3--3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- SLCo PAR125951 Sugar House Park Pond Dredge - CONST
- Issued by
- Salt Lake County, Salt Lake City, Utah
About this file
This document is a Schedule of Values spreadsheet for the Sugar House Park Pond Dredge project (PAR125951) in Utah, prepared for a state and local government contract opportunity. The project involves excavating approximately 13,700 cubic yards of sediment from a pond and transporting it to an identified dump site. The schedule outlines various work divisions including payment and performance bond, insurance, general conditions, traffic control, Stormwater Pollution Prevention Plan (SWPPP), demolition of an aeration system, sediment excavation and transport, grading of sediment at the drop site, and landscape repair.
The Schedule of Values spreadsheet appears to be a bidding document with columns for Base Bid and multiple Alternates (Alternate 1-4, Alternate B, and Alternate C), though all current entries are listed at $0.00. The document requires bidders to enter their total bid amounts into an Online Solicitation System (OSS), with a note emphasizing that the base bid and alternate totals must match the OSS entries. While no specific pricing details are currently populated, the document serves as a structured template for contractors to itemize their proposed costs for the Sugar House Park pond dredging project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Section 2 - Document 3.0 | ||||||||
| Schedule Of Values | ||||||||
| Project: PAR125951 Sugar House Park Pond Dredge | ||||||||
| Divisions of Work | Base Bid | Alternate 1 | Alternate 2 | Alternate 3 | Alternate 4 | |||
| (Specify entire work scope; examples are listed below) | Alternate B | Alternate C | Total | |||||
| Payment & Performance Bond | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Insurance & Builder's Risk | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Division 01-General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Traffic control | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SWPPP: Plan and execution | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Demolition and disconnect of aeration system | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Excavation and Transport of Sediment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Grading of sediment at drop site | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Repair of damaged landscape | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Totals (Enter in OSS) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| The total for the base bid must be the same total that was entered into the Online Solicitation System (OSS). |
| The total for each alternate must be the same total that was entered into the Online Solicitation System (OSS) |
| Name of Company Bidding ________________________________ |