4-21423.6 05-28-24 507 W Brevard St - Bid Set.pdf
PDF 8 MB Posted
- Solicitation number
- IFB-013-26-KM
- Issued by
- Leon County, Florida
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ID
RE
VI
SI
ON
DR
AW
N:
RE
VI
EW
ED
DA
TE
TH
ES
E
DR
AW
IN
GS
A
ND
R
EN
DE
RI
NG
S
AR
E
IN
ST
RU
ME
NT
S
OF
S
ER
VI
CE
. T
HE
D
RA
W
IN
GS
A
ND
A
SS
OC
IA
TE
D
CO
PI
ES
T
HE
RE
OF
, I
NC
LU
DI
NG
E
LE
CT
RO
NI
C
ME
DI
A
AN
D
CA
DD
F
ILE
S, A
RE
T
HE
P
RO
PE
RT
Y
OF
A
RC
HI
TE
CT
S:
LE
W
IS
W
HI
TL
OC
K, P A.
A.
T
HE
IR
U
SE
, R
EP
RE
SE
NT
AT
IO
N
OR
R
EP
RO
DU
CT
IO
N
FO
R
AN
Y
PU
RP
OS
E
EX
CE
PT
B
Y W
RI
TT
EN
A
GR
EE
ME
NT
W
IT
H
TH
E
AR
CH
IT
EC
T
IS
P
RO
HI
BI
TE
D.
T
HI
S
CO
PY
RI
GH
T
NO
TI
FI
CA
TI
ON
S
HA
LL
B E
TR
UE
A S
IF
D
IR
EC
TL
Y
PL
AC
ED
O
N
EA
CH
D
RA
W
IN
G
EX
HI
BI
T
OR
R
EN
DE
RI
NG
O N
TH
IS
D
OC
UM
EN
T
AN
D
SH
AL
L N
OT
B
E
RE
MO
VE
D
FR
OM
T
HE
SE
D
OC
UM
EN
TS
Sheet No.:
CS
PH
AS
E:
DR
AW
N:
DA
TE
C on su lta nt
Description:
Index of Drawings, Standard Abbreviations and General Notes
Jo b
Ti tle
W
. B re va rd
S tre et R en ov at io n Pr oj ec t #
Ph as e:
3.
0%
C on st ru ct io n D oc um en ts
C lie nt
C ity o f T al la ha ss ee Ta lla ha ss ee
, F lo rid a
Se al
Z :\2
B
IM
B lu ep rin t C
O T
C on tin ui ng S er vi ce s\
3.
B
IM
B re va rd S tr ee t\M od el \2
.6 B re va rd S tr ee t.p ln
:3
AM
Architects Lewis + Whitlock 206 West Virginia St.
Tallahassee, Florida 32301 850,942.1718 www.think3d.net
RE
VI
EW
ED
C.
W
HI
TL
OC
K
/12
/20
SC
HE
MA
TI
C
DE
SI
GN
C
ON
ST
RU
CT
IO
N
DO
CS
0%
C
ON
ST
RU
CT
IO
N
DO
CS
AB
/ M
P C.
W
HI
TL
OC
K
/23 /20
AB
/ M P
C.
W
HI
TL
OC
K
/15
/20
AB
/ M
P
PE
RM
IT
D
OC
UM
EN
TS
C.
W
HI
TL
OC
K
/21
/20
AB
/ M
P
CS
LS1.1
D1.1 D1.2 D1.3 D1.4 D1.5
AS.1
A1.1 A1.2 A2.1 A3.1 A5.1 A5.2 A6.1 A7.1 A8.1 A8.2
Sheet Name Index of Drawings, Standard Abbreviations and General Notes Life Safety Plan Demolition Site Plan Demolition Plan Demolition Roof Plan Demolition Elevations Demolition Building Sections Site Plan & Site Details Architectural Floor Plan Roof Plan Exterior Elevations Building Sections and Details Sections and Details Sections and Details Door Schedules, Elevations, & Details Reflected Ceiling Plan Interior Elevations Finish Plan & Schedule
N
N
N
PROJECT AREA
PROJECT LOCATION
NUMBER INDICATES
SECTION, ELEVATION OR DETAIL
SHEET NUMBER WHERE
ELEVATION, SECTION
OR DETAIL IS DRAWN
A
Architectural General Notes: Index of Drawings:Legend of Architectural Symbols: Standard Abbreviations:
2) ALL DIMENSIONS ARE TO THE FACE OF STUD OR STUD TRACK, CENTER LINE OF STUD OR STUD TRACK, FACE OF MASONRY
AND TO THE CENTER LINE OF STRUCTURAL STEEL COLUMNS, UNLESS OTHERWISE INDICATED.
3) WHERE STRUCTURAL DESIGN LOADS ARE NOT PROVIDED FOR ANY COMPONENTS REQUIRING MANUFACTURER
OR FABRICATOR ENGINEERING, AND MINIMUM LOADING CONDITIONS ARE NOT PROVIDED IN APPLICABLE CODES
AND STANDARDS, CONSULT ARCHITECT PRIOR TO PROCEEDING.
13) THE CONTRACTOR SHALL ERECT AND MAINTAIN ALL REASONABLE SAFEGUARDS FOR SAFETY AND HEALTH, INCLUDING
POSTING DANGER SIGNS AND OTHER WARNING AGAINST HAZARDS, AS WELL AS PROMULGATING SAFETY STANDARDS.
4) DIMENSIONS FOR PATHS OF EGREES INCLUDING CORRIDORS AND STAIRS SHALL MEAN CLEAR WIDTH BETWEEN CORRIDOR
WALLS, AND AT STAIRS CLEAR WIDTH BETWEEN WALLS OR CURBS.
6) IF AN ORDER OF PRECEDENT FOR THE INTERPRETATION OF DOCUMENTS IS NOT PROVIDED IN THE PROJECT MANUAL (IF
PROVIDED), AND A CONFLICT OCCURS IN THE SPECIFICATIONS, ON THE DRAWINGS, OR BETWEEN THE DRAWINGS AND
SPECIFICATIONS, CONTACT THE ARCHITECT. ALL REQUEST FOR CLARIFICATION TO THE ARCHITECT SHALL BE MADE IN WRITING.
THE ARCHITECT'S RESPONSE SHALL BE MADE IN WRITING AND NO FORMAL INSTRUCTIONS SHALL BE GIVEN VERBALLY.
8) ALL FIRE RATED PARTITION OR WALL ASSEMBLIES SHALL EXTEND FROM THE FLOOR SLAB TO THE UNDERSIDE OF THE
BUILDING STRUCTURE AND/OR DECK ABOVE. ALL PENETRATIONS IN RATED CONSTRUCTION SHALL BE PROPERLY SEALED TO
INSURE THE RATING IS MAINTAINED.
15) THE CONTRACTOR SHALL MAINTAIN A CLEAN WORK PREMISE AT ALL TIMES AND SHALL CLEAN CONSTRUCTION SITE OF
ALL DEBRIS DAILY. THE WORK PREMISE SHALL BE CLEAN AT COMPLETION OF JOB AND BEFORE FINAL PAYMENT IS MADE.
9) ALL FIRE RATED FLOOR/CEILING OR ROOF/CEILING ASSEMBLIES SHALL BE CONTINUOUS BETWEEN PARTITIONS AND/OR WALLS
FOR THE SPACE OR HORIZONTAL AREA INDICATED. ALL PENETRATIONS IN RATED CONSTRUCTION SHALL BE PROPERLY SEALED
TO INSURE THE RATING IS MAINTAINED.
16) THE CONTRACTOR SHALL TAKE CARE NOT DAMAGE EXISTING SURFACES AND SHALL BE RESPONSIBLE FOR RESTORING
AREAS DAMAGED BY THE CONTRACTOR (MATERIALS, FINISHES, ETC.) TO THEIR ORIGINAL CONDITIONS. SURFACES SHALL BE
REPAINTED TO MATCH EXISTING ADJACENT FINISHES.
10) TYPICAL AND STANDARD DETAILS MAY BE PROVIDED IN THE DRAWINGS. IF A SPECIFIC DETAIL IS NOT PROVIDED
FOR CONDITION OF FABRICATION AND/OR INSTALLATION, CONTACT THE ARCHITECT PRIOR TO PROCEEDING.
11) THE INSTALLATION OF MECHANICAL, PLUMBING AND ELECTRICAL ITEMS (INCLUDING UTILITIES, ROUGH-INS, SYSTEM
COMPONENTS AND FINISHED FIXTURES) IN EXPOSED TO VIEW AREAS OR SPACES SHALL BE UNDERTAKEN WITH SKILL AND
CRAFTMANSHIP TO PROVIDE A FINISHED CONDITION ACCEPTABLE TO THE ARCHITECT. ALL EXPOSED TO VIEW ITEMS SHALL
BE FINISHED WITH PAINT UNLESS OTHERWISE SPECIFIED TO BE PREFINISHED OR NOT TO BE PAINTED.
12) THESE GENERAL NOTES HAVE THE SAME AUTHORITY AS OTHER NOTES AND REFERENCES IN THE DRAWINGS OR
SPECIFICATIONS AND SHALL NOT BE EXCLUDED IN THE EXECUTION OF THE WORK. THEY MAY REQUIRE COORDINATION
BETWEEN VARIOUS TRADE CONTRACTORS. IN ADDITION TO THESE GENERAL NOTES, REFER TO DEMOLITION AND
CONSTRUCTION NOTES SPECIFIC TO EACH DRAWING.
1) THESE DRAWINGS AND RENDERINGS ARE INSTRUMENTS OF SERVICE. THE DRAWINGS AND COPIES THEREOF, INCLUDING ELECTRONIC MEDIA AND CAD FILES, ARE THE PROPERTY OF ARCHITECTS: LEWIS + WHITLOCK, P.A. THEIR
USE, REPRESENTATION OR REPRODUCTION IN ACTUAL FORM OR CONTENT BY ANY ENTITY THAT POSSESSES THEM FOR
ANY PURPOSE EXCEPT BY WRITTEN AGREEMENT WITH THE ARCHITECT IS PROHIBITED. THE COPYRIGHT NOTIFICATION
SHALL BE TRUE AS IF DIRECTLY PLACED ON EACH DRAWING, DETAIL, EXHIBIT OR RENDERING ON THIS DOCUMENT AND
SHALL NOT BE REMOVED FROM THESE DOCUMENTS.
14) THE CONTRACTOR SHALL BE RESTRICTED TO AREAS SPECIFIED BY THE OWNER FOR ON-SITE STORAGE OF MATERIALS
5) DO NOT SCALE DRAWINGS, IF THERE IS A CONFLICT IN DIMENSIONS OR IF THERE IS INSUFFICIENT DIMENSIONING, CONTACT THE
ARCHITECT FOR CLARIFICATION PRIOR TO PROCEEDING.
7) WHERE CLEAR DIMENSIONS ARE INDICATED, THIS SHALL MEAN CLEAR WIDTH FROM FINISHED WALL TO FINISHED
WALL OR CLEAR FLOOR AREA BETWEEN BUILDING COMPONENTS.
