4--7- Exhibit A- Minimum Standards for Responsiveness- PAR129713.pdf
PDF 85 KB Posted
- Solicitation number
- SLCo PAR129713 Holladay Lions Recreation Center RTU Replacement - CONST
- Issued by
- Salt Lake County, Hildale City, Utah
About this file
This is a Minimum Standards for Responsiveness exhibit for Salt Lake County's construction services contract PAR129713 for the Holladay Lions Recreation Center Roof Top Unit (RTU) Replacement Project. The document establishes mandatory qualification criteria that all proposing general contractors must satisfy affirmatively to be deemed responsive and responsible. Prospective bidders must demonstrate five years of experience completing specialized RTU projects without involvement of sureties or owner intervention, five years of successful RTU replacement projects without default claims, five years of construction project completion without liquidated damages assessments, relevant experience on projects of similar size and scope within the last five years, and three years of commercial and/or government project experience outside residential work. Additionally, contractors must provide a minimum of three professional references, commit to supporting third-party inspectors and material testing firms, demonstrate specific experience with RTU replacement construction, and show successful experience constructing projects in fully occupied adjacent areas. The contract specifications reference numerous technical standards and sections covering HVAC systems, mechanical requirements, ductwork, piping, vibration controls, and testing and balancing procedures consistent with industry-standard construction specifications.
The document does not contain explicit information regarding pricing terms, contract duration, funding sources, bid submission deadlines, or award dates. Completion of Exhibit A in the required format is mandatory for bid package inclusion, and Salt Lake County reserves the right to conduct further investigation into any proposer responses to verify qualifications and past performance claims.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MINIMUM STANDARDS FOR RESPONSIVENESS
YES NO QUESTIONS
CONTRACT SPECIFIC PERFORMANCE:
PROJECT SPECIFIC PERFORMANCE:
EXHIBIT A PROJ. ID.
CONSTRUCTION SERVICES FOR: Holladay Lions Recreation Center - RTU Replacement Project
Proposer must answer, in the affirmative, to all questions below or the Proposer's bid will be deemed non-responsive and non-responsible.
In the last five years, has your firm, acting as the General Contractor:
Completed all specialized Roof Top Unit (RTU) projects without the owner(s) calling in or involving sureties to assist in completing or assuming responsibility for completing a project?
Completed all Roof Top Unit (RTU) replacement projects without being removed from the project upon a claim by the Owner for default or breach of contract?
Completed all construction projects without assessment or payment of Liquidated Damages?
In the last five years, has your firm, acting as the General Contractor worked on a project of similar size and scope?
In the last 3 years, has your firm, acting as the General Contractor, worked on a commercial project(s) and/or Government projects(s) outside of new single-family homes and single-family renovations?
From the last five years, is your firm able to provide a minimum of 3 references who will speak to your performance?
Will your firm and your sub-contractors support third-party inspectors and material testing firms on this project?
Does your firm or your sub-contractor have experience with Roof Top Unit Replacement construction?
Does your firm have successful experience constructing projects while fully occupied in adjacent areas?
Not Applicable
This form must be included in your bid package as part of the required forms for submittal.
The County reserves the right to investigate further, any of the responses to the above questions.
COMPANY NAME
SIGNER
TITLE
SALT LAKE COUNTY - SMALL PROJECT
| 00 0100 MINIMUM STANDARDS FOR RESPONSIVENESS |
| 00 0101 PROJECT COVER PAGE |
| 00 0110 TABLE OF CONTENTS |
| 00 3143 - PERMIT APPLICATION |
| 01 1000 - SUMMARY |
| 01 2500 - SUBSTITUTION PROCEDURES |
| 01 3100 - PROJECT MANAGEMENT AND COORDINATION |
| 01 3233 - PHOTOGRAPHIC DOCUMENTATION |
| 01 3300 - SUBMITTAL PROCEDURES |
| 01 4000 - QUALITY REQUIREMENTS |
| 01 4200 - REFERENCES |
| 01 5000 - TEMPORARY FACILITIES AND CONTROLS |
| 01 6000 - PRODUCT REQUIREMENTS |
| 01 7300 - EXECUTION |
| 01 7419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL |
| 01 7700 - CLOSEOUT PROCEDURES |
| 01 7823 - OPERATION AND MAINTENANCE DATA |
| 01 7839 - PROJECT RECORD DOCUMENTS |
| 02 4119 - SELECTIVE DEMOLITION |
| 07 9200 - JOINT SEALANTS |
| 220500 Common Work Results for Plumbing (lead free) |
| 221316 Sanitary Waste and Vent Piping - 2019-04-02 |
| 230100 Mechanical Requirements -2014-11-24 |
| 230513 Common Motor Requirements for HVAC Equipment - 2013-01-15 |
| 230519 Meters and Gages for HVAC - 2013-03-15 |
| 230523 General-Duty Valves for HVAC Piping - 2013-03-15 |
| 230529 Hangers and Supports for HVAC Piping and Equipment - 2014-05-13 |
| 230548 Vibration and Seismic Controls for HVAC - 2020-03-30 |
| 230550 Operation and Maintenance of HVAC Systems - 2016-01-18 |
| 230593 Testing Adjusting and Balancing for HVAC - 2013-09-26 |
| 230713 Duct Insulation - 2014-05-02 |
| 230719 HVAC Piping Insulation - 2016-01-19 |
| 230900 Sequence of Operations |
| 232113 Hydronic Piping - 2017-09-13 |
| 232116 Hydronic Piping Specialties - 2016-05-09 |
| 232500 Chemical Water Treatment |
| 233113 Metal Ducts - 2015-12-09 |
| 237324 CUSTOM NATATORIUM AIR-HANDLING UNITS 2015-11-12 |
File details come from the government source that posted it. Updated .