This is a Request for Information (RFI) document for Fermilab project 2-1-561 WH16 Electric and Elevator Machine Rooms Upgrade, dated November 19, 2026. The RFI provides clarifications and responses to 15 bidder questions regarding contract documents, specifications, and drawings for the upgrade work.

Key scope clarifications include: elevator machinery/equipment work is excluded; penetration firestopping applies to all 1/4-inch to 6-inch wall penetrations, with bidders responsible for conducting field surveys and including contingency allowances; wall and ceiling assemblies are governed by drawing sheet A-05, requiring two layers of 5/8-inch Type X gypsum wallboard for new 2-hour-rated walls and two layers of 1/2-inch Type X for overlay and infill work; medium-weight concrete masonry units (CMU) are required for all fire-rated Type B infill locations per UL 618 ratings; and no three-hour rated wall assemblies are within scope. Additional specifications address exterior CMU waterproof coating requirements, delegated design requirements for ASHRAE 15 refrigerant-concentration calculations for an R-32 variable refrigerant flow (VRF) system with approved-equal product consideration permitted, labor warranty of two years from substantial completion, AC-5 condenser location on the East observation deck roof, steel stair PE-sealed submittals per Section 055119, and removal of flammable storage and waste containers by Fermilab prior to demolition. Multiple specification sections and drawing sheets are amended through Revision 1 Amendment 02 to correct references and clarify requirements, including removal of incorrect references to Section 014000 and Section 078443.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2-1-561 WH16 Electric and Elevator Machine Rooms Upgrade 11/19/2026

RFI # Question Response n/a Exterior CMU Waterproof Coating specification. Refer to revision to specification Section 099100 3.4. page 8. Item 3 was added for Exterior CMU Waterproof Coating. Please see Revision 1 Ammendment 02 for sheet A-05. In addition, please see Revision 1 Ammendment 02 for sheet A-05.

1 Is there any elevator work in this bid? Refer to Statement of Work, project manual, and drawing set. Work will be completed in the Elevator Machine Rooms. Proper pecautions and protection of equipment within rooms are to be made during project.

There is no required work on elevator machinery/equipment for this project.

2 . Penetration firestopping quantity (SOW; A-02/A-03 Note 7): The SOW requires sealing all penetrations 1/4 inch to 6 inch and the drawings state not all penetrations are shown. Can Fermilab provide an approximate penetration count or a survey from a prior project for bidding purposes? If not, will Fermilab confirm that bidders should carry their own field-survey allowance within the lump sum?

FFDG has not performed a comprehensive survey of all wall penetrations and is unable to provide an estimated penetration count for bidding purposes. As noted in the SOW and drawing notes, not all penetrations are indicated on the contract documents.

Bidders should conduct their own review of readily accessible conditions and include an appropriate allowance within their lump sum proposal to address penetration firestopping required by the contract documents. The Contractor shall be responsible for field verification of quantities necessary to complete the work in accordance with the project requirements.

3 . Wall/ceiling assembly basis (A-05 vs SOW): Please confirm the A-05 wall types govern over the SOW narrative:

new 2-hour walls and ceilings at two layers of 5/8 inch Type X GWB (Types A2 and ceiling), upgrade overlay Type A1, and infill Type A at two layers of 1/2 inch Type X.

The Wall types on sheet A-05 govern over the SOW narrative. Refer to drawing set and specifications.

4 . Type C board (Section 092900, 3.3.A.3): Section 092900 references Type C gypsum board, which is not defined in Part 2 of that section.

Where is Type C board required, and what product/standard defines it?

Refer to Sheet G-04- This sheet is for reference only. This sheet references the wall construction for the elevator machine room construction project from 1996. As noted on Sheet G-04, existing walls were designed to have "2 layers 1/2" Firecode C on both sides of 3 5/8" metal studs". There was no way to determine if for sure Type "C" board was used. No new work is requiring Type "C" Firecode GWB.

This project is requiring use of Type X GWB. Refer to wall types on sheet A-05.

5 . CMU weight (Section 042000): Section 042000 defaults to normal-weight CMU (2.2.A.1) but bases the fire rating on medium-weight units per UL 618 (1.2.C.3). Which unit weight is required for the rated (Type B) infill?

The rated Type B infill shall utilize medium-weight CMU. The reference to normal-weight CMU in Section 2.2.A.1 is a general material requirement; however, the fire-resistance requirements of Section 1.2.C govern for this application. Since the detail requires restoration of the existing 2-hour-rated wall and the specified CMU fire rating is based on medium-weight units per UL 618, provide medium-weight CMU for all fire-rated infill locations Please see the amended specification section 042000 2.2A.3 page 3.