Area Map
-AIR CONDITIONING
-AMERICAN CONCRETE INSTITUTE
-ACOUSTICAL CEILING TILE
-ADJACENT
-ABOVE FINISH FLOOR
-ALTERNATE
-ALUMINUM
-AMERICAN SOCIETY OF TSTG. & MTLS.
-BOARD
-BUILDING
-BOLT
-BEAM
-BOTTOM
-BEARING
-CENTER TO CENTER
-CEMENT
-CUBIC FEET
-CUBIC FEET PER MINUTE
-CORNER GUARD
-CIRCLE, CIRCULAR
-CAST-IN-PLACE
-CONTROL JOINT
-CEILING
-CLOSET
-CLEARANCE, CLEAR
-CONCRETE MASONRY UNIT
-COLUMN
-COMPRESSOR, COMPOSITE
-CONCRETE
-CONSTRUCTION
-CONTINUOUS
-CORRUGATED
-COUNTERSINK
-CENTER
-DOUBLE
-DIRECT APPLIED EXT FINISH SYSTEM
-DEGREES
-DETAIL
-DRINKING FOUNTAIN
-DIAMETER
-DIMENSION
-DOWN
-DOWNSPOUT
-DETAIL
-DRAWING
-EACH
-EXPANSION JOINT
-ELECTRICAL
-ELEVATOR, ELEVATION
-ENCLOSURE
-EQUAL
-EQUIPMENT
-ELECTRICAL WATERCOOLER
-EXHAUST
-EXISTING
-EXTERIOR
A/C
ACI
ACT
ADJ
AFF
ALT
ALUM
ASTM
BD
BLDG
BLT
BM
BOT
BRG
C/C
CEM
CF
CFM
CG
CIR
CIP
CJ
CLG
CLO
CLR
CMU
COL
COMP
CONC
CONSTR
CONT
CORR
CS
CTR
DBL
DEFS
DEG
DTL
DF
DIA
DIM
DN
DS
DTL
DWG
EA
EJ
ELEC
ELEV
ENCL
EQ
EQUIP
EWC
EXH
EX
EXT
FD
FEB
FEC
FF
FHC
FIN
FL
FLG
FT
FTG
GA
GALV
GEN
GND
GWB
GYP
HC
HDR
HDRL
HM
HORZ
HGT
ID
IN
INSUL
INT
JAN
JB
JT
K
KD
L
LAM
LAV
LBS
LH
LL
LLH
LLV
LTL
LTWT
LVR
-FLOOR DRAIN
-FIRE EXTINGUISHER W/ BRACKET
-FIRE EXTINGUISHER IN CABINET
-FINISH FLOOR
-FIRE HOSE CABINET
-FINISH
-FLOOR
-FLASHING
-FOOT OR FEET
-FOOTING
-GAUGE
-GALVANIZED
-GENERAL
-GROUND
-GYPSUM WALLBOARD
-GYPSUM
-HANDICAPPED ACCESSIBLE
-HEADER
-HANDRAIL
-HOLLOW METAL
-HORIZONTAL
-HEIGHT
-INSIDE DIAMETER (DIM.)
-INCHES
-INSULATION
-INTERIOR
-JANITOR
-JAMB
-JOINT
-KIPS (KILO POUND OR 1000LBS.)
-KILN DRIED
-STEEL ANGLE, LENGTH
-LAMINATED
-LAVATORY
-POUNDS
-LEFT HAND
-LIVE LOAD
-LONG LEG HORIZONTAL
-LONG LEG VERTICAL
-LINTEL
-LIGHTWEIGHT
-LOUVER
M
MATL
MAX
MC
MECH
MTL
MEZZ
MFR
MIN
MISC
MK
MO
MTD
MULL
N
NA
NIC
NOM
NS
NTS
OA
OC
OD
OH
OPP
OPPH
PCF
PKG
PL
PLAM
PLYWD
PNL
PR
PREFAB
PREP
PSF
PSI
PT
PVC
PVMT
QC
QT
REF
REINF
REQD
REV
RH
RM
RO
-METER
-MATERIAL
-MAXIMUM
-MEDICINE CABINET
-MECHANICAL
-METAL
-MEZZANINE
-MANUFACTURER
-MINIMUM
-MISCELLANEOUS
-MARK
-MASONRY OPENING
-MOUNTED
-MULLION
-NORTH
-NOT APPLICABLE
-NOT IN CONTRACT
-NOMINAL
-NON SHRINK
-NOT TO SCALE
-OVERALL
-ON CENTER
-OUTSIDE DIAMETER
-OVERHEAD
-OPPOSITE
-OPPOSITE HAND
-POUNDS PER CUBIC FOOT
-PARKING
-PLATE
-PLASTIC LAMINATE
-PLYWOOD
-PANEL
-PAIR
-PREFABRICATED
-PREPARATION
-POUNDS PER SQUARE FOOT
-POUNDS PER SQUARE INCH
-PRESSURE TREATED, PAINT, POINT
-POLYVINYL CHLORIDE
-PAVEMENT
-QUALITY CONTROL
-QUARRY TILE
-REFERENCE
-REINFORCED, REINFORCEMENT
-REQUIRED
-REVISION
-RIGHT HAND
-ROOM
-ROUGH OPENING
SAN
SC
SECT
SEW
SF
SGL
SIM
SJ
SPKLR
SQ
SST
STD
STL
STOR
STRUCT
SUSP
TBD
TEL
TEMP
T&G
THK
TOB
TOC
TOF
TOS
TS
TV
TYP
UNF
UON
UR
VCT
VB
VERT
VEST
VFY
VOL
VT
W/ W/C
WD
W/O
WP
WWF
-SANITARY
-SOLID CORE
-SECTION
-SEWER
-SQUARE FEET
-SINGLE
-SIMILAR
-SAWED JOINT
-SPRINKLER
-SQUARE
-STAINLESS STEEL
-STANDARD
-STEEL
-STORAGE
-STRUCTURAL
-SUSPENDED
-TO BE DETERMINED
-TELEPHONE
-TEMPORARY, TEMPERATURE
-TONGUE & GROOVE
-THICK
-TOP OF BEAM
-TOP OF CONCRETE
-TOP OF FOOTING
-TOP OF STEEL
-STRUCTURAL TUBE STEEL
-TELEVISION
-TYPICAL
-UNFINISHED
-UNLESS OTHERWISE NOTED
-URINAL
-VINYL COMPOSITION TILE
-VAPOR BARRIER
-VERTICAL
-VESTIBULE
-VERIFY
-VOLUME
-VINYL TILE
-WITH
-WATER CLOSET
-WOOD
-WITHOUT
-WATERPROOF, WORKING POINT
-WELDED WIRE FABRIC
Location Map
Applicable Codes:
507 W. Brevard Street Tallahassee FL 32301
A1.1
A1.1
TO BREAK OFF PARTS OF DRAWING
FINISH COLOR
DEMOLITION NOTES
ALPHABETICAL
CONSTRUCTION NOTES
NUMERICAL
REVISION
DOUBLE DASHED LINE
PROPERTY LINES, BOUNDRY LINES
DASHED LINES
HIDDEN, FUTURE, OR EXIST. CONST. TO BE REMOVED
BREAK LINE
SINGLE DASH LINE
PROJECT NORTH
BUILDING SECTION REFERENCE
WALL SECTION REFERENCE
DETAIL REFERENCE
INTERIOR ELEVATION
ELEVATION REFERENCE
C1
COLUMN LINES
ELEVATION
REFERENCE POINT
DASH AND DOT
FIRE RATED WALLS
A1.1
A1.1
A1.1
A1.1
A1.1D###
DOOR NUMBER
Florida Building Code, Building (FBC-B)
Florida Building Code, Plumbing
Florida Fire Prevention Code (FFPC) National Electrical Code (NEC)
Florida Building Code, Mechanical Florida Building Code, Fuel Gas
7th Edition
7th Edition
Florida Building Code, Existing Building (FBC-EB) 7th Edition
2017 Edition
7th Edition 7th Edition 7th Edition
7th EditionFlorida Building Code, Accessibility (FBC-A)
NOTE: CONTRACTOR SHAL MAKE AVALIABLE TO THE BUILDING INSPECTOR, DOCUMENTATION
NECESSARY TO VERIFY THAT ALL EXTERIOR ENVELOPE COMPONENTS REQUIRING PRODUCT
APPROVAL PER FS 533.842 ARE IN COMPLIANCE WITH PRODUCT APPROVAL INSTALLATION
REQUIREMENTS.
Florida Building Code, Energy Conservation 7th Edition
W. GEORGIA ST
N . M
A C
O M
B S
T
N . M
O N
R O
E
ST
100% Construction Documents
Tallahassee, FL
ALW Project #21423.6
507 W. Brevard Street Renovation for City of Tallahassee
December 04, 2023
Consultants:
Johnson + Milner, INC.
1725 Capital Cir NE #301 Tallahassee, FL 32308 850.205.6355 johnsonmilner.com
Applied Research & Design, INC.
3998 Bradfordville Rd Tallahassee, FL 32309 850.668.6324
(FKA Ashmore Store)W. BREVARD STREET
OLD BAINBRIDGE RD
O
LD
B A
IN
B
R
ID
G E
R D
W. BREVARD STREET
N . M
O N
R O
E
ST
R
EE
T
W. TENNESSEE STREET
Facility Solutions & Management 150 John Knox Rd Tallahassee, FL 32303 850.222.5683 FacilitySolutionsManagement.com
S-0.1 General Notes Sheet S-0.2 General Notes Sheet Continued S-1.1 Structural Wall Layout S-2.1 Structural Wall Sections and Details S-3.1 Connection Details
M0.1 HVAC Abbreviations, Symbols & Legends M0.2 HVAC Notes M1.1 Floor Plan - HVAC M5.1 HVAC Details M5.2 HVAC Details M6.1 HVAC Schedules
P0.1 Plumbing Abbreviations, Symbols & Legend P1.1 Floor Plan - Plumbing - Drain & Vent P1.2 Floor Plan - Plumbing - Pressure P5.1 Plumbing Details P6.1 Plumbing Fixtures and Schedules
E0.1 Electrical Legend & Notes E1.1 Floor Plan - Power & Systems E1.2 Floor Plan - Lighting
NOTE: FIRE PROTECTION IS NOT PART OF THE BUILDING
PERMIT EVALUATION. EACH FIRE PROTECTION
SUBCONTRACTOR SHALL SUBMIT PLANS FOR EVALUATION
AND APPROVAL PRIOR TO COMMENCEMENT OF NEW WORK,
UPON ISSUANCE OF THE BUILDING PERMIT.
mpersinger Rectangle
RE
VI
SI
ON
DR
AW
N:
RE
VI
EW
ED
DA
TE
TH
ES
E
DR
AW
IN
GS
A
ND
R
EN
DE
RI
NG
S
AR
E
IN
ST
RU
ME
NT
S
OF
S
ER
VI
CE
. T
HE
D
RA
W
IN
GS
A
ND
A
SS
OC
IA
TE
D
CO
PI
ES
T
HE
RE
OF
, I
NC
LU
DI
NG
E
LE
CT
RO
NI
C
ME
DI
A
AN
D
CA
DD
F
ILE
S, A
RE
T
HE
P
RO
PE
RT
Y
OF
A
RC
HI
TE
CT
S:
LE
W
IS
W
HI
TL
OC
K, P A.
