36E77619R0073-0001004.pdf

PDF 14 MB Posted

Attached to
Minneapolis VAMC Upgrade Pharmacy 18 (VA-19-00063438)
Solicitation number
36E77619R0073
Issued by

About this file

36E77619R0073 0001 Attachment 4 - CD set_618-16-120 Upgrade Pharmacy 18_Part2.pdf

View the file

Other files

File Type Posted
36E77619C0058-000.docx DOCX document
36E77619R0073-0005000.docx DOCX document
36E77619R0073-0005001.pdf PDF
36E77619R0073-0005002.docx DOCX document
36E77619R0073-0004000.docx DOCX document
36E77619R0073-0004001.docx DOCX document
36E77619R0073-0004003.pdf PDF
36E77619R0073-0004002.pdf PDF
36E77619R0073-0003000.docx DOCX document
36E77619R0073-0003001.docx DOCX document
36E77619R0073-0002004.pdf PDF
36E77619R0073-0002000.docx DOCX document
36E77619R0073-0002008.pdf PDF
36E77619R0073-0002010.pdf PDF
36E77619R0073-0002007.pdf PDF
36E77619R0073-0002009.pdf PDF
36E77619R0073-0002006.pdf PDF
36E77619R0073-0002001.pdf PDF
36E77619R0073-0002003.pdf PDF
36E77619R0073-0002005.pdf PDF
36E77619R0073-0002002.pdf PDF
36E77619R0073-0001007.pdf PDF
36E77619R0073-0001006.xlsx XLSX spreadsheet
36E77619R0073-0001000.docx DOCX document
36E77619R0073-0001001.pdf PDF
36E77619R0073-0001002.pdf PDF
36E77619R0073-0001003.pdf PDF
36E77619R0073-0001005.pdf PDF
36E77619R0073-012.docx DOCX document
36E77619R0073-007.pdf PDF
36E77619R0073-008.zip ZIP file
36E77619R0073-011.docx DOCX document
36E77619R0073-006.pdf PDF
36E77619R0073-014.pdf PDF
36E77619R0073-009.zip ZIP file
36E77619R0073-005.docx DOCX document
36E77619R0073-013.docx DOCX document
36E77619R0073-010.zip ZIP file
36E77619R0073-000.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECHANICAL ABBREVIATIONS

AD AREA DRAIN

A.F.F. ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AHU AIR HANDLING UNIT

ANB ACID NEUTRALIZING BASIN

AP ACCESS PANEL

ARCH ARCHITECT

AS AIR SEPARATOR

BD BUTTERFLY DAMPER

B/G BELOW GRADE

BTU BRITISH THERMAL UNIT

BWV BACKWATER VALVE

CCF HUNDRED CUBIC FEET

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CL CENTER LINE

CLG CEILING

CO CLEAN OUT

CONTR CONTRACTOR

CONV CONVECTOR

CUH CABINET UNIT HEATER

CW COLD WATER

DB DECIBEL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIFF DIFFUSER

DISCH DISCHARGE

DMPR DAMPER

DN DOWN

DR DRAIN

DS DOWNSPOUT

DWG DRAWING

EAT ENTERING AIR TEMPERATURE

EDR EQUIVALENT DIRECT RADIATION

EP ELECTRIC-PNEUMATIC

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

EXP EXPANSION

F FAHRENHEIT

FC FAN COIL

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FHC FIRE HOSE CABINET

FHR FIRE HOSE RACK

FLR FLOOR

FLEX FLEXIBLE

FM FIRE MAIN

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FEET OR FOOT

F&T FLOAT AND THERMOSTATIC

FTG FOOTING

FTR FINNED TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLON

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HB HOSE BIBB

HD HEAD

HOA HANDS-OFF-AUTOMATIC

HTG HEATING

HTR HEATER

HVAC HEATING, VENTILATION,

AND AIR CONDITIONING

HYD HYDRANT

HW HOT WATER

GCO GRADE CLEANOUT

INSUL INSULATION

KW KILOWATT

LAT LEAVING AIR TEMPERATURE

LAV LAVATORY

LWT LEAVING WATER TEMPERATURE

MBH BTU PER HOUR (THOUSANDS)

MCF THOUSAND CUBIC FEET

MH MANHOLE

NC NOISE CRITERIA OR

NORMALLY CLOSED

NEG NEGATIVE

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

ORD OVERFLOW ROOF DRAIN

PD PRESSURE DROP OR DIFFERENCE

PE PNEUMATIC-ELECTRIC

PLBG PLUMBING

PRV

PRESSURE REDUCING VALVE

OR POWER ROOF VENTILATOR

PSIA POUNDS/SQ INCH ABSOLUTE

PSIG POUNDS/SQ INCH GAUGE

PVC POLY VINYL CHLORIDE

RA RETURN AIR

RCP REINFORCED CONCRETE PIPE

RD ROOF DRAIN

RECIRC RECIRCULATING

REG REGISTER

RET RETURN

RH RELATIVE HUMIDITY

RHT REHEAT

RHC REHEAT COIL

RHW RECIRCULATED HOT WATER

RM ROOM

RPM REVOLUTIONS PER MINUTE

RPZ REDUCED ZONE BACKFLOW

PREVENTER

SA SUPPLY AIR

SAN SANITARY

SCFM CFM, STANDARD CONDITIONS

SD SMOKE DAMPER

SP STATIC PRESSURE

SPECS SPECIFICATIONS

SUP SUPPLY

SQ SQUARE

STM STEAM

TD TEMPERATURE DIFFERENCE

TEMP TEMPERATURE

TONS TONS OF REFRIGERATION

T-STAT THERMOSTAT

TYP TYPICAL

UB UP-BLAST

UG UNDERGROUND

UH UNIT HEATER

UR URINAL

V SANITARY VENT

VD VOLUME DAMPER

VEL VELOCITY

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

W SANITARY WASTE

W/ WITH

WC WATER CLOSET

WCO WALL CLEANOUT

WH WALL HYDRANT

W/0 WITHOUT

WTR WATER

PLUMBING

ACID VENT BELOW GRADE

ACID VENT ABOVE GRADE

ACID WASTE BELOW GRADE

ACID WASTE ABOVE GRADE

DEIONIZED WATER

FILTERED WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER (TEMP. INDICATED)

DOMESTIC RECIRC. HOT WATER

HARD COLD WATER

OVERFLOW STORM DRAIN BELOW GRADE

OVERFLOW STORM DRAIN ABOVE GRADE

REVERSE OSMOSIS WATER

SANITARY VENT BELOW GRADE

SANITARY VENT ABOVE GRADE

SANITARY WASTE

SANITARY SEWER

SOIL DRAINAGE TILE

SOFTENED COLD WATER

SOFTENED HOT WATER

TEMPERED WATER

STORM DRAIN BELOW GRADE

STORM DRAIN ABOVE GRADE

WELL WATER

EXISTING PLUMBING TO REMAIN

EXISTING PLUMBING TO BE REMOVED

AV

AV

AW

AW

DI

HARD

SDT

OSD

RO

V

V

SS

W

SOFT

SHW

TW

OSD

SD

SD

WW

MECHANICAL PIPING

BOILER FEED

CHILLED WATER SUPPLY

CHILLED WATER RETURN

COMPRESSED AIR (PSI INDICATED)

CONDENSATE DRAIN

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

FUEL OIL SUPPLY

FUEL OIL RETURN

FUEL OIL VENT

FUEL OIL FILL

GLYCOL SUPPLY

GLYCOL RETURN

HEAT RECOVERY SUPPLY

HEAT RECOVERY RETURN

HEATING WATER SUPPLY

HEATING WATER RETURN

LABORATORY VACUUM

LABORATORY AIR

LIQUIFIED PETROLEUM GAS

NATURAL GAS (PSI INDICATED)

PLANT VACUUM

PUMPED CONDENSATE

RADIATION WATER SUPPLY

RADIATION WATER RETURN

REFRIGERANT LIQUID

BF

CHWS

CHWR

10#A

CD

FOS

LV

GS

GR

HRS

HRR

HWR

HWS

LA

LPG

2#G

FOF

PV

PC

RADS

CS

CR

FOR

FOV

RADR

RL

REFRIGERANT SUCTION

REFRIGERANT HOT GAS BYPASS

REHEAT WATER SUPPLY

REHEAT WATER RETURN

REMOTE RADIATOR SUPPLY

REMOTE RADIATOR RETURN

SECONDARY HEATING WATER SUPPLY

SECONDARY HEATING WATER RETURN

SNOW MELT SUPPLY

SNOW MELT RETURN

STEAM SUPPLY (PSI INDICATED)

STEAM RETURN (PSI INDICATED)

EXISTING PIPING TO REMAIN

RRS

RS

RHG

RHR

RHS

RRR

SHWS

SHWR

SMS

SMR

10#STM

10#R

PLUMBING /PIPING

ELBOW DOWN

PIPE CAP

ELBOW UP

TEE, OUTLET UP

TEE, OUTLET DOWN

CONNECTION, BOTTOM

CONNECTION, TOP

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLEXIBLE CONNECTION

PIPE ANCHOR

ALIGNMENT GUIDE

CHECK VALVE

SHUTOFF VALVE

PLUG VALVE

COMBINATION BALANCE VALVE

AND FLOW METER

STRAINER

STRAINER W/BLOWDOWN

CAP AND VALVE

PRESSURE REDUCING VALVE

(SETTING AS NOTED, PSI)

MEDICAL GAS

MEDICAL VACUUM

WASTE ANESTHETIC GAS DISPOSAL

CARBON DIOXIDE

OXYGEN

NITROGEN

NITROUS OXIDE

MEDICAL AIR

WAGD

CO2

O

N

MV

N2O

MA

CONTROLS

AQUA STAT

TAMPERPROOF THERMOSTAT

HUMIDISTAT OR R.H. SENSOR

REFRIGERANT SENSOR

SMOKE DETECTOR

SPACE TEMPERATURE SENSOR

STATIC PRESSURE SENSOR

DUCTWORK

SUPPLY AIR

RETURN AIR

EXHAUST AIR

STANDARD BRANCH, NO SPLITTER -

SUPPLY FLOW TO RIGHT -

RETURN/EXHAUST FLOW TO LEFT

BELLMOUTH WITH BALANCING

DAMPER

FLEXIBLE DUCT

TURNING VANES

FLEXIBLE CONNECTION

MANUAL VOLUME DAMPER

MOTORIZED DAMPER

FIRE DAMPER & ACCESS

PANEL

SMOKE DAMPER &

ACCESS PANEL

COMBINATION FIRE/SMOKE

DAMPER & ACCESS PANEL

SUPPLY GRILLE OR REGISTER

T

T

P P

ROOM PRESSURE

MONITOR

H

R

SD

TS

SP

T THERMOSTAT

THERMOSTAT W/GUARDT

EXPANSION JOINT

AUTOMATIC CONTROL VALVE, 2-WAY

AUTOMATIC CONTROL VALVE, 3-WAY

AUTOMATIC AIR VENT

MANUAL AIR VENT

PRESSURE RELIEF/SAFETY

VALVES(SETTING AS NOTED, PSI)

