PREPROPOSAL_Q&A_7_10_2019.pdf

PDF 17 KB Posted

Attached to
SOLICITATION - 47PF0019R0080 - Operations and Maintenance Services - 3 Locations in the State of Michigan
Solicitation number
3_LOCATION_OM_MI
Issued by

View the file

Other files

File Type Posted
PREPROPOSAL_Q&A_7_9_2019.pdf PDF
47PF0019R0080_0002.pdf PDF
47PF0019R0080_0001.pdf PDF
SECTION_B.pdf PDF
PREPROPOSAL_Q&A_6_19_2019.pdf PDF
PREPROPOSAL_CONFERENCE_AGENDA.pdf PDF
PREPROPOSAL_ATTENDANCE_FORM.pdf PDF
PAST_PERFORMANCE_FORM.docx DOCX document
SEE_EXHIBIT_17_ATTACHMENT_PM_SCHEDULE_GUIDES.pdf PDF
SECTION_B_-_PRICE_SHEET.docx DOCX document
47PF0019R0080__FORM_1_PAGE.pdf PDF
STANDARD_FORM_24.pdf PDF
47PF0019R0080_DATED_5_28_2019.pdf PDF
OM_CONTRACTOR_COST_PROPOSAL_SHEET.xls XLS spreadsheet
SYNOPSIS_REVISED_4_8_2019.pdf PDF
SYNOPSIS_REVISED.pdf PDF
SYNOPSIS.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. General Services Administration

QUESTION AND ANSWERS 3

SOLICITATION 47PF0019R0080

1. Does the non-reimbursable threshold apply when performing repairs on Agency owned equipment?

a. The non-reimbursable repair threshold applies to GSA Owned Equipment.

b. The non-reimbursable repair threshold does not apply to Tenant Owned and

Operated Equipment.

2. Section C.8.5.2 - The paragraph at the end of this section speaks to doing an audit of a CMMS and compare it against the NCMMS yet CMMS has been reserved. Is this paragraph necessary?

a. CMMS is no longer included in this contract, it is expected that the contractor audit the NCMMS system. The contractor is required to use the Government NCMMS and audit the equipment lists and PM’s in NCCMS against what is in the building. This includes inventories and/or PM plans/schedules. The contractor shall make corrections in NCCMS when there are any discrepancies

3. Section C.41.10 - Electrical Safety, Has there been an Arc Flash analysis performed onsite and do all labels reflect this? If not, will the incoming O&M be required to have this analysis performed to come into compliance with C.41.10 and NFPA 70, 70E?

a. No. Arc Flash analysis is not part of the basic services under the contract.

4. Can proposals be emailed directly to hunter.vanhorn@gsa.gov and ronald.sieben@gsa.gov? Is there a size limitation?

a. Yes, this is the preferred method.

b. There is no size limitation that we are aware of.

mailto:hunter.vanhorn@gsa.gov mailto:ronald.sieben@gsa.gov