A.
T
HE
IR
U
SE
, R
EP
RE
SE
NT
AT
IO
N
OR
R
EP
RO
DU
CT
IO
N
FO
R
AN
Y
PU
RP
OS
E
EX
CE
PT
B
Y W
RI
TT
EN
A
GR
EE
ME
NT
W
IT
H
TH
E
AR
CH
IT
EC
T
IS
P
RO
HI
BI
TE
D.
T
HI
S
CO
PY
RI
GH
T
NO
TI
FI
CA
TI
ON
S
HA
LL
B E
TR
UE
A S
IF
D
IR
EC
TL
Y
PL
AC
ED
O
N
EA
CH
D
RA
W
IN
G
EX
HI
BI
T
OR
R
EN
DE
RI
NG
O N
TH
IS
D
OC
UM
EN
T
AN
D
SH
AL
L N
OT
B
E
RE
MO
VE
D
FR
OM
T
HE
SE
D
OC
UM
EN
TS
Sheet No.:
LS1.1
PH
AS
E:
DR
AW
N:
DA
TE
C on su lta nt
Description:
Life Safety Plan
Jo b
Ti tle
W
. B re va rd
S tre et R en ov at io n Pr oj ec t #
Ph as e:
3.
0%
C on st ru ct io n D oc um en ts
C lie nt
C ity o f T al la ha ss ee Ta lla ha ss ee
, F lo rid a
Se al
Z :\2
B
IM
B lu ep rin t C
O T
C on tin ui ng S er vi ce s\
3.
B
IM
B re va rd S tr ee t\M od el \2
.6 B re va rd S tr ee t.p ln
2:
P M
Architects Lewis + Whitlock 206 West Virginia St.
Tallahassee, Florida 32301 850,942.1718 www.think3d.net
RE
VI
EW
ED
C.
W
HI
TL
OC
K
/23 /20
SC
HE
MA
TI
C
DE
SI
GN
C
ON
ST
RU
CT
IO
N
DO
CS
0% C
ON
ST
RU
CT
IO
N
DO
CS
(F
KA
A sh m or e St or e)
AB
/ M
P C.
W
HI
TL
OC
K
/12 /20
AB
/ M P
C.
W
HI
TL
OC
K
/15
/20
AB
/ M
P
PE
RM
IT
D
OC
UM
HI
TL
OC
K
/21
/20
AB
/ M
P
EXISTING SHARED (3) WITHE BRICK PARTY WALL
68" 0.2"
32" 0.2"
FE
C
ASSEMBLY
2,679 SF/ 30 NSF
EXIT
TOTAL DISTANCE: 76'-0" / R
EQUIRED
EXIT SEPERATION: 76' / 3
= 25'-4"
TRAVEL DISTANCE TO EXIT: 37'-10"
EXIT
MECH
55 SF/ 300 GSF
DISTANCE - 49'
MECH
55 SF/ 300 GSF
CLEAR EXIT WIDTH PROVIDED
MINIMUM WIDTH PER OCCUPANT
EXIT LIGHT
32" 0.2"
160 MAXIMUM EGRESS CAPACITY
FIRE EXTINGUISHER CABINET
2A10BC, U.N.O.
BRACKET MOUNTED FIRE
EXTINGUISHER, 2A10BC, U.N.O.
LEGEND
FEC
FEB
INDICATES # OF OCCUPANTS FOR A
PARTICULAR BUILDING AREA#
INDICATES # OF OCCUPANTS FOR AREAS THAT
INCLUDE OCCUPANT LOADS FROM ADJACENT
SPACES
507 BREVARD STREET CODE ANALYSIS Allowed/ Req'd Provided Project Specific Notes
Applicable Codes:
Florida Building Code, Building (FBC-EB) 8th Edition (2023)
Florida Building Code, Building (FBC-B) 8th Edition (2023)
Florida Building Code, Accessibility (FBC-A) 8th Edition (2023)
Florida Building Code, Mechanical (FBC-M) 8th Edition (2023)
Florida Building Code, Fuel Gas (FBC-FG) 8th Edition (2023)
Florida Building Code, Plumbing (FBC-P) 8th Edition (2023)
Florida Fire Prevention Code (FFPC) 8th Edition (2023)
National Electric Code (NEC) 2017 Edition
2018 NFPA 101 Life Safety Code
2010 ADA Standards
Occupancy Class: Assembly (A-3 ) *Single Occupancy A-3 w/Accessory Mechanical Spaces
Gross Building Area - Existing ( No. of Floors - 1 story)
Area of Work: 2,818 sf
Florida Building Code - Existing Building Eighth Edition (2023)
Area of Alteration: 2,818 SF
Level of Alteration Scope: Level 3
Chapter 3 - Administration
301.3 Alteration, addition, or change of occupancy. *This project is considered an alteration Level 3 with a Change of Occupancy.
301.3.2 - Work Area Compliance Method *This project will use the work area compliance method.
Chapter 6 - Classification of Work
604 Alteration Level 3
604.1 Scope *This project is considered a Level 3 Alteration - as the work area exceeds 50% of the building area
605 Change of Occupancy *This project is a change of occupancy and will comply with Ch 10 of the FBC-EB
605.1 Scope
Chapter 7 - Alterations - Level 1
703.1 General
Alterations shall be done in a manner that maintains the level of fire protection provided.
Chapter 8 - Alterations - Level 2
804.2.2 Automatic Sprinkler Requirement Not Required per FBC-B No Sprinkler System Provided * Building is within allowable height and area without sprinkler system.
[BS]807.4 Existing structural elements carrying gravity loads.
Alterations shall not reduce the capacity of existing gravity load-carrying structural elements unless it is demonstrated that the elements have the capacity to carry the applicable design gravity loads required by the Florida Building Code, Building . Existing structural elements supporting any additional gravity loads as a result of the alterations , including the effects of snow drift, shall comply with the Florida Building Code, Building .
* Alterations will not reduce structural capacity of the building.
Chapter 9 - Alteration - Level 3
904.2 Fire alarm and detection systems.
Fire alarm and detection shall be provided in accordance with Section 907 of the Florida Building Code, Building as required for new construction.
Fire Alarm System Req'd Fire Alarm System Provided * Fire alarm will be provided per 907 of the FBC - B.
[BS]907.3 Existing structural elements carrying gravity loads
Existing structural elements carrying gravity loads shall comply with Section 807.4.
Chapter 10 - Change of Occupancy
1012.6.2 Exterior wall rating for change of occupancy classification to an equal or lesser hazard category.
When a change of occupancy classification is made to an equal or lesser hazard category as shown in Table 1012.6, existing exterior walls, including openings, shall be accepted.
Existing Conditions Accepted NA * Change in Occupancy from M - (Ashmore Store) to A-3 reduces the hazard category from 3 to 2 per Table 1012.6.
Accessible Means of Egress - A continuous and unobstructed way of egress travel from any accessible point in a building or facility to a public way
REQ'D YES
FLORIDA BUILDING CODE - BUILDING Eighth Edition (2023)
Construction Type: Type V-B Non-Sprinklered
Table 504.3 - Allowable Building Height
Allowable Building Height (above grade plane): Type V-B Construction Type - Occupancy Classification A-3 - Non-Sprinklered 40' 15'
Table 504.4 - No. of Stories Allowed Above Grade Plane
Allowable Building Height (above grade plane): Type V-B Construction Type - Occupancy Classification A-3 - Non-Sprinklered 1 1
Table 506.2 - Building Area Allowed Per Floor
Allowable Building Height (above grade plane): Type V-B Construction Type - Occupancy Classification A-3 - Non-Sprinklered 6,000 sf 2,813 sf
Table 601 - Fire-Resistance Rating Requirements For Building Elements
Type V-B Construction Type - Occupancy Classification A-3 - Non-Sprinklered
Structural Frame 0 HR 0 HR * Not applicable.
Bearing Walls - Exterior 2 HR 2HR * 3-wythe exterior walls are approx. 12" thick. Per FBC-B 722.4.1(1) 6" = 4Hrs
Bearing Walls - Interior 0 HR 0 HR
Non-Bearing Walls - Exterior (from Table 705.5) 2 HR 2HR * 3-wythe exterior walls are approx. 12" thick. Per FBC-B 722.4.1(1) 6" = 4Hrs
Non-Bearing Walls - Interior 0 HR 0 HR
Floor 0 HR 0 HR
Roof 0 HR 0 HR
Table 705.5 - Fire-Resistance Rating Requirements For Exterior Walls
Fire Resistance Separation Distance "X" < 5' 2 NA * At south and west party conditions.
Fire Resistance Separation Distance "X" > 30' 0 hr 0 hr
705.5 Fire-resistance ratings.
Exterior walls shall be fire-resistance rated in accordance with Table 601 based on the type of construction and Table 705.5 based on the fire separation distance. The required fire-resistance rating of exterior walls with a fire separation distance of greater than 10 feet (3048
mm) shall be rated for exposure to fire from the inside. The required fire-resistance rating of exterior walls with a fire separation distance of less than or equal to 10 feet (3048 mm) shall be rated for exposure to fire from both sides.
705.6 Structural Integrity
Exterior walls shall extend to the height required by Section 705.11. Interior structural elements that brace the exterior wall but that are not located within the plane of the exterior wall shall have the minimum fire-resistance rating required in Table 601 for that structural element. Structural elements that brace the exterior wall but are located outside of the exterior wall or within the plane of the exterior wall shall have the minimum fire-resistance rating required in Tables 601 and 705.5 for the exterior wall.
705.11 Parapets
Parapets shall be provided on exterior walls of buildings. Req'd NA
706 Fire Walls
706.1 General. Each portion of a building separated by one or more fire walls that comply with the provisions of this section shall be considered a separate building. The extent and location of such fire walls shall provide a complete separation. Where a fire wall separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply
NA NA
706.1 Party Walls
706.1.1 - Any wall located on a lot line between adjacent buildings, which is used or adapted for joint service between the two buildings, shall be constructed as a fire wall in accordance with Section 706. Party walls shall be constructed without openings and shall create separate buildings.
NA NA
*The existing eastern wall of 505 Brevard St. is a shared party wall with the adjacent 501 Brevard St Property. This condition is accepted per FBC- EB 1012.6.2.
706.2 Structural stability.
Fire walls shall be designed and constructed to allow collapse of the structure on either side without collapse of the wall under fire conditions. Fire walls designed and constructed in accordance with NFPA 221 shall be deemed to comply with this section.
NA NA
*The existing eastern wall of 505 Brevard St. is a shared party wall with the adjacent 501 Brevard St Property. This condition is accepted per FBC- EB 1012.6.2.
706.4 Fire-resistance rating.
Fire walls shall have a fire-resistance rating of not less than that required by Table 706.4. NA NA *The existing eastern wall of 505 Brevard St. is a shared party wall with the adjacent 501 Brevard St Property. This condition is accepted per FBC- EB 1012.6.2.