6 . Fire dampers (G-02 Note 6): G-02 Note 6 states existing improperly installed fire dampers at modified shaft connections should be replaced.

No damper product or section is specified. (a) Is damper replacement included in this subcontract's scope? (b) If so, how many dampers, of what type/rating, and under which specification section?

There are no shaft walls in this project scope of work. No ductwork is being installed. Please refer to mechanical drawings and mechanical specifications for more information.

7 . Joint firestopping (Section 238129, 3.13): Section 238129 references Section 078443 (Joint Firestopping), which does not appear in the Project Manual. Is joint firestopping required beyond Section 078413, and if so, under what requirements?

Specification Revision: Replace the attached page of Section 23 81 29 in its entirety. The reference to Section 07 84 43 - Joint Firestopping has been removed. Firestopping requirements shall be in accordance with SECTION 078413 - PENETRATION

FIRESTOPPING

Please see the amended specification section 238129 3.13 page 32

8 . Or-equal (M-0 vs Section 238129, 2.2.A): The M-0 schedules state an equal may be submitted with Fermilab approval, while Section 238129 names Trane Inc. as the only manufacturer. Will Fermilab consider an approved-equal VRF system, or is Trane/Mitsubishi City Multi mandatory?

Fermilab will consider an approved equal.

9 . Warranty labor (Section 238129, 1.9): Section 238129 states the labor warranty as '2 10 year(s),' which is unclear.

Please confirm the required labor warranty period (compressor and parts are stated as 10 years).

Referenced line 1.9.A.2.c should read: “c. For Labor: 2 year(s) from date of Substantial Completion.” Referenced lines “1.9.A.2.a” and “1.9.A.2.b” are correct as written.

10 . Condenser location (M-01 vs E-01): M-01 and the SOW place AC-5 on the west roof; an E-01 callout references a new condenser near the East Observation Deck roof. Please confirm AC-5's location is the west roof as shown on M-01.

The AC-5 condensor is to be located on the East observation deck roof.

11 . ASHRAE 15 (Section 238129, 2.1.A.2): The delegated-design requirements include ASHRAE 15 refrigerant-concentration calculations for the R-32 system. Has Fermilab determined whether mechanical ventilation or refrigerant gas detection will be required in any of the four rooms, or is that determination entirely the subcontractor's PE's?

Fermilab has utilized the specified equipment manufacturer to perform the ASHRAE 15 calculations. It is up to the subcontractor to verify with the equipment manufacturer that these calculations are revised to account for any deviations due to field conditions (i.e.

if pipe routing in the field requires additional pipe length that translates to additional system volume, how does that affect the ASHRAE 15 calculations?).

12 . 3-hour tags (G-02/A-02/A-03): The drawing legend includes F-3HR designations. Please confirm no 3-hour assembly is within this scope and that all rated work is 2-hour (with 90-minute doors) as described in the SOW.

There are no three (3) hour rated walls in this scope of work. Sheet G-02 notes exterior walls that are F-3HR, but these are not in scope- this is for information only. There are no F-3HR designations noted on sheets A-02 nor A-03.

13 . Missing sheet (A-05): A-05 references Sheet A-09, which is not in the issued drawing set. Is a Sheet A-09 forthcoming by amendment, or should the reference be disregarded?

No Sheet A-09 exists for this project and no amendment is anticipated to add Sheet A-09. The reference on Sheet A-05 is in error and should be disregarded. Existing wall conditions are represented by Wall Type EX on Sheet A-05.

Please see Revision 1 Ammendment 02 for sheet A-05.

14 . Paint booth contents (AD keynotes D13–D18): D18 assigns relocation of paint booth filters/pavers to Fermilab.

Please confirm the disposition of the flammables storage cabinet and oily-waste can currently in front of the booth (observed Nov 18): removed by Fermilab before demolition, or by the subcontractor?

Fermilab will remove flammable storage cabinet and oil waste can adjacent to existing Paint Booth.

15 . Stair (A-03 Detail 4 / Section 055119): Section 055119 requires PE delegated design for the steel stair and cites Section 014000, which does not appear in the manual (the quality section is 014100). Please confirm the stair submittal requirements are as stated in 055119 notwithstanding the reference.

The reference to Section 014000 in Section 055119 is incorrect. Refer to Section 014100, Quality Requirements. Delegated design and PE-sealed submittals shall be provided as specified in Section 055119.

Please see the amended specification section 055119 2.1.A page 2.