4--4- 1.4 Section 2 Document 2.0 Unit Price.docx

DOCX document 29 KB Posted

Attached to
SLCo PAR125951 Sugar House Park Pond Dredge - CONST
Solicitation number
SLCo PAR125951 Sugar House Park Pond Dredge - CONST
Issued by
Salt Lake County, Salt Lake City, Utah

About this file

This document is a Unit Price Schedule for a county-level project related to the Sugar House Park Pond Dredging construction initiative in Utah. The document outlines a requirement for contractors to submit installed unit costs that include overhead and profit, with the specific focus on excavation and transport of sediment. The unit price schedule is to be attached to the Online Solicitation System (OSS), with the primary project involving the excavation of approximately 13,700 cubic yards of material from the park's pond to be transported to an identified dump site.

The pricing document provides a template for unit pricing, currently showing one line item for "Excavation and transport of sediment" measured in cubic feet, though the specific unit bid price is not completed in the provided document. The schedule is designed to be flexible, allowing for potential additions or deletions of items during construction while maintaining the same unit cost validity. The contract appears to be structured with provisions for potential scope adjustments, suggesting a comprehensive approach to the pond dredging project that allows for potential modifications during the construction process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 2 – Document 2.0 Unit Price Schedule

County requires Contractor to submit the following installed unit costs, which include Contractor overhead and profit. Should the need arise to add or delete items during construction, the unit cost must be valid for either adding or deleting. This unit price schedule must be attached in the Online Solicitation System (OSS).

Item No.

Unit

Description of Item

Unit Bid Price Dollars Cents

1.
Cubic Feet
Excavation and transport of sediment

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

Sept 2025

File details come from the government source that posted it. Updated .