Table 803.11
Classification of Finishes: Interior exit stairways and ramps and exit passageways - Group A-3 A A
Classification of Finishes: Corridors and enclosure for exit access stairways and ramps - Group A-3 A A
Classification of Finishes: Rooms and enclosed spaces - Group A-3 C C
903.2.1.3 - Group A-3
Assembly NOT REQ'D NA *Fire area under 12,000 sf, Occupant load under 300, fire area is located on level of exit discharge.
906 - Portable Fire Extinguishers
A-3 Max Travel - 75' Max Travel - 75' 2-A:10-B:C Extinguisher Min.
1003.2 - Ceiling Height for Means of Egress 7'-6" Min. >7'-6"
OCCUPANT LOAD CALCULATIONS :
Table 1004.5 - Maximum Floor Area Allowances Per Occupant *Does not include corridor, stairs, mechanical, unoccupied spaces, etc.
Mechanical 300 gross (110 gsf) 2
Assembly: Exhibit Gallery and Museum 30 net (2,679 nsf) 90
Total Project Occupants 92
Table 1005.3.2 - Means of Egress Sizing
Means of egress capacity factor (A-3 Non-Sprinklered) 0.2 inch/occupant *See LS Plans for capacity per egress provided.
Table 1006.2.1 Spaces with One Exit or Exit Access Doorway
Maximum Occupant Load of Space w/ One Exit or Exit Access Doorway - Group A-3 Non-Sprinklered 49 92 > 49 *Second means of egress Provided
Maximum Common Path of Egress Travel - Group A-3 75' < 75' *See LS Plans.
Table 1006.2.1 Spaces with One Exit or Exit Access Doorway
Number exits required - 2 2
1010.1.1 Exit Access Size of Doors
32" Min. 32" *See LS Plans.
Table 1017.2 Exit Access Travel Distance
Maximum Travel Distance - Group A-3 Not Sprinklered 200' < 200'
Table 1020.3 Minimum Corridor Width
Minimum Corridor Aisle Width (where occupancy less than 50) 36" "x" < 36" *See LS Plans.
1020.4 Corridor Dead Ends
Length Where More Than One Exit or Exit Access Doorway Required and Building "X" < 20'-0" <20'-0" *See LS Plans.
Complies with 807.4
N
3/16" = 1'-0"1 Life Safety Plan
RE
VI
SI
ON
DR
AW
N:
RE
VI
EW
ED
DA
TE
TH
ES
E
DR
AW
IN
GS
A
ND
R
EN
DE
RI
NG
S
AR
E
IN
ST
RU
ME
NT
S
OF
S
ER
VI
CE
. T
HE
D
RA
W
IN
GS
A
ND
A
SS
OC
IA
TE
D
CO
PI
ES
T
HE
RE
OF
, I
NC
LU
DI
NG
E
LE
CT
RO
NI
C
ME
DI
A
AN
D
CA
DD
F
ILE
S, A
RE
T
HE
P
RO
PE
RT
Y
OF
A
RC
HI
TE
CT
S:
LE
W
IS
W
HI
TL
OC
K, P A.
A.
T
HE
IR
U
SE
, R
EP
RE
SE
NT
AT
IO
N
OR
R
EP
RO
DU
CT
IO
N
FO
R
AN
Y
PU
RP
OS
E
EX
CE
PT
B
Y W
RI
TT
EN
A
GR
EE
ME
NT
W
IT
H
TH
E
AR
CH
IT
EC
T
IS
P
RO
HI
BI
TE
D.
T
HI
S
CO
PY
RI
GH
T
NO
TI
FI
CA
TI
ON
S
HA
LL
B E
TR
UE
A S
IF
D
IR
EC
TL
Y
PL
AC
ED
O
N
EA
CH
D
RA
W
IN
G
EX
HI
BI
T
OR
R
EN
DE
RI
NG
O N
TH
IS
D
OC
UM
EN
T
AN
D
SH
AL
L N
OT
B
E
RE
MO
VE
D
FR
OM
T
HE
SE
D
OC
UM
EN
TS
Sheet No.:
D1.1
PH
AS
E:
DR
AW
N:
DA
TE
C on su lta nt
Description:
Demolition Site Plan
Jo b
Ti tle
W
. B re va rd
S tre et R en ov at io n Pr oj ec t #
Ph as e:
3.
0%
C on st ru ct io n D oc um en ts
C lie nt
C ity o f T al la ha ss ee Ta lla ha ss ee
, F lo rid a
Se al
Z :\2
B
IM
B lu ep rin t C
O T
C on tin ui ng S er vi ce s\
3.
B
IM
B re va rd S tr ee t\M od el \2
.6 B re va rd S tr ee t.p ln
4:
P M
Architects Lewis + Whitlock 206 West Virginia St.
Tallahassee, Florida 32301 850,942.1718 www.think3d.net
RE
VI
EW
ED
C.
W
HI
TL
OC
K
/23 /20
SC
HE
MA
TI
C
DE
SI
GN
C
ON
ST
RU
CT
IO
N
DO
CS
0% C
ON
ST
RU
CT
IO
N
DO
CS
(F
KA
A sh m or e St or e)
AB
/ M
P C.
W
HI
TL
OC
K
/12 /20
AB
/ M P
C.
W
HI
TL
OC
K
/30
/20
AB
/ M
P
D1.4
1D1 .4
D1.4
D1.5
11" ELM TO BE REMOVED
EXISTING LAMP POST
EXISTING ELECTRICAL POST
EXISTING TRAFFIC LIGHT POST
B EXISTING SHARED
(3) WITHE BRICK
PARTY WALL
BB
EXISTING LAMP POST
TO REMAIN
EXISTING 42" ELM
TO REMAIN
EXISTING HEDGES TO BE REMOVED
EXISTING DETECTABLE
PAVERS
GRADING TO COORDINATE/ COVER
HELICAL PIER FOUNDATION SUPPORT.
COORDINATE W/ STRUCTURAL & CIVIL
CONCRETE TO BE DEMOLISHED
AT WATER CONNECTION
OLD BAINBRIDGE RD
1-STORY BRICK BUILDING
1 B
RE
VA
RD
S
T
EXIST. BLDG.
NOT IN SCOPE
EXISTING PAINTED
CROSSWALK
EXISTING PAINTED
CROSSWALK
PROPERTY LINE
SEE ROOF PLAN
FOR ROOF
SCOPE
SEE ROOF PLAN
FOR ROOF
SCOPE
D1.5
EXISTING (2) ADDITIONS
TO BE FULLY REMOVED
5 B
RE
VA
RD
S
T
7 B
RE
VA
RD
S
T
9 B
RE
VA
RD
S
T
1 STORY CMU BUILDING
1. THE CONTRACTOR SHALL EXAMINE THE SITE AND EXISTING CONDITIONS AND
BECOME FAMILIAR WITH ALL CONDITIONS WHICH MAY AFFECT THE WORK, PRIOR
TO STARTING.
2. OWNER SHALL REMOVE ALL LOOSE FURNISHINGS PRIOR TO THE START OF
WORK, TYP.
3. CONTRACTOR TO PROVIDE FOR AND ABIDE BY ALL APPLICABLE FEDERAL, STATE,
AND LOCAL HAZARDOUS MATERIAL ABATEMENT PROCEDURES AND PROTOCOLS,
INCLUDING NOTIFICATIONS OF WORK, PROTECTION OF OWNER PROPERTY AND
PROTECTION OF PUBLIC HEALTH AS REQUIRED BY THESE AUTHORITIES. REFER
TO THE PRE-DEMOLITION/RENOVATION ASBESTOS INSPECTION REPORT, DATED
SEPTEMBER 06, 2023 FOR THE EXTENT OF IDENTIFIED HAZARDOUS MATERIAL,
AND AS NOTED HEREIN.
4. CONTRACTOR SHALL REVIEW AND COORDINATE ALL DEMOLITION ACTIVITIES
WITH ASBESTOS REPORT AND REQUIRED FEDERAL, STATE, AND LOCAL
ABATEMENT REGULATIONS.
5. PROVIDE BARRIERS AND PROTECTIVE MATERIAL TO MINIMIZE DAMAGES/
DISTURBANCES TO EXISTING ADJACENT MATERIALS AND PUBLIC SPACE.
6. ANY DAMAGE TO EXISTING CONSTRUCTION, NOT SCHEDULED FOR REMOVAL,
SHALL BE REPAIRED AT NO EXPENSE TO THE OWNER, TYP.
7. SALVAGE MATERIALS, AND ITEMS INDICATED ON THE DRAWINGS AND TURN THEM
OVER TO THE OWNER WITH A SIGNED RECEIPT.
8. UTILITY INTERRUPTIONS SHALL BE SCHEDULED IN ADVANCE AND THE OWNER
NOTIFIED.
9. NOT USED.
10. CONTRACTOR SHALL PATCH AND REPAIR ALL WALLS, WITH IN-KIND MATERIAL
AND QUALITY, THAT ARE IMPACTED BY MECHANICAL AND/OR ELECTRICAL
CONDUIT, PIPING, AND ALL OTHER MISC DEVICE REMOVAL.
11. CONTRACTOR TO MAINTAIN WEATHER-TIGHT CONDITIONS TO PROTECT
STRUCTURE FROM FURTHER DAMAGE.THE CONTRACTOR SHALL PROVIDE
TEMPORARY WEATHER AND SECURITY ENCLOSURES THROUGHOUT DEMOLITION
AND CONSTRUCTION AND SHALL MAINTAIN A SECURE SITE UNTIL SUBSTANTIAL
COMPLETION HAS BEEN ACHIEVED.
12. SYSTEMS DEMOLITION: COMPLETELY AND ENTIRELY REMOVE THE EXISTING
HVAC SYSTEM(S) (INCLUDING ALL IN-BUILDING EQUIPMENT, ROOFTOP
EQUIPMENT, DUCTWORK, HANGERS, AND DISTRIBUTION FIXTURES), PLUMBING
SYSTEM (SANITARY, SUPPLY, ALL FIXTURES, PIPING, WATER HEATERS, HANGERS
TO THE GREATEST EXTENT PRACTICABLE), STORM DRAINAGE SYSTEM (FROM
ROOF TO CITY STORMWATER CONNECTIONS), ELECTRICAL SYSTEM (REMOVE ALL
EXISTING OVERHEAD SERVICE, RISER, WEATHER HEAD, AND METERS (RETURN
METERING EQUIPMENT TOTHE UTILITY), AND REMOVE ALL INTERIOR AND
EXTERIOR ELECTRICAL SYSTEMS OF THE FIRST FLOOR AND ROOF TOP OF THE
BUILDING INCLUDING ALL PLANELS, LIGHTING FIXTURES, DEVICES, SWICHES/
RECEPTICLES, WIRE AND CONDUIT.
13. EXISTING CONDITIONS ARE SHOWN TO THE GREATEST EXTENT POSSIBLE; THE
CONTRACTOR SHALL VERIFY AND ACCOUNT FOR UNFORESEEN DEMOLITION
WORK ASSOCIATED WITH THESE SYSTEMS DURING BIDDING AND NOTIFY THE
ARCHITECT.