DRAIN VALVE

BALL VALVE

BUTTERFLY VALVE

GLOBE ANGLE VALVE

0. S.& Y. VALVE

REDUCED PRESSURE ZONE

BACK FLOW PREVENTER

SOLENOID VALVE

FLOW LIMITING VALVE

DIAPHRAGM

GLOBE VALVE

REFRIGERANT SIGHT GLASS

GAS PRESSURE REGULATOR VALVE

BACKWATER VALVE

REFRIGERANT DRYER

FLOW DIRECTION

FLOW DIRECTION W/PITCH

DUPLEX STRAINER

PIPE UNION

PIPE FLANGE

PUMP

THERMOMETER

PRESSURE/TEMPERATURE TEST PORT

STEAM TRAP (TYPE INDICATED)

FLOW MEASURING STATION

(FLOW INDICATED)

FLOW SWITCH

PRESSURE GAUGE W/PIGTAIL &

PETCOCK

PRESSURE SWITCH

SHOCK ABSORBER

ELBOW

FLOOR DRAIN

DRAIN ABOVE

FLOOR SINK

WALL HYDRANT

HOSE BIBB

TEE

WALL CLEANOUT

ROOF DRAIN

CATCH BASIN

MANHOLE

HB

RETURN DUCT UP, NEGATIVE

PRESSURE

SUPPLY DIFFUSER/REGISTER

BLANKOFF INDICATED

RETURN OR EXHAUST GRILLE

OR REGISTER

SUPPLY DUCT UP, POSITIVE

PRESSURE

EXHAUST DUCT UP, NEGATIVE

PRESSURE

RETURN GRILLE/REGISTER

EXHAUST GRILLE/REGISTER

LINEAR DIFFUSER

CONCENTRIC DUCT TRANSITION

ECCENTRIC DUCT TRANSITION

RECTANGULAR-TO-ROUND DUCT

TRANSITION

VAV BOX

REHEAT COIL

VAV BOX W/REHEAT COIL

DUCT OFFSETS

DUCT CUTLINE

M

FD

VERTICALHORIZONTAL

FD

SD

VERTICAL

VERTICALHORIZONTAL

FSD FSD

RETURN DUCT DN, NEGATIVE

PRESSURE

SUPPLY DUCT DN, POSITIVE

PRESSURE

EXHAUST DUCT DN, NEGATIVE

PRESSURE

DROPRISE

FIRE PROTECTION

DFP

F FIRE PROTECTION

FIRE PROTECTION (DRY SYSTEM)

POST INDICATOR VALVE (PIV)

FIRE HYDRANT WITH SHUTOFF VALVE

RECESSED FIRE DEPT CABINET

SURFACE MOUNTED FIRE DEPT CABINET

FIRE PROTECTION RISER

UPRIGHT SPRINKLER HEAD W/GUARD

PENDANT SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

SIDEWALL SPRINKLER HEAD

BUTTERFLY VALVE W/TAMPER SWITCH

DETECTOR CHECK W/BYPASS METER

GRADE FIRE DEPT CONNECTION

FLUSH FIRE DEPT CONNECTION

FIRE DEPT VALVE W/CAP AND CHAIN

O.S. & Y. VALVE W/TAMPER SWITCH

DRY PIPE VALVE

PREACTION VALVE

GPM

AM

S

FS

PS

TS

FDVC

FDVC

FDV

TS

SD

HORIZONTAL

GAS COCK VALVE

CLEANOUT

WH

GR GRILLE

VAV VARIABLE AIR VOLUME

VTR VENT THROUGH ROOF

CARBON MONOXIDE SENSORCO

ANNOTATION

(4) A-12"Ø 450

GRILLE, REGISTER, &

DIFFUSER IDENTIFICATION

QUANTITY

CFM

TYPE

SIZE

X X

X X

X X

X X

DETAIL NUMBER

SHEET NUMBER

SECTION NUMBER

SHEET NUMBER

EQUIP DESIGNATION

EQUIP NUMBER

POINT OF CONNECTION, NEW TO EXISTING

POINT OF DISCONNECTION

FTR/RP 01

6'-5"

0.5

HYDRONIC FINNED TUBE

RADIATION & RADIANT

PANEL IDENTIFICATION

TYPE ACTIVE

ELEMENT

LENGTHGPM

EBR 01

6'-5"

ELECTRIC BASEBOARD

RADIATION

IDENTIFICATION

ACTIVE

ELEMENT

LENGTH

ZONE VALVE BOXZVB

AREA ALARM PANELAAP

MASTER ALARM PANELMAP

COMBINATION AREA/MASTER ALARM PANELCAP

NPCW NON-POTABLE COLD WATER

NPHW NON-POTABLE HOT WATER

INV INVERT

RLF RELIEF

FW

HW

CHW

GW GREASE WASTE

ISO ISOLATION EXHAUST

GEXH GREASE EXHAUST

MECHANICAL SYMBOLS LEGEND

EXISTING PIPING TO BE REMOVED

TYPE

DOMESTIC COLD WATERCW

CO2 CARBON DIOXIDE SENSOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

AE PROJECT NUMBER: Dwg. of 78Dunham Project No: 0419950-004

I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

CONSTRUCTION DOCUMENTS

C R e v it P ro je c ts

\1

M p ls P h a rm a c y R e n o

M

E P

R c h a d g .r v t

/5

/2

:2

:5

A

M

1361-M000

MECHANICAL TITLE SHEET UPGRADE PHARMACY 18

MINNEAPOLIS, MN

618-16-120

06/04/2019 JG SAProject Number 30

06/04/2019

MECHANICAL SHEET LIST

SHEET

NUMBER SHEET NAME

M000 MECHANICAL TITLE SHEET

MD101 LOWER LEVEL HVAC DEMOLITION PLAN

MD102 LOWER LEVEL INTERSTITIAL HVAC DEMOLITION PLAN

MD103 LOWER LEVEL INTERSTITIAL HYDRONIC DEMOLITION PLAN

MD131 THIRD LEVEL HVAC DEMOLITION PLANS

MD151 PENTHOUSE HVAC DEMOLITION PLAN - SHAFT #2

M101 LOWER LEVEL HVAC PLAN

M102 LOWER LEVEL INTERSTITIAL HVAC PLAN

M103 LOWER LEVEL INTERSTITIAL HYDRONIC PLAN

M131 THIRD LEVEL HVAC PLANS

M151 PENTHOUSE PRE-CONSTRUCTION MECHANICAL PLAN - SHAFT #2

M152 PENTHOUSE MECHANICAL PLAN - SHAFT #2

M153 PENTHOUSE MECHANICAL PLAN - SHAFT #7

M501 MECHANICAL PLANS - SHAFT #7

M502 MECHANICAL DETAILS

M601 MECHANICAL SCHEDULES AND OPERATION SEQUENCES

M602 MECHANICAL ELELCTRICAL SCHEDULES

M603 MECHANICAL ELELCTRICAL SCHEDULES

PD101 UNDERFLOOR PLUMBING DEMOLITION PLAN

PD102 LOWER LEVEL PLUMBING DEMOLITION PLAN

PD103 LOWER LEVEL INTERSTITIAL PLUMBING DEMOLITION PLAN

PD131 THIRD LEVEL PLUMBING DEMOLITION PLANS

P101 UNDERFLOOR PLUMBING PLAN

P102 LOWER LEVEL PLUMBING AND FIRE PROTECTION PLAN

P103 LOWER LEVEL INTERSTITIAL PLUMBING PLAN

P131 THIRD LEVEL PLUMBING PLANS

P500 PLUMBING RISERS DIAGRAMS

P501 PLUMBING RISERS DIAGRAMS

P600 PLUMBING DETAILS AND SCHEDULES

SHEET TOTAL: 29

Signature

Name

Date

Registration Number

Jason R. Gottwalt, P.E.

41360Revisions: Date:

KEY NOTES:

GENERAL NOTES:

T

T

T

T

T

T T

T

TT

T

T

T

T

TT

T

TT

T

T

T

T

T

1 1

1 1

T

T

T

DD CC BB Z Y X W V

AA

BA-108

CB79CB81

CB78

CB16

BR-118

BR-119A

BR-119

BR-122

BR-122A

BR-121

BR-120

BR-82

BR-123 BR-124

BR-113

BR-125

BR-126 BR-127

BR-128

BR-129

BR-130

BR-131

BR-115 BR-114

BR-116

BR-118A

BR-117A

BR-117B

BR-117

BR-102

BR-101

BR-113A

BR-113B

BR-103

BR-104

BR-112

CB58

DD CC BB Z Y X W VAA

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

MECHANICAL CONTRACTOR SHALL REFER TO THE VA MASTER

SPECIFICATION MANUAL EDITED FOR THIS PROJECT ALONG WITH ANY

APPLICABLE STANDARDS WITHIN THE 2017 HVAC DESIGN MANUAL. ALL

REQUIREMENTS OF THOSE MANUALS SHALL BE MAINTAINED IN ADDITION

TO ALL NOTES AND DESCRIPTIONS INDICATED WITHIN THESE

DRAWINGS. ANY CONFLICTS BETWEEN THOSE DOCUMENTS SHOULD BE

BROUGHT TO THE ATTENTION OF THE ENGINEER FOR INTERPRETATION.

MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO REVIEW

ACCESSIBILITY TO AREAS OUTSIDE THE CONSTRUCTION LIMITS TO

DETERMINE APPROXIMATE AMOUNT OF OVERTIME REQUIRED TO

PERFORM ALL MECHANICAL WORK INDICATED. COORDINATION OF

SCHEDULES WITH ADJACENT DEPARTMENTS AND CLEANING OF ALL

DEBRIS AFTER EACH WORK SHIFT SHOULD BE ASSUMED IN THE BASE

BID.

ANY MAJOR VENTILATION OUTAGES INDICATED ON THESE DRAWINGS

SHALL BE SCHEDULED TO BE PERFORMED AFTER NORMAL BUSINESS

HOURS OR DURING WEEKEND PERIODS TO MINIMIZE DISRUPTION. VA

HOSPITAL FACILITIES WILL REQUIRE A MINIMUM OF TWO(2) WEEKS

NOTICE PRIOR TO ANY SUCH OUTAGE AFFECTING MORE THAN ONE

ADJACENT AREA.

COORDINATE ALL NEW DUCTWORK ROUTING WITH ALL OTHER TRADES

TO INSURE ADEQUATE CLEARANCES FOR PLUMBING, ELECTRICAL

CONDUIT, STRUCTURAL SUPPORTS, PIPING, ETC. ANY UNAVOIDABLE

CONFLICTS SHALL BE BROUGHT THE ATTENTION OF THE

ARCHITECT/ENGINEER OF RECORD. PROVIDE ALL OFFSETS AND

TRANSITIONS AS REQUIRED FOR A CLEAN INSTALLATION.

THE EXACT LOCATION OF EQUIPMENT ROUGH-INS SHALL BE VERIFIED

WITH THE STAMPED APPROVED SHOP DRAWINGS PRIOR TO ANY FIELD

INSTALLATION.

SUPPORT ALL DUCTWORK DIRECTLY TO STRUCTURE. DO NOT SUPPORT

ANY DUCTS FROM DUCTWORK, CONDUIT, OR OTHER PIPING

ENCOUNTERED.

WHERE MECHANICAL SYSTEMS TO REMAIN ARE DAMAGED, OR

DISTURBED, DURING THE COURSE OF CONSTRUCTION THE

CONTRACTOR WILL BE RESPONSIBLE TO REMOVE DAMAGED PORTIONS

AND INSTALL NEW PRODUCTS OF EQUAL QUALITY AND FUNCTIONALITY.

ALL EXISTING DUCTWORK THROUGH NEW FIRE RATED WALLS SHALL BE

ADEQUATELY FIRE SEALED AS REQUIRED. PIPING PENETRATIONS

THROUGH INTERSTITIAL FLOOR SHALL BE DRILLED, OR CUT, BY THE

CONTRACTOR AND FIRE SEALED AS REQUIRED.

THE MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN

EACH PROJECT SPACE IN A NEGATIVE PRESSURIZATION AND PROVIDE

HEPA FILTRATION UNITS AS REQUIRED BY INFECTION CONTROL. IF

NECESSARY CONSULT WITH VA, OR ENGINEER OF RECORD, FOR

SUGGESTED METHODS THAT MAY BE UTILIZED TO ELIMINATE

CONTAMINATED AIR TO OUTSIDE. VISUAL PRESSURIZATION INDICATORS

SHALL BE PROVIDED AT EACH ENTRANCE TO THE CONSTRUCTION ZONE

AND MONITORED DAILY TO INSURE A CONSTANT NEGATIVE PRESSURE

IS MAINTAINED THROUGHOUT EACH PHASE. COORDINATE

PRESSURIZATION PLANNING WITH VA FACILITIES AND INFECTION

CONTROL REPRESENTATIVE PRIOR TO EACH CONSTRUCTION PHASE.

ALL EXISTING RETURN/EXHAUST DUCTWORK NOT TEMPORARILY

CAPPED SHALL BE PROTECTED WITH REMOVABLE FILTER MEDIA TO

PROTECT EXISTING DUCT SYSTEMS FROM CONSTRUCTION DEBRIS. ALL

NEW DUCTWORK SHALL BE PROTECTED AS REQUIRED AND CLEANED

PRIOR TO START-UP. IF CONSTRUCTION DEBRIS IS FOUND INSIDE

UNPROTECTED DUCTWORK THAN DUCT CLEANING OF THE ENTIRE

SYSTEM SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE.

ALL WORK OUTSIDE THE PROTECTED PROJECT BOUNDARIES ABOVE

EXISTING CEILING SHALL BE COMPLETED WITH CEILINGS REPLACED IN

THE SAME DAY UNLESS FULLY COORDINATED THROUGH INFECTION

CONTROL. CLEAN AREA TO ORIGINAL CONDITION ON COMPLETION.

CONTRACTOR TO INSTALL TEMPORARY BARRIERS FOR EACH PROJECT

PHASE AND/OR AREA. THESE BARRIERS SHALL BE COORDINATED WITH

VA HOSPITAL AND, IN MOST CASES, CONTAIN SOME FORM OF AIRLOCK

VESTIBULE PRIOR TO ENTERING THE CONSTRUCTION AREA.

FLUTTER STRIPS OR AIR PRESSURE GAUGES SHALL BE PROVIDED AT

THE ENTRANCES TO EACH CONSTRUCTION AREA. ALL CONTRACTED

WORKERS SHALL BE TRAINED TO VISUALLY MONITOR THESE DEVICES

FOR ADEQUATE NEGATIVE PRESSURIZATION AS THEY ENTER/EXIT THE

CONSTRUCTION AREA. DAILY LOGS SHALL BE KEPT BY THE

MECHANICAL CONTRACTOR TO INSURE CONSTANT PRESSURIZATION

HAS BEEN MAINTAINED.

NEGATIVE PRESSURIZATION SHALL BE MAINTAINED IN EACH

CONSTRUCTION AREA. IF LOCATED ON AN EXTERIOR WALL FANS

SHOULD BE UTILIZED TO EXHAUST AIR DIRECTLY OUT A NEARBY

WINDOW, TAKING PRECAUTIONS TO NOT INTERFERE WITH EXISTING

BUILDING AIR INTAKES, PUBLIC AREAS, ETC. IF NO EXTERIOR WALL IS

AVAILABLE THEN NEGATIVE AIR MACHINES WITH INTERNAL FILTRATION

SHALL BE PROVIDED AND CONNECTION TO THE NEAREST EXHAUST OR

RETURN DUCT AVAILABLE (CONTACT ENGINEER TO VERIFY EXISTING

DUCTWORK CAPACITY PRIOR TO EXHAUST CONNECTION).

2 REMOVE ALL EXISTING DIFFUSERS AND/OR GRILLES WITH

ASSOCIATED DUCTWORK UP TO INTERSTITIAL SPACE ABOVE, TYPICAL

WITHIN THIS OUTLINED AREA.

REMOVE EXISTING THERMOSTAT.

3 REMOVE EXISTING INLINE FAN WITH ASSOCIATED DUCTWORK.

4 REMOVE EXISTING COIL WITH ASSOCIATED PIPING. TERMINATE AT

EXISTING ISOLATION VALVE (IF AVAILABLE) OR REMOVE COMPLETELY

TO MAIN AND APPLY PIPING CAP.

PLAN

NORTH

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

AE PROJECT NUMBER:

KEY PLAN

BUILDING 70

Dwg. of 78Dunham Project No: 0419950-004

I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

CONSTRUCTION DOCUMENTS

C R e v it P ro je c ts

\1

M p ls P h a rm a c y R e n o

M

E P

R c h a d g .r v t

/5

/2

:2

:3

A

M

1361-MD101

LOWER LEVEL HVAC DEMOLITION

PLAN

UPGRADE PHARMACY 18

MINNEAPOLIS, MN

618-16-120

06/04/2019 JG SAProject Number 31

06/04/2019

1/8" = 1'-0"

BASMENT LEVEL HVAC DEMOLITION PLAN

Signature

Name

Date

Registration Number ø

30ø ø

28ø

18ø

18ø

24ø

18ø

18ø

26ø

/8 ø ø ø

30ø

30ø18ø

18ø

CAP

CAP

CAP

CAP CAP

CAP

26ø

CAP

26ø 30ø

30ø

26ø

24ø ø 8 ø ø ø

26ø

26ø

26ø

30ø

/8 ø

CAP

ø ø

CAP

CAP

ø

CAP

CAP

ø ø

8ø ø ø

12ø

16ø

CAP

ø

52/14

CAP

32/45

28ø

30ø

45/32

/1

30ø ø ø ø ø ø ø ø ø ø ø

/8

/8 ø ø8 ø

12/8 ø

10ø ø ø ø

12/8 ø ø ø

8ø ø ø ø ø ø1 ø

8ø

SHAFT #2

DD CC BB Z Y X W VAA

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

MECHANICAL CONTRACTOR SHALL REFER TO THE VA MASTER

SPECIFICATION MANUAL EDITED FOR THIS PROJECT ALONG WITH ANY

APPLICABLE STANDARDS WITHIN THE 2017 HVAC DESIGN MANUAL. ALL

REQUIREMENTS OF THOSE MANUALS SHALL BE MAINTAINED IN ADDITION

TO ALL NOTES AND DESCRIPTIONS INDICATED WITHIN THESE

DRAWINGS. ANY CONFLICTS BETWEEN THOSE DOCUMENTS SHOULD BE

BROUGHT TO THE ATTENTION OF THE ENGINEER FOR INTERPRETATION.

MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO REVIEW

ACCESSIBILITY TO AREAS OUTSIDE THE CONSTRUCTION LIMITS TO

DETERMINE APPROXIMATE AMOUNT OF OVERTIME REQUIRED TO

PERFORM ALL MECHANICAL WORK INDICATED. COORDINATION OF

SCHEDULES WITH ADJACENT DEPARTMENTS AND CLEANING OF ALL

DEBRIS AFTER EACH WORK SHIFT SHOULD BE ASSUMED IN THE BASE

BID.

ANY MAJOR VENTILATION OUTAGES INDICATED ON THESE DRAWINGS

SHALL BE SCHEDULED TO BE PERFORMED AFTER NORMAL BUSINESS

HOURS OR DURING WEEKEND PERIODS TO MINIMIZE DISRUPTION. VA

HOSPITAL FACILITIES WILL REQUIRE A MINIMUM OF TWO(2) WEEKS

NOTICE PRIOR TO ANY SUCH OUTAGE AFFECTING MORE THAN ONE

ADJACENT AREA.

COORDINATE ALL NEW DUCTWORK ROUTING WITH ALL OTHER TRADES

TO INSURE ADEQUATE CLEARANCES FOR PLUMBING, ELECTRICAL

CONDUIT, STRUCTURAL SUPPORTS, PIPING, ETC. ANY UNAVOIDABLE

CONFLICTS SHALL BE BROUGHT THE ATTENTION OF THE

ARCHITECT/ENGINEER OF RECORD. PROVIDE ALL OFFSETS AND

TRANSITIONS AS REQUIRED FOR A CLEAN INSTALLATION.

THE EXACT LOCATION OF EQUIPMENT ROUGH-INS SHALL BE VERIFIED

WITH THE STAMPED APPROVED SHOP DRAWINGS PRIOR TO ANY FIELD

INSTALLATION.

SUPPORT ALL DUCTWORK DIRECTLY TO STRUCTURE. DO NOT SUPPORT

ANY DUCTS FROM DUCTWORK, CONDUIT, OR OTHER PIPING

ENCOUNTERED.

WHERE MECHANICAL SYSTEMS TO REMAIN ARE DAMAGED, OR

DISTURBED, DURING THE COURSE OF CONSTRUCTION THE

CONTRACTOR WILL BE RESPONSIBLE TO REMOVE DAMAGED PORTIONS

AND INSTALL NEW PRODUCTS OF EQUAL QUALITY AND FUNCTIONALITY.

ALL EXISTING DUCTWORK THROUGH NEW FIRE RATED WALLS SHALL BE

ADEQUATELY FIRE SEALED AS REQUIRED. PIPING PENETRATIONS

THROUGH INTERSTITIAL FLOOR SHALL BE DRILLED, OR CUT, BY THE

CONTRACTOR AND FIRE SEALED AS REQUIRED.

THE MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN

EACH PROJECT SPACE IN A NEGATIVE PRESSURIZATION AND PROVIDE

HEPA FILTRATION UNITS AS REQUIRED BY INFECTION CONTROL. IF

NECESSARY CONSULT WITH VA, OR ENGINEER OF RECORD, FOR

SUGGESTED METHODS THAT MAY BE UTILIZED TO ELIMINATE

CONTAMINATED AIR TO OUTSIDE. VISUAL PRESSURIZATION INDICATORS

SHALL BE PROVIDED AT EACH ENTRANCE TO THE CONSTRUCTION ZONE

AND MONITORED DAILY TO INSURE A CONSTANT NEGATIVE PRESSURE

IS MAINTAINED THROUGHOUT EACH PHASE. COORDINATE

PRESSURIZATION PLANNING WITH VA FACILITIES AND INFECTION

CONTROL REPRESENTATIVE PRIOR TO EACH CONSTRUCTION PHASE.

ALL EXISTING RETURN/EXHAUST DUCTWORK NOT TEMPORARILY

CAPPED SHALL BE PROTECTED WITH REMOVABLE FILTER MEDIA TO

PROTECT EXISTING DUCT SYSTEMS FROM CONSTRUCTION DEBRIS. ALL

NEW DUCTWORK SHALL BE PROTECTED AS REQUIRED AND CLEANED

PRIOR TO START-UP. IF CONSTRUCTION DEBRIS IS FOUND INSIDE

UNPROTECTED DUCTWORK THAN DUCT CLEANING OF THE ENTIRE

SYSTEM SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE.

ALL WORK OUTSIDE THE PROTECTED PROJECT BOUNDARIES ABOVE

EXISTING CEILING SHALL BE COMPLETED WITH CEILINGS REPLACED IN

THE SAME DAY UNLESS FULLY COORDINATED THROUGH INFECTION

CONTROL. CLEAN AREA TO ORIGINAL CONDITION ON COMPLETION.

CONTRACTOR TO INSTALL TEMPORARY BARRIERS FOR EACH PROJECT

PHASE AND/OR AREA. THESE BARRIERS SHALL BE COORDINATED WITH

VA HOSPITAL AND, IN MOST CASES, CONTAIN SOME FORM OF AIRLOCK

VESTIBULE PRIOR TO ENTERING THE CONSTRUCTION AREA.

FLUTTER STRIPS OR AIR PRESSURE GAUGES SHALL BE PROVIDED AT

THE ENTRANCES TO EACH CONSTRUCTION AREA. ALL CONTRACTED

WORKERS SHALL BE TRAINED TO VISUALLY MONITOR THESE DEVICES

FOR ADEQUATE NEGATIVE PRESSURIZATION AS THEY ENTER/EXIT THE

CONSTRUCTION AREA. DAILY LOGS SHALL BE KEPT BY THE

MECHANICAL CONTRACTOR TO INSURE CONSTANT PRESSURIZATION

HAS BEEN MAINTAINED.

NEGATIVE PRESSURIZATION SHALL BE MAINTAINED IN EACH

CONSTRUCTION AREA. IF LOCATED ON AN EXTERIOR WALL FANS

SHOULD BE UTILIZED TO EXHAUST AIR DIRECTLY OUT A NEARBY

WINDOW, TAKING PRECAUTIONS TO NOT INTERFERE WITH EXISTING

BUILDING AIR INTAKES, PUBLIC AREAS, ETC. IF NO EXTERIOR WALL IS

AVAILABLE THEN NEGATIVE AIR MACHINES WITH INTERNAL FILTRATION

SHALL BE PROVIDED AND CONNECTION TO THE NEAREST EXHAUST OR

RETURN DUCT AVAILABLE (CONTACT ENGINEER TO VERIFY EXISTING

DUCTWORK CAPACITY PRIOR TO EXHAUST CONNECTION).

PRIOR TO ANY DEMOLITION, OBTAIN PRE-CONSTRUCTION CFM

READING OF EXISTING DUCT MAIN AT THIS POINT.

2 REMOVE EXISTING VAV BOX WITH ASSOCIATED DUCTWORK.

3 REMOVE EXISTING SIDE-LOADING HEPA FILTER HOUSING. VA WILL

BAG AND REMOVE HEPA FILTER FOLLOWING ALL SAFETY

GUIDELINES. CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING

FILTER HOUSING AND DUCTWORK INDICATED.

PLAN

NORTH

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

AE PROJECT NUMBER:

KEY PLAN

BUILDING 70

Dwg. of 78Dunham Project No: 0419950-004

I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

CONSTRUCTION DOCUMENTS

C R e v it P ro je c ts

\1

M p ls P h a rm a c y R e n o

M

E P

R c h a d g .r v t

/5

/2

:2

:5

A

M

1361-MD102

LOWER LEVEL INTERSTITIAL HVAC

DEMOLITION PLAN

UPGRADE PHARMACY 18

MINNEAPOLIS, MN

618-16-120

06/04/2019 JG SAProject Number 32

06/04/2019

1/8" = 1'-0"

BASMENT FLOOR INTERSTITIAL HVAC DEMOLITION PLAN

Signature

Name

Date

Registration Number

3/4"3/4"

1 1/4" 1 1/4"

/4

/4

/4

H

W R

/4

H

W S

1 1/2" 1 1/2"

H W

R

H

W S

1" HWS

1" HWR

1 1/4" HWR

1 1/4" HWS

/2

/2

1 1/2" 1 1/2"

/4

H

W R

/4

H

W S

CAP1

1 1

CAP

2" C H W

S

2" C H W

R

C H

W S

C H

W R

CAP

CAP

DD CC BB Z Y X W VAA

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

MECHANICAL CONTRACTOR SHALL REFER TO THE VA MASTER

SPECIFICATION MANUAL EDITED FOR THIS PROJECT ALONG WITH ANY

APPLICABLE STANDARDS WITHIN THE 2011 HVAC DESIGN GUIDE. ALL

REQUIREMENTS OF THOSE MANUALS SHALL BE MAINTAINED IN

ADDITION TO ALL NOTES AND DESCRIPTIONS INDICATED WITHIN THESE

DRAWINGS. ANY CONFLICTS BETWEEN THOSE DOCUMENTS SHOULD BE

BROUGHT TO THE ATTENTION OF THE ENGINEER FOR INTERPRETATION.

MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO REVIEW

ACCESSIBILITY TO AREAS OUTSIDE THE CONSTRUCTION LIMITS TO

DETERMINE APPROXIMATE AMOUNT OF OVERTIME REQUIRED TO

PERFORM ALL MECHANICAL WORK INDICATED. COORDINATION OF

SCHEDULES WITH ADJACENT DEPARTMENTS AND CLEANING OF ALL

DEBRIS AFTER EACH WORK SHIFT SHOULD BE ASSUMED IN THE BASE

BID.

ANY MAJOR VENTILATION OUTAGES INDICATED ON THESE DRAWINGS

SHALL BE SCHEDULED TO BE PERFORMED AFTER NORMAL BUSINESS

HOURS OR DURING WEEKEND PERIODS TO MINIMIZE DISRUPTION. VA

HOSPITAL FACILITIES WILL REQUIRE A MINIMUM OF TWO(2) WEEKS

NOTICE PRIOR TO ANY SUCH OUTAGE AFFECTING MORE THAN ONE

ADJACENT AREA.

COORDINATE ALL NEW PIPE ROUTING WITH ALL OTHER TRADES TO

INSURE ADEQUATE CLEARANCES FOR PLUMBING, ELECTRICAL

CONDUIT, STRUCTURAL SUPPORTS, PIPING, ETC. ANY UNAVOIDABLE

CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE

ARCHITECT/ENGINEER OF RECORD. PROVIDE ALL OFFSETS AND

TRANSITIONS AS REQUIRED FOR A CLEAN INSTALLATION.

THE EXACT LOCATION OF EQUIPMENT ROUGH-INS SHALL BE VERIFIED

WITH THE STAMPED APPROVED SHOP DRAWINGS PRIOR TO ANY FIELD

INSTALLATION.

SUPPORT ALL PIPING DIRECTLY TO STRUCTURE. DO NOT SUPPORT ANY

PIPE FROM DUCTWORK, CONDUIT, OR OTHER PIPING ENCOUNTERED.

WHERE MECHANICAL SYSTEMS TO REMAIN ARE DAMAGED, OR

DISTURBED, DURING THE COURSE OF CONSTRUCTION THE

CONTRACTOR WILL BE RESPONSIBLE TO REMOVE DAMAGED PORTIONS

AND INSTALL NEW PRODUCTS OF EQUAL QUALITY AND FUNCTIONALITY.

ALL EXISTING PIPING THROUGH NEW FIRE RATED WALLS SHALL BE

ADEQUATELY FIRE SEALED AS REQUIRED. PIPING PENETRATIONS

THROUGH INTERSTITIAL FLOOR SHALL BE DRILLED, OR CUT, BY THE

CONTRACTOR AND FIRE SEALED AS REQUIRED.

THE MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN

EACH PROJECT SPACE IN A NEGATIVE PRESSURIZATION AND PROVIDE

HEPA FILTRATION UNITS AS REQUIRED BY INFECTION CONTROL. IF

NECESSARY CONSULT WITH VA, OR ENGINEER OF RECORD, FOR

SUGGESTED METHODS THAT MAY BE UTILIZED TO ELIMINATE

CONTAMINATED AIR TO OUTSIDE. VISUAL PRESSURIZATION INDICATORS

SHALL BE PROVIDED AT EACH ENTRANCE TO THE CONSTRUCTION ZONE

AND MONITORED DAILY TO INSURE A CONSTANT NEGATIVE PRESSURE

IS MAINTAINED THROUGHOUT EACH PHASE. COORDINATE

PRESSURIZATION PLANNING WITH VA FACILITIES AND INFECTION

CONTROL REPRESENTATIVE PRIOR TO EACH CONSTRUCTION PHASE.

