36E77619R0073-0001003.pdf

PDF 6 MB Posted

Attached to
Minneapolis VAMC Upgrade Pharmacy 18 (VA-19-00063438)
Solicitation number
36E77619R0073
Issued by

About this file

36E77619R0073 0001 Attachment 3 - CD set_618-16-120 Upgrade Pharmacy 18_Part1.pdf

View the file

Other files

File Type Posted
36E77619C0058-000.docx DOCX document
36E77619R0073-0005000.docx DOCX document
36E77619R0073-0005001.pdf PDF
36E77619R0073-0005002.docx DOCX document
36E77619R0073-0004000.docx DOCX document
36E77619R0073-0004001.docx DOCX document
36E77619R0073-0004003.pdf PDF
36E77619R0073-0004002.pdf PDF
36E77619R0073-0003000.docx DOCX document
36E77619R0073-0003001.docx DOCX document
36E77619R0073-0002004.pdf PDF
36E77619R0073-0002000.docx DOCX document
36E77619R0073-0002008.pdf PDF
36E77619R0073-0002010.pdf PDF
36E77619R0073-0002007.pdf PDF
36E77619R0073-0002009.pdf PDF
36E77619R0073-0002006.pdf PDF
36E77619R0073-0002001.pdf PDF
36E77619R0073-0002003.pdf PDF
36E77619R0073-0002005.pdf PDF
36E77619R0073-0002002.pdf PDF
36E77619R0073-0001007.pdf PDF
36E77619R0073-0001006.xlsx XLSX spreadsheet
36E77619R0073-0001000.docx DOCX document
36E77619R0073-0001004.pdf PDF
36E77619R0073-0001001.pdf PDF
36E77619R0073-0001002.pdf PDF
36E77619R0073-0001005.pdf PDF
36E77619R0073-012.docx DOCX document
36E77619R0073-007.pdf PDF
36E77619R0073-008.zip ZIP file
36E77619R0073-011.docx DOCX document
36E77619R0073-006.pdf PDF
36E77619R0073-014.pdf PDF
36E77619R0073-009.zip ZIP file
36E77619R0073-005.docx DOCX document
36E77619R0073-013.docx DOCX document
36E77619R0073-010.zip ZIP file
36E77619R0073-000.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROJECT NAME:

SITE ADDRESS:

VA PROJECT NUMBER:

OWNER AND CONSULTANTS:

VICINITY MAP:

AE PROJECT NUMBER: Dwg. of 781

CONSTRUCTION DOCUMENTS

C U s e rs \m p a rk e r\

D o c u m e n ts

\1

M in n e a p o lis

P h a rm a c y R e n o v a ti o n

R

C e n tr a l m o d e l_ m p a rk e rX U

R A

.r v t

/5

/2

:5

:5

A

M

1361-GI000

COVER SHEET UPGRADE PHARMACY 18

MINNEAPOLIS, MN

618-16-120

06/04/19 LA/BB CD

UPGRADE PHARMACY 18

1 Veterans Dr, Minneapolis, MN 55417

618-16-120

14849

VA COR:

CONTACT:

ADDRESS:

PHONE:

DANIEL FLECK

ONE VETERANS DRIVE

MINNEAPOLIS, MN 55417

612-467-4702

ARCHITECT:

NAME:

ADDRESS:

CONTACT:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

TOM OLESAK

PHONE: 763-412-4000 OR 763-412-4071

MEDICAL PLANNER:

NAME:

ADDRESS:

CONTACT:

LHB CORP

701 N WASHINGTON AVENUE

SUITE 200 MINNEAPOLIS, MN 55401

DANIEL MALDONADO

PHONE: 612-338-2029

MECH/PLUMB/FIRE ENGINEER:

NAME:

ADDRESS:

CONTACT:

DUNHAM ASSOCIATES INC.

50 SOUTH SIXTH STREET / SUITE 1100

MINNEAPOLIS, MN 55402-1540

JASON GOTTWALT

PHONE: 612-465-7273 FAX: 612-465-7073

FACILITIES ENGINEERING, PROJECTS SECTION

PROJECT MANAGER

ELECTRICAL ENGINEER:

NAME:

ADDRESS:

CONTACT:

DUNHAM ASSOCIATES INC.

50 SOUTH SIXTH STREET / SUITE 1100

MINNEAPOLIS, MN 55402-1540

CURT BARLAGE

PHONE: 612-465-7641 FAX: 612-465-7073

NORTHNORTH SITE LOCATION MAP:

Revisions: Date:

█ ISSUED

NOT ISSUED

ISSUED FOR REFERENCE ONLY

ISSUED AS NOTED

R

N

SHEET ABBREVIATION AND NUMBERING

AE 1 1 1 - 01

DI

SC

IP

LI

NE

D

ES

IG

NA

TO

R

SH

EE

T

TY

PE

D

ES

IG

NA

TO

R

FL

O

O R

LE

VE

L

SH

EE

T G

RO

UP

IN

G

ZO

NE

N

UM

BE

R

AE 111-01

ARCHITECTURAL ELEMENTS, PLAN, FIRST FLOOR, FLOOR PLAN, ZONE 1

QH 1 1 0 - 01

DI

SC

IP

LI

NE

D

ES

IG

NA

TO

R

SH

EE

T

TY

PE

D

ES

IG

NA

TO

R

FL

O

O R

LE

VE

L

SH

EE

T G

RO

UP

IN

G

ZO

NE

N

UM

BE

R

QH110-01

EQUIPMENT HOSPITAL, PLAN, FIRST FLOOR, FLOOR PLAN, ZONE 1

DISCIPLINE

DESIGNATOR

SHEET TYPE

DESIGNATOR

FLOOR

LEVEL

SHEET

GROUPING

GI - GENERAL INFORMATION

AD- ARCHITECTURAL DEMOLITION

AS-ARCHITECTURAL SITE

AE-ARCHITECTURAL ELEMENTS

AF-ARCHTECTURAL FINISHES

AC-REFLECTED CEILING PLANS

IF-INTERIOR FURNISHINGS

QC-EQUIPMETN LAUNDRY

QF-EQUIPMENT FOOD SERVICE

QH-EQUIPMENT HOSPITAL

QL-EQUIPMENT LABORATORY

0 - GENERAL

1 - PLANS

2 - ELEVATIONS

3 - SECTIONS

4 - LARGE SCALE VIEWS

5 - DETAILS

6 - SCHEDULES & DIAGRAMS

0 - LOWER LEVEL

1 - FIRST FLOOR

2 - SECOND FLOOR

3 - THIRD FLOOR

4 - FOURTH FLOOR

GENERAL:

00-10 - TITLE SHEET, NOTES,

ABBREVIATIONS, SYMBOLS,

SCHEDULES

PLANS:

1 - FLOOR PLAN

2 - DIMENSION PLAN

ELEVATIONS:

01-10 - EXTERIOR ELEVATIONS

11-19 - INTERIOR ELEVATION

SECTIONS:

01-10 - BUILDING SECTIONS

11-19 - WALL SECTIONS

20-29 - STAIR SECTIONS & PLANS

DETAILS:

01-19 - EXTERIOR PLAN DETAILS

20-29 - EXTERIOR SECTION DETAILS

30-39 - ROOF DETAILS

40-49 - INTERIOR PLAN DETAILS

50-59 - INTERIOR SECTION DETAILS

60-69 - CEILING DETAILS

PLANS ONLY

AE 5 1 2

DI

SC

IP

LI

NE

D

ES

IG

NA

TO

R

SH

EE

T

TY

PE

D

ES

IG

NA

TO

R

SH

EE

T G

RO

UP

IN

G

AE 501

ARCHITECTURAL ELEMENTS, EXTERIOR PLAN DETAILS

AF 6 7 0

DI

SC

IP

LI

NE

D

ES

IG

NA

TO

R

SH

EE

T

TY

PE

D

ES

IG

NA

TO

R

SH

EE

T G

RO

UP

IN

G

AF 670

ARCHITECTURAL FINISHES, FINISH SCHEDULE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCTION DOCUMENTS

AE PROJECT NUMBER: Dwg. of 78

C U s e rs \p c h o i\ D o c u m e n ts \1

M in n e a p o lis

P h a rm a c y R e n o v a ti o n

R

C e n tr a l m o d e l_ Y e u n y o u n g .r v t

/5

/2

:4

:1

P

M

1361-GI001

SHEET INDEX UPGRADE PHARMACY 18

MINNEAPOLIS, MN

618-16-120

06/04/19 LA/BB CD14849 2

SHEET INDEX - GENERAL, ARCHITECTURAL AND EQUIPMENT

PAGE

NO.

SHEET

NO. SHEET TITLE 6

5%

IS

SU

E

- 1 2/

/1

5%

IS

SU

E

- 0

3/

/1

IS

SU

E

- 0 4/

C O

NS

TR

UC

TI

O N

DO

CU

M

EN

TS

/0

4/

1 GI000 COVER SHEET █ █ █ █

2 GI001 SHEET INDEX █ █ █

3 GI002 ABBREVIATIONS █ █ █ █

4 GI003 GENERAL NOTES & SYMBOLS █ █ █ █

5 GI004 LOWER LEVEL LIFE SAFETY PLAN █ █ █ █

6 GI005 THIRD LEVEL LIFE SAFETY PLAN █ █

7 GI006 INFECTION CONTROL RISK ASSESSMENT PLAN █ █ █ █

8 GI007 CONSTRUCTION PHASING PLAN █ █ █ █

9 AD100 LOWER LEVEL DEMOLITION PLAN █ █ █ █

10 AD101 LOWER LEVEL INTERSTITIAL DEMOLITION PLAN █ █ █ █

11 AE100 LOWER LEVEL FLOOR PLAN █ █ █ █

12 AE101 LOWER LEVEL INTERSTITIAL PLAN █ █ █ █

13 AC100 LOWER LEVEL REFLECTED CEILING PLAN █ █ █ █

14 AE131 THIRD LEVEL PARTIAL PLANS █ █ █

15 AE132 THIRD LEVEL PARTIAL PLANS █ █

16 AE211 INTERIOR ELEVATIONS █ █ █ █

17 AE212 INTERIOR ELEVATIONS █ █ █

18 AE301 BUILDING SECTIONS █ █ █ █

19 AE411 ENLARGED PLANS & MOUNTING HEIGHTS █ █ █ █

20 AE540 INTERIOR DETAILS █ █ █ █

21 AE550 INTERIOR DETAILS █

22 AE551 INTERSTITIAL DETAILS █ █ █ █

23 AE601 PARTITION TYPES AND DETAILS █ █ █ █

24 AE602 DOOR & FRAME TYPES, SCHEDULE & DETAILS █ █ █ █

25 AW600 WAYFINDING PLANS & SCHEDULE █ █ █ █

26 AF101 LOWER LEVEL FINISH PLAN █ █ █ █

27 AF600 MATERIAL AND ROOM FINISH SCHEDULE █ █ █ █

28 QH100 LOWER LEVEL FURNITURE & EQUIPMENT PLANS █ █ █ █

29 QH401 ENLARGED FURNITURE & EQUIPMENT PLANS █ █ █

SHEET INDEX - PLUMBING, MECHANICAL AND ELETRICAL

PAGE

NO.

SHEET

NO. SHEET TITLE 6

5%

IS

SU

E

- 1 2/

/1

5%

IS

SU

E

- 0

3/

IS

SU

E

- 0 4/

NS

TR

UC

TI

O N

DO

CU

M

EN

TS

/0

4/

30 M000 MECHANICAL TITLE SHEET █ █ █ █

31 MD101 LOWER LEVEL HVAC DEMOLITION PLAN █ █ █ █

32 MD102 LOWER LEVEL INTERSTITIAL HVAC DEMOLITION PLAN █ █ █ █

33 MD103 LOWER LEVEL INTERSTITIAL HYDRONIC DEMOLITION PLAN █ █ █ █

34 MD131 THIRD LEVEL HVAC DEMOLITION PLANS █ █ █

35 MD151 PENTHOUSE HVAC DEMOLITION PLAN - SHAFT #2 █ █ █ █

36 M101 LOWER LEVEL HVAC PLAN █ █ █ █

37 M102 LOWER LEVEL INTERSTITIAL HVAC PLAN █ █ █ █

38 M103 LOWER LEVEL INTERSTITIAL HYDRONIC PLAN █ █ █ █

39 M131 THIRD LEVEL HVAC PLANS █ █ █

40 M151 PENTHOUSE PRE-CONSTRUCTION MECHANICAL PLAN - SHAFT #2 █ █ █ █

41 M152 PENTHOUSE MECHANICAL PLAN - SHAFT #2 █ █ █ █

42 M153 PENTHOUSE MECHANICAL PLAN - SHAFT #7 █ █ █ █

43 M501 MECHANICAL PLANS - SHAFT #7 █ █ █ █

44 M502 MECHANICAL DETAILS █ █ █ █

45 M601 MECHANICAL SCHEDULES AND OPERATION SEQUENCES █ █ █ █

46 M602 MECHANICAL ELELCTRICAL SCHEDULES █ █ █ █

47 M603 MECHANICAL ELELCTRICAL SCHEDULES █ █ █

48 PD101 UNDERFLOOR PLUMBING DEMOLITION PLAN █ █ █ █

49 PD102 LOWER LEVEL PLUMBING DEMOLITION PLAN █ █ █ █

50 PD103 LOWER LEVEL INTERSTITIAL PLUMBING DEMOLITION PLAN █ █ █ █

51 PD131 THIRD LEVEL PLUMBING DEMOLITION PLANS █ █ █

52 P101 UNDERFLOOR PLUMBING PLAN █ █ █ █

53 P102 LOWER LEVEL PLUMBING AND FIRE PROTECTION PLAN █ █ █ █

54 P103 LOWER LEVEL INTERSTITIAL PLUMBING PLAN █ █ █ █

55 P131 THIRD LEVEL PLUMBING PLANS █ █ █

56 P500 PLUMBING RISERS DIAGRAMS █ █ █ █

57 P501 PLUMBING RISERS DIAGRAMS █ █ █ █

58 P600 PLUMBING DETAILS AND SCHEDULES █ █ █ █

59 E000 ELECTRICAL TITLE SHEET █ █ █ █

60 E001 ELECTRICAL ZONING PLAN █ █ █ █

61 ED101 DEMOLITION LOWER LEVEL LIGHTING PLAN █ █ █ █

62 ED102 DEMOLITION LOWER LEVEL POWER PLAN █ █ █ █

63 ED103 DEMOLITION LOWER LEVEL SYSTEMS PLAN █ █ █ █

64 ED130 DEMOLITION THIRD LEVEL PLAN █ █ █ █

65 E101 LOWER LEVEL LIGHTING PLAN █ █ █ █

66 E102 LOWER LEVEL POWER PLAN █ █ █ █

67 E103 LOWER LEVEL SYSTEMS PLAN █ █ █ █

68 E104 LOWER LEVEL INTERSTITIAL PLAN █ █ █ █

69 E130 THIRD LEVEL PLAN █ █ █

70 E152 PENTHOUSE POWER PLAN █ █ █

71 E400 ENLARGED PLANS █ █ █

72 E500 ELECTRICAL DETAILS █ █ █

73 E501 ELECTRICAL DETAILS █ █

74 E600 ELECTRICAL EQUIPMENT PLAN AND SCHEDULES █ █ █

75 E601 ELECTRICAL SCHEDULES █ █ █

76 E602 ELECTRICAL SCHEDULES █ █ █

77 E603 SECURITY SURVEILLANCE PLAN AND SCHEDULE █ █

78 E604 ELECTRICAL RISER █ █ █ █

ARCHITECTURAL ABBREVIATIONS

A/C

A/C UNIT

A/E

AAMA

AAP

AB

ABC

ACI

ACS DR

ACS FLR

ACS PNL

ACST

ACT

AD

ADA

ADC

ADDL

ADDN

ADH

ADJ

ADMIN

AFF

AFG

AFS

AGC

AGGR

AHJ

AHR

AHU

AIA

AISC

ALT

ALT NO

ALUM

AMT

ANOD

ANSI

ANT

AP

APA

APC

APPD

APPROX

AR

ARCH

ASB

ASI

ASKLR

ASPH

ASSN

ASTM

ATCH

ATM

AUTO

AUX

AV

AVG

AW

AWI

AWPA

AWS

B PL

BAT

BD

BD FT

BEV

BHMA

BI FLD DR

BITUM

BKG

BLD

BLDG

BM

BOT

BRCG

BRDG

BRDG JST

BRG

BRG PL

BRKT

BRZ

BSMT

BTWN

BUR

C CONC

C TO C

CAB

CAC

CB

CBB

CCD

CCTV

CCW

CD

CEM

CEM PLAS

CER

CF

CF/CI

CF/OI

CFLG

CFMF

CG

CGSFU

CH

CHEM

CHFR

CHK

CI

CIP

CIR

CIRC

CJ

CL

CLDG

CLG

CLR

CM

CMU

AIR CONDITION

AIR CONDITIONING UNIT

ARCHITECT/ENGINEER

AMERICAN ARCHITECTURAL MANUFACTURERS ASSN

ALARM ANNUNCIATOR PANEL

ANCHOR BOLT

AGGREGATE BASE COURSE

AMERICAN CONCRETE INSTITUTE

ACCESS DOOR

ACCESS FLOOR

ACCESS PANEL

ACOUSTIC

ACOUSTICAL CEILING TILE

AREA DRAIN

AMERICANS WITH DISABILITIES ACT

AUTOMATIC DOOR CLOSER

ADDITIONAL

ADDITION

ADHESIVE

ADJACENT, ADJOINING, OR ADJUSTABLE

ADMINISTRATION

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ABOVE FINISHED SLAB

ASSOCIATED GENERAL CONTRACTORS

AGGREGATE

AUTHORITY HAVING JURISDICTION

ANCHOR

AIR HANDLING UNIT

AMERICAN INSTITUTE OF ARCHITECTS

AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALTERNATE

ALTERNATE NUMBER

ALUMINUM

AMOUNT

ANODIZE

AMERICAN NATIONAL STANDARDS INSTITUTE

ANTENNA

ACCESS PANEL

AMERICAN PLYWOOD ASSOCIATION

ARCHITECTURAL PRECAST CONCRETE

APPROVED

APPROXIMATE

AS REQUIRED

ARCHITECT

ASBESTOS

ARCHITECT'S SUPPLEMENTAL INSTRUCTION

AUTOMATIC SPRINKLER

ASPHALT

ASSOCIATION

AMERICAN SOCIETY FOR TESTING AND MATERIALS

ATTACHMENT

AUTOMATIC TELLER MACHINE

AUTOMATIC

AUXILIARY

AUDIO VISUAL

AVERAGE

ACID WASTE

ARCHITECTURAL WOODWORKING INSTITUTE

AMERICAN WOOD PRESERVERS' ASSOCIATION

AMERICAN WELDING SOCIETY