14. CAP ABANDONED PLUMBING AND STORM LINES AS REQUIRED. TEMPORARILY CAP
PLUMBING AND STORM LINES IDENTIFIED FOR REUSE FOR CONSTRUCTION
PHASE TIE-INS.
15. REMOVE ALL APPLIED FLOOR FINISHES TO THE ORIGINAL WOOD OR CONCRETE
FLOOR. AT AREAS DESIGNATED HARZAROUS PER THE ABATEMENT REPORT,
PREPARE AREAS PER ABATEMENT REQUIREMENTS IN PREPARATION FOR RE-
FINISHING OR RE-FLOORING PER DRAWINGS.
A REMOVE EXISTING BRICK INFILL, DOORS AND WINDOWS IN THEIR
ENTIRETY. PREPARE OPENINGS FOR NEW STOREFRONT INSTALL.
PROVIDE SHORING AS REQUIRED.
B EXISTING CANOPIES TO BE REMOVED, TYP.
C REMOVE EXISTING DOOR, DOOR FRAME AND ALL ASSOCIATED DOOR
HARDWARE. TAKE CARE TO NOT DAMAGE ADJACENT SURFACES.
PREPARE OPENING FOR NEW DOOR INSTALL WHERE INDICATED ON
RENOVATION PLANS.
D REMOVE EXISTING WOOD WINDOW, WINDOW FRAME, AND ASSOCIATED
HARDWARE. EXISTING BRICK MASONRY SILL TO REMAIN. PREPARE
OPENING FOR NEW FRAME AND WINDOW INSTALLATION.
E REMOVE PORTION OF EXISTING MASONRY WALL TO EXTENTS SHOWN
ON DEMOLITION. PROVIDE SHORING AS REQURED.
F REMOVE MASONRY INFILL AND PREPARE OPENING FOR NEW WINDOW/
DOOR INSTALL.
G REMOVE EXISTING INFILL AT ARCHED OPNENINGS.
H REMOVE ALL GYP. BOARD AND FURRING BUILD-OUT(S) BACK TO
EXISITNG BRICK OR PLASTER SURFACES.
J REMOVE BUILT-IN CONSTRUCTION.
K REMOVE PLUMBING FIXTURE(S). COORDINATE CAPPING OF UTILITIES
W/ PLUMBING DRAWINGS.
L REMOVE EXISTING ELECTRICAL PANEL(S). COORDINATE CAPPING OF
ELECTRICAL UTILITIES WITH ELECTRICAL DRAWINGS.
M REMOVE ALL HVAC, ELECTRICAL, OR PLUMBING ITEM(S) - COORDINATE
CAPPING OF UTILITIES W/ PLUMBING DRAWINGS.
N REMOVE ALL CEILING-MOUNTED ELECTRICAL/LIGHTING FIXTURES
THROUGHOUT.
O REMOVE PORTION OF SLAB AND PROVIDE TRENCHING FOR NEW
PLUMBING - SEE PLUMBING DRAWINGS
P PROTECT EXISTING CEILING TO REMAIN. STRIP AND PREP FOR NEW
FINISH.
Q REMOVE EXISTING FLOORING TO SLAB. COORDINATE FLOORING
REMOVAL WITH THE ABATEMENT CONTRACTOR.
R REMOVE EXISTING ROOFING MATERIAL, AND ALL EXISTING FLASHINGS.
PROTECT ROOF SHEATHING AND WOOD-FRAMED TRUSSES TO
REMAIN. ROOF SHEATHING TO REMAIN AND SHALL BE REPAIRED,
REPLACED, AND REATTACHED PER STRUCTURAL. COORDINATE
ROOFING REMOVAL WITH THE ABATEMENT CONTRACTOR.
S EXISTING CUPOLA TO BE FULLY REMOVED, INCLUDING SUPPORT
COLUMNS BELOW, AND ROOFING PATCHED. SEE STRUCTURAL.
T REMOVE EXISTING COPING(S) AND BLOCKING.
U REMOVE EXISTING PORTIONS OF CEILING ABOVE.
'X' REPRESENTS NOTE ON PLANS
ALTERNATE #1
REMOVE ENTIRE EXISTING PLANK CEILING. PREPARE FOR NEW 6"
TONGUE & GROOVE CEILING INSTILLATION.
CONSTRUCTION TO BE REMOVED
EXISTING PARTITION TO REMAIN
EXISTING CONSTRUCTION TO REMAIN
PARTITION TO BE REMOVED
CEILING TO BE REMOVED
CONC SLAB TO BE REMOVED
N
3/16" = 1'-0"1 Demolition Site Plan
GENERAL DEMOLITION NOTESDEMOLITION NOTES
Demolition Legend
RE
VI
SI
ON
DR
AW
N:
RE
VI
EW
ED
DA
TE
TH
ES
E
DR
AW
IN
GS
A
ND
R
EN
DE
RI
NG
S
AR
E
IN
ST
RU
ME
NT
S
OF
S
ER
VI
CE
. T
HE
D
RA
W
IN
GS
A
ND
A
SS
OC
IA
TE
D
CO
PI
ES
T
HE
RE
OF
, I
NC
LU
DI
NG
E
LE
CT
RO
NI
C
ME
DI
A
AN
D
CA
DD
F
ILE
S, A
RE
T
HE
P
RO
PE
RT
Y
OF
A
RC
HI
TE
CT
S:
LE
W
IS
W
HI
TL
OC
K, P A.
A.
T
HE
IR
U
SE
, R
EP
RE
SE
NT
AT
IO
N
OR
R
EP
RO
DU
CT
IO
N
FO
R
AN
Y
PU
RP
OS
E
EX
CE
PT
B
Y W
RI
TT
EN
A
GR
EE
ME
NT
W
IT
H
TH
E
AR
CH
IT
EC
T
IS
P
RO
HI
BI
TE
D.
T
HI
S
CO
PY
RI
GH
T
NO
TI
FI
CA
TI
ON
S
HA
LL
B E
TR
UE
A S
IF
D
IR
EC
TL
Y
PL
AC
ED
O
N
EA
CH
D
RA
W
IN
G
EX
HI
BI
T
OR
R
EN
DE
RI
NG
O N
TH
IS
D
OC
UM
EN
T
AN
D
SH
AL
L N
OT
B
E
RE
MO
VE
D
FR
OM
T
HE
SE
D
OC
UM
EN
TS
Sheet No.:
D1.2
PH
AS
E:
DR
AW
N:
DA
TE
C on su lta nt
Description:
Demolition Plan
Jo b
Ti tle
W
. B re va rd
S tre et R en ov at io n Pr oj ec t #
Ph as e:
3.
0%
C on st ru ct io n D oc um en ts
C lie nt
C ity o f T al la ha ss ee Ta lla ha ss ee
, F lo rid a
Se al
Z :\2
B
IM
B lu ep rin t C
O T
C on tin ui ng S er vi ce s\
3.
B
IM
B re va rd S tr ee t\M od el \2
.6 B re va rd S tr ee t.p ln
4:
P M
Architects Lewis + Whitlock 206 West Virginia St.
Tallahassee, Florida 32301 850,942.1718 www.think3d.net
RE
VI
EW
ED
C.
W
HI
TL
OC
K
/23 /20
SC
HE
MA
TI
C
DE
SI
GN
C
ON
ST
RU
CT
IO
N
DO
CS
0% C
ON
ST
RU
CT
IO
N
DO
CS
(F
KA
A sh m or e St or e)
AB
/ M
P C.
W
HI
TL
OC
K
/12 /20
AB
/ M P
C.
W
HI
TL
OC
K
/30
/20
AB
/ M
P
'-2
'-5 1/
2"
'-7
1/ 2"
16'-0 1/2" 45'-2 1/8"
2'- 0"
2'-4 1/2"
D1.4
1D1 .4
D1.4
D1.5
A
B
A
B
A
B
E
REMOVE COLUMNS(4)
K K K
EXISTING (2) ADDITIONS TO BE FULLY
REMOVED INCLUDING SLAB & FOOTINGS
E
CONC. STEPS TO BE REMOVED CONC. STEPS TO BE REMOVED
CUPOLA ABOVE
OPENING IN CEILING
TO CUPOLA ABOVE
M
C
F
L
M MM
M
D FD FD D DD
C C
F
ALIGN NEW OPENINGS W/ EXIST.ALIGN NEW OPENINGS W/ EXIST.
ALIGN NEW OPENINGS W/ EXIST.ALIGN NEW OPENINGS W/ EXIST.
L L
CAP FLOOR DRAIN
H H H
UUJU JU
O
M Q M Q M Q
UU
ALT #1
O
ALT #1 ALT #1
60'-6 3/8" VIF
MA
TC
H
EX
IS
T.
MA
TC
H
EX
IS
T.
MA
TC
H
EX
IS
T.
MA
TC
H
EX
IS
T.
'-0
" V
IF
7'- 9"
V
IF
'-0
" V
IF
8'- 6"
V
IF
D1.5
EXISTING FIRE ALARM TO REMAIN AND BE REFINISHED
1. THE CONTRACTOR SHALL EXAMINE THE SITE AND EXISTING CONDITIONS AND
BECOME FAMILIAR WITH ALL CONDITIONS WHICH MAY AFFECT THE WORK, PRIOR
TO STARTING.
2. OWNER SHALL REMOVE ALL LOOSE FURNISHINGS PRIOR TO THE START OF
WORK, TYP.
3. CONTRACTOR TO PROVIDE FOR AND ABIDE BY ALL APPLICABLE FEDERAL, STATE,
AND LOCAL HAZARDOUS MATERIAL ABATEMENT PROCEDURES AND PROTOCOLS,
INCLUDING NOTIFICATIONS OF WORK, PROTECTION OF OWNER PROPERTY AND
PROTECTION OF PUBLIC HEALTH AS REQUIRED BY THESE AUTHORITIES. REFER
TO THE PRE-DEMOLITION/RENOVATION ASBESTOS INSPECTION REPORT, DATED
SEPTEMBER 06, 2023 FOR THE EXTENT OF IDENTIFIED HAZARDOUS MATERIAL,
AND AS NOTED HEREIN.
4. CONTRACTOR SHALL REVIEW AND COORDINATE ALL DEMOLITION ACTIVITIES
WITH ASBESTOS REPORT AND REQUIRED FEDERAL, STATE, AND LOCAL
ABATEMENT REGULATIONS.
5. PROVIDE BARRIERS AND PROTECTIVE MATERIAL TO MINIMIZE DAMAGES/
DISTURBANCES TO EXISTING ADJACENT MATERIALS AND PUBLIC SPACE.
6. ANY DAMAGE TO EXISTING CONSTRUCTION, NOT SCHEDULED FOR REMOVAL,
SHALL BE REPAIRED AT NO EXPENSE TO THE OWNER, TYP.
7. SALVAGE MATERIALS, AND ITEMS INDICATED ON THE DRAWINGS AND TURN THEM
OVER TO THE OWNER WITH A SIGNED RECEIPT.
8. UTILITY INTERRUPTIONS SHALL BE SCHEDULED IN ADVANCE AND THE OWNER
NOTIFIED.
9. NOT USED.
10. CONTRACTOR SHALL PATCH AND REPAIR ALL WALLS, WITH IN-KIND MATERIAL
AND QUALITY, THAT ARE IMPACTED BY MECHANICAL AND/OR ELECTRICAL
CONDUIT, PIPING, AND ALL OTHER MISC DEVICE REMOVAL.
11. CONTRACTOR TO MAINTAIN WEATHER-TIGHT CONDITIONS TO PROTECT
STRUCTURE FROM FURTHER DAMAGE.THE CONTRACTOR SHALL PROVIDE
TEMPORARY WEATHER AND SECURITY ENCLOSURES THROUGHOUT DEMOLITION
AND CONSTRUCTION AND SHALL MAINTAIN A SECURE SITE UNTIL SUBSTANTIAL
COMPLETION HAS BEEN ACHIEVED.
12. SYSTEMS DEMOLITION: COMPLETELY AND ENTIRELY REMOVE THE EXISTING
HVAC SYSTEM(S) (INCLUDING ALL IN-BUILDING EQUIPMENT, ROOFTOP
EQUIPMENT, DUCTWORK, HANGERS, AND DISTRIBUTION FIXTURES), PLUMBING
SYSTEM (SANITARY, SUPPLY, ALL FIXTURES, PIPING, WATER HEATERS, HANGERS
TO THE GREATEST EXTENT PRACTICABLE), STORM DRAINAGE SYSTEM (FROM
ROOF TO CITY STORMWATER CONNECTIONS), ELECTRICAL SYSTEM (REMOVE ALL
EXISTING OVERHEAD SERVICE, RISER, WEATHER HEAD, AND METERS (RETURN
METERING EQUIPMENT TOTHE UTILITY), AND REMOVE ALL INTERIOR AND
EXTERIOR ELECTRICAL SYSTEMS OF THE FIRST FLOOR AND ROOF TOP OF THE
BUILDING INCLUDING ALL PLANELS, LIGHTING FIXTURES, DEVICES, SWICHES/
RECEPTICLES, WIRE AND CONDUIT.
13. EXISTING CONDITIONS ARE SHOWN TO THE GREATEST EXTENT POSSIBLE; THE
CONTRACTOR SHALL VERIFY AND ACCOUNT FOR UNFORESEEN DEMOLITION
WORK ASSOCIATED WITH THESE SYSTEMS DURING BIDDING AND NOTIFY THE
ARCHITECT.
14. CAP ABANDONED PLUMBING AND STORM LINES AS REQUIRED. TEMPORARILY CAP
PREPARE AREAS PER ABATEMENT REQUIREMENTS IN PREPARATION FOR RE-
FINISHING OR RE-FLOORING PER DRAWINGS.
A REMOVE EXISTING BRICK INFILL, DOORS AND WINDOWS IN THEIR
ENTIRETY. PREPARE OPENINGS FOR NEW STOREFRONT INSTALL.
PROVIDE SHORING AS REQUIRED.
B EXISTING CANOPIES TO BE REMOVED, TYP.
C REMOVE EXISTING DOOR, DOOR FRAME AND ALL ASSOCIATED DOOR
HARDWARE. TAKE CARE TO NOT DAMAGE ADJACENT SURFACES.
PREPARE OPENING FOR NEW DOOR INSTALL WHERE INDICATED ON
RENOVATION PLANS.
D REMOVE EXISTING WOOD WINDOW, WINDOW FRAME, AND ASSOCIATED
HARDWARE. EXISTING BRICK MASONRY SILL TO REMAIN. PREPARE
OPENING FOR NEW FRAME AND WINDOW INSTALLATION.
E REMOVE PORTION OF EXISTING MASONRY WALL TO EXTENTS SHOWN
ON DEMOLITION. PROVIDE SHORING AS REQURED.
F REMOVE MASONRY INFILL AND PREPARE OPENING FOR NEW WINDOW/
DOOR INSTALL.
G REMOVE EXISTING INFILL AT ARCHED OPNENINGS.
H REMOVE ALL GYP. BOARD AND FURRING BUILD-OUT(S) BACK TO
EXISITNG BRICK OR PLASTER SURFACES.
J REMOVE BUILT-IN CONSTRUCTION.
K REMOVE PLUMBING FIXTURE(S). COORDINATE CAPPING OF UTILITIES
W/ PLUMBING DRAWINGS.
L REMOVE EXISTING ELECTRICAL PANEL(S). COORDINATE CAPPING OF
ELECTRICAL UTILITIES WITH ELECTRICAL DRAWINGS.
M REMOVE ALL HVAC, ELECTRICAL, OR PLUMBING ITEM(S) - COORDINATE
CAPPING OF UTILITIES W/ PLUMBING DRAWINGS.
N REMOVE ALL CEILING-MOUNTED ELECTRICAL/LIGHTING FIXTURES
THROUGHOUT.
O REMOVE PORTION OF SLAB AND PROVIDE TRENCHING FOR NEW
PLUMBING - SEE PLUMBING DRAWINGS
P PROTECT EXISTING CEILING TO REMAIN. STRIP AND PREP FOR NEW
FINISH.
Q REMOVE EXISTING FLOORING TO SLAB. COORDINATE FLOORING
REMOVAL WITH THE ABATEMENT CONTRACTOR.
R REMOVE EXISTING ROOFING MATERIAL, AND ALL EXISTING FLASHINGS.
PROTECT ROOF SHEATHING AND WOOD-FRAMED TRUSSES TO
REMAIN. ROOF SHEATHING TO REMAIN AND SHALL BE REPAIRED,
REPLACED, AND REATTACHED PER STRUCTURAL. COORDINATE
ROOFING REMOVAL WITH THE ABATEMENT CONTRACTOR.
S EXISTING CUPOLA TO BE FULLY REMOVED, INCLUDING SUPPORT
COLUMNS BELOW, AND ROOFING PATCHED. SEE STRUCTURAL.
T REMOVE EXISTING COPING(S) AND BLOCKING.
U REMOVE EXISTING PORTIONS OF CEILING ABOVE.
CONSTRUCTION TO BE REMOVED
EXISTING PARTITION TO REMAIN
EXISTING CONSTRUCTION TO REMAIN
PARTITION TO BE REMOVED
CEILING TO BE REMOVED
CONC SLAB TO BE REMOVED
N
1/4" = 1'-0"1 Demolition Plan
RE
VI
SI
ON
DR
AW
N:
RE
VI
EW
ED
DA
TE
TH
ES
E
DR
AW
IN
GS
A
ND
R
EN
DE
RI
NG
S
AR
E
IN
ST
RU
ME
NT
S
OF
S
ER
VI
CE
. T
HE
D
RA
W
IN
GS
A
ND
A
SS
OC
IA
TE
D
CO
PI
ES
T
HE
RE
OF
, I
NC
LU
DI
NG
E
LE
CT
RO
NI
C
ME
DI
A
AN
D
CA
DD
F
ILE
S, A
RE
T
HE
P
RO
PE
RT
Y
OF
A
RC
HI
TE
CT
S:
LE
W
IS
W
HI
TL
OC
K, P A.
A.
T
HE
IR
U
SE
, R
EP
RE
SE
NT
AT
IO
N
OR
R
EP
RO
DU
CT
IO
N
FO
R
AN
Y
PU
RP
OS
E
EX
CE
PT
B
Y W
RI
TT
EN
A
GR
EE
ME
NT
W
IT
H
TH
E
AR
CH
IT
EC
T
IS
P
RO
HI
BI
TE
D.
T
HI
S
CO
PY
RI
GH
T
NO
TI
FI
CA
TI
ON
S
HA
LL
B E
TR
UE
A S
IF
D
IR
EC
TL
Y
PL
AC
ED
O
N
EA
CH
D
RA
W
IN
G
EX
HI
BI
T
OR
R
EN
DE
RI
NG
O N
TH
IS
D
OC
UM
EN
T
AN
D
SH
AL
L N
OT
B
E
RE
MO
VE
D
FR
OM
T
HE
SE
D
OC
UM
EN
TS
Sheet No.:
D1.3
PH
AS
E:
DR
AW
N:
DA
TE
C on su lta nt
Description:
Demolition Roof Plan
Jo b
Ti tle
W
. B re va rd
S tre et R en ov at io n Pr oj ec t #
Ph as e:
3.
0%
C on st ru ct io n D oc um en ts
C lie nt
C ity o f T al la ha ss ee Ta lla ha ss ee
, F lo rid a
Se al
Z :\2
B
IM
B lu ep rin t C
O T
C on tin ui ng S er vi ce s\
3.
B
IM
B re va rd S tr ee t\M od el \2
.6 B re va rd S tr ee t.p ln
4:
P M
Architects Lewis + Whitlock 206 West Virginia St.
Tallahassee, Florida 32301 850,942.1718 www.think3d.net
RE
VI
EW
ED
C.
W
HI
TL
OC
K
/23 /20
SC
HE
MA
TI
C
DE
SI
GN
C
ON
ST
RU
CT
IO
N
DO
CS
0% C
ON
ST
RU
CT
IO
N
DO
CS
(F
KA
A sh m or e St or e)
AB
/ M
P C.
W
HI
TL
OC
K
/12 /20
AB
/ M P
C.
W
HI
TL
OC
K
/30
/20
AB
/ M
P
EXIST.
SLOPE
VIF
RR
T
T
R
S
EXIST.
SLOPE
VIF
EXIST.
SLOPE
VIF
EXIST.
SLOPE
VIF
1. THE CONTRACTOR SHALL EXAMINE THE SITE AND EXISTING CONDITIONS AND
BECOME FAMILIAR WITH ALL CONDITIONS WHICH MAY AFFECT THE WORK, PRIOR
TO STARTING.
2. OWNER SHALL REMOVE ALL LOOSE FURNISHINGS PRIOR TO THE START OF
WORK, TYP.
3. CONTRACTOR TO PROVIDE FOR AND ABIDE BY ALL APPLICABLE FEDERAL, STATE,
AND LOCAL HAZARDOUS MATERIAL ABATEMENT PROCEDURES AND PROTOCOLS,
INCLUDING NOTIFICATIONS OF WORK, PROTECTION OF OWNER PROPERTY AND
PROTECTION OF PUBLIC HEALTH AS REQUIRED BY THESE AUTHORITIES. REFER
TO THE PRE-DEMOLITION/RENOVATION ASBESTOS INSPECTION REPORT, DATED
SEPTEMBER 06, 2023 FOR THE EXTENT OF IDENTIFIED HAZARDOUS MATERIAL,
AND AS NOTED HEREIN.
4. CONTRACTOR SHALL REVIEW AND COORDINATE ALL DEMOLITION ACTIVITIES
WITH ASBESTOS REPORT AND REQUIRED FEDERAL, STATE, AND LOCAL
ABATEMENT REGULATIONS.
5. PROVIDE BARRIERS AND PROTECTIVE MATERIAL TO MINIMIZE DAMAGES/
DISTURBANCES TO EXISTING ADJACENT MATERIALS AND PUBLIC SPACE.
6. ANY DAMAGE TO EXISTING CONSTRUCTION, NOT SCHEDULED FOR REMOVAL,
SHALL BE REPAIRED AT NO EXPENSE TO THE OWNER, TYP.
7. SALVAGE MATERIALS, AND ITEMS INDICATED ON THE DRAWINGS AND TURN THEM
OVER TO THE OWNER WITH A SIGNED RECEIPT.
8. UTILITY INTERRUPTIONS SHALL BE SCHEDULED IN ADVANCE AND THE OWNER
NOTIFIED.
9. NOT USED.
10. CONTRACTOR SHALL PATCH AND REPAIR ALL WALLS, WITH IN-KIND MATERIAL
AND QUALITY, THAT ARE IMPACTED BY MECHANICAL AND/OR ELECTRICAL
CONDUIT, PIPING, AND ALL OTHER MISC DEVICE REMOVAL.
11. CONTRACTOR TO MAINTAIN WEATHER-TIGHT CONDITIONS TO PROTECT
STRUCTURE FROM FURTHER DAMAGE.THE CONTRACTOR SHALL PROVIDE
TEMPORARY WEATHER AND SECURITY ENCLOSURES THROUGHOUT DEMOLITION
AND CONSTRUCTION AND SHALL MAINTAIN A SECURE SITE UNTIL SUBSTANTIAL
COMPLETION HAS BEEN ACHIEVED.
12. SYSTEMS DEMOLITION: COMPLETELY AND ENTIRELY REMOVE THE EXISTING
HVAC SYSTEM(S) (INCLUDING ALL IN-BUILDING EQUIPMENT, ROOFTOP
EQUIPMENT, DUCTWORK, HANGERS, AND DISTRIBUTION FIXTURES), PLUMBING
SYSTEM (SANITARY, SUPPLY, ALL FIXTURES, PIPING, WATER HEATERS, HANGERS
TO THE GREATEST EXTENT PRACTICABLE), STORM DRAINAGE SYSTEM (FROM
ROOF TO CITY STORMWATER CONNECTIONS), ELECTRICAL SYSTEM (REMOVE ALL
EXISTING OVERHEAD SERVICE, RISER, WEATHER HEAD, AND METERS (RETURN
METERING EQUIPMENT TOTHE UTILITY), AND REMOVE ALL INTERIOR AND
EXTERIOR ELECTRICAL SYSTEMS OF THE FIRST FLOOR AND ROOF TOP OF THE
BUILDING INCLUDING ALL PLANELS, LIGHTING FIXTURES, DEVICES, SWICHES/
RECEPTICLES, WIRE AND CONDUIT.
13. EXISTING CONDITIONS ARE SHOWN TO THE GREATEST EXTENT POSSIBLE; THE
CONTRACTOR SHALL VERIFY AND ACCOUNT FOR UNFORESEEN DEMOLITION
WORK ASSOCIATED WITH THESE SYSTEMS DURING BIDDING AND NOTIFY THE
ARCHITECT.
14. CAP ABANDONED PLUMBING AND STORM LINES AS REQUIRED. TEMPORARILY CAP
PREPARE AREAS PER ABATEMENT REQUIREMENTS IN PREPARATION FOR RE-
FINISHING OR RE-FLOORING PER DRAWINGS.
A REMOVE EXISTING BRICK INFILL, DOORS AND WINDOWS IN THEIR
ENTIRETY. PREPARE OPENINGS FOR NEW STOREFRONT INSTALL.
PROVIDE SHORING AS REQUIRED.
B EXISTING CANOPIES TO BE REMOVED, TYP.
C REMOVE EXISTING DOOR, DOOR FRAME AND ALL ASSOCIATED DOOR
HARDWARE. TAKE CARE TO NOT DAMAGE ADJACENT SURFACES.
PREPARE OPENING FOR NEW DOOR INSTALL WHERE INDICATED ON
RENOVATION PLANS.
D REMOVE EXISTING WOOD WINDOW, WINDOW FRAME, AND ASSOCIATED
HARDWARE. EXISTING BRICK MASONRY SILL TO REMAIN. PREPARE
OPENING FOR NEW FRAME AND WINDOW INSTALLATION.
E REMOVE PORTION OF EXISTING MASONRY WALL TO EXTENTS SHOWN
ON DEMOLITION. PROVIDE SHORING AS REQURED.
F REMOVE MASONRY INFILL AND PREPARE OPENING FOR NEW WINDOW/
DOOR INSTALL.
G REMOVE EXISTING INFILL AT ARCHED OPNENINGS.
H REMOVE ALL GYP. BOARD AND FURRING BUILD-OUT(S) BACK TO
EXISITNG BRICK OR PLASTER SURFACES.
J REMOVE BUILT-IN CONSTRUCTION.
K REMOVE PLUMBING FIXTURE(S). COORDINATE CAPPING OF UTILITIES
W/ PLUMBING DRAWINGS.
L REMOVE EXISTING ELECTRICAL PANEL(S). COORDINATE CAPPING OF
ELECTRICAL UTILITIES WITH ELECTRICAL DRAWINGS.
M REMOVE ALL HVAC, ELECTRICAL, OR PLUMBING ITEM(S) - COORDINATE
CAPPING OF UTILITIES W/ PLUMBING DRAWINGS.
N REMOVE ALL CEILING-MOUNTED ELECTRICAL/LIGHTING FIXTURES
THROUGHOUT.
O REMOVE PORTION OF SLAB AND PROVIDE TRENCHING FOR NEW
PLUMBING - SEE PLUMBING DRAWINGS
P PROTECT EXISTING CEILING TO REMAIN. STRIP AND PREP FOR NEW
FINISH.
Q REMOVE EXISTING FLOORING TO SLAB. COORDINATE FLOORING
REMOVAL WITH THE ABATEMENT CONTRACTOR.
R REMOVE EXISTING ROOFING MATERIAL, AND ALL EXISTING FLASHINGS.
PROTECT ROOF SHEATHING AND WOOD-FRAMED TRUSSES TO
REMAIN. ROOF SHEATHING TO REMAIN AND SHALL BE REPAIRED,
REPLACED, AND REATTACHED PER STRUCTURAL. COORDINATE
ROOFING REMOVAL WITH THE ABATEMENT CONTRACTOR.
S EXISTING CUPOLA TO BE FULLY REMOVED, INCLUDING SUPPORT
COLUMNS BELOW, AND ROOFING PATCHED. SEE STRUCTURAL.
T REMOVE EXISTING COPING(S) AND BLOCKING.
U REMOVE EXISTING PORTIONS OF CEILING ABOVE.
CONSTRUCTION TO BE REMOVED
EXISTING PARTITION TO REMAIN
EXISTING CONSTRUCTION TO REMAIN
PARTITION TO BE REMOVED
CEILING TO BE REMOVED
CONC SLAB TO BE REMOVED
N
1/4" = 1'-0"1 Roof Demolition Plan
RE
VI
SI
ON
DR
AW
N:
RE
VI
EW
ED
DA
TE
TH
ES
E
DR
AW
IN
GS
A
ND
R
EN
DE
RI
NG
S
AR
E
IN
ST
RU
ME
NT
S
OF
S
ER
VI
CE
. T
HE
D
RA
W
IN
GS
A
ND
A
SS
OC
IA
TE
D
CO
PI
ES
T
HE
RE
OF
, I
NC
LU
DI
NG
E
LE
CT
RO
NI
C
ME
DI
A
AN
D
CA
DD
F
ILE
S, A
RE
T
HE
P
RO
PE
RT
Y
OF
A
RC
HI
TE
CT
S:
LE
W
IS
W
HI
TL
OC
K, P A.
A.
T
HE
IR
U
SE
, R
EP
RE
SE
NT
AT
IO
N
OR
R
EP
RO
DU
CT
IO
N
FO
R
AN
Y
PU
RP
OS
E
EX
CE
PT
B
Y W
RI
TT
EN
A
GR
EE
ME
NT
W
IT
H
TH
E
AR
CH
IT
EC
T
IS
P
RO
HI
BI
TE
D.
T
HI
S
CO
PY
RI
GH
T
NO
TI
FI
CA
TI
ON
S
HA
LL
B E
TR
UE
A S
IF
D
IR
EC
TL
Y
PL
AC
ED
O
N
EA
CH
D
RA
W
IN
G
EX
HI
BI
T
OR
R
EN
DE
RI
NG
O N
TH
IS
D
OC
UM
EN
T
AN
D
SH
AL
L N
OT
B
E
RE
MO
VE
D
FR
OM
T
HE
SE
D
OC
UM
EN
TS
Sheet No.:
D1.4
PH
AS
E:
DR
AW
N:
DA
TE
C on su lta nt
Description:
Demolition Elevations
Jo b
Ti tle
W
. B re va rd
S tre et R en ov at io n Pr oj ec t #
Ph as e:
3.
0%
C on st ru ct io n D oc um en ts
C lie nt
C ity o f T al la ha ss ee Ta lla ha ss ee
, F lo rid a
Se al
Z :\2
B
IM
B lu ep rin t C
O T
C on tin ui ng S er vi ce s\
3.
B
IM
B re va rd S tr ee t\M od el \2
.6 B re va rd S tr ee t.p ln
4:
P M
Architects Lewis + Whitlock 206 West Virginia St.
Tallahassee, Florida 32301 850,942.1718 www.think3d.net
RE
VI
EW
ED
C.
W
HI
TL
OC
K
/23 /20
SC
HE
MA
TI
C
DE
SI
GN
C
ON
ST
RU
CT
IO
N
DO
CS
0% C
ON
ST
RU
CT
IO
N
DO
CS
(F
KA
A sh m or e St or e)
AB
/ M
P C.
W
HI
TL
OC
K
/12 /20
AB
/ M P
C.
W
HI
TL
OC
K
/30
/20
AB
/ M
P
EXIST. 2 STORY BLDG
NOT IN SCOPE
EXIST. BLDG
IN SCOPE
±0" Ground Floor
+12'-8 1/2" Top of Parapet
B
BA
R T
S
TREE TO BE REMOVED
PROTECT BUILDING & FOUNDATIONM
EXIST. ALARM
TO REMAIN
M M
M
M
BA BA
NOTE: SEE STRUCTURAL FOR SHORING NOTES AT EAST STOREFRONT
TO BE MOVED; COORD. W/ ELECT.
BBBBB
D1.5
ADDITIONS (2) TO BE FULLY REMOVEDADDITIONS (2) TO BE FULLY REMOVED
±0" Ground Floor
+12'-8 1/2" Top of Parapet
D1.5
S
TREE TO BE REMOVED
PROTECT BUILDING & FOUNDATION
B M
M
R
R T
M
TREE TO BE REMOVED
WOOD ELEMENTS (2) TO BE REMOVEDWOOD ELEMENTS (2) TO BE REMOVED
PAINT TO BE REMOVED.
EXISTING BRICK TO BE
PREPARED FOR SEAL & PAINT
PAINT TO BE REMOVED.
EXISTING BRICK TO BE
PREPARED FOR SEAL & PAINT
EXISTING FIRE ALARM TO
REMAIN AND BE REFINISHED
1. THE CONTRACTOR SHALL EXAMINE THE SITE AND EXISTING CONDITIONS AND
BECOME FAMILIAR WITH ALL CONDITIONS WHICH MAY AFFECT THE WORK, PRIOR
TO STARTING.
2. OWNER SHALL REMOVE ALL LOOSE FURNISHINGS PRIOR TO THE START OF
WORK, TYP.
3. CONTRACTOR TO PROVIDE FOR AND ABIDE BY ALL APPLICABLE FEDERAL, STATE,
AND LOCAL HAZARDOUS MATERIAL ABATEMENT PROCEDURES AND PROTOCOLS,
INCLUDING NOTIFICATIONS OF WORK, PROTECTION OF OWNER PROPERTY AND
PROTECTION OF PUBLIC HEALTH AS REQUIRED BY THESE AUTHORITIES. REFER
TO THE PRE-DEMOLITION/RENOVATION ASBESTOS INSPECTION REPORT, DATED
SEPTEMBER 06, 2023 FOR THE EXTENT OF IDENTIFIED HAZARDOUS MATERIAL,
AND AS NOTED HEREIN.
4. CONTRACTOR SHALL REVIEW AND COORDINATE ALL DEMOLITION ACTIVITIES
WITH ASBESTOS REPORT AND REQUIRED FEDERAL, STATE, AND LOCAL
ABATEMENT REGULATIONS.
5. PROVIDE BARRIERS AND PROTECTIVE MATERIAL TO MINIMIZE DAMAGES/
DISTURBANCES TO EXISTING ADJACENT MATERIALS AND PUBLIC SPACE.
6. ANY DAMAGE TO EXISTING CONSTRUCTION, NOT SCHEDULED FOR REMOVAL,
SHALL BE REPAIRED AT NO EXPENSE TO THE OWNER, TYP.
7. SALVAGE MATERIALS, AND ITEMS INDICATED ON THE DRAWINGS AND TURN THEM
OVER TO THE OWNER WITH A SIGNED RECEIPT.
8. UTILITY INTERRUPTIONS SHALL BE SCHEDULED IN ADVANCE AND THE OWNER
NOTIFIED.
9. NOT USED.
10. CONTRACTOR SHALL PATCH AND REPAIR ALL WALLS, WITH IN-KIND MATERIAL
AND QUALITY, THAT ARE IMPACTED BY MECHANICAL AND/OR ELECTRICAL
CONDUIT, PIPING, AND ALL OTHER MISC DEVICE REMOVAL.
11. CONTRACTOR TO MAINTAIN WEATHER-TIGHT CONDITIONS TO PROTECT
STRUCTURE FROM FURTHER DAMAGE.THE CONTRACTOR SHALL PROVIDE
TEMPORARY WEATHER AND SECURITY ENCLOSURES THROUGHOUT DEMOLITION
AND CONSTRUCTION AND SHALL MAINTAIN A SECURE SITE UNTIL SUBSTANTIAL
COMPLETION HAS BEEN ACHIEVED.
12. SYSTEMS DEMOLITION: COMPLETELY AND ENTIRELY REMOVE THE EXISTING
HVAC SYSTEM(S) (INCLUDING ALL IN-BUILDING EQUIPMENT, ROOFTOP
EQUIPMENT, DUCTWORK, HANGERS, AND DISTRIBUTION FIXTURES), PLUMBING
SYSTEM (SANITARY, SUPPLY, ALL FIXTURES, PIPING, WATER HEATERS, HANGERS
TO THE GREATEST EXTENT PRACTICABLE), STORM DRAINAGE SYSTEM (FROM
ROOF TO CITY STORMWATER CONNECTIONS), ELECTRICAL SYSTEM (REMOVE ALL
EXISTING OVERHEAD SERVICE, RISER, WEATHER HEAD, AND METERS (RETURN
METERING EQUIPMENT TOTHE UTILITY), AND REMOVE ALL INTERIOR AND
EXTERIOR ELECTRICAL SYSTEMS OF THE FIRST FLOOR AND ROOF TOP OF THE
BUILDING INCLUDING ALL PLANELS, LIGHTING FIXTURES, DEVICES, SWICHES/
RECEPTICLES, WIRE AND CONDUIT.
13. EXISTING CONDITIONS ARE SHOWN TO THE GREATEST EXTENT POSSIBLE; THE
CONTRACTOR SHALL VERIFY AND ACCOUNT FOR UNFORESEEN DEMOLITION
WORK ASSOCIATED WITH THESE SYSTEMS DURING BIDDING AND NOTIFY THE
ARCHITECT.
14. CAP ABANDONED PLUMBING AND STORM LINES AS REQUIRED. TEMPORARILY CAP
PREPARE AREAS PER ABATEMENT REQUIREMENTS IN PREPARATION FOR RE-
FINISHING OR RE-FLOORING PER DRAWINGS.
A REMOVE EXISTING BRICK INFILL, DOORS AND WINDOWS IN THEIR
ENTIRETY. PREPARE OPENINGS FOR NEW STOREFRONT INSTALL.
PROVIDE SHORING AS REQUIRED.
B EXISTING CANOPIES TO BE REMOVED, TYP.
C REMOVE EXISTING DOOR, DOOR FRAME AND ALL ASSOCIATED DOOR
HARDWARE. TAKE CARE TO NOT DAMAGE ADJACENT SURFACES.
PREPARE OPENING FOR NEW DOOR INSTALL WHERE INDICATED ON
RENOVATION PLANS.
D REMOVE EXISTING WOOD WINDOW, WINDOW FRAME, AND ASSOCIATED
HARDWARE. EXISTING BRICK MASONRY SILL TO REMAIN. PREPARE
OPENING FOR NEW FRAME AND WINDOW INSTALLATION.
E REMOVE PORTION OF EXISTING MASONRY WALL TO EXTENTS SHOWN
ON DEMOLITION. PROVIDE SHORING AS REQURED.
F REMOVE MASONRY INFILL AND PREPARE OPENING FOR NEW WINDOW/
DOOR INSTALL.
G REMOVE EXISTING INFILL AT ARCHED OPNENINGS.
H REMOVE ALL GYP. BOARD AND FURRING BUILD-OUT(S) BACK TO
EXISITNG BRICK OR PLASTER SURFACES.
J REMOVE BUILT-IN CONSTRUCTION.
K REMOVE PLUMBING FIXTURE(S). COORDINATE CAPPING OF UTILITIES
W/ PLUMBING DRAWINGS.
L REMOVE EXISTING ELECTRICAL PANEL(S). COORDINATE CAPPING OF
ELECTRICAL UTILITIES WITH ELECTRICAL DRAWINGS.
M REMOVE ALL HVAC, ELECTRICAL, OR PLUMBING ITEM(S) - COORDINATE
CAPPING OF UTILITIES W/ PLUMBING DRAWINGS.
N REMOVE ALL CEILING-MOUNTED ELECTRICAL/LIGHTING FIXTURES
THROUGHOUT.
O REMOVE PORTION OF SLAB AND PROVIDE TRENCHING FOR NEW
PLUMBING - SEE PLUMBING DRAWINGS
P PROTECT EXISTING CEILING TO REMAIN. STRIP AND PREP FOR NEW
FINISH.
Q REMOVE EXISTING FLOORING TO SLAB. COORDINATE FLOORING
REMOVAL WITH THE ABATEMENT CONTRACTOR.
R REMOVE EXISTING ROOFING MATERIAL, AND ALL EXISTING FLASHINGS.
PROTECT ROOF SHEATHING AND WOOD-FRAMED TRUSSES TO
REMAIN. ROOF SHEATHING TO REMAIN AND SHALL BE REPAIRED,
REPLACED, AND REATTACHED PER STRUCTURAL. COORDINATE
ROOFING REMOVAL WITH THE ABATEMENT CONTRACTOR.
S EXISTING CUPOLA TO BE FULLY REMOVED, INCLUDING SUPPORT
COLUMNS BELOW, AND ROOFING PATCHED. SEE STRUCTURAL.
T REMOVE EXISTING COPING(S) AND BLOCKING.
U REMOVE EXISTING PORTIONS OF CEILING ABOVE.
CONSTRUCTION TO BE REMOVED
EXISTING PARTITION TO REMAIN
EXISTING CONSTRUCTION TO REMAIN
PARTITION TO BE REMOVED
CEILING TO BE REMOVED
CONC SLAB TO BE REMOVED
EXIST. 2 STORY BLDG
NOT IN SCOPE
EXIST. BLDG
IN SCOPE
±0" Ground Floor
+12'-8 1/2" Top of Parapet
D1.5
D
FD
F
M
M
T
R
R
ADDITIONS (2) TO BE FULLY REMOVED.ADDITIONS (2) TO BE FULLY REMOVED.
S
D
F
TREE TO BE REMOVEDTREE TO BE REMOVED
3/16" = 1'-0"2 North Elevation
3/16" = 1'-0"1 East Elevation
GENERAL DEMOLITION NOTESDEMOLITION NOTES
3/16" = 1'-0"3 South Elevation
RE
VI
SI
ON
DR
AW
N:
RE
VI
EW
ED
DA
TE
TH
ES
E
DR
AW
IN
GS
A
ND
R
EN
DE
RI
NG
S
AR
E
IN
ST
RU
ME
NT
S
OF
S
ER
VI
CE
. T
HE
D
RA
W
IN
GS
A
ND
A
SS
OC
IA
TE
D
CO
PI
ES
T
HE
RE
OF
, I
NC
LU
DI
NG
E
LE
CT
RO
NI
C
ME
DI
A
AN
D
CA
DD
F
ILE
S, A
RE
T
HE
P
RO
PE
RT
Y
OF
A
RC
HI
TE
CT
S:
LE
W
IS
W
HI
TL
OC
K, P A.
A.
T
HE
IR
U
SE
, R
EP
RE
SE
NT
AT
IO
N
OR
R
EP
RO
DU
CT
IO
N
FO
R
AN
Y
PU
RP
OS
E
EX
CE
PT
B
Y W
RI
TT
EN
A
GR
EE
ME
NT
W
IT
H
TH
E
AR
CH
IT
EC
T
IS
P
RO
HI
BI
TE
D.
T
HI
S
CO
PY
RI
GH
T
NO
TI
FI
CA
TI
ON
S
HA
LL
B E
TR
UE
A S
IF
D
IR
EC
TL
Y
PL
AC
ED
O
N
EA
CH
D
RA
W
IN
G
EX
HI
BI
T
OR
R
EN
DE
RI
NG
O N
TH
IS
D
OC
UM
EN
T
AN
D
SH
AL
L N
OT
B
E
RE
MO
VE
D
FR
OM
T
HE
SE
D
OC
UM
EN
TS
Sheet No.:
D1.5
PH
AS
E:
DR
AW
N:
DA
TE
C on su lta nt
Description:
Demolition Building Sections
Jo b
Ti tle
W
. B re va rd
S tre et R en ov at io n Pr oj ec t #
Ph as e:
3.
0%
C on st ru ct io n D oc um en ts
C lie nt
C ity o f T al la ha ss ee Ta lla ha ss ee
, F lo rid a
Se al
Z :\2
B
IM
B lu ep rin t C
O T
C on tin ui ng S er vi ce s\
3.
B
IM
B re va rd S tr ee t\M od el \2
.6 B re va rd S tr ee t.p ln
4:
P M
Architects Lewis + Whitlock 206 West Virginia St.
Tallahassee, Florida 32301…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .