36E77620R0012-0002004.xlsx
XLSX spreadsheet Posted
- Attached to
- Tiered Evaluation Pre-Solicitation Notice White River Junction Replace Underground Utilities Construction Project Federal contract opportunity
- Solicitation number
- 36E77620R0012
About this file
This document contains a pricing plan and solicitation notice for a federal construction contract. The Department of Veterans Affairs seeks to award a firm-fixed-price contract to provide all labor, materials, equipment and services necessary to complete an underground utilities replacement project at its White River Junction medical center in Vermont. The project scope includes demolition, earthwork, and new utility systems for sanitary sewer, storm sewer, water and steam. Offerors must complete the pricing plan table providing unit pricing for various line items. The solicitation will be issued on December 20, 2019 as a tiered evaluation with priority given to service-disabled veteran-owned small businesses, then veteran-owned small businesses or HUBZone small businesses/8(a) participants, and finally other small businesses. The period of performance is approximately 545 calendar days from notice to proceed, and the magnitude of construction is estimated between $5-10 million.
36E77620R0012 0002 S02 - Attachment 7 - Pricing Schedule.xlsx
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Aug 20 Pricing Plan
Line Description Water Steam Storm Sewer
| Qty (Ea or LF or Lumpsum | Material | Labor | Equipment | Qty (Ea or LF or Lumpsum | Material | Labor | Equipment | Qty (Ea or LF or Lumpsum | Material | Labor | Equipment | Qty (Ea or LF or Lumpsum | Material | Labor | Equipment | |
| General Requirements | 1 Ea | 1 Ea | 1 Ea | 1 Ea | ||||||||||||
| Mobilization/Demobilization | 1 Ea | 1 Ea | 1 Ea | 1 Ea | ||||||||||||
| Restoration (Loam and Seed or Pavement) | ||||||||||||||||
| Soil Offsite Disposal | ||||||||||||||||
| Remove Ledge | ||||||||||||||||
| Remove and Replace ACP | ||||||||||||||||
| Disposal of ACP |
| Remove Dispose of Old Water Line-valves box |
| Install New 8" DOP Water Line |
| Tap in to State Line at North Hartland Rd |
| Exercise & Maintain Valves |
| Maintain Hydrants |
| Hydrant & Valve Repairs |
| Steam Carrier Pipe (Building B-2 to B-37) |
| Steam Carrier Pipe (Building B-28 to B-4) |
| Steam Carrier Pipe (Building B-4 to B-6) |
| Steam Carrier Pipe (Building B-6 to B-7) |
| Demolition & Hazmat of existing Carrier Pipe |
| Remove & Replace VCP, CMP & CIP |
| Remove & Replace RCP |
| Pipe Bursting |
| Rehabilitate Catch Basins & Manholes |
| Remove & Replace Catch Basins & Manholes |
| Replace ACP with Pipe Bursting |
| Rehabilitate Manholes |
| Remove & Replace Manholes |
| New Manholes |
| Clean Sewer Pipe |
| Subtotal |
| O&P |
| Bond |
| CLIN 1 | Base Bid: Summary Total (total of all columns) | ||
| CLIN 2 | Option: Necessary Removal of Additional Underground Rock Ledge | $45,000 | |
| CLIN 3 | Asbestos Cost | $25,000 |
CLIN 0001: Base Bid Offer: Provide all labor, materials, equipment, transportation, supervision, general demolition, general construction, alterations, earthwork and restoration, testing and commissioning and certain other items for the Underground Utilities Replacement at the White River Junction VAMC in White River Junction, VT with the terms, conditions, specifications, drawings for Project 405-15-101 and applicable wage rates as incorporated. The project scope includes but is not limited to complete preparation of site for building operations, including demolition, earthwork, utility systems of sanitary sewer; storm sewer, including inlets and outlets; water; and steam and certain other items, as required by drawings and specifications. Work effort is to include maintaining vehicular and pedestrian access for WRJ VA Medical Center personnel at all times unless coordinated ahead of time for necessary site work included in this contract.
CLIN 0001: $__________________________________
CLIN 0002: Necessary Removal of Additional Underground Rock: Provide for all removal and proper disposal of additional rock ledge. If the amount of additional rock ledge removal exceeds the Not to Exceed (NTE) amount, the contractor must notify the Contracting Officer before proceeding. If the amount of additional rock ledge removal is less than the NTE amount or none is required, a credit to the government will be provided for any remaining amount.
CLIN 0002: NTE $45,000.00
| CLIN 0003: Asbestos Related Cost. If the amount of asbestos exceeds the Not to Exceed (NTE) amount, the contractor must notify the Contracting Officer before proceeding. If the amount of asbestos is less than the NTE amount or none is required, a credit to the government will be provided for any remaining amount. | ||
| CLIN 0003: NTE $25,000.00 | ||
| NOTICE | ||
| 1. | CLIN 0001 contains all of the work for the project. CLIN 0002 contains work for additional rock ledge removal. CLIN 0003 contains absestos related cost. | |
| 2. | Offerors must provide must complete the table shown under the Price Schedule. | |
| 3. | Any reference in the specification to Add/Deduct Item No.01 Rock (and/or Ledge) Excavation is included in CLIN 0001, the base bid, up to one-hundred (100) cubic yards. | |
| 4. | CLIN 0002 is expressed as an NTE amount that will be included in the total evaluated price for each offeror in the amount of $45,000.00. |
5. CLIN 0003 is expressed as a NTE amount that will be included in the totla evaluated price for each offeror in the amount of $25,000.00.