ALL WORK OUTSIDE THE PROTECTED PROJECT BOUNDARIES ABOVE

EXISTING CEILING SHALL BE COMPLETED WITH CEILINGS REPLACED IN

THE SAME DAY UNLESS FULLY COORDINATED THROUGH INFECTION

CONTROL. CLEAN AREA TO ORIGINAL CONDITION ON COMPLETION.

CONTRACTOR TO INSTALL TEMPORARY BARRIERS FOR EACH PROJECT

PHASE AND/OR AREA. THESE BARRIERS SHALL BE COORDINATED WITH

VA HOSPITAL AND, IN MOST CASES, CONTAIN SOME FORM OF AIRLOCK

VESTIBULE PRIOR TO ENTERING THE CONSTRUCTION AREA.

FLUTTER STRIPS OR AIR PRESSURE GAUGES SHALL BE PROVIDED AT

THE ENTRANCES TO EACH CONSTRUCTION AREA. ALL CONTRACTED

WORKERS SHALL BE TRAINED TO VISUALLY MONITOR THESE DEVICES

FOR ADEQUATE NEGATIVE PRESSURIZATION AS THEY ENTER/EXIT THE

CONSTRUCTION AREA. DAILY LOGS SHALL BE KEPT BY THE

MECHANICAL CONTRACTOR TO INSURE CONSTANT PRESSURIZATION

HAS BEEN MAINTAINED.

NEGATIVE PRESSURIZATION SHALL BE MAINTAINED IN EACH

CONSTRUCTION AREA. IF LOCATED ON AN EXTERIOR WALL FANS

SHOULD BE UTILIZED TO EXHAUST AIR DIRECTLY OUT A NEARBY

WINDOW, TAKING PRECAUTIONS TO NOT INTERFERE WITH EXISTING

BUILDING AIR INTAKES, PUBLIC AREAS, ETC. IF NO EXTERIOR WALL IS

AVAILABLE THEN NEGATIVE AIR MACHINES WITH INTERNAL FILTRATION

SHALL BE PROVIDED AND CONNECTION TO THE NEAREST EXHAUST OR

RETURN DUCT AVAILABLE (CONTACT ENGINEER TO VERIFY EXISTING

DUCTWORK CAPACITY PRIOR TO EXHAUST CONNECTION).

EXISTING VAV BOX WITH ASSOCIATED PIPING TO REMAIN.

REMOVE EXISTING VAV BOX WITH ASSOCIATED PIPING AS INDICATED.

3 REMOVE EXISTING PIPING DOWN TO COIL IN MECHANICAL ROOM ON

FLOOR BELOW.

PLAN

NORTH

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

AE PROJECT NUMBER:

KEY PLAN

BUILDING 70

Dwg. of 78Dunham Project No: 0419950-004

I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

CONSTRUCTION DOCUMENTS

C R e v it P ro je c ts

\1

M p ls P h a rm a c y R e n o

M

E P

R c h a d g .r v t

/5

/2

:2

:1

A

M

1361-MD103

LOWER LEVEL INTERSTITIAL

HYDRONIC DEMOLITION PLAN

UPGRADE PHARMACY 18

MINNEAPOLIS, MN

618-16-120

06/04/2019 JG SAProject Number 33

06/04/2019

1/8" = 1'-0"

BASMENT FLOOR INTERSTITIAL HYDRONIC DEMOLITION PLAN

Signature

Name

Date

Registration Number

KEY NOTES: GENERAL NOTES:

JK

T

T

T

SP

SP

6 6

6 6

JK

K

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

MECHANICAL CONTRACTOR SHALL REFER TO THE VA MASTER

SPECIFICATION MANUAL EDITED FOR THIS PROJECT ALONG WITH ANY

APPLICABLE STANDARDS WITHIN THE 2011 HVAC DESIGN GUIDE. ALL

REQUIREMENTS OF THOSE MANUALS SHALL BE MAINTAINED IN ADDITION

TO ALL NOTES AND DESCRIPTIONS INDICATED WITHIN THESE

DRAWINGS. ANY CONFLICTS BETWEEN THOSE DOCUMENTS SHOULD BE

BROUGHT TO THE ATTENTION OF THE ENGINEER FOR INTERPRETATION.

MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO REVIEW

ACCESSIBILITY TO AREAS OUTSIDE THE CONSTRUCTION LIMITS TO

DETERMINE APPROXIMATE AMOUNT OF OVERTIME REQUIRED TO

PERFORM ALL MECHANICAL WORK INDICATED. COORDINATION OF

SCHEDULES WITH ADJACENT DEPARTMENTS AND CLEANING OF ALL

DEBRIS AFTER EACH WORK SHIFT SHOULD BE ASSUMED IN THE BASE

BID.

ANY MAJOR VENTILATION OUTAGES INDICATED ON THESE DRAWINGS

SHALL BE SCHEDULED TO BE PERFORMED AFTER NORMAL BUSINESS

HOURS OR DURING WEEKEND PERIODS TO MINIMIZE DISRUPTION. VA

HOSPITAL FACILITIES WILL REQUIRE A MINIMUM OF TWO(2) WEEKS

NOTICE PRIOR TO ANY SUCH OUTAGE AFFECTING MORE THAN ONE

ADJACENT AREA.

COORDINATE ALL NEW DUCTWORK ROUTING WITH ALL OTHER TRADES

TO INSURE ADEQUATE CLEARANCES FOR PLUMBING, ELECTRICAL

CONDUIT, STRUCTURAL SUPPORTS, PIPING, ETC. ANY UNAVOIDABLE

CONFLICTS SHALL BE BROUGHT THE ATTENTION OF THE

ARCHITECT/ENGINEER OF RECORD. PROVIDE ALL OFFSETS AND

TRANSITIONS AS REQUIRED FOR A CLEAN INSTALLATION.

THE EXACT LOCATION OF EQUIPMENT ROUGH-INS SHALL BE VERIFIED

WITH THE STAMPED APPROVED SHOP DRAWINGS PRIOR TO ANY FIELD

INSTALLATION.

SUPPORT ALL DUCTWORK DIRECTLY TO STRUCTURE. DO NOT SUPPORT

ANY DUCTS FROM DUCTWORK, CONDUIT, OR OTHER PIPING

ENCOUNTERED.

WHERE MECHANICAL SYSTEMS TO REMAIN ARE DAMAGED, OR

DISTURBED, DURING THE COURSE OF CONSTRUCTION THE

CONTRACTOR WILL BE RESPONSIBLE TO REMOVE DAMAGED PORTIONS

AND INSTALL NEW PRODUCTS OF EQUAL QUALITY AND FUNCTIONALITY.

ALL EXISTING DUCTWORK THROUGH NEW FIRE RATED WALLS SHALL BE

ADEQUATELY FIRE SEALED AS REQUIRED. PIPING PENETRATIONS

THROUGH INTERSTITIAL FLOOR SHALL BE DRILLED, OR CUT, BY THE

CONTRACTOR AND FIRE SEALED AS REQUIRED.

THE MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN

EACH PROJECT SPACE IN A NEGATIVE PRESSURIZATION AND PROVIDE

HEPA FILTRATION UNITS AS REQUIRED BY INFECTION CONTROL. IF

NECESSARY CONSULT WITH VA, OR ENGINEER OF RECORD, FOR

SUGGESTED METHODS THAT MAY BE UTILIZED TO ELIMINATE

CONTAMINATED AIR TO OUTSIDE. VISUAL PRESSURIZATION INDICATORS

SHALL BE PROVIDED AT EACH ENTRANCE TO THE CONSTRUCTION ZONE

AND MONITORED DAILY TO INSURE A CONSTANT NEGATIVE PRESSURE

IS MAINTAINED THROUGHOUT EACH PHASE. COORDINATE

PRESSURIZATION PLANNING WITH VA FACILITIES AND INFECTION

CONTROL REPRESENTATIVE PRIOR TO EACH CONSTRUCTION PHASE.

ALL EXISTING RETURN/EXHAUST DUCTWORK NOT TEMPORARILY

CAPPED SHALL BE PROTECTED WITH REMOVABLE FILTER MEDIA TO

PROTECT EXISTING DUCT SYSTEMS FROM CONSTRUCTION DEBRIS. ALL

NEW DUCTWORK SHALL BE PROTECTED AS REQUIRED AND CLEANED

PRIOR TO START-UP. IF CONSTRUCTION DEBRIS IS FOUND INSIDE

UNPROTECTED DUCTWORK THAN DUCT CLEANING OF THE ENTIRE

SYSTEM SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE.

ALL WORK OUTSIDE THE PROTECTED PROJECT BOUNDARIES ABOVE

EXISTING CEILING SHALL BE COMPLETED WITH CEILINGS REPLACED IN

THE SAME DAY UNLESS FULLY COORDINATED THROUGH INFECTION

CONTROL. CLEAN AREA TO ORIGINAL CONDITION ON COMPLETION.

CONTRACTOR TO INSTALL TEMPORARY BARRIERS FOR EACH PROJECT

PHASE AND/OR AREA. THESE BARRIERS SHALL BE COORDINATED WITH

VA HOSPITAL AND, IN MOST CASES, CONTAIN SOME FORM OF AIRLOCK

VESTIBULE PRIOR TO ENTERING THE CONSTRUCTION AREA.

FLUTTER STRIPS OR AIR PRESSURE GAUGES SHALL BE PROVIDED AT

THE ENTRANCES TO EACH CONSTRUCTION AREA. ALL CONTRACTED

WORKERS SHALL BE TRAINED TO VISUALLY MONITOR THESE DEVICES

FOR ADEQUATE NEGATIVE PRESSURIZATION AS THEY ENTER/EXIT THE

CONSTRUCTION AREA. DAILY LOGS SHALL BE KEPT BY THE

MECHANICAL CONTRACTOR TO INSURE CONSTANT PRESSURIZATION

HAS BEEN MAINTAINED.

NEGATIVE PRESSURIZATION SHALL BE MAINTAINED IN EACH

CONSTRUCTION AREA. IF LOCATED ON AN EXTERIOR WALL FANS

SHOULD BE UTILIZED TO EXHAUST AIR DIRECTLY OUT A NEARBY

WINDOW, TAKING PRECAUTIONS TO NOT INTERFERE WITH EXISTING

BUILDING AIR INTAKES, PUBLIC AREAS, ETC. IF NO EXTERIOR WALL IS

AVAILABLE THEN NEGATIVE AIR MACHINES WITH INTERNAL FILTRATION

SHALL BE PROVIDED AND CONNECTION TO THE NEAREST EXHAUST OR

RETURN DUCT AVAILABLE (CONTACT ENGINEER TO VERIFY EXISTING

DUCTWORK CAPACITY PRIOR TO EXHAUST CONNECTION).

REMOVE EXISTING LAMINAR SUPPLY DIFFUSER. REFER TO

INTERSTITIAL SPACE FOR REMOVAL OF ASSOCIATED INLINE HEPA

FILTER ABOVE.

REMOVE EXISTING RETURN OR EXHAUST GRILLE. REFER TO

INTERSTITIAL PLANS ABOVE FOR ASSOCIATED DUCTWORK

DEMOLITION.

REMOVE EXISTING FAN POWERED HEPA FILTER (field verify exact location). REMOVE ALL ASSOCIATED DUCTWORK AND POWER

CONNECTIONS AS REQUIRED.

REMOVE EXISTING THERMOSTAT AND CONTROL WIRING. REFER TO

NEW FLOOR PLANS FOR INTEGRATION OF NEW DDC THERMOSTAT

AND MODIFICATIONS OF EXISTING VAV BOX ACTUATORS.

REMOVE EXISTING TSI ROOM PRESSURE MONITOR. SALVAGE PARTS

TO TURN OVER TO VA FOR USE IN REPAIRS. REFER TO NEW PLANS

FOR INTEGRATION OF NEW ROOM PRESSURIZATION MONITORS.

DISCONNECT EXISTING EXHAUST AND MAKE-UP AIR DUCTWORK

CONNECTIONS TO EXISTING BSC HOODS TO BE RELOCATED.

COORDINATE DISCONNECTION AND REPLACEMENT OF EXISTING

INTERNAL FILTERS WITH VA REPRESENTATIVES WHO WILL REMOVE

AND DISPOSE OF HAZARDOUS MATERIALS PER CETA REQUIREMENTS.

NOT USED.

NOT USED.

NOT USED.

REMOVE EXISTING SIDE-LOADING HEPA FILTER HOUSING. VA WILL

BAG AND REMOVE HEPA FILTER FOLLOWING ALL SAFETY GUIDELINES.

CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING FILTER HOUSING

AND DUCTWORK INDICATED.

REMOVE EXISTING SUPPLY DUCTWORK INDICATED. TEMPORARILY

CAP SERVICES UNTIL NEW DUCT CONNECTIONS ARE INSTALLED.

REMOVE EXISTING RETURN OR EXHAUST DUCTWORK INDICATED AND

CAP/SEAL AIRTIGHT AS REQUIRED AT MAIN DUCT TAKE-OFF.

REMOVE EXISTING FUME HOOD EXHAUST DUCTWORK AND SHUT-

DOWN WITH TEMPORARY LOCK-OUT OF ASSOCIATED FAN WITHIN 4TH

FLOOR MECHANICAL ROOM AS REQUIRED.

REMOVE EXISTING VAV BOX AND ANY ASSOICATED REHEAT COIL

PIPING AND CONTROLS. CAP AT TAKE-OFF FROM MAIN DUCT AND

PATCH/SEAL AIRTIGHT WITH INSULATION REPAIRED IN THAT LOCATION.

PLAN

NORTH

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

AE PROJECT NUMBER:

KEY PLAN

BUILDING 70

Dwg. of 78Dunham Project No: 0419950-004

I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

CONSTRUCTION DOCUMENTS

C R e v it P ro je c ts

\1

M p ls P h a rm a c y R e n o

M

E P

R c h a d g .r v t

/5

/2

:2

:2

A

M

1361-MD131

THIRD LEVEL HVAC DEMOLITION

PLANS

UPGRADE PHARMACY 18

MINNEAPOLIS, MN

618-16-120

06/04/2019 JG SAProject Number 34

06/04/2019

1/4" = 1'-0"

THIRD LEVEL HVAC DEMOLITION PLAN

1/4" = 1'-0"

THIRD LEVEL INTERSTITIAL HVAC DEMOLITION PLAN

1/4" = 1'-0"

THIRD LEVEL INTERSTITIAL HYDRONIC DEMOLITION PLAN

Signature

Name

Date

Registration Number

MM

M

F

F

KEY NOTES:

GENERAL NOTES:

2 1/2" MPC DN

EXISTING EXHAUST

FAN WITH 24" EXHAUST

STACK UP THRU ROOF

EXISTING RETURN

AIR FAN

EXISTING RELIEF

AIR LOUVER

EXISTING OUTSIDE

AIR LOUVER

60x60

48x72

60ø ø ø ø ø ø

120x36

34ø

48x72

EXISTING

70-HVPN

ø

66ø

C H

W S

C H

W R

M P

S ø x

24x42

24x42

SHAFT #2

120x36 x

48x72

34ø

5"CHWS

5"CHWR

5"CHWR

5"CHWS

4"MPS

1"MPC

2 1/2"MPC

54ø

EXISTING

70-AHPN

6" CHWS

6" CHWR

96x48

G R

G S ø ø ø

C H

W S

C H

W R

M P

S

X W V

1 AFTER ALL PROVISIONS SHOWN ON PRE-CONSTRUCTION DRAWING

TO PROVIDE TEMPORARY VENTILATION NEEDS FOR ALL AREAS

SERVED BY THIS UNIT IS COMPLETE. THEN REMOVE EXISTING AIR

HANDLING UNIT AHPN-37 IN ITS ENTIRETY AS FOLLOWS.

• DISCONNECT SUPPLY DUCTWORK FROM EXISTING UNIT.

• DISCONNECT RETURN DUCTWORK UP TO POINT OF RELIEF TAKE-

OFF, INCLUDE REMOVAL OF EXISTING RETURN AIR DAMPER.

• DISCONNECT OUTSIDE AIR DUCTWORK CONNECTION, INCLUDING

REMOVAL OF EXISTING OUTDOOR AIR DAMPER AT LOUVER.

• DISCONNECT AND REMOVE EXISTING CHILLED WATER PIPING

ALONG WITH ALL PIPING COMPONENTS BACK TO MAIN, OR

EXISTING ISOLATION VALVE IF AVAILABLE, AND CAP OFF.

• DISCONNECT AND REMOVE EXISTING STEAM AND CONDENSATE

PIPING FOR BOTH HUMIDIFIER AND IFB COIL, ALONG WITH ALL

PIPING COMPONENTS, TO MAIN AND TEMPORARILY CAP.

• REMOVE ALL COILS, SUPPLY FANS, FILTER RACKS, ETC OUT OF

EXISTING AHPN-37. REFER TO ELECTRICAL FOR POWER

DISCONNECTION AND REROUTING.

• REMOVE ALL ASSOCIATED CONTROLS AND PNEUMATIC CONTROL

TUBING AND DDC SENSORS CURRENTLY IN PLACE. REVISE ALL

PROGRAMMING ON CENTRAL AUTOMATION COMPUTER TO

OPERATE TEMPORARY UNIT AS INDICATED ON PRE-

CONSTRUCTION PLAN.

• CONTRACTOR TO REPAIR ANY FLOOR DAMAGE AND REMOVE ANY

ASSOCIATED CONCRETE EQUIPMENT PADS AS REQUIRED. REFER

TO NEW PLANS FOR NEW CONCRETE EQUIPMENT CURB TO

ENSURE LEVEL SURFACE FOR NEW AHU INSTALLATION.

• REMOVE ALL WALL PANELS, STRUCTURAL UNIT BASE, AND

FLOOR/ROOF FOR ENTIRE AIR HANDLING UNIT BEING

DEMOLISHED. TAKE SAFETY PRECAUTIONS FOR POTENTIAL

MOLD OR CONTAMINATION WITHIN INSULATED PANELS.

• COORDINATE METHOD FOR REMOVAL OF ALL MATERIAL FROM

SITE, REFER TO DETAIL 3/M151 FOR POTENTIAL CRANE PICK-UP

LOCATIONS OR DEVELOP PATH (FOR VA REVIEW/APPROVAL)

THROUGH BUILDING FOR DEMOLISHED MATERIALS.

DISCONNECT AND CAP EXISTING RETURN DUCTWORK. REFER TO

DRAWING M151 FOR ADDITIONAL INFORMATION.

CAP AND RE-DIRECT SUPPLY MAIN TO TEMPORARY AIR HANDLING

UNIT. REFER TO DRAWING M151 FOR MORE INFORMATION.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

MECHANICAL CONTRACTOR SHALL REFER TO THE VA MASTER

SPECIFICATION MANUAL EDITED FOR THIS PROJECT ALONG WITH ANY

APPLICABLE STANDARDS WITHIN THE 2011 HVAC DESIGN GUIDE. ALL

REQUIREMENTS OF THOSE MANUALS SHALL BE MAINTAINED IN ADDITION

TO ALL NOTES AND DESCRIPTIONS INDICATED WITHIN THESE

DRAWINGS. ANY CONFLICTS BETWEEN THOSE DOCUMENTS SHOULD BE

BROUGHT TO THE ATTENTION OF THE ENGINEER FOR INTERPRETATION.

MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO REVIEW

ACCESSIBILITY TO AREAS OUTSIDE THE CONSTRUCTION LIMITS TO

DETERMINE APPROXIMATE AMOUNT OF OVERTIME REQUIRED TO

PERFORM ALL MECHANICAL WORK INDICATED. COORDINATION OF

SCHEDULES WITH ADJACENT DEPARTMENTS AND CLEANING OF ALL

DEBRIS AFTER EACH WORK SHIFT SHOULD BE ASSUMED IN THE BASE

BID.

ANY MAJOR VENTILATION OUTAGES INDICATED ON THESE DRAWINGS

SHALL BE SCHEDULED TO BE PERFORMED AFTER NORMAL BUSINESS

HOURS OR DURING WEEKEND PERIODS TO MINIMIZE DISRUPTION. VA

HOSPITAL FACILITIES WILL REQUIRE A MINIMUM OF TWO(2) WEEKS

NOTICE PRIOR TO ANY SUCH OUTAGE AFFECTING MORE THAN ONE

ADJACENT AREA.

COORDINATE ALL NEW DUCTWORK ROUTING WITH ALL OTHER TRADES

TO INSURE ADEQUATE CLEARANCES FOR PLUMBING, ELECTRICAL

CONDUIT, STRUCTURAL SUPPORTS, PIPING, ETC. ANY UNAVOIDABLE

CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE

ARCHITECT/ENGINEER OF RECORD. PROVIDE ALL OFFSETS AND

TRANSITIONS AS REQUIRED FOR A CLEAN INSTALLATION.

THE EXACT LOCATION OF EQUIPMENT ROUGH-INS SHALL BE VERIFIED

WITH THE STAMPED APPROVED SHOP DRAWINGS PRIOR TO ANY FIELD

INSTALLATION.

SUPPORT ALL DUCTWORK DIRECTLY TO STRUCTURE. DO NOT SUPPORT

ANY DUCTS FROM DUCTWORK, CONDUIT, OR OTHER PIPING

ENCOUNTERED.

WHERE MECHANICAL SYSTEMS TO REMAIN ARE DAMAGED, OR

DISTURBED, DURING THE COURSE OF CONSTRUCTION THE

CONTRACTOR WILL BE RESPONSIBLE TO REMOVE DAMAGED PORTIONS

AND INSTALL NEW PRODUCTS OF EQUAL QUALITY AND FUNCTIONALITY.

ALL EXISTING DUCTWORK THROUGH NEW FIRE RATED WALLS SHALL BE

ADEQUATELY FIRE SEALED AS REQUIRED. PIPING PENETRATIONS

THROUGH INTERSTITIAL FLOOR SHALL BE DRILLED, OR CUT, BY THE

CONTRACTOR AND FIRE SEALED AS REQUIRED.

THE MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN

EACH PROJECT SPACE IN A NEGATIVE PRESSURIZATION AND PROVIDE

HEPA FILTRATION UNITS AS REQUIRED BY INFECTION CONTROL. IF

NECESSARY CONSULT WITH VA, OR ENGINEER OF RECORD, FOR

SUGGESTED METHODS THAT MAY BE UTILIZED TO ELIMINATE

CONTAMINATED AIR TO OUTSIDE. VISUAL PRESSURIZATION INDICATORS

SHALL BE PROVIDED AT EACH ENTRANCE TO THE CONSTRUCTION ZONE

AND MONITORED DAILY TO INSURE A CONSTANT NEGATIVE PRESSURE

IS MAINTAINED THROUGHOUT EACH PHASE. COORDINATE

PRESSURIZATION PLANNING WITH VA FACILITIES AND INFECTION

CONTROL REPRESENTATIVE PRIOR TO EACH CONSTRUCTION PHASE.

ALL EXISTING RETURN/EXHAUST DUCTWORK NOT TEMPORARILY

CAPPED SHALL BE PROTECTED WITH REMOVABLE FILTER MEDIA TO

PROTECT EXISTING DUCT SYSTEMS FROM CONSTRUCTION DEBRIS. ALL

NEW DUCTWORK SHALL BE PROTECTED AS REQUIRED AND CLEANED

PRIOR TO START-UP. IF CONSTRUCTION DEBRIS IS FOUND INSIDE

UNPROTECTED DUCTWORK THAN DUCT CLEANING OF THE ENTIRE

SYSTEM SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE.

ALL WORK OUTSIDE THE PROTECTED PROJECT BOUNDARIES ABOVE

EXISTING CEILING SHALL BE COMPLETED WITH CEILINGS REPLACED IN

THE SAME DAY UNLESS FULLY COORDINATED THROUGH INFECTION

CONTROL. CLEAN AREA TO ORIGINAL CONDITION ON COMPLETION.

CONTRACTOR TO INSTALL TEMPORARY BARRIERS FOR EACH PROJECT

PHASE AND/OR AREA. THESE BARRIERS SHALL BE COORDINATED WITH

VA HOSPITAL AND, IN MOST CASES, CONTAIN SOME FORM OF AIRLOCK

VESTIBULE PRIOR TO ENTERING THE CONSTRUCTION AREA.

FLUTTER STRIPS OR AIR PRESSURE GAUGES SHALL BE PROVIDED AT

THE ENTRANCES TO EACH CONSTRUCTION AREA. ALL CONTRACTED

WORKERS SHALL BE TRAINED TO VISUALLY MONITOR THESE DEVICES

FOR ADEQUATE NEGATIVE PRESSURIZATION AS THEY ENTER/EXIT THE

CONSTRUCTION AREA. DAILY LOGS SHALL BE KEPT BY THE

MECHANICAL CONTRACTOR TO INSURE CONSTANT PRESSURIZATION

HAS BEEN MAINTAINED.

NEGATIVE PRESSURIZATION SHALL BE MAINTAINED IN EACH

CONSTRUCTION AREA. IF LOCATED ON AN EXTERIOR WALL FANS

SHOULD BE UTILIZED TO EXHAUST AIR DIRECTLY OUT A NEARBY

WINDOW, TAKING PRECAUTIONS TO NOT INTERFERE WITH EXISTING

BUILDING AIR INTAKES, PUBLIC AREAS, ETC. IF NO EXTERIOR WALL IS

AVAILABLE THEN NEGATIVE AIR MACHINES WITH INTERNAL FILTRATION

SHALL BE PROVIDED AND CONNECTION TO THE NEAREST EXHAUST OR

RETURN DUCT AVAILABLE (CONTACT ENGINEER TO VERIFY EXISTING

DUCTWORK CAPACITY PRIOR TO EXHAUST CONNECTION).

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

AE PROJECT NUMBER: Dwg. of 78Dunham Project No: 0419950-004

I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

CONSTRUCTION DOCUMENTS

C R e v it P ro je c ts

\1

M p ls P h a rm a c y R e n o

M

E P

R c h a d g .r v t

/5

/2

:2

:3

A

M

1361-MD151

PENTHOUSE HVAC DEMOLITION

PLAN - SHAFT #2

UPGRADE PHARMACY 18

MINNEAPOLIS, MN

618-16-120

06/04/2019 JG SAProject Number 35

06/04/2019

1/4" = 1'-0"

PENTHOUSE HVAC DEMOLITION PLAN

Signature

Name

Date

Registration Number

P S

P S

P S

PS

KEY NOTES: GENERAL NOTES:

MECH

BR-101C

Unoccupied

Unoccupied

Unoccupied

Unoccupied

Unoccupied

Unoccupied

INVESTIGATIONAL

DRUG SERVICES

BR-117

INPATIENT

NARCOTIC

VAULT

BR-116

CONFERENCE/TRAINING

BR-124

OFFICE

BR-101E

HD BUFFER

ROOM

BR-118C

STORAGE HD

DRUGS

BR-119

STAFF LOUNGE

BR-125

WOMEN'S

LOCKERS

BR-122

WORK

STATIONS

BR-123

GENERAL

PHARMACY

BR-113

MECH

BR-108

ANTE ROOM

BR-118

OFFICE

BR-115

OFFICE

BR-101F

OFFICE

BR-101H

OFFICE

BR-101G

OFFICE

BR-114

OFFICE

BR-101B

OPEN OFFICE

BR-101D

RECEIVING

BR-120

MEN'S LOCKER

BR-121

HSKP

BR-127

CONFERENCE

ROOM

BR-126

GENERAL

PHARMACY

BR-113

PICKUP

WINDOW

BR-128

RECEPTION

BR-101

CORRIDOR

CB78

(4)A-12"

NON HD BUFFER

ROOM

BR-118B

(2)D-16x4 (BOTH UNDER &

ABOVE COUNTER)

(5)A-12"

D-10x10

(LOW)

8ø UP

18x6 UP

D-16x16

(LOW)

B-6"

C-8"

C-8"

B-6"

C-8" 105 B-6"

B-8"

B-8"

C-6"

B-6"

C-6"

B-6"

B-6"

C-6"

E-6"

B-6"

B-8"

B-8"

C-16"

B-8"

B-10"

B-10"

B-6"

B-6"

C-10"

B-10"

C-8" 160 C-6"

C-6"

C-6"

B-6"

B-6"

C-16"

B-10"

B-10"

B-10"

B-10"

B-10"

B-10"

B-10"

B-10"

B-10"

C-16"

C-16"

C-16"

C-16"

C-16"

C-16"

C-16"

C-16"

C-16"

C-16"

B-10"

B-10"

B-10"

B-10"

B-8"

B-8"

B-8"

B-8"

C-10"

C-12"

B-8"

B-8"

B-8"

C-14"

B-6"

C-8"

C-12"

B-6"

C-6"

C-16"

B-8"

B-8"

B-8"

B-10"

B-10"

B-10"

B-10"

B-10"

B-10"

B-10"

B-10"

B-10"

B-10"

B-10"

B-8"

B-8"

B-8"

(2)B-8"

C-16"

C-16"

C-16"

T

70.VAV.37.BR120

T70.VAV.37.BR119

TAC 03

TAC 02

T AC 01T 70.VAV.37.BR113.3

T70.VAV.37.BR122

T 70.VAV.37.BR113.2

T

70.VAV.37.BR113.1

T 70.VAV.37.BR124

T70.VAV.37.BR126

T70.VAV.37.BR125

T 70.VAV.37.BR128

T

70.VAV.37.BR117

T70.VAV.37.BR116

T 70.VAV.37.BR114

T70.VAV.37.BR101

T 70.VAV.37.BR101A

T

70.VAV.37.BR101D

T

70.VAV.37.BR101G

T 70.VAV.37.BR101F

T

70.VAV.37.BR123

OPEN OFFICE

BR-101A

CFM

CFM

CFM

CFM

CFM

CFM

E-12x12

B-6" ø

H

7 H

H

8H

(5)A-12"

AC

AC

AC

Room

BR-111

1 1 1

14x28 FROM ABOVE

24x18 UP

18ø FROM ABOVE

14ø FROM ABOVE

24x18 UP

24x18 UP

OFFICE

BR-110A

OFFICE

BR-110B

2 190

CFM

B-8"

2 430

CFM

B-6"

B-6"

C-8"

C-8"

T70.VAV.37.BR110B

GENERAL

PHARMACY

BR-113

D-16x10

(LOW)

D-16x16

(LOW)

D-10x10

D-10x10

18x6 UP

DD CC BB Z Y X W VAA

E-12x6

1 AIR CONDITIONING UNIT. MAINTAIN MANUFACTURER'S

RECOMMENDED INSTALLATION CLEARANCES. PROVIDE UNIT WITH:

• UPFLOW SUPPLY AIR PLENUM WITH COLLAR.

• REAR RETURN FLOORSTAND. CONNECT FULL SIZE FLEXIBLE

DUCT TO UNIT.

