About this file
This document is Attachment D - Table of Contents for solicitation 25RFP82 for Patient Care Monitors, issued by Wilco Purchasing. The table of contents outlines the required attachments for a proposal submission, including documents such as the Scope of Work, Transmittal Letter, Executive Summary, Pricing Sheet, References, and several other mandatory components. Key attachments requiring signatures include the Transmittal Letter, Conflict of Interest Questionnaire, Proposal Affidavit, and FEMA Addendum.
The document emphasizes the importance of completing and submitting all listed attachments through the Enus (formerly Bonfire) platform. Failure to return the attachments as specified in Attachment A may result in the proposal being considered non-responsive. The table provides a comprehensive checklist for respondents to ensure they have prepared and uploaded all necessary documentation for the Patient Care Monitors solicitation, with specific attention to signature requirements for certain documents.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment D – Table of Contents
25RFP82 | Attachment D - Table of Contents
Respondent Legal Entity Name:
All noted Attachments are to be completed and submitted as part of the Proposal of this Solicitation in lieu of a Table of Contents. Attachments C-Letter of Transmittal, J-Conflict of Interest Questionnaire, K- Proposal Affidavit, and L-FEMA Addendum must be signed.
Check if each Attachment that is required to return is completed, signed (as applicable), and submitted.
Please upload the required document in the specific Group in Enus (formerly Bonfire). Failure to return the attachments as outlined in Attachment A, 25RFP82, may result in the response submission being considered non-responsive.
Attachment Title
Euna Group (formerly Bonfire) Submitted
A 25RFP82 Patient Care Monitors
B Scope of Work
C Transmittal Letter (signature required)
D Table of Contents
E Executive Summary
F Pricing Sheet
G References
H Similar Contracts
I Cancelled or Terminated Contracts
J Conflict of Interest Questionnaire (signature required)
K Proposal Affidavit (signature required)
L FEMA Addendum to mean FEMA Required Contract Provisions (signature required)
M Quality and Safety Program
N Added Services
O Schedule of Events
REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK