MECHANICAL ABBREVIATIONS
AD AREA DRAIN
A.F.F. ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AHU AIR HANDLING UNIT
ANB ACID NEUTRALIZING BASIN
AP ACCESS PANEL
ARCH ARCHITECT
AS AIR SEPARATOR
BD BUTTERFLY DAMPER
B/G BELOW GRADE
BTU BRITISH THERMAL UNIT
BWV BACKWATER VALVE
CCF HUNDRED CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CL CENTER LINE
CLG CEILING
CO CLEAN OUT
CONTR CONTRACTOR
CONV CONVECTOR
CUH CABINET UNIT HEATER
CW COLD WATER
DB DECIBEL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIFF DIFFUSER
DISCH DISCHARGE
DMPR DAMPER
DN DOWN
DR DRAIN
DS DOWNSPOUT
DWG DRAWING
EAT ENTERING AIR TEMPERATURE
EDR EQUIVALENT DIRECT RADIATION
EP ELECTRIC-PNEUMATIC
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXP EXPANSION
F FAHRENHEIT
FC FAN COIL
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FHC FIRE HOSE CABINET
FHR FIRE HOSE RACK
FLR FLOOR
FLEX FLEXIBLE
FM FIRE MAIN
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET OR FOOT
F&T FLOAT AND THERMOSTATIC
FTG FOOTING
FTR FINNED TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLON
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HB HOSE BIBB
HD HEAD
HOA HANDS-OFF-AUTOMATIC
HTG HEATING
HTR HEATER
HVAC HEATING, VENTILATION,
AND AIR CONDITIONING
HYD HYDRANT
HW HOT WATER
GCO GRADE CLEANOUT
INSUL INSULATION
KW KILOWATT
LAT LEAVING AIR TEMPERATURE
LAV LAVATORY
LWT LEAVING WATER TEMPERATURE
MBH BTU PER HOUR (THOUSANDS)
MCF THOUSAND CUBIC FEET
MH MANHOLE
NC NOISE CRITERIA OR
NORMALLY CLOSED
NEG NEGATIVE
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
ORD OVERFLOW ROOF DRAIN
PD PRESSURE DROP OR DIFFERENCE
PE PNEUMATIC-ELECTRIC
PLBG PLUMBING
PRV
PRESSURE REDUCING VALVE
OR POWER ROOF VENTILATOR
PSIA POUNDS/SQ INCH ABSOLUTE
PSIG POUNDS/SQ INCH GAUGE
PVC POLY VINYL CHLORIDE
RA RETURN AIR
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
RECIRC RECIRCULATING
REG REGISTER
RET RETURN
RH RELATIVE HUMIDITY
RHT REHEAT
RHC REHEAT COIL
RHW RECIRCULATED HOT WATER
RM ROOM
RPM REVOLUTIONS PER MINUTE
RPZ REDUCED ZONE BACKFLOW
PREVENTER
SA SUPPLY AIR
SAN SANITARY
SCFM CFM, STANDARD CONDITIONS
SD SMOKE DAMPER
SP STATIC PRESSURE
SPECS SPECIFICATIONS
SUP SUPPLY
SQ SQUARE
STM STEAM
TD TEMPERATURE DIFFERENCE
TEMP TEMPERATURE
TONS TONS OF REFRIGERATION
T-STAT THERMOSTAT
TYP TYPICAL
UB UP-BLAST
UG UNDERGROUND
UH UNIT HEATER
UR URINAL
V SANITARY VENT
VD VOLUME DAMPER
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
W SANITARY WASTE
W/ WITH
WC WATER CLOSET
WCO WALL CLEANOUT
WH WALL HYDRANT
W/0 WITHOUT
WTR WATER
PLUMBING
ACID VENT BELOW GRADE
ACID VENT ABOVE GRADE
ACID WASTE BELOW GRADE
ACID WASTE ABOVE GRADE
DEIONIZED WATER
FILTERED WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER (TEMP. INDICATED)
DOMESTIC RECIRC. HOT WATER
HARD COLD WATER
OVERFLOW STORM DRAIN BELOW GRADE
OVERFLOW STORM DRAIN ABOVE GRADE
REVERSE OSMOSIS WATER
SANITARY VENT BELOW GRADE
SANITARY VENT ABOVE GRADE
SANITARY WASTE
SANITARY SEWER
SOIL DRAINAGE TILE
SOFTENED COLD WATER
SOFTENED HOT WATER
TEMPERED WATER
STORM DRAIN BELOW GRADE
STORM DRAIN ABOVE GRADE
WELL WATER
EXISTING PLUMBING TO REMAIN
EXISTING PLUMBING TO BE REMOVED
AV
AV
AW
AW
DI
HARD
SDT
OSD
RO
V
V
SS
W
SOFT
SHW
TW
OSD
SD
SD
WW
MECHANICAL PIPING
BOILER FEED
CHILLED WATER SUPPLY
CHILLED WATER RETURN
COMPRESSED AIR (PSI INDICATED)
CONDENSATE DRAIN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
FUEL OIL SUPPLY
FUEL OIL RETURN
FUEL OIL VENT
FUEL OIL FILL
GLYCOL SUPPLY
GLYCOL RETURN
HEAT RECOVERY SUPPLY
HEAT RECOVERY RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
LABORATORY VACUUM
LABORATORY AIR
LIQUIFIED PETROLEUM GAS
NATURAL GAS (PSI INDICATED)
PLANT VACUUM
PUMPED CONDENSATE
RADIATION WATER SUPPLY
RADIATION WATER RETURN
REFRIGERANT LIQUID
BF
CHWS
CHWR
10#A
CD
FOS
LV
GS
GR
HRS
HRR
HWR
HWS
LA
LPG
2#G
FOF
PV
PC
RADS
CS
CR
FOR
FOV
RADR
RL
REFRIGERANT SUCTION
REFRIGERANT HOT GAS BYPASS
REHEAT WATER SUPPLY
REHEAT WATER RETURN
REMOTE RADIATOR SUPPLY
REMOTE RADIATOR RETURN
SECONDARY HEATING WATER SUPPLY
SECONDARY HEATING WATER RETURN
SNOW MELT SUPPLY
SNOW MELT RETURN
STEAM SUPPLY (PSI INDICATED)
STEAM RETURN (PSI INDICATED)
EXISTING PIPING TO REMAIN
RRS
RS
RHG
RHR
RHS
RRR
SHWS
SHWR
SMS
SMR
10#STM
10#R
PLUMBING /PIPING
ELBOW DOWN
PIPE CAP
ELBOW UP
TEE, OUTLET UP
TEE, OUTLET DOWN
CONNECTION, BOTTOM
CONNECTION, TOP
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLEXIBLE CONNECTION
PIPE ANCHOR
ALIGNMENT GUIDE
CHECK VALVE
SHUTOFF VALVE
PLUG VALVE
COMBINATION BALANCE VALVE
AND FLOW METER
STRAINER
STRAINER W/BLOWDOWN
CAP AND VALVE
PRESSURE REDUCING VALVE
(SETTING AS NOTED, PSI)
MEDICAL GAS
MEDICAL VACUUM
WASTE ANESTHETIC GAS DISPOSAL
CARBON DIOXIDE
OXYGEN
NITROGEN
NITROUS OXIDE
MEDICAL AIR
WAGD
CO2
O
N
MV
N2O
MA
CONTROLS
AQUA STAT
TAMPERPROOF THERMOSTAT
HUMIDISTAT OR R.H. SENSOR
REFRIGERANT SENSOR
SMOKE DETECTOR
SPACE TEMPERATURE SENSOR
STATIC PRESSURE SENSOR
DUCTWORK
SUPPLY AIR
RETURN AIR
EXHAUST AIR
STANDARD BRANCH, NO SPLITTER -
SUPPLY FLOW TO RIGHT -
RETURN/EXHAUST FLOW TO LEFT
BELLMOUTH WITH BALANCING
DAMPER
FLEXIBLE DUCT
TURNING VANES
FLEXIBLE CONNECTION
MANUAL VOLUME DAMPER
MOTORIZED DAMPER
FIRE DAMPER & ACCESS
PANEL
SMOKE DAMPER &
ACCESS PANEL
COMBINATION FIRE/SMOKE
DAMPER & ACCESS PANEL
SUPPLY GRILLE OR REGISTER
T
T
P P
ROOM PRESSURE
MONITOR
H
R
SD
TS
SP
T THERMOSTAT
THERMOSTAT W/GUARDT
EXPANSION JOINT
AUTOMATIC CONTROL VALVE, 2-WAY
AUTOMATIC CONTROL VALVE, 3-WAY
AUTOMATIC AIR VENT
MANUAL AIR VENT
PRESSURE RELIEF/SAFETY
VALVES(SETTING AS NOTED, PSI)
DRAIN VALVE
BALL VALVE
BUTTERFLY VALVE
GLOBE ANGLE VALVE
0. S.& Y. VALVE
REDUCED PRESSURE ZONE
BACK FLOW PREVENTER
SOLENOID VALVE
FLOW LIMITING VALVE
DIAPHRAGM
GLOBE VALVE
REFRIGERANT SIGHT GLASS
GAS PRESSURE REGULATOR VALVE
BACKWATER VALVE
REFRIGERANT DRYER
FLOW DIRECTION
FLOW DIRECTION W/PITCH
DUPLEX STRAINER
PIPE UNION
PIPE FLANGE
PUMP
THERMOMETER
PRESSURE/TEMPERATURE TEST PORT
STEAM TRAP (TYPE INDICATED)
FLOW MEASURING STATION
(FLOW INDICATED)
FLOW SWITCH
PRESSURE GAUGE W/PIGTAIL &
PETCOCK
PRESSURE SWITCH
SHOCK ABSORBER
ELBOW
FLOOR DRAIN
DRAIN ABOVE
FLOOR SINK
WALL HYDRANT
HOSE BIBB
TEE
WALL CLEANOUT
ROOF DRAIN
CATCH BASIN
MANHOLE
HB
RETURN DUCT UP, NEGATIVE
PRESSURE
SUPPLY DIFFUSER/REGISTER
BLANKOFF INDICATED
RETURN OR EXHAUST GRILLE
OR REGISTER
SUPPLY DUCT UP, POSITIVE
PRESSURE
EXHAUST DUCT UP, NEGATIVE
PRESSURE
RETURN GRILLE/REGISTER
EXHAUST GRILLE/REGISTER
LINEAR DIFFUSER
CONCENTRIC DUCT TRANSITION
ECCENTRIC DUCT TRANSITION
RECTANGULAR-TO-ROUND DUCT
TRANSITION
VAV BOX
REHEAT COIL
VAV BOX W/REHEAT COIL
DUCT OFFSETS
DUCT CUTLINE
M
FD
VERTICALHORIZONTAL
FD
SD
VERTICAL
VERTICALHORIZONTAL
FSD FSD
RETURN DUCT DN, NEGATIVE
PRESSURE
SUPPLY DUCT DN, POSITIVE
PRESSURE
EXHAUST DUCT DN, NEGATIVE
PRESSURE
DROPRISE
FIRE PROTECTION
DFP
F FIRE PROTECTION
FIRE PROTECTION (DRY SYSTEM)
POST INDICATOR VALVE (PIV)
FIRE HYDRANT WITH SHUTOFF VALVE
RECESSED FIRE DEPT CABINET
SURFACE MOUNTED FIRE DEPT CABINET
FIRE PROTECTION RISER
UPRIGHT SPRINKLER HEAD W/GUARD
PENDANT SPRINKLER HEAD
UPRIGHT SPRINKLER HEAD
SIDEWALL SPRINKLER HEAD
BUTTERFLY VALVE W/TAMPER SWITCH
DETECTOR CHECK W/BYPASS METER
GRADE FIRE DEPT CONNECTION
FLUSH FIRE DEPT CONNECTION
FIRE DEPT VALVE W/CAP AND CHAIN
O.S. & Y. VALVE W/TAMPER SWITCH
DRY PIPE VALVE
PREACTION VALVE
GPM
AM
S
FS
PS
TS
FDVC
FDVC
FDV
TS
SD
HORIZONTAL
GAS COCK VALVE
CLEANOUT
WH
GR GRILLE
VAV VARIABLE AIR VOLUME
VTR VENT THROUGH ROOF
CARBON MONOXIDE SENSORCO
ANNOTATION
(4) A-12"Ø 450
GRILLE, REGISTER, &
DIFFUSER IDENTIFICATION
QUANTITY
CFM
TYPE
SIZE
X X
X X
X X
X X
DETAIL NUMBER
SHEET NUMBER
SECTION NUMBER
SHEET NUMBER
EQUIP DESIGNATION
EQUIP NUMBER
POINT OF CONNECTION, NEW TO EXISTING
POINT OF DISCONNECTION
FTR/RP 01
6'-5"
0.5
HYDRONIC FINNED TUBE
RADIATION & RADIANT
PANEL IDENTIFICATION
TYPE ACTIVE
ELEMENT
LENGTHGPM
EBR 01
6'-5"
ELECTRIC BASEBOARD
RADIATION
IDENTIFICATION
ACTIVE
ELEMENT
LENGTH
ZONE VALVE BOXZVB
AREA ALARM PANELAAP
MASTER ALARM PANELMAP
COMBINATION AREA/MASTER ALARM PANELCAP
NPCW NON-POTABLE COLD WATER
NPHW NON-POTABLE HOT WATER
INV INVERT
RLF RELIEF
FW
HW
CHW
GW GREASE WASTE
ISO ISOLATION EXHAUST
GEXH GREASE EXHAUST
MECHANICAL SYMBOLS LEGEND
EXISTING PIPING TO BE REMOVED
TYPE
DOMESTIC COLD WATERCW
CO2 CARBON DIOXIDE SENSOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE PROJECT NUMBER: Dwg. of 78Dunham Project No: 0419950-004
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
CONSTRUCTION DOCUMENTS
C R e v it P ro je c ts
\1
M p ls P h a rm a c y R e n o
M
E P
R c h a d g .r v t
/5
/2
:2
:5
A
M
1361-M000
MECHANICAL TITLE SHEET UPGRADE PHARMACY 18
MINNEAPOLIS, MN
618-16-120
06/04/2019 JG SAProject Number 30
06/04/2019
MECHANICAL SHEET LIST
SHEET
NUMBER SHEET NAME
M000 MECHANICAL TITLE SHEET
MD101 LOWER LEVEL HVAC DEMOLITION PLAN
MD102 LOWER LEVEL INTERSTITIAL HVAC DEMOLITION PLAN
MD103 LOWER LEVEL INTERSTITIAL HYDRONIC DEMOLITION PLAN
MD131 THIRD LEVEL HVAC DEMOLITION PLANS
MD151 PENTHOUSE HVAC DEMOLITION PLAN - SHAFT #2
M101 LOWER LEVEL HVAC PLAN
M102 LOWER LEVEL INTERSTITIAL HVAC PLAN
M103 LOWER LEVEL INTERSTITIAL HYDRONIC PLAN
M131 THIRD LEVEL HVAC PLANS
M151 PENTHOUSE PRE-CONSTRUCTION MECHANICAL PLAN - SHAFT #2
M152 PENTHOUSE MECHANICAL PLAN - SHAFT #2
M153 PENTHOUSE MECHANICAL PLAN - SHAFT #7
M501 MECHANICAL PLANS - SHAFT #7
M502 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES AND OPERATION SEQUENCES
M602 MECHANICAL ELELCTRICAL SCHEDULES
M603 MECHANICAL ELELCTRICAL SCHEDULES
PD101 UNDERFLOOR PLUMBING DEMOLITION PLAN
PD102 LOWER LEVEL PLUMBING DEMOLITION PLAN
PD103 LOWER LEVEL INTERSTITIAL PLUMBING DEMOLITION PLAN
PD131 THIRD LEVEL PLUMBING DEMOLITION PLANS
P101 UNDERFLOOR PLUMBING PLAN
P102 LOWER LEVEL PLUMBING AND FIRE PROTECTION PLAN
P103 LOWER LEVEL INTERSTITIAL PLUMBING PLAN
P131 THIRD LEVEL PLUMBING PLANS
P500 PLUMBING RISERS DIAGRAMS
P501 PLUMBING RISERS DIAGRAMS
P600 PLUMBING DETAILS AND SCHEDULES
SHEET TOTAL: 29
Signature
Name
Date
Registration Number
Jason R. Gottwalt, P.E.
41360Revisions: Date:
KEY NOTES:
GENERAL NOTES:
T
T
T
T
T
T T
T
TT
T
T
T
T
TT
T
TT
T
T
T
T
T
1 1
1 1
T
T
T
DD CC BB Z Y X W V
AA
BA-108
CB79CB81
CB78
CB16
BR-118
BR-119A
BR-119
BR-122
BR-122A
BR-121
BR-120
BR-82
BR-123 BR-124
BR-113
BR-125
BR-126 BR-127
BR-128
BR-129
BR-130
BR-131
BR-115 BR-114
BR-116
BR-118A
BR-117A
BR-117B
BR-117
BR-102
BR-101
BR-113A
BR-113B
BR-103
BR-104
BR-112
CB58
DD CC BB Z Y X W VAA
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
MECHANICAL CONTRACTOR SHALL REFER TO THE VA MASTER
SPECIFICATION MANUAL EDITED FOR THIS PROJECT ALONG WITH ANY
APPLICABLE STANDARDS WITHIN THE 2017 HVAC DESIGN MANUAL. ALL
REQUIREMENTS OF THOSE MANUALS SHALL BE MAINTAINED IN ADDITION
TO ALL NOTES AND DESCRIPTIONS INDICATED WITHIN THESE
DRAWINGS. ANY CONFLICTS BETWEEN THOSE DOCUMENTS SHOULD BE
BROUGHT TO THE ATTENTION OF THE ENGINEER FOR INTERPRETATION.
MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO REVIEW
ACCESSIBILITY TO AREAS OUTSIDE THE CONSTRUCTION LIMITS TO
DETERMINE APPROXIMATE AMOUNT OF OVERTIME REQUIRED TO
PERFORM ALL MECHANICAL WORK INDICATED. COORDINATION OF
SCHEDULES WITH ADJACENT DEPARTMENTS AND CLEANING OF ALL
DEBRIS AFTER EACH WORK SHIFT SHOULD BE ASSUMED IN THE BASE
BID.
ANY MAJOR VENTILATION OUTAGES INDICATED ON THESE DRAWINGS
SHALL BE SCHEDULED TO BE PERFORMED AFTER NORMAL BUSINESS
HOURS OR DURING WEEKEND PERIODS TO MINIMIZE DISRUPTION. VA
HOSPITAL FACILITIES WILL REQUIRE A MINIMUM OF TWO(2) WEEKS
NOTICE PRIOR TO ANY SUCH OUTAGE AFFECTING MORE THAN ONE
ADJACENT AREA.
COORDINATE ALL NEW DUCTWORK ROUTING WITH ALL OTHER TRADES
TO INSURE ADEQUATE CLEARANCES FOR PLUMBING, ELECTRICAL
CONDUIT, STRUCTURAL SUPPORTS, PIPING, ETC. ANY UNAVOIDABLE
CONFLICTS SHALL BE BROUGHT THE ATTENTION OF THE
ARCHITECT/ENGINEER OF RECORD. PROVIDE ALL OFFSETS AND
TRANSITIONS AS REQUIRED FOR A CLEAN INSTALLATION.
THE EXACT LOCATION OF EQUIPMENT ROUGH-INS SHALL BE VERIFIED
WITH THE STAMPED APPROVED SHOP DRAWINGS PRIOR TO ANY FIELD
INSTALLATION.
SUPPORT ALL DUCTWORK DIRECTLY TO STRUCTURE. DO NOT SUPPORT
ANY DUCTS FROM DUCTWORK, CONDUIT, OR OTHER PIPING
ENCOUNTERED.
WHERE MECHANICAL SYSTEMS TO REMAIN ARE DAMAGED, OR
DISTURBED, DURING THE COURSE OF CONSTRUCTION THE
CONTRACTOR WILL BE RESPONSIBLE TO REMOVE DAMAGED PORTIONS
AND INSTALL NEW PRODUCTS OF EQUAL QUALITY AND FUNCTIONALITY.
ALL EXISTING DUCTWORK THROUGH NEW FIRE RATED WALLS SHALL BE
ADEQUATELY FIRE SEALED AS REQUIRED. PIPING PENETRATIONS
THROUGH INTERSTITIAL FLOOR SHALL BE DRILLED, OR CUT, BY THE
CONTRACTOR AND FIRE SEALED AS REQUIRED.
THE MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN
EACH PROJECT SPACE IN A NEGATIVE PRESSURIZATION AND PROVIDE
HEPA FILTRATION UNITS AS REQUIRED BY INFECTION CONTROL. IF
NECESSARY CONSULT WITH VA, OR ENGINEER OF RECORD, FOR
SUGGESTED METHODS THAT MAY BE UTILIZED TO ELIMINATE
CONTAMINATED AIR TO OUTSIDE. VISUAL PRESSURIZATION INDICATORS
SHALL BE PROVIDED AT EACH ENTRANCE TO THE CONSTRUCTION ZONE
AND MONITORED DAILY TO INSURE A CONSTANT NEGATIVE PRESSURE
IS MAINTAINED THROUGHOUT EACH PHASE. COORDINATE
PRESSURIZATION PLANNING WITH VA FACILITIES AND INFECTION
CONTROL REPRESENTATIVE PRIOR TO EACH CONSTRUCTION PHASE.
ALL EXISTING RETURN/EXHAUST DUCTWORK NOT TEMPORARILY
CAPPED SHALL BE PROTECTED WITH REMOVABLE FILTER MEDIA TO
PROTECT EXISTING DUCT SYSTEMS FROM CONSTRUCTION DEBRIS. ALL
NEW DUCTWORK SHALL BE PROTECTED AS REQUIRED AND CLEANED
PRIOR TO START-UP. IF CONSTRUCTION DEBRIS IS FOUND INSIDE
UNPROTECTED DUCTWORK THAN DUCT CLEANING OF THE ENTIRE
SYSTEM SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE.
ALL WORK OUTSIDE THE PROTECTED PROJECT BOUNDARIES ABOVE
EXISTING CEILING SHALL BE COMPLETED WITH CEILINGS REPLACED IN
THE SAME DAY UNLESS FULLY COORDINATED THROUGH INFECTION
CONTROL. CLEAN AREA TO ORIGINAL CONDITION ON COMPLETION.
CONTRACTOR TO INSTALL TEMPORARY BARRIERS FOR EACH PROJECT
PHASE AND/OR AREA. THESE BARRIERS SHALL BE COORDINATED WITH
VA HOSPITAL AND, IN MOST CASES, CONTAIN SOME FORM OF AIRLOCK
VESTIBULE PRIOR TO ENTERING THE CONSTRUCTION AREA.
FLUTTER STRIPS OR AIR PRESSURE GAUGES SHALL BE PROVIDED AT
THE ENTRANCES TO EACH CONSTRUCTION AREA. ALL CONTRACTED
WORKERS SHALL BE TRAINED TO VISUALLY MONITOR THESE DEVICES
FOR ADEQUATE NEGATIVE PRESSURIZATION AS THEY ENTER/EXIT THE
CONSTRUCTION AREA. DAILY LOGS SHALL BE KEPT BY THE
MECHANICAL CONTRACTOR TO INSURE CONSTANT PRESSURIZATION
HAS BEEN MAINTAINED.
NEGATIVE PRESSURIZATION SHALL BE MAINTAINED IN EACH
CONSTRUCTION AREA. IF LOCATED ON AN EXTERIOR WALL FANS
SHOULD BE UTILIZED TO EXHAUST AIR DIRECTLY OUT A NEARBY
WINDOW, TAKING PRECAUTIONS TO NOT INTERFERE WITH EXISTING
BUILDING AIR INTAKES, PUBLIC AREAS, ETC. IF NO EXTERIOR WALL IS
AVAILABLE THEN NEGATIVE AIR MACHINES WITH INTERNAL FILTRATION
SHALL BE PROVIDED AND CONNECTION TO THE NEAREST EXHAUST OR
RETURN DUCT AVAILABLE (CONTACT ENGINEER TO VERIFY EXISTING
DUCTWORK CAPACITY PRIOR TO EXHAUST CONNECTION).
2 REMOVE ALL EXISTING DIFFUSERS AND/OR GRILLES WITH
ASSOCIATED DUCTWORK UP TO INTERSTITIAL SPACE ABOVE, TYPICAL
WITHIN THIS OUTLINED AREA.
REMOVE EXISTING THERMOSTAT.
3 REMOVE EXISTING INLINE FAN WITH ASSOCIATED DUCTWORK.
4 REMOVE EXISTING COIL WITH ASSOCIATED PIPING. TERMINATE AT
EXISTING ISOLATION VALVE (IF AVAILABLE) OR REMOVE COMPLETELY
TO MAIN AND APPLY PIPING CAP.
PLAN
NORTH
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE PROJECT NUMBER:
KEY PLAN
BUILDING 70
Dwg. of 78Dunham Project No: 0419950-004
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
CONSTRUCTION DOCUMENTS
C R e v it P ro je c ts
\1
M p ls P h a rm a c y R e n o
M
E P
R c h a d g .r v t
/5
/2
:2
:3
A
M
1361-MD101
LOWER LEVEL HVAC DEMOLITION
PLAN
UPGRADE PHARMACY 18
MINNEAPOLIS, MN
618-16-120
06/04/2019 JG SAProject Number 31
06/04/2019
1/8" = 1'-0"
BASMENT LEVEL HVAC DEMOLITION PLAN
Signature
Name
Date
Registration Number ø
30ø ø
28ø
18ø
18ø
24ø
18ø
18ø
26ø
/8 ø ø ø
30ø
30ø18ø
18ø
CAP
CAP
CAP
CAP CAP
CAP
26ø
CAP
26ø 30ø
30ø
26ø
24ø ø 8 ø ø ø
26ø
26ø
26ø
30ø
/8 ø
CAP
ø ø
CAP
CAP
ø
CAP
CAP
ø ø
8ø ø ø
12ø
16ø
CAP
ø
52/14
CAP
32/45
28ø
30ø
45/32
/1
30ø ø ø ø ø ø ø ø ø ø ø
/8
/8 ø ø8 ø
12/8 ø
10ø ø ø ø
12/8 ø ø ø
8ø ø ø ø ø ø1 ø
8ø
SHAFT #2
DD CC BB Z Y X W VAA
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
MECHANICAL CONTRACTOR SHALL REFER TO THE VA MASTER
SPECIFICATION MANUAL EDITED FOR THIS PROJECT ALONG WITH ANY
APPLICABLE STANDARDS WITHIN THE 2017 HVAC DESIGN MANUAL. ALL
REQUIREMENTS OF THOSE MANUALS SHALL BE MAINTAINED IN ADDITION
TO ALL NOTES AND DESCRIPTIONS INDICATED WITHIN THESE
DRAWINGS. ANY CONFLICTS BETWEEN THOSE DOCUMENTS SHOULD BE
BROUGHT TO THE ATTENTION OF THE ENGINEER FOR INTERPRETATION.
MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO REVIEW
ACCESSIBILITY TO AREAS OUTSIDE THE CONSTRUCTION LIMITS TO
DETERMINE APPROXIMATE AMOUNT OF OVERTIME REQUIRED TO
PERFORM ALL MECHANICAL WORK INDICATED. COORDINATION OF
SCHEDULES WITH ADJACENT DEPARTMENTS AND CLEANING OF ALL
DEBRIS AFTER EACH WORK SHIFT SHOULD BE ASSUMED IN THE BASE
BID.
ANY MAJOR VENTILATION OUTAGES INDICATED ON THESE DRAWINGS
SHALL BE SCHEDULED TO BE PERFORMED AFTER NORMAL BUSINESS
HOURS OR DURING WEEKEND PERIODS TO MINIMIZE DISRUPTION. VA
HOSPITAL FACILITIES WILL REQUIRE A MINIMUM OF TWO(2) WEEKS
NOTICE PRIOR TO ANY SUCH OUTAGE AFFECTING MORE THAN ONE
ADJACENT AREA.
COORDINATE ALL NEW DUCTWORK ROUTING WITH ALL OTHER TRADES
TO INSURE ADEQUATE CLEARANCES FOR PLUMBING, ELECTRICAL
CONDUIT, STRUCTURAL SUPPORTS, PIPING, ETC. ANY UNAVOIDABLE
CONFLICTS SHALL BE BROUGHT THE ATTENTION OF THE
ARCHITECT/ENGINEER OF RECORD. PROVIDE ALL OFFSETS AND
TRANSITIONS AS REQUIRED FOR A CLEAN INSTALLATION.
THE EXACT LOCATION OF EQUIPMENT ROUGH-INS SHALL BE VERIFIED
WITH THE STAMPED APPROVED SHOP DRAWINGS PRIOR TO ANY FIELD
INSTALLATION.
SUPPORT ALL DUCTWORK DIRECTLY TO STRUCTURE. DO NOT SUPPORT
ANY DUCTS FROM DUCTWORK, CONDUIT, OR OTHER PIPING
ENCOUNTERED.
WHERE MECHANICAL SYSTEMS TO REMAIN ARE DAMAGED, OR
DISTURBED, DURING THE COURSE OF CONSTRUCTION THE
CONTRACTOR WILL BE RESPONSIBLE TO REMOVE DAMAGED PORTIONS
AND INSTALL NEW PRODUCTS OF EQUAL QUALITY AND FUNCTIONALITY.
ALL EXISTING DUCTWORK THROUGH NEW FIRE RATED WALLS SHALL BE
ADEQUATELY FIRE SEALED AS REQUIRED. PIPING PENETRATIONS
THROUGH INTERSTITIAL FLOOR SHALL BE DRILLED, OR CUT, BY THE
CONTRACTOR AND FIRE SEALED AS REQUIRED.
THE MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN
EACH PROJECT SPACE IN A NEGATIVE PRESSURIZATION AND PROVIDE
HEPA FILTRATION UNITS AS REQUIRED BY INFECTION CONTROL. IF
NECESSARY CONSULT WITH VA, OR ENGINEER OF RECORD, FOR
SUGGESTED METHODS THAT MAY BE UTILIZED TO ELIMINATE
CONTAMINATED AIR TO OUTSIDE. VISUAL PRESSURIZATION INDICATORS
SHALL BE PROVIDED AT EACH ENTRANCE TO THE CONSTRUCTION ZONE
AND MONITORED DAILY TO INSURE A CONSTANT NEGATIVE PRESSURE
IS MAINTAINED THROUGHOUT EACH PHASE. COORDINATE
PRESSURIZATION PLANNING WITH VA FACILITIES AND INFECTION
CONTROL REPRESENTATIVE PRIOR TO EACH CONSTRUCTION PHASE.
ALL EXISTING RETURN/EXHAUST DUCTWORK NOT TEMPORARILY
CAPPED SHALL BE PROTECTED WITH REMOVABLE FILTER MEDIA TO
PROTECT EXISTING DUCT SYSTEMS FROM CONSTRUCTION DEBRIS. ALL
NEW DUCTWORK SHALL BE PROTECTED AS REQUIRED AND CLEANED
PRIOR TO START-UP. IF CONSTRUCTION DEBRIS IS FOUND INSIDE
UNPROTECTED DUCTWORK THAN DUCT CLEANING OF THE ENTIRE
SYSTEM SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE.
ALL WORK OUTSIDE THE PROTECTED PROJECT BOUNDARIES ABOVE
EXISTING CEILING SHALL BE COMPLETED WITH CEILINGS REPLACED IN
THE SAME DAY UNLESS FULLY COORDINATED THROUGH INFECTION
CONTROL. CLEAN AREA TO ORIGINAL CONDITION ON COMPLETION.
CONTRACTOR TO INSTALL TEMPORARY BARRIERS FOR EACH PROJECT
PHASE AND/OR AREA. THESE BARRIERS SHALL BE COORDINATED WITH
VA HOSPITAL AND, IN MOST CASES, CONTAIN SOME FORM OF AIRLOCK
VESTIBULE PRIOR TO ENTERING THE CONSTRUCTION AREA.
FLUTTER STRIPS OR AIR PRESSURE GAUGES SHALL BE PROVIDED AT
THE ENTRANCES TO EACH CONSTRUCTION AREA. ALL CONTRACTED
WORKERS SHALL BE TRAINED TO VISUALLY MONITOR THESE DEVICES
FOR ADEQUATE NEGATIVE PRESSURIZATION AS THEY ENTER/EXIT THE
CONSTRUCTION AREA. DAILY LOGS SHALL BE KEPT BY THE
MECHANICAL CONTRACTOR TO INSURE CONSTANT PRESSURIZATION
HAS BEEN MAINTAINED.
NEGATIVE PRESSURIZATION SHALL BE MAINTAINED IN EACH
CONSTRUCTION AREA. IF LOCATED ON AN EXTERIOR WALL FANS
SHOULD BE UTILIZED TO EXHAUST AIR DIRECTLY OUT A NEARBY
WINDOW, TAKING PRECAUTIONS TO NOT INTERFERE WITH EXISTING
BUILDING AIR INTAKES, PUBLIC AREAS, ETC. IF NO EXTERIOR WALL IS
AVAILABLE THEN NEGATIVE AIR MACHINES WITH INTERNAL FILTRATION
SHALL BE PROVIDED AND CONNECTION TO THE NEAREST EXHAUST OR
RETURN DUCT AVAILABLE (CONTACT ENGINEER TO VERIFY EXISTING
DUCTWORK CAPACITY PRIOR TO EXHAUST CONNECTION).
PRIOR TO ANY DEMOLITION, OBTAIN PRE-CONSTRUCTION CFM
READING OF EXISTING DUCT MAIN AT THIS POINT.
2 REMOVE EXISTING VAV BOX WITH ASSOCIATED DUCTWORK.
3 REMOVE EXISTING SIDE-LOADING HEPA FILTER HOUSING. VA WILL
BAG AND REMOVE HEPA FILTER FOLLOWING ALL SAFETY
GUIDELINES. CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING
FILTER HOUSING AND DUCTWORK INDICATED.
PLAN
NORTH
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE PROJECT NUMBER:
KEY PLAN
BUILDING 70
Dwg. of 78Dunham Project No: 0419950-004
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
CONSTRUCTION DOCUMENTS
C R e v it P ro je c ts
\1
M p ls P h a rm a c y R e n o
M
E P
R c h a d g .r v t
/5
/2
:2
:5
A
M
1361-MD102
LOWER LEVEL INTERSTITIAL HVAC
DEMOLITION PLAN
UPGRADE PHARMACY 18
MINNEAPOLIS, MN
618-16-120
06/04/2019 JG SAProject Number 32
06/04/2019
1/8" = 1'-0"
BASMENT FLOOR INTERSTITIAL HVAC DEMOLITION PLAN
Signature
Name
Date
Registration Number
3/4"3/4"
1 1/4" 1 1/4"
/4
/4
/4
H
W R
/4
H
W S
1 1/2" 1 1/2"
H W
R
H
W S
1" HWS
1" HWR
1 1/4" HWR
1 1/4" HWS
/2
/2
1 1/2" 1 1/2"
/4
H
W R
/4
H
W S
CAP1
1 1
CAP
2" C H W
S
2" C H W
R
C H
W S
C H
W R
CAP
CAP
DD CC BB Z Y X W VAA
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
MECHANICAL CONTRACTOR SHALL REFER TO THE VA MASTER
SPECIFICATION MANUAL EDITED FOR THIS PROJECT ALONG WITH ANY
APPLICABLE STANDARDS WITHIN THE 2011 HVAC DESIGN GUIDE. ALL
REQUIREMENTS OF THOSE MANUALS SHALL BE MAINTAINED IN
ADDITION TO ALL NOTES AND DESCRIPTIONS INDICATED WITHIN THESE
DRAWINGS. ANY CONFLICTS BETWEEN THOSE DOCUMENTS SHOULD BE
BROUGHT TO THE ATTENTION OF THE ENGINEER FOR INTERPRETATION.
MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO REVIEW
ACCESSIBILITY TO AREAS OUTSIDE THE CONSTRUCTION LIMITS TO
DETERMINE APPROXIMATE AMOUNT OF OVERTIME REQUIRED TO
PERFORM ALL MECHANICAL WORK INDICATED. COORDINATION OF
SCHEDULES WITH ADJACENT DEPARTMENTS AND CLEANING OF ALL
DEBRIS AFTER EACH WORK SHIFT SHOULD BE ASSUMED IN THE BASE
BID.
ANY MAJOR VENTILATION OUTAGES INDICATED ON THESE DRAWINGS
SHALL BE SCHEDULED TO BE PERFORMED AFTER NORMAL BUSINESS
HOURS OR DURING WEEKEND PERIODS TO MINIMIZE DISRUPTION. VA
HOSPITAL FACILITIES WILL REQUIRE A MINIMUM OF TWO(2) WEEKS
NOTICE PRIOR TO ANY SUCH OUTAGE AFFECTING MORE THAN ONE
ADJACENT AREA.
COORDINATE ALL NEW PIPE ROUTING WITH ALL OTHER TRADES TO
INSURE ADEQUATE CLEARANCES FOR PLUMBING, ELECTRICAL
CONDUIT, STRUCTURAL SUPPORTS, PIPING, ETC. ANY UNAVOIDABLE
CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT/ENGINEER OF RECORD. PROVIDE ALL OFFSETS AND
TRANSITIONS AS REQUIRED FOR A CLEAN INSTALLATION.
THE EXACT LOCATION OF EQUIPMENT ROUGH-INS SHALL BE VERIFIED
WITH THE STAMPED APPROVED SHOP DRAWINGS PRIOR TO ANY FIELD
INSTALLATION.
SUPPORT ALL PIPING DIRECTLY TO STRUCTURE. DO NOT SUPPORT ANY
PIPE FROM DUCTWORK, CONDUIT, OR OTHER PIPING ENCOUNTERED.
WHERE MECHANICAL SYSTEMS TO REMAIN ARE DAMAGED, OR
DISTURBED, DURING THE COURSE OF CONSTRUCTION THE
CONTRACTOR WILL BE RESPONSIBLE TO REMOVE DAMAGED PORTIONS
AND INSTALL NEW PRODUCTS OF EQUAL QUALITY AND FUNCTIONALITY.
ALL EXISTING PIPING THROUGH NEW FIRE RATED WALLS SHALL BE
ADEQUATELY FIRE SEALED AS REQUIRED. PIPING PENETRATIONS
THROUGH INTERSTITIAL FLOOR SHALL BE DRILLED, OR CUT, BY THE
CONTRACTOR AND FIRE SEALED AS REQUIRED.
THE MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN
EACH PROJECT SPACE IN A NEGATIVE PRESSURIZATION AND PROVIDE
HEPA FILTRATION UNITS AS REQUIRED BY INFECTION CONTROL. IF
NECESSARY CONSULT WITH VA, OR ENGINEER OF RECORD, FOR
SUGGESTED METHODS THAT MAY BE UTILIZED TO ELIMINATE
CONTAMINATED AIR TO OUTSIDE. VISUAL PRESSURIZATION INDICATORS
SHALL BE PROVIDED AT EACH ENTRANCE TO THE CONSTRUCTION ZONE
AND MONITORED DAILY TO INSURE A CONSTANT NEGATIVE PRESSURE
IS MAINTAINED THROUGHOUT EACH PHASE. COORDINATE
PRESSURIZATION PLANNING WITH VA FACILITIES AND INFECTION
CONTROL REPRESENTATIVE PRIOR TO EACH CONSTRUCTION PHASE.
ALL WORK OUTSIDE THE PROTECTED PROJECT BOUNDARIES ABOVE
EXISTING CEILING SHALL BE COMPLETED WITH CEILINGS REPLACED IN
THE SAME DAY UNLESS FULLY COORDINATED THROUGH INFECTION
CONTROL. CLEAN AREA TO ORIGINAL CONDITION ON COMPLETION.
CONTRACTOR TO INSTALL TEMPORARY BARRIERS FOR EACH PROJECT
PHASE AND/OR AREA. THESE BARRIERS SHALL BE COORDINATED WITH
VA HOSPITAL AND, IN MOST CASES, CONTAIN SOME FORM OF AIRLOCK
VESTIBULE PRIOR TO ENTERING THE CONSTRUCTION AREA.
FLUTTER STRIPS OR AIR PRESSURE GAUGES SHALL BE PROVIDED AT
THE ENTRANCES TO EACH CONSTRUCTION AREA. ALL CONTRACTED
WORKERS SHALL BE TRAINED TO VISUALLY MONITOR THESE DEVICES
FOR ADEQUATE NEGATIVE PRESSURIZATION AS THEY ENTER/EXIT THE
CONSTRUCTION AREA. DAILY LOGS SHALL BE KEPT BY THE
MECHANICAL CONTRACTOR TO INSURE CONSTANT PRESSURIZATION
HAS BEEN MAINTAINED.
NEGATIVE PRESSURIZATION SHALL BE MAINTAINED IN EACH
CONSTRUCTION AREA. IF LOCATED ON AN EXTERIOR WALL FANS
SHOULD BE UTILIZED TO EXHAUST AIR DIRECTLY OUT A NEARBY
WINDOW, TAKING PRECAUTIONS TO NOT INTERFERE WITH EXISTING
BUILDING AIR INTAKES, PUBLIC AREAS, ETC. IF NO EXTERIOR WALL IS
AVAILABLE THEN NEGATIVE AIR MACHINES WITH INTERNAL FILTRATION
SHALL BE PROVIDED AND CONNECTION TO THE NEAREST EXHAUST OR
RETURN DUCT AVAILABLE (CONTACT ENGINEER TO VERIFY EXISTING
DUCTWORK CAPACITY PRIOR TO EXHAUST CONNECTION).
EXISTING VAV BOX WITH ASSOCIATED PIPING TO REMAIN.
REMOVE EXISTING VAV BOX WITH ASSOCIATED PIPING AS INDICATED.
3 REMOVE EXISTING PIPING DOWN TO COIL IN MECHANICAL ROOM ON
FLOOR BELOW.
PLAN
NORTH
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE PROJECT NUMBER:
KEY PLAN
BUILDING 70
Dwg. of 78Dunham Project No: 0419950-004
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
CONSTRUCTION DOCUMENTS
C R e v it P ro je c ts
\1
M p ls P h a rm a c y R e n o
M
E P
R c h a d g .r v t
/5
/2
:2
:1
A
M
1361-MD103
LOWER LEVEL INTERSTITIAL
HYDRONIC DEMOLITION PLAN
UPGRADE PHARMACY 18
MINNEAPOLIS, MN
618-16-120
06/04/2019 JG SAProject Number 33
06/04/2019
1/8" = 1'-0"
BASMENT FLOOR INTERSTITIAL HYDRONIC DEMOLITION PLAN
Signature
Name
Date
Registration Number
KEY NOTES: GENERAL NOTES:
JK
T
T
T
SP
SP
6 6
6 6
JK
K
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
MECHANICAL CONTRACTOR SHALL REFER TO THE VA MASTER
SPECIFICATION MANUAL EDITED FOR THIS PROJECT ALONG WITH ANY
APPLICABLE STANDARDS WITHIN THE 2011 HVAC DESIGN GUIDE. ALL
REQUIREMENTS OF THOSE MANUALS SHALL BE MAINTAINED IN ADDITION
TO ALL NOTES AND DESCRIPTIONS INDICATED WITHIN THESE
DRAWINGS. ANY CONFLICTS BETWEEN THOSE DOCUMENTS SHOULD BE
BROUGHT TO THE ATTENTION OF THE ENGINEER FOR INTERPRETATION.
MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO REVIEW
ACCESSIBILITY TO AREAS OUTSIDE THE CONSTRUCTION LIMITS TO
DETERMINE APPROXIMATE AMOUNT OF OVERTIME REQUIRED TO
PERFORM ALL MECHANICAL WORK INDICATED. COORDINATION OF
SCHEDULES WITH ADJACENT DEPARTMENTS AND CLEANING OF ALL
DEBRIS AFTER EACH WORK SHIFT SHOULD BE ASSUMED IN THE BASE
BID.
ANY MAJOR VENTILATION OUTAGES INDICATED ON THESE DRAWINGS
SHALL BE SCHEDULED TO BE PERFORMED AFTER NORMAL BUSINESS
HOURS OR DURING WEEKEND PERIODS TO MINIMIZE DISRUPTION. VA
HOSPITAL FACILITIES WILL REQUIRE A MINIMUM OF TWO(2) WEEKS
NOTICE PRIOR TO ANY SUCH OUTAGE AFFECTING MORE THAN ONE
ADJACENT AREA.
COORDINATE ALL NEW DUCTWORK ROUTING WITH ALL OTHER TRADES
TO INSURE ADEQUATE CLEARANCES FOR PLUMBING, ELECTRICAL
CONDUIT, STRUCTURAL SUPPORTS, PIPING, ETC. ANY UNAVOIDABLE
CONFLICTS SHALL BE BROUGHT THE ATTENTION OF THE
ARCHITECT/ENGINEER OF RECORD. PROVIDE ALL OFFSETS AND
TRANSITIONS AS REQUIRED FOR A CLEAN INSTALLATION.
THE EXACT LOCATION OF EQUIPMENT ROUGH-INS SHALL BE VERIFIED
WITH THE STAMPED APPROVED SHOP DRAWINGS PRIOR TO ANY FIELD
INSTALLATION.
SUPPORT ALL DUCTWORK DIRECTLY TO STRUCTURE. DO NOT SUPPORT
ANY DUCTS FROM DUCTWORK, CONDUIT, OR OTHER PIPING
ENCOUNTERED.
WHERE MECHANICAL SYSTEMS TO REMAIN ARE DAMAGED, OR
DISTURBED, DURING THE COURSE OF CONSTRUCTION THE
CONTRACTOR WILL BE RESPONSIBLE TO REMOVE DAMAGED PORTIONS
AND INSTALL NEW PRODUCTS OF EQUAL QUALITY AND FUNCTIONALITY.
ALL EXISTING DUCTWORK THROUGH NEW FIRE RATED WALLS SHALL BE
ADEQUATELY FIRE SEALED AS REQUIRED. PIPING PENETRATIONS
THROUGH INTERSTITIAL FLOOR SHALL BE DRILLED, OR CUT, BY THE
CONTRACTOR AND FIRE SEALED AS REQUIRED.
THE MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN
EACH PROJECT SPACE IN A NEGATIVE PRESSURIZATION AND PROVIDE
HEPA FILTRATION UNITS AS REQUIRED BY INFECTION CONTROL. IF
NECESSARY CONSULT WITH VA, OR ENGINEER OF RECORD, FOR
SUGGESTED METHODS THAT MAY BE UTILIZED TO ELIMINATE
CONTAMINATED AIR TO OUTSIDE. VISUAL PRESSURIZATION INDICATORS
SHALL BE PROVIDED AT EACH ENTRANCE TO THE CONSTRUCTION ZONE
AND MONITORED DAILY TO INSURE A CONSTANT NEGATIVE PRESSURE
IS MAINTAINED THROUGHOUT EACH PHASE. COORDINATE
PRESSURIZATION PLANNING WITH VA FACILITIES AND INFECTION
CONTROL REPRESENTATIVE PRIOR TO EACH CONSTRUCTION PHASE.
ALL EXISTING RETURN/EXHAUST DUCTWORK NOT TEMPORARILY
CAPPED SHALL BE PROTECTED WITH REMOVABLE FILTER MEDIA TO
PROTECT EXISTING DUCT SYSTEMS FROM CONSTRUCTION DEBRIS. ALL
NEW DUCTWORK SHALL BE PROTECTED AS REQUIRED AND CLEANED
PRIOR TO START-UP. IF CONSTRUCTION DEBRIS IS FOUND INSIDE
UNPROTECTED DUCTWORK THAN DUCT CLEANING OF THE ENTIRE
SYSTEM SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE.
ALL WORK OUTSIDE THE PROTECTED PROJECT BOUNDARIES ABOVE
EXISTING CEILING SHALL BE COMPLETED WITH CEILINGS REPLACED IN
THE SAME DAY UNLESS FULLY COORDINATED THROUGH INFECTION
CONTROL. CLEAN AREA TO ORIGINAL CONDITION ON COMPLETION.
CONTRACTOR TO INSTALL TEMPORARY BARRIERS FOR EACH PROJECT
PHASE AND/OR AREA. THESE BARRIERS SHALL BE COORDINATED WITH
VA HOSPITAL AND, IN MOST CASES, CONTAIN SOME FORM OF AIRLOCK
VESTIBULE PRIOR TO ENTERING THE CONSTRUCTION AREA.
FLUTTER STRIPS OR AIR PRESSURE GAUGES SHALL BE PROVIDED AT
THE ENTRANCES TO EACH CONSTRUCTION AREA. ALL CONTRACTED
WORKERS SHALL BE TRAINED TO VISUALLY MONITOR THESE DEVICES
FOR ADEQUATE NEGATIVE PRESSURIZATION AS THEY ENTER/EXIT THE
CONSTRUCTION AREA. DAILY LOGS SHALL BE KEPT BY THE
MECHANICAL CONTRACTOR TO INSURE CONSTANT PRESSURIZATION
HAS BEEN MAINTAINED.
NEGATIVE PRESSURIZATION SHALL BE MAINTAINED IN EACH
CONSTRUCTION AREA. IF LOCATED ON AN EXTERIOR WALL FANS
SHOULD BE UTILIZED TO EXHAUST AIR DIRECTLY OUT A NEARBY
WINDOW, TAKING PRECAUTIONS TO NOT INTERFERE WITH EXISTING
BUILDING AIR INTAKES, PUBLIC AREAS, ETC. IF NO EXTERIOR WALL IS
AVAILABLE THEN NEGATIVE AIR MACHINES WITH INTERNAL FILTRATION
SHALL BE PROVIDED AND CONNECTION TO THE NEAREST EXHAUST OR
RETURN DUCT AVAILABLE (CONTACT ENGINEER TO VERIFY EXISTING
DUCTWORK CAPACITY PRIOR TO EXHAUST CONNECTION).
REMOVE EXISTING LAMINAR SUPPLY DIFFUSER. REFER TO
INTERSTITIAL SPACE FOR REMOVAL OF ASSOCIATED INLINE HEPA
FILTER ABOVE.
REMOVE EXISTING RETURN OR EXHAUST GRILLE. REFER TO
INTERSTITIAL PLANS ABOVE FOR ASSOCIATED DUCTWORK
DEMOLITION.
REMOVE EXISTING FAN POWERED HEPA FILTER (field verify exact location). REMOVE ALL ASSOCIATED DUCTWORK AND POWER
CONNECTIONS AS REQUIRED.
REMOVE EXISTING THERMOSTAT AND CONTROL WIRING. REFER TO
NEW FLOOR PLANS FOR INTEGRATION OF NEW DDC THERMOSTAT
AND MODIFICATIONS OF EXISTING VAV BOX ACTUATORS.
REMOVE EXISTING TSI ROOM PRESSURE MONITOR. SALVAGE PARTS
TO TURN OVER TO VA FOR USE IN REPAIRS. REFER TO NEW PLANS
FOR INTEGRATION OF NEW ROOM PRESSURIZATION MONITORS.
DISCONNECT EXISTING EXHAUST AND MAKE-UP AIR DUCTWORK
CONNECTIONS TO EXISTING BSC HOODS TO BE RELOCATED.
COORDINATE DISCONNECTION AND REPLACEMENT OF EXISTING
INTERNAL FILTERS WITH VA REPRESENTATIVES WHO WILL REMOVE
AND DISPOSE OF HAZARDOUS MATERIALS PER CETA REQUIREMENTS.
NOT USED.
NOT USED.
NOT USED.
REMOVE EXISTING SIDE-LOADING HEPA FILTER HOUSING. VA WILL
BAG AND REMOVE HEPA FILTER FOLLOWING ALL SAFETY GUIDELINES.
CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING FILTER HOUSING
AND DUCTWORK INDICATED.
REMOVE EXISTING SUPPLY DUCTWORK INDICATED. TEMPORARILY
CAP SERVICES UNTIL NEW DUCT CONNECTIONS ARE INSTALLED.
REMOVE EXISTING RETURN OR EXHAUST DUCTWORK INDICATED AND
CAP/SEAL AIRTIGHT AS REQUIRED AT MAIN DUCT TAKE-OFF.
REMOVE EXISTING FUME HOOD EXHAUST DUCTWORK AND SHUT-
DOWN WITH TEMPORARY LOCK-OUT OF ASSOCIATED FAN WITHIN 4TH
FLOOR MECHANICAL ROOM AS REQUIRED.
REMOVE EXISTING VAV BOX AND ANY ASSOICATED REHEAT COIL
PIPING AND CONTROLS. CAP AT TAKE-OFF FROM MAIN DUCT AND
PATCH/SEAL AIRTIGHT WITH INSULATION REPAIRED IN THAT LOCATION.
PLAN
NORTH
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE PROJECT NUMBER:
KEY PLAN
BUILDING 70
Dwg. of 78Dunham Project No: 0419950-004
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
CONSTRUCTION DOCUMENTS
C R e v it P ro je c ts
\1
M p ls P h a rm a c y R e n o
M
E P
R c h a d g .r v t
/5
/2
:2
:2
A
M
1361-MD131
THIRD LEVEL HVAC DEMOLITION
PLANS
UPGRADE PHARMACY 18
MINNEAPOLIS, MN
618-16-120
06/04/2019 JG SAProject Number 34
06/04/2019
1/4" = 1'-0"
THIRD LEVEL HVAC DEMOLITION PLAN
1/4" = 1'-0"
THIRD LEVEL INTERSTITIAL HVAC DEMOLITION PLAN
1/4" = 1'-0"
THIRD LEVEL INTERSTITIAL HYDRONIC DEMOLITION PLAN
Signature
Name
Date
Registration Number
MM
M
F
F
KEY NOTES:
GENERAL NOTES:
2 1/2" MPC DN
EXISTING EXHAUST
FAN WITH 24" EXHAUST
STACK UP THRU ROOF
EXISTING RETURN
AIR FAN
EXISTING RELIEF
AIR LOUVER
EXISTING OUTSIDE
AIR LOUVER
60x60
48x72
60ø ø ø ø ø ø
120x36
34ø
48x72
EXISTING
70-HVPN
ø
66ø
C H
W S
C H
W R
M P
S ø x
24x42
24x42
SHAFT #2
120x36 x
48x72
34ø
5"CHWS
5"CHWR
5"CHWR
5"CHWS
4"MPS
1"MPC
2 1/2"MPC
54ø
EXISTING
70-AHPN
6" CHWS
6" CHWR
96x48
G R
G S ø ø ø
C H
W S
C H
W R
M P
S
X W V
1 AFTER ALL PROVISIONS SHOWN ON PRE-CONSTRUCTION DRAWING
TO PROVIDE TEMPORARY VENTILATION NEEDS FOR ALL AREAS
SERVED BY THIS UNIT IS COMPLETE. THEN REMOVE EXISTING AIR
HANDLING UNIT AHPN-37 IN ITS ENTIRETY AS FOLLOWS.
• DISCONNECT SUPPLY DUCTWORK FROM EXISTING UNIT.
• DISCONNECT RETURN DUCTWORK UP TO POINT OF RELIEF TAKE-
OFF, INCLUDE REMOVAL OF EXISTING RETURN AIR DAMPER.
• DISCONNECT OUTSIDE AIR DUCTWORK CONNECTION, INCLUDING
REMOVAL OF EXISTING OUTDOOR AIR DAMPER AT LOUVER.
• DISCONNECT AND REMOVE EXISTING CHILLED WATER PIPING
ALONG WITH ALL PIPING COMPONENTS BACK TO MAIN, OR
EXISTING ISOLATION VALVE IF AVAILABLE, AND CAP OFF.
• DISCONNECT AND REMOVE EXISTING STEAM AND CONDENSATE
PIPING FOR BOTH HUMIDIFIER AND IFB COIL, ALONG WITH ALL
PIPING COMPONENTS, TO MAIN AND TEMPORARILY CAP.
• REMOVE ALL COILS, SUPPLY FANS, FILTER RACKS, ETC OUT OF
EXISTING AHPN-37. REFER TO ELECTRICAL FOR POWER
DISCONNECTION AND REROUTING.
• REMOVE ALL ASSOCIATED CONTROLS AND PNEUMATIC CONTROL
TUBING AND DDC SENSORS CURRENTLY IN PLACE. REVISE ALL
PROGRAMMING ON CENTRAL AUTOMATION COMPUTER TO
OPERATE TEMPORARY UNIT AS INDICATED ON PRE-
CONSTRUCTION PLAN.
• CONTRACTOR TO REPAIR ANY FLOOR DAMAGE AND REMOVE ANY
ASSOCIATED CONCRETE EQUIPMENT PADS AS REQUIRED. REFER
TO NEW PLANS FOR NEW CONCRETE EQUIPMENT CURB TO
ENSURE LEVEL SURFACE FOR NEW AHU INSTALLATION.
• REMOVE ALL WALL PANELS, STRUCTURAL UNIT BASE, AND
FLOOR/ROOF FOR ENTIRE AIR HANDLING UNIT BEING
DEMOLISHED. TAKE SAFETY PRECAUTIONS FOR POTENTIAL
MOLD OR CONTAMINATION WITHIN INSULATED PANELS.
• COORDINATE METHOD FOR REMOVAL OF ALL MATERIAL FROM
SITE, REFER TO DETAIL 3/M151 FOR POTENTIAL CRANE PICK-UP
LOCATIONS OR DEVELOP PATH (FOR VA REVIEW/APPROVAL)
THROUGH BUILDING FOR DEMOLISHED MATERIALS.
DISCONNECT AND CAP EXISTING RETURN DUCTWORK. REFER TO
DRAWING M151 FOR ADDITIONAL INFORMATION.
CAP AND RE-DIRECT SUPPLY MAIN TO TEMPORARY AIR HANDLING
UNIT. REFER TO DRAWING M151 FOR MORE INFORMATION.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
MECHANICAL CONTRACTOR SHALL REFER TO THE VA MASTER
SPECIFICATION MANUAL EDITED FOR THIS PROJECT ALONG WITH ANY
APPLICABLE STANDARDS WITHIN THE 2011 HVAC DESIGN GUIDE. ALL
REQUIREMENTS OF THOSE MANUALS SHALL BE MAINTAINED IN ADDITION
TO ALL NOTES AND DESCRIPTIONS INDICATED WITHIN THESE
DRAWINGS. ANY CONFLICTS BETWEEN THOSE DOCUMENTS SHOULD BE
BROUGHT TO THE ATTENTION OF THE ENGINEER FOR INTERPRETATION.
MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO REVIEW
ACCESSIBILITY TO AREAS OUTSIDE THE CONSTRUCTION LIMITS TO
DETERMINE APPROXIMATE AMOUNT OF OVERTIME REQUIRED TO
PERFORM ALL MECHANICAL WORK INDICATED. COORDINATION OF
SCHEDULES WITH ADJACENT DEPARTMENTS AND CLEANING OF ALL
DEBRIS AFTER EACH WORK SHIFT SHOULD BE ASSUMED IN THE BASE
BID.
ANY MAJOR VENTILATION OUTAGES INDICATED ON THESE DRAWINGS
SHALL BE SCHEDULED TO BE PERFORMED AFTER NORMAL BUSINESS
HOURS OR DURING WEEKEND PERIODS TO MINIMIZE DISRUPTION. VA
HOSPITAL FACILITIES WILL REQUIRE A MINIMUM OF TWO(2) WEEKS
NOTICE PRIOR TO ANY SUCH OUTAGE AFFECTING MORE THAN ONE
ADJACENT AREA.
COORDINATE ALL NEW DUCTWORK ROUTING WITH ALL OTHER TRADES
TO INSURE ADEQUATE CLEARANCES FOR PLUMBING, ELECTRICAL
CONDUIT, STRUCTURAL SUPPORTS, PIPING, ETC. ANY UNAVOIDABLE
CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT/ENGINEER OF RECORD. PROVIDE ALL OFFSETS AND
TRANSITIONS AS REQUIRED FOR A CLEAN INSTALLATION.
THE EXACT LOCATION OF EQUIPMENT ROUGH-INS SHALL BE VERIFIED
WITH THE STAMPED APPROVED SHOP DRAWINGS PRIOR TO ANY FIELD
INSTALLATION.
SUPPORT ALL DUCTWORK DIRECTLY TO STRUCTURE. DO NOT SUPPORT
ANY DUCTS FROM DUCTWORK, CONDUIT, OR OTHER PIPING
ENCOUNTERED.
WHERE MECHANICAL SYSTEMS TO REMAIN ARE DAMAGED, OR
DISTURBED, DURING THE COURSE OF CONSTRUCTION THE
CONTRACTOR WILL BE RESPONSIBLE TO REMOVE DAMAGED PORTIONS
AND INSTALL NEW PRODUCTS OF EQUAL QUALITY AND FUNCTIONALITY.
ALL EXISTING DUCTWORK THROUGH NEW FIRE RATED WALLS SHALL BE
ADEQUATELY FIRE SEALED AS REQUIRED. PIPING PENETRATIONS
THROUGH INTERSTITIAL FLOOR SHALL BE DRILLED, OR CUT, BY THE
CONTRACTOR AND FIRE SEALED AS REQUIRED.
THE MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN
EACH PROJECT SPACE IN A NEGATIVE PRESSURIZATION AND PROVIDE
HEPA FILTRATION UNITS AS REQUIRED BY INFECTION CONTROL. IF
NECESSARY CONSULT WITH VA, OR ENGINEER OF RECORD, FOR
SUGGESTED METHODS THAT MAY BE UTILIZED TO ELIMINATE
CONTAMINATED AIR TO OUTSIDE. VISUAL PRESSURIZATION INDICATORS
SHALL BE PROVIDED AT EACH ENTRANCE TO THE CONSTRUCTION ZONE
AND MONITORED DAILY TO INSURE A CONSTANT NEGATIVE PRESSURE
IS MAINTAINED THROUGHOUT EACH PHASE. COORDINATE
PRESSURIZATION PLANNING WITH VA FACILITIES AND INFECTION
CONTROL REPRESENTATIVE PRIOR TO EACH CONSTRUCTION PHASE.
ALL EXISTING RETURN/EXHAUST DUCTWORK NOT TEMPORARILY
CAPPED SHALL BE PROTECTED WITH REMOVABLE FILTER MEDIA TO
PROTECT EXISTING DUCT SYSTEMS FROM CONSTRUCTION DEBRIS. ALL
NEW DUCTWORK SHALL BE PROTECTED AS REQUIRED AND CLEANED
PRIOR TO START-UP. IF CONSTRUCTION DEBRIS IS FOUND INSIDE
UNPROTECTED DUCTWORK THAN DUCT CLEANING OF THE ENTIRE
SYSTEM SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE.
ALL WORK OUTSIDE THE PROTECTED PROJECT BOUNDARIES ABOVE
EXISTING CEILING SHALL BE COMPLETED WITH CEILINGS REPLACED IN
THE SAME DAY UNLESS FULLY COORDINATED THROUGH INFECTION
CONTROL. CLEAN AREA TO ORIGINAL CONDITION ON COMPLETION.
CONTRACTOR TO INSTALL TEMPORARY BARRIERS FOR EACH PROJECT
PHASE AND/OR AREA. THESE BARRIERS SHALL BE COORDINATED WITH
VA HOSPITAL AND, IN MOST CASES, CONTAIN SOME FORM OF AIRLOCK
VESTIBULE PRIOR TO ENTERING THE CONSTRUCTION AREA.
FLUTTER STRIPS OR AIR PRESSURE GAUGES SHALL BE PROVIDED AT
THE ENTRANCES TO EACH CONSTRUCTION AREA. ALL CONTRACTED
WORKERS SHALL BE TRAINED TO VISUALLY MONITOR THESE DEVICES
FOR ADEQUATE NEGATIVE PRESSURIZATION AS THEY ENTER/EXIT THE
CONSTRUCTION AREA. DAILY LOGS SHALL BE KEPT BY THE
MECHANICAL CONTRACTOR TO INSURE CONSTANT PRESSURIZATION
HAS BEEN MAINTAINED.
NEGATIVE PRESSURIZATION SHALL BE MAINTAINED IN EACH
CONSTRUCTION AREA. IF LOCATED ON AN EXTERIOR WALL FANS
SHOULD BE UTILIZED TO EXHAUST AIR DIRECTLY OUT A NEARBY
WINDOW, TAKING PRECAUTIONS TO NOT INTERFERE WITH EXISTING
BUILDING AIR INTAKES, PUBLIC AREAS, ETC. IF NO EXTERIOR WALL IS
AVAILABLE THEN NEGATIVE AIR MACHINES WITH INTERNAL FILTRATION
SHALL BE PROVIDED AND CONNECTION TO THE NEAREST EXHAUST OR
RETURN DUCT AVAILABLE (CONTACT ENGINEER TO VERIFY EXISTING
DUCTWORK CAPACITY PRIOR TO EXHAUST CONNECTION).
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE PROJECT NUMBER: Dwg. of 78Dunham Project No: 0419950-004
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
CONSTRUCTION DOCUMENTS
C R e v it P ro je c ts
\1
M p ls P h a rm a c y R e n o
M
E P
R c h a d g .r v t
/5
/2
:2
:3
A
M
1361-MD151
PENTHOUSE HVAC DEMOLITION
PLAN - SHAFT #2
UPGRADE PHARMACY 18
MINNEAPOLIS, MN
618-16-120
06/04/2019 JG SAProject Number 35
06/04/2019
1/4" = 1'-0"
PENTHOUSE HVAC DEMOLITION PLAN
Signature
Name
Date
Registration Number
P S
P S
P S
PS
KEY NOTES: GENERAL NOTES:
MECH
BR-101C
Unoccupied
Unoccupied
Unoccupied
Unoccupied
Unoccupied
Unoccupied
INVESTIGATIONAL
DRUG SERVICES
BR-117
INPATIENT
NARCOTIC
VAULT
BR-116
CONFERENCE/TRAINING
BR-124
OFFICE
BR-101E
HD BUFFER
ROOM
BR-118C
STORAGE HD
DRUGS
BR-119
STAFF LOUNGE
BR-125
WOMEN'S
LOCKERS
BR-122
WORK
STATIONS
BR-123
GENERAL
PHARMACY
BR-113
MECH
BR-108
ANTE ROOM
BR-118
OFFICE
BR-115
OFFICE
BR-101F
OFFICE
BR-101H
OFFICE
BR-101G
OFFICE
BR-114
OFFICE
BR-101B
OPEN OFFICE
BR-101D
RECEIVING
BR-120
MEN'S LOCKER
BR-121
HSKP
BR-127
CONFERENCE
ROOM
BR-126
GENERAL
PHARMACY
BR-113
PICKUP
WINDOW
BR-128
RECEPTION
BR-101
CORRIDOR
CB78
(4)A-12"
NON HD BUFFER
ROOM
BR-118B
(2)D-16x4 (BOTH UNDER &
ABOVE COUNTER)
(5)A-12"
D-10x10
(LOW)
8ø UP
18x6 UP
D-16x16
(LOW)
B-6"
C-8"
C-8"
B-6"
C-8" 105 B-6"
B-8"
B-8"
C-6"
B-6"
C-6"
B-6"
B-6"
C-6"
E-6"
B-6"
B-8"
B-8"
C-16"
B-8"
B-10"
B-10"
B-6"
B-6"
C-10"
B-10"
C-8" 160 C-6"
C-6"
C-6"
B-6"
B-6"
C-16"
B-10"
B-10"
B-10"
B-10"
B-10"
B-10"
B-10"
B-10"
B-10"
C-16"
C-16"
C-16"
C-16"
C-16"
C-16"
C-16"
C-16"
C-16"
C-16"
B-10"
B-10"
B-10"
B-10"
B-8"
B-8"
B-8"
B-8"
C-10"
C-12"
B-8"
B-8"
B-8"
C-14"
B-6"
C-8"
C-12"
B-6"
C-6"
C-16"
B-8"
B-8"
B-8"
B-10"
B-10"
B-10"
B-10"
B-10"
B-10"
B-10"
B-10"
B-10"
B-10"
B-10"
B-8"
B-8"
B-8"
(2)B-8"
C-16"
C-16"
C-16"
T
70.VAV.37.BR120
T70.VAV.37.BR119
TAC 03
TAC 02
T AC 01T 70.VAV.37.BR113.3
T70.VAV.37.BR122
T 70.VAV.37.BR113.2
T
70.VAV.37.BR113.1
T 70.VAV.37.BR124
T70.VAV.37.BR126
T70.VAV.37.BR125
T 70.VAV.37.BR128
T
70.VAV.37.BR117
T70.VAV.37.BR116
T 70.VAV.37.BR114
T70.VAV.37.BR101
T 70.VAV.37.BR101A
T
70.VAV.37.BR101D
T
70.VAV.37.BR101G
T 70.VAV.37.BR101F
T
70.VAV.37.BR123
OPEN OFFICE
BR-101A
CFM
CFM
CFM
CFM
CFM
CFM
E-12x12
B-6" ø
H
7 H
H
8H
(5)A-12"
AC
AC
AC
Room
BR-111
1 1 1
14x28 FROM ABOVE
24x18 UP
18ø FROM ABOVE
14ø FROM ABOVE
24x18 UP
24x18 UP
OFFICE
BR-110A
OFFICE
BR-110B
2 190
CFM
B-8"
2 430
CFM
B-6"
B-6"
C-8"
C-8"
T70.VAV.37.BR110B
GENERAL
PHARMACY
BR-113
D-16x10
(LOW)
D-16x16
(LOW)
D-10x10
D-10x10
18x6 UP
DD CC BB Z Y X W VAA
E-12x6
1 AIR CONDITIONING UNIT. MAINTAIN MANUFACTURER'S
RECOMMENDED INSTALLATION CLEARANCES. PROVIDE UNIT WITH:
• UPFLOW SUPPLY AIR PLENUM WITH COLLAR.
• REAR RETURN FLOORSTAND. CONNECT FULL SIZE FLEXIBLE
DUCT TO UNIT.
• 1-1/4" CHWS AND 1-1/4" CHWR FROM INTERSTITIAL SPACE ABOVE.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
MECHANICAL CONTRACTOR SHALL REFER TO THE VA MASTER
SPECIFICATION MANUAL EDITED FOR THIS PROJECT ALONG WITH ANY
APPLICABLE STANDARDS WITHIN THE VA DESIGN GUIDE. ALL
REQUIREMENTS OF THOSE MANUALS SHALL BE MAINTAINED IN
ADDITION TO ALL NOTES AND DESCRIPTIONS INDICATED WITHIN THESE
DRAWINGS. ANY CONFLICTS BETWEEN THOSE DOCUMENTS SHOULD
BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR
INTERPRETATION.
MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO REVIEW
ACCESSIBILITY TO AREAS OUTSIDE THE CONSTRUCTION LIMITS TO
DETERMINE APPROXIMATE AMOUNT OF OVERTIME REQUIRED TO
PERFORM ALL MECHANICAL WORK INDICATED. COORDINATION OF
SCHEDULES WITH ADJACENT DEPARTMENTS AND CLEANING OF ALL
DEBRIS AFTER EACH WORK SHIFT SHOULD BE ASSUMED IN THE BASE
BID.
ANY MAJOR VENTILATION OUTAGES INDICATED ON THESE DRAWINGS
SHALL BE SCHEDULED TO BE PERFORMED AFTER NORMAL BUSINESS
HOURS OR DURING WEEKEND PERIODS TO MINIMIZE DISRUPTION. VA
HOSPITAL FACILITIES WILL REQUIRE A MINIMUM OF TWO(2) WEEKS
NOTICE PRIOR TO ANY SUCH OUTAGE AFFECTING MORE THAN ONE
ADJACENT AREA.
WHERE MECHANICAL SYSTEMS TO REMAIN ARE DAMAGED, OR
DISTURBED, DURING THE COURSE OF CONSTRUCTION THE
CONTRACTOR WILL BE RESPONSIBLE TO REMOVE DAMAGED PORTIONS
AND INSTALL NEW PRODUCTS OF EQUAL QUALITY AND FUNCTIONALITY.
ALL EXISTING DUCTWORK AND PIPING THROUGH NEW FIRE RATED
WALLS SHALL BE ADEQUATELY FIRE SEALED AS REQUIRED. PIPING
PENETRATIONS THROUGH INTERSTITIAL FLOOR SHALL BE DRILLED, OR
CUT, BY THE CONTRACTOR AND FIRE SEALED AS REQUIRED.
THE EXACT LOCATION OF EQUIPMENT ROUGH-INS SHALL BE VERIFIED
WITH THE STAMPED APPROVED SHOP DRAWINGS PRIOR TO ANY FIELD
INSTALLATION.
THE MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN
EACH PROJECT SPACE IN A NEGATIVE PRESSURIZATION AND PROVIDE
HEPA FILTRATION UNITS AS REQUIRED BY INFECTION CONTROL. IF
NECESSARY CONSULT WITH VA, OR ENGINEER OF RECORD, FOR
SUGGESTED METHODS THAT MAY BE UTILIZED TO ELIMINATE
CONTAMINATED AIR TO OUTSIDE. VISUAL PRESSURIZATION INDICATORS
SHALL BE PROVIDED AT EACH ENTRANCE TO THE CONSTRUCTION ZONE
AND MONITORED DAILY TO INSURE A CONSTANT NEGATIVE PRESSURE
IS MAINTAINED THROUGHOUT EACH PHASE. COORDINATE
PRESSURIZATION PLANNING WITH VA FACILITIES AND INFECTION
CONTROL REPRESENTATIVE PRIOR TO EACH CONSTRUCTION PHASE.
ALL EXISTING RETURN/EXHAUST DUCTWORK NOT TEMPORARILY
CAPPED SHALL BE PROTECTED WITH REMOVABLE FILTER MEDIA TO
PROTECT EXISTING DUCT SYSTEMS FROM CONSTRUCTION DEBRIS. ALL
NEW DUCTWORK SHALL BE PROTECTED AS REQUIRED AND CLEANED
PRIOR TO START-UP. IF CONSTRUCTION DEBRIS IS FOUND INSIDE
UNPROTECTED DUCTWORK THAN DUCT CLEANING OF THE ENTIRE
SYSTEM SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE.
ALL WORK OUTSIDE THE PROTECTED PROJECT BOUNDARIES ABOVE
EXISTING CEILING SHALL BE COMPLETED WITH CEILINGS REPLACED IN
THE SAME DAY UNLESS FULLY COORDINATED THROUGH INFECTION
CONTROL. CLEAN AREA TO ORIGINAL CONDITION ON COMPLETION.
CONTRACTOR TO INSTALL TEMPORARY BARRIERS FOR EACH PROJECT
PHASE AND/OR AREA. THESE BARRIERS SHALL BE COORDINATED WITH
VA HOSPITAL AND, IN MOST CASES, CONTAIN SOME FORM OF AIRLOCK
VESTIBULE PRIOR TO ENTERING THE CONSTRUCTION AREA.
FLUTTER STRIPS OR AIR PRESSURE GAUGES SHALL BE PROVIDED AT
THE ENTRANCES TO EACH CONSTRUCTION AREA. ALL CONTRACTED
WORKERS SHALL BE TRAINED TO VISUALLY MONITOR THESE DEVICES
FOR ADEQUATE NEGATIVE PRESSURIZATION AS THEY ENTER/EXIT THE
CONSTRUCTION AREA. DAILY LOGS SHALL BE KEPT BY THE
MECHANICAL CONTRACTOR TO INSURE CONSTANT PRESSURIZATION
HAS BEEN MAINTAINED.
NEGATIVE PRESSURIZATION SHALL BE MAINTAINED IN EACH
CONSTRUCTION AREA. IF LOCATED ON AN EXTERIOR WALL FANS
SHOULD BE UTILIZED TO EXHAUST AIR DIRECTLY OUT A NEARBY
WINDOW, TAKING PRECAUTIONS TO NOT INTERFERE WITH EXISTING
BUILDING AIR INTAKES, PUBLIC AREAS, ETC. IF NO EXTERIOR WALL IS
AVAILABLE THEN NEGATIVE AIR MACHINES WITH INTERNAL FILTRATION
SHALL BE PROVIDED AND CONNECTION TO THE NEAREST EXHAUST OR
RETURN DUCT AVAILABLE (CONTACT ENGINEER TO VERIFY EXISTING
DUCTWORK CAPACITY PRIOR TO EXHAUST CONNECTION).
TAKEOFFS TO SUPPLY AIR DIFFUSERS AND REGISTERS SHALL BE SAME
SIZE AS DUCT CONNECTION SIZE, UNLESS OTHERWISE NOTED.
PIPING RUNOUTS TO VAV' BOXES SHALL BE 3/4" DIAMETER, UNLESS
NOTED OTHERWISE.
2 REBALANCE EXISTING DIFFUSER OR GRILLE TO CFM AS INDICATED.
CONNECT 10" EXHAUST DUCT TO HOOD COLLAR AND UP TO LEVEL
ABOVE USING APPROPRIATE COUPLER RECOMMENDED BY
MANUFACTURER. BALANCING CONTRACTOR TO MEAUSRE STATIC
PRESSURE APPROXIMATELY 2 DUCT DIAMATERS ABOVE HOOD (TO BE
AT LEAST 1.7" W.C.) AND TRANVERSE DUCT AIRFLOW A MINIMUM OF
7.5 DUCT DIAMETERS DOWNSTREAM OF HOOD IN STRAIGHT SECTION
OF DUCT TO THE MANUFACTURER'S 'CONCURRENT BALANCE VALUE'
(785 CFM FOR EXISTING NUAIRE MODEL NU-430-400 TYPE B2 BSC).
PROVIDE DOOR POSITION INDICATOR WIRED WITHIN DOOR FRAME.
SET DELAY ON ASSOCIATED ROOM PRESSURE MONITOR TO SILENCE
ALARM FOR 2 MINUTES (adj) AFTER DOOR CONTACT SWITCH
INDICATED THAT IS WAS OPENED. NOTIFY BUILDING AUTOMATION OF
ACTUAL PRESSURIZATION ALARM ONLY AFTER ELAPSED TIME.
PROVIDE WALL SPACE TO TERMINATE THIRTEEN(13) AEROSOL
INJECTION PORTS FOR ALL THE HEPA DIFFUSERS. CLEARLY LABEL
EACH PORT AND ASSOCIATED DIFFUSER AS REQUIRED WITH
LAMINATE SIGNAGE. GATHER ALL TUBING TOGETHER AND ROUTE
THROUGH SLEEVE TO GET UP INTO INTERSTITIAL SPACE. REFER TO
DRAWING M102, KEY NOTE #11, FOR TERMINATION POINTS INTO
DUCTWORK FOR EACH HEPA DIFFERS (minimum of 60" prior to final diffuser connection point).
CONNECT 12" EXHAUST DUCT TO HOOD COLLAR AND UP TO LEVEL
ABOVE USING APPROPRIATE COUPLER RECOMMENDED BY
MANUFACTURER. BALANCING CONTRACTOR TO MEAUSRE STATIC
PRESSURE APPROXIMATELY 2 DUCT DIAMATERS ABOVE HOOD
(VERIFY REQUIREMENT WITH NEW HOOD SPECS, APPROX 2.0" W.C.)
AND TRANVERSE DUCT AIRFLOW A MINIMUM OF 7.5 DUCT DIAMETERS
DOWNSTREAM OF HOOD IN STRAIGHT SECTION OF DUCT TO THE
MANUFACTURER'S 'CONCURRENT BALANCE VALUE' (VERIFY EXACT
AIRFLOW WITH NEW TYPE B2 BSC SPECS, APPROX. 800 CFM).
CONNECT 10" EXHAUST DUCT TO THIMBLE CONNECTION FURNISHED
BY MANUFACTUER ROUTING EXHAUST DUCT UP TO LEVEL ABOVE.
BALANCING CONTRACTOR TO MEAUSURE STATIC PRESSURE
APPROXIMATELY 2 DUCT DIAMATERS ABOVE HOOD (VERIFY
REQUIREMENT WITH NEW HOOD SPECS, APPROX 0.1" W.C.) AND
TRANVERSE DUCT AIRFLOW A MINIMUM OF 7.5 DUCT DIAMETERS
DOWNSTREAM OF HOOD IN STRAIGHT SECTION OF DUCT (VERIFY
EXAC…