• 1-1/4" CHWS AND 1-1/4" CHWR FROM INTERSTITIAL SPACE ABOVE.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

MECHANICAL CONTRACTOR SHALL REFER TO THE VA MASTER

SPECIFICATION MANUAL EDITED FOR THIS PROJECT ALONG WITH ANY

APPLICABLE STANDARDS WITHIN THE VA DESIGN GUIDE. ALL

REQUIREMENTS OF THOSE MANUALS SHALL BE MAINTAINED IN

ADDITION TO ALL NOTES AND DESCRIPTIONS INDICATED WITHIN THESE

DRAWINGS. ANY CONFLICTS BETWEEN THOSE DOCUMENTS SHOULD

BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR

INTERPRETATION.

MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO REVIEW

ACCESSIBILITY TO AREAS OUTSIDE THE CONSTRUCTION LIMITS TO

DETERMINE APPROXIMATE AMOUNT OF OVERTIME REQUIRED TO

PERFORM ALL MECHANICAL WORK INDICATED. COORDINATION OF

SCHEDULES WITH ADJACENT DEPARTMENTS AND CLEANING OF ALL

DEBRIS AFTER EACH WORK SHIFT SHOULD BE ASSUMED IN THE BASE

BID.

ANY MAJOR VENTILATION OUTAGES INDICATED ON THESE DRAWINGS

SHALL BE SCHEDULED TO BE PERFORMED AFTER NORMAL BUSINESS

HOURS OR DURING WEEKEND PERIODS TO MINIMIZE DISRUPTION. VA

HOSPITAL FACILITIES WILL REQUIRE A MINIMUM OF TWO(2) WEEKS

NOTICE PRIOR TO ANY SUCH OUTAGE AFFECTING MORE THAN ONE

ADJACENT AREA.

WHERE MECHANICAL SYSTEMS TO REMAIN ARE DAMAGED, OR

DISTURBED, DURING THE COURSE OF CONSTRUCTION THE

CONTRACTOR WILL BE RESPONSIBLE TO REMOVE DAMAGED PORTIONS

AND INSTALL NEW PRODUCTS OF EQUAL QUALITY AND FUNCTIONALITY.

ALL EXISTING DUCTWORK AND PIPING THROUGH NEW FIRE RATED

WALLS SHALL BE ADEQUATELY FIRE SEALED AS REQUIRED. PIPING

PENETRATIONS THROUGH INTERSTITIAL FLOOR SHALL BE DRILLED, OR

CUT, BY THE CONTRACTOR AND FIRE SEALED AS REQUIRED.

THE EXACT LOCATION OF EQUIPMENT ROUGH-INS SHALL BE VERIFIED

WITH THE STAMPED APPROVED SHOP DRAWINGS PRIOR TO ANY FIELD

INSTALLATION.

THE MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN

EACH PROJECT SPACE IN A NEGATIVE PRESSURIZATION AND PROVIDE

HEPA FILTRATION UNITS AS REQUIRED BY INFECTION CONTROL. IF

NECESSARY CONSULT WITH VA, OR ENGINEER OF RECORD, FOR

SUGGESTED METHODS THAT MAY BE UTILIZED TO ELIMINATE

CONTAMINATED AIR TO OUTSIDE. VISUAL PRESSURIZATION INDICATORS

SHALL BE PROVIDED AT EACH ENTRANCE TO THE CONSTRUCTION ZONE

AND MONITORED DAILY TO INSURE A CONSTANT NEGATIVE PRESSURE

IS MAINTAINED THROUGHOUT EACH PHASE. COORDINATE

PRESSURIZATION PLANNING WITH VA FACILITIES AND INFECTION

CONTROL REPRESENTATIVE PRIOR TO EACH CONSTRUCTION PHASE.

ALL EXISTING RETURN/EXHAUST DUCTWORK NOT TEMPORARILY

CAPPED SHALL BE PROTECTED WITH REMOVABLE FILTER MEDIA TO

PROTECT EXISTING DUCT SYSTEMS FROM CONSTRUCTION DEBRIS. ALL

NEW DUCTWORK SHALL BE PROTECTED AS REQUIRED AND CLEANED

PRIOR TO START-UP. IF CONSTRUCTION DEBRIS IS FOUND INSIDE

UNPROTECTED DUCTWORK THAN DUCT CLEANING OF THE ENTIRE

SYSTEM SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE.

ALL WORK OUTSIDE THE PROTECTED PROJECT BOUNDARIES ABOVE

EXISTING CEILING SHALL BE COMPLETED WITH CEILINGS REPLACED IN

THE SAME DAY UNLESS FULLY COORDINATED THROUGH INFECTION

CONTROL. CLEAN AREA TO ORIGINAL CONDITION ON COMPLETION.

CONTRACTOR TO INSTALL TEMPORARY BARRIERS FOR EACH PROJECT

PHASE AND/OR AREA. THESE BARRIERS SHALL BE COORDINATED WITH

VA HOSPITAL AND, IN MOST CASES, CONTAIN SOME FORM OF AIRLOCK

VESTIBULE PRIOR TO ENTERING THE CONSTRUCTION AREA.

FLUTTER STRIPS OR AIR PRESSURE GAUGES SHALL BE PROVIDED AT

THE ENTRANCES TO EACH CONSTRUCTION AREA. ALL CONTRACTED

WORKERS SHALL BE TRAINED TO VISUALLY MONITOR THESE DEVICES

FOR ADEQUATE NEGATIVE PRESSURIZATION AS THEY ENTER/EXIT THE

CONSTRUCTION AREA. DAILY LOGS SHALL BE KEPT BY THE

MECHANICAL CONTRACTOR TO INSURE CONSTANT PRESSURIZATION

HAS BEEN MAINTAINED.

NEGATIVE PRESSURIZATION SHALL BE MAINTAINED IN EACH

CONSTRUCTION AREA. IF LOCATED ON AN EXTERIOR WALL FANS

SHOULD BE UTILIZED TO EXHAUST AIR DIRECTLY OUT A NEARBY

WINDOW, TAKING PRECAUTIONS TO NOT INTERFERE WITH EXISTING

BUILDING AIR INTAKES, PUBLIC AREAS, ETC. IF NO EXTERIOR WALL IS

AVAILABLE THEN NEGATIVE AIR MACHINES WITH INTERNAL FILTRATION

SHALL BE PROVIDED AND CONNECTION TO THE NEAREST EXHAUST OR

RETURN DUCT AVAILABLE (CONTACT ENGINEER TO VERIFY EXISTING

DUCTWORK CAPACITY PRIOR TO EXHAUST CONNECTION).

TAKEOFFS TO SUPPLY AIR DIFFUSERS AND REGISTERS SHALL BE SAME

SIZE AS DUCT CONNECTION SIZE, UNLESS OTHERWISE NOTED.

PIPING RUNOUTS TO VAV' BOXES SHALL BE 3/4" DIAMETER, UNLESS

NOTED OTHERWISE.

2 REBALANCE EXISTING DIFFUSER OR GRILLE TO CFM AS INDICATED.

CONNECT 10" EXHAUST DUCT TO HOOD COLLAR AND UP TO LEVEL

ABOVE USING APPROPRIATE COUPLER RECOMMENDED BY

MANUFACTURER. BALANCING CONTRACTOR TO MEAUSRE STATIC

PRESSURE APPROXIMATELY 2 DUCT DIAMATERS ABOVE HOOD (TO BE

AT LEAST 1.7" W.C.) AND TRANVERSE DUCT AIRFLOW A MINIMUM OF

7.5 DUCT DIAMETERS DOWNSTREAM OF HOOD IN STRAIGHT SECTION

OF DUCT TO THE MANUFACTURER'S 'CONCURRENT BALANCE VALUE'

(785 CFM FOR EXISTING NUAIRE MODEL NU-430-400 TYPE B2 BSC).

PROVIDE DOOR POSITION INDICATOR WIRED WITHIN DOOR FRAME.

SET DELAY ON ASSOCIATED ROOM PRESSURE MONITOR TO SILENCE

ALARM FOR 2 MINUTES (adj) AFTER DOOR CONTACT SWITCH

INDICATED THAT IS WAS OPENED. NOTIFY BUILDING AUTOMATION OF

ACTUAL PRESSURIZATION ALARM ONLY AFTER ELAPSED TIME.

PROVIDE WALL SPACE TO TERMINATE THIRTEEN(13) AEROSOL

INJECTION PORTS FOR ALL THE HEPA DIFFUSERS. CLEARLY LABEL

EACH PORT AND ASSOCIATED DIFFUSER AS REQUIRED WITH

LAMINATE SIGNAGE. GATHER ALL TUBING TOGETHER AND ROUTE

THROUGH SLEEVE TO GET UP INTO INTERSTITIAL SPACE. REFER TO

DRAWING M102, KEY NOTE #11, FOR TERMINATION POINTS INTO

DUCTWORK FOR EACH HEPA DIFFERS (minimum of 60" prior to final diffuser connection point).

CONNECT 12" EXHAUST DUCT TO HOOD COLLAR AND UP TO LEVEL

ABOVE USING APPROPRIATE COUPLER RECOMMENDED BY

MANUFACTURER. BALANCING CONTRACTOR TO MEAUSRE STATIC

PRESSURE APPROXIMATELY 2 DUCT DIAMATERS ABOVE HOOD

(VERIFY REQUIREMENT WITH NEW HOOD SPECS, APPROX 2.0" W.C.)

AND TRANVERSE DUCT AIRFLOW A MINIMUM OF 7.5 DUCT DIAMETERS

DOWNSTREAM OF HOOD IN STRAIGHT SECTION OF DUCT TO THE

MANUFACTURER'S 'CONCURRENT BALANCE VALUE' (VERIFY EXACT

AIRFLOW WITH NEW TYPE B2 BSC SPECS, APPROX. 800 CFM).

CONNECT 10" EXHAUST DUCT TO THIMBLE CONNECTION FURNISHED

BY MANUFACTUER ROUTING EXHAUST DUCT UP TO LEVEL ABOVE.

BALANCING CONTRACTOR TO MEAUSURE STATIC PRESSURE

APPROXIMATELY 2 DUCT DIAMATERS ABOVE HOOD (VERIFY

REQUIREMENT WITH NEW HOOD SPECS, APPROX 0.1" W.C.) AND

TRANVERSE DUCT AIRFLOW A MINIMUM OF 7.5 DUCT DIAMETERS

DOWNSTREAM OF HOOD IN STRAIGHT SECTION OF DUCT (VERIFY

EXAC…