About this file

This document includes a pricing plan spreadsheet and pre-solicitation notice for an underground utilities replacement construction project. The Department of Veterans Affairs will solicit proposals and award a firm-fixed-price contract to provide all necessary labor, equipment, materials, and infrastructure work to replace underground sanitary sewer, storm sewer, water, and steam systems at the White River Junction VAMC campus in Vermont. The pre-solicitation notice provides additional details including a project description, administrative information, and magnitude of construction between $5-10 million. The solicitation will be issued as a tiered evaluation set-aside for SDVOSB, VOSB, HUBZone, 8(a), or small business concerns. The period of performance is approximately 545 days from notice to proceed. The pricing plan spreadsheet includes line items for general requirements, mobilization, restoration, utility demolition and replacement, and identifies a base bid CLIN and optional CLIN for additional rock removal up to $45,000.

36E77620R0012 S02 - Attachment 7 - Pricing Schedule.xlsx

View the file

Other files for this federal contract opportunity

Other files attached to Tiered Evaluation Pre-Solicitation Notice White River Junction Replace Underground Utilities Construction Project, newest first.
File Type Posted
36E77620R0012-0006001.docx DOCX document
36E77620R0012-0006000.docx DOCX document
36E77620R0012-0005001.pdf PDF
36E77620R0012-0005000.docx DOCX document
36E77620R0012-0004000.docx DOCX document
36E77620R0012-0003001.doc DOC document
36E77620R0012-0003000.docx DOCX document
36E77620R0012-0002002.pdf PDF
36E77620R0012-0002001.pdf PDF
36E77620R0012-0002004.xlsx XLSX spreadsheet
36E77620R0012-0002003.pdf PDF
36E77620R0012-0002000.docx DOCX document
36E77620R0012-0001004.pdf PDF
36E77620R0012-0001003.pdf PDF
36E77620R0012-0001002.pdf PDF
36E77620R0012-0001001.pdf PDF
36E77620R0012-0001000.docx DOCX document
36E77620R0012-098.pdf PDF
36E77620R0012-101.pdf PDF
36E77620R0012-099.pdf PDF
36E77620R0012-100.pdf PDF
36E77620R0012-095.docx DOCX document
36E77620R0012-096.doc DOC document
36E77620R0012-102.docx DOCX document
36E77620R0012-097.pdf PDF
36E77620R0012-103.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Aug 20 Pricing Plan

Line Description Water Steam Storm Sewer

Qty (Ea or LF or LumpsumMaterialLaborEquipmentQty (Ea or LF or LumpsumMaterialLaborEquipmentQty (Ea or LF or LumpsumMaterialLaborEquipmentQty (Ea or LF or LumpsumMaterialLaborEquipment
General Requirements1 Ea1 Ea1 Ea1 Ea
Mobilization/Demobilization1 Ea1 Ea1 Ea1 Ea
Restoration (Loam and Seed or Pavement)
Soil Offsite Disposal
Remove Ledge
Remove and Replace ACP
Disposal of ACP
Remove Dispose of Old Water Line-valves box
Install New 8" DOP Water Line
Tap in to State Line at North Hartland Rd
Exercise & Maintain Valves
Maintain Hydrants
Hydrant & Valve Repairs
Steam Carrier Pipe (Building B-2 to B-37)
Steam Carrier Pipe (Building B-28 to B-4)
Steam Carrier Pipe (Building B-4 to B-6)
Steam Carrier Pipe (Building B-6 to B-7)
Demolition & Hazmat of existing Carrier Pipe
Remove & Replace VCP, CMP & CIP
Remove & Replace RCP
Pipe Bursting
Rehabilitate Catch Basins & Manholes
Remove & Replace Catch Basins & Manholes
Replace ACP with Pipe Bursting
Rehabilitate Manholes
Remove & Replace Manholes
New Manholes
Clean Sewer Pipe
Subtotal
O&P
Bond
CLIN 1Base Bid: Summary Total (total of all columns)
CLIN 2Option: Necessary Removal of Additional Underground Rock Ledge$45,000

CLIN 0001: Base Bid Offer: Provide all labor, materials, equipment, transportation, supervision, general demolition, general construction, alterations, earthwork and restoration, testing and commissioning and certain other items for the Underground Utilities Replacement at the White River Junction VAMC in White River Junction, VT with the terms, conditions, specifications, drawings for Project 405-15-101 and applicable wage rates as incorporated. The project scope includes but is not limited to complete preparation of site for building operations, including demolition, earthwork, utility systems of sanitary sewer; storm sewer, including inlets and outlets; water; and steam and certain other items, as required by drawings and specifications. Work effort is to include maintaining vehicular and pedestrian access for WRJ VA Medical Center personnel at all times unless coordinated ahead of time for necessary site work included in this contract.

CLIN 0001: $__________________________________

CLIN 0002: Necessary Removal of Additional Underground Rock: Provide for all removal and proper disposal of additional rock ledge. If the amount of additional rock ledge removal exceeds the Not to Exceed (NTE) amount, the contractor must notify the Contracting Officer before proceeding. If the amount of additional rock ledge removal is less than the NTE amount or none is required, a credit to the government will be provided for any remaining amount.

CLIN 0002: NTE $45,000.00

NOTICE
1.CLIN 0001 contains all of the work for the project. CLIN 0002 contains work for additional rock ledge removal.
2.Offerors must provide must complete the table shown under the Price Schedule.
3.Any reference in the specification to Add/Deduct Item No.01 Rock (and/or Ledge) Excavation is included in CLIN 0001, the base bid, up to one-hundred (100) cubic yards.
4.CLIN 0002 is expressed as an NTE amount that will be included in the total evaluated price for each offeror in the amount of $45,000.00.