METHOD OF AWARD

The Contract will be awarded to the responsive, responsible Bidder submitting the Bid which is in the best interest of the Owner as determined solely by the Owner. Award will be made in part on the basis of the prices given in the Base Bid, not including alternates. Alternates may be awarded at the discretion of the Owner within 10 days after the Notice to Proceed.

The Bidder to whom the award is made will be notified. The Owner reserves the right to reject any and all Bids and to waive any minor irregularities in Bids received whenever such rejection or waiver is in the Owner's interest.

C. A responsive Bidder shall be one who submits a Bid in the proper form without qualification or intent other than as called for in the Contract Documents, and who properly completes all forms required to be completed and submitted at the time of the Bidding. The Bidder shall furnish all data required by these Contract Documents. Failure to do so may result in the Bid being declared non‑responsive.

D.

A responsible Bidder shall be one who can fulfill the following requirements:

The Bidder shall maintain a permanent place of business. This requirement applies to the Bidder where the Bidder is a division of a corporation, or where the Bidder is 50 percent or more owned by a person, corporation or firm.

The Bidder shall demonstrate adequate construction experience and sufficient equipment resources to properly perform the work under and in conformance with the Contract Documents. This evaluation will be based upon a list of completed or active projects and a list of construction equipment available to the Bidder to perform the work. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work, and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may reasonably request. The Owner reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Contract and to complete the Project contemplated therein.

The Bidder shall demonstrate financial resources of sufficient strength to meet the obligations incident to the performance of the work covered by these Contract Documents. The ability to obtain the required Performance and Payment Bonds will not alone demonstrate adequate financial capability.

1.12- INSURANCE

Insurance The Contractor shall be responsible for his work and every part thereof, and for all materials, tools, equipment, appliances, and properties of any and all description used in connection with this project.

The Contractor assumes all risks of direct and indirect damage or injury to the property of persons used or employed on or in connection with the work contracted for, and of all damage or injury to any person or property wherever located, resulting from any action, omission, commission or operation under the Contract, or in connection in any way whatsoever with the contracted work.

The Contractor shall, during the continuance of all work under the Contract, provide the following:

Maintain statutory Worker's Compensation and Employer's Liability insurance in an amount of not less than $1,000,000.00 to protect the Contractor from any liability or damages for any injuries (including death and disability) to any of its employees, volunteers, or sub-contractors, including any and all liability or damage which may arise by virtue or any statute or law in force within the State of Georgia, or which may be herein after enacted.

The Contractor agrees to maintain Comprehensive General Liability insurance in an amount of not less than $1,000,000.00 per occurrence to protect the Contractor, its sub-contractors, and the interest of the County, against any and all injuries to third parties, including bodily injury and personal injury, wherever located, resulting from any action or operation under the Contract or in connection with the contracted work. The General Liability insurance shall also include the Broad Form Property Damage Liability endorsement, in addition to coverage for explosion, collapse, and underground hazards, where required.

The Contractor agrees to maintain Automobile Liability Insurance in an amount of not less than $500,000 per occurrence. Such insurance shall include coverage for owned, hired, and non-owned automobiles.

The Contractor further agrees to protect, defend, indemnify, and hold harmless the County, its commissioners, officers, agents, and employees from and against any and all liability incurred whatsoever as a result of the work performed pursuant to the terms of this Bid.

The Contractor shall notify the County, in writing, sixty (60) days prior to any change in insurance coverage, including cancellation, non-renewal, etc. The Contractor shall furnish a new certificate prior to any change or cancellation date. The failure of the Contractor to deliver a new and valid certificate shall result in suspension of all payments until the new certificate is furnished. Additionally, contract work may be suspended until the new certificate is furnished to the County.

Insurance coverage required in these specifications shall be in force throughout the

Contract term. Should the Contractor fail to provide acceptable evidence of current insurance within five (5) days of written notice at any time during the Contract term, the Owner shall have the absolute right to terminate the Contract without any further obligation to the Contractor. Further, the Contractor shall be responsible for the cost of procuring the uncompleted portion of the Contract at the time of termination.

Contractual and other Liability insurance provided under this Contract shall not contain a supervision, inspection, or engineering services exclusion that would preclude the County from supervising and/or inspecting the project as to the end result. The Contractor shall assume all on-the-job responsibilities as to the control of persons under its direct employment and of the sub Contractors and any persons employed by the sub Contractor.

The Contractor and all sub Contractors shall comply with the Occupational Safety and Health Act of 1970, and amendments, as it may apply to this Contract.

If the Contractor does not meet the insurance requirements of the specifications, alternate insurance coverage satisfactory to the County may be considered. The Contractor shall be responsible for the costs of any and all alternate insurance coverage so obtained.

A “Certificate of Insurance” showing he Elbert County as the Certificate Holder must be provided prior and incorporated as part of the award contract.

1.13 Project Coordination

The Contractor shall employ and assign only qualified and competent personnel to perform any service or task involved in this project. The Contractor shall designate one such person as a

Project Manager, and the Project manager shall be deemed to be the Contractor’s authorized representative, who shall be authorized to receive and accept any and all communications from the County. The County shall name a Project Manager who shall be authorized to generate, receive and accept communication as an authorized representative of the County.

The Contractor hereby agrees to replace any personnel or sub-contractor, at no cost or penalty to the County, if the County reasonably determines that the performance of any sub-contractor or personnel is unsatisfactory.

1.14 Accuracy of Work

The Contractor shall be responsible for the accuracy of the work performed and shall promptly correct its errors and omissions without additional compensation. Acceptance of the work by the

County will not relieve the Contractor of the responsibility for subsequent correction of errors, the clarification of any ambiguities, or the costs associated with any additional work caused by negligent acts, errors, or omissions by the Contractor or latent defects in the products sold by the

Contractor.

At any time during the execution of this project or during any phase of work performed by others based on data secured by the Contractor under this Agreement, the Contractor shall confer with the County for the purpose of interpreting the information supplied by the Contractor and to correct any errors or omissions. The above consultations, clarifications, and/or corrections shall be made without added compensation to the Contractor. The Contractor shall give immediate attention to these changes so there will be minimum delay to others. The Contractor shall be responsible for errors and omissions and save harmless the County and its agents as provided in this Agreement.

1.15 Ownership

Reports, plans, data, statistics, specifications, and other supporting records compiled or prepared in the performance of the Services required by this Contract, shall be the absolute property of the

County and shall not be used by the Contractor for purposes unrelated to this Contract without the prior written approval of the County. Such original documents shall be turned over to the

County upon completion of the contract except that Contractor shall have the right to retain copies of the same.

1.16 Severability/Cancellation

It is understood and agreed by the parties hereto that if any part, term, or provision of this

Contract is held illegal or in conflict with any law of the State, the validity of the remaining portions or provisions shall not be affected, and the rights and obligations of the parties shall be construed and enforced as if the Contract did not contain the particular part, term, or provisions held to be invalid.

The COUNTY and the Contractor agree to resolve through negotiation or mediation prior to filing any cause of action. The venue for any litigation arising from this contract shall be

Elbert County, Georgia.

1.17 Drug Free Workplace

By submission of a Bid, the Contractor certifies that the provisions of Code Sections 5024-1 through 50-24-6 of the Official Code of Georgia Annotated, relating to the "Drug-free

Workplace Act", have been complied with in full. The Contractor further certifies that:

1. A drug-free workplace will be provided for the Contractor's employees during performance of the contract; and

2. Each Contractor who hires a sub Contractor to work in a drug-free work place shall secure from that sub Contractor the following written certification:

3. As part of the subcontracting agreement with (Contractor's name), (Sub Contractor's name) certifies to the Contractor that a drug-free workplace will be provided for the sub Contractor's employees during the performance of this Contract pursuant to

Paragraph (7) of Sub-section (b) of Code Section 50-24-3".

4. The Contractor further certifies that he will not engage in the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana during the performance of the Contract.

1.18 Assignment of Contractual Rights

It is agreed that the Contractor will not assign, transfer, convey, or otherwise dispose of a contract that may result from this bid or his right, title, or interest in or to the same, or any part thereof, without written consent of the County.

1.19 Indemnity

To the fullest extent permitted by law, the Contractor will indemnify, defend, and hold Elbert County harmless from and against any and all claims, damages, losses, and expenses, including, but not limited to, fees and charges of attorneys and court and arbitration costs, arising out of or resulting from the negligent acts, negligent omissions, willful misconduct, or reckless misconduct of the Contractor or anyone for whom the Contractor is responsible.

1.20 Non-Collusive Bidding

By submitting a response to this Invitation to Bid, the Bidder represents and warrants that such bid is genuine and not a sham or collusive or made in the interest or on behalf of any person not therein named and that the Bidder has not directly or indirectly induced or solicited any other vendor to put in a sham bid, or any other person or company to refrain from submitting and that the Bidder has not in any manner sought by collusion to secure to that vendor any advantage over any other vendor.

1.21 Georgia Security and Immigration Compliance

To comply with the State of Georgia’s Security and Immigration Compliance Act, all contractors must comply with regulations by completing the provided affidavits relative to the Compliance

Act. All applicable affidavits have been included with this Invitation to Bid and must be signed and provided with the Bid submission.

1.22 Appropriation of Funds

The initial contract and any continuation contract(s) shall terminate immediately and absolutely at any such time as there are no appropriated and otherwise unencumbered funds available to satisfy the County’s obligations under said contract(s) 1.23

EMPLOYMENT OF LOCAL LABOR

Preference in employment on the Project shall, insofar as practical, be given to qualified local labor.

END OF SECTION