This document is an Airport Sponsor Requested Funding - Capital Improvement Plan (CIP) Summary for Albert Whitted Airport, located in Saint Petersburg, Florida, covering planned infrastructure and development projects from 2025 to 2030. The comprehensive plan includes multiple airport improvement projects such as replacing the airport fuel farm, runway and taxiway improvements, hangar construction, terminal expansions, and rehabilitation of existing infrastructure. Key projects include Runway 7-25 improvements, Taxiway A rehabilitation, constructing multiple hangars (including Hangar #2A, #2B, and a second terminal hangar), and extending runway and taxiway infrastructure.
The funding breakdown demonstrates a multi-year investment strategy with federal, state, and local funding sources, totaling approximately $55.9 million across the six-year period. Federal funding ranges from $0 to $20,250,000 annually, with state contributions between $0 and $5,564,800, and local investments between $36,400 and $4,691,200. Priority levels are assigned to projects (1 or 2), indicating strategic importance. The most significant investments include the 2030 Runway 7-25 and Taxiway D construction ($22.5 million), 2029 Hangar #2A construction ($8.8 million), and 2026 Hangar #2B construction ($4.7 million). The plan reflects a systematic approach to airport infrastructure development, with phased improvements designed to enhance airport capabilities and infrastructure over time.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIRPORT SPONSOR REQUESTED FUNDING -
CAPITAL IMPROVEMENT PLAN SUMMARY
Page 1 of 25/3/2024
Local ID:Albert Whitted Airport
City of Saint Petersburg
12-0074
03474.*A
Airport:
Sponsor: Sponsor ID:
NPIAS No.:
Site No.:
SPG
SPG
Sponsor Sponsor YearProject Description:
Sponsor Requested Funding Breakdown
Federal State Local
Fed
Priority
PFL0012967 2025UPIN: FDOT Item No.: $3,800,000
Replace Airport Fuel Farm
$0 $3,040,000 $760,000
PFL0014363 2025UPIN: FDOT Item No.: $160,000
Runway 7-25 Improvements for Current Critical Aircraft - Planning & Design
$144,000 $12,800 $3,2001
2025Yearly Total $3,960,000$144,000 $3,052,800 $763,200
PFL0012077 446804 1 2026UPIN: FDOT Item No.: $132,000
Taxiway A Rehab (Design Phase)
$118,800 $10,560 $2,6401
PFL0013456 2026UPIN: FDOT Item No.: $4,700,000
Construct Hangar #2B
$0 $2,350,000 $2,350,000
PFL0014364 2026UPIN: FDOT Item No.: $670,000
Runway 7-25 Improvements for Current Critical Aircraft - Construction
$603,000 $53,600 $13,4002
2026Yearly Total $5,502,000$721,800 $2,414,160 $2,366,040
PFL0012569 2027UPIN: FDOT Item No.: $1,880,000
Taxiway A Rehab
$1,710,000 $136,000 $34,0001
PFL0014365 2027UPIN: FDOT Item No.: $120,000
Extend Runway 7-25 and Taxiway D - Purpose and Need
$108,000 $9,600 $2,4002
2027Yearly Total $2,000,000$1,818,000 $145,600 $36,400
PFL0013459 2028UPIN: FDOT Item No.: $4,000,000
Construct T-hangar #5A, #5B & 6 Buildings
$0 $2,000,000 $2,000,000
PFL0014366 2028UPIN: FDOT Item No.: $600,000
Extend Runway 7-25 and Taxiway D - Environmental Assessment
$540,000 $48,000 $12,0001
2028Yearly Total $4,600,000$540,000 $2,048,000 $2,012,000
PFL0013654 2029UPIN: FDOT Item No.: $8,800,000
Construct Hangar #2A
$0 $4,400,000 $4,400,000
PFL0014367 2029UPIN: FDOT Item No.: $2,500,000
Extend Runway 7-25 and Taxiway D - Design
$2,250,000 $200,000 $50,0001
PFL0014368 2029UPIN: FDOT Item No.: $60,000
Rehab Taxiway C (from Taxiway A to Taxiway B) - Design
$54,000 $4,800 $1,2002
PFL0014370 2029UPIN: FDOT Item No.: $800,000
Rehab Apron - Design/Build Hangar #1 Ramp Area
$0 $640,000 $160,000
PFL0014371 2029UPIN: FDOT Item No.: $400,000
Construct 2nd Terminal Hangar - Design Phase
$0 $320,000 $80,000
2029Yearly Total $12,560,000$2,304,000 $5,564,800 $4,691,200
PFL0014372 2030UPIN: FDOT Item No.: $22,500,000
Extend Runway 7-25 and Taxiway D - Construction
$20,250,000 $1,800,000 $450,0001
PFL0014373 2030UPIN: FDOT Item No.: $3,800,000
Construct 2nd Terminal Hangar - Construction Phase
$0 $3,040,000 $760,000
PFL0014374 2030UPIN: FDOT Item No.: $600,000
Rehab Taxiway C (from Taxiway A to Taxiway B) - Construction
$540,000 $48,000 $12,0002
PFL0014375 2030UPIN: FDOT Item No.: $400,000
Construct SW Corner Hangar - Design
$0 $320,000 $80,000
2030Yearly Total $27,300,000$20,790,000 $5,208,000 $1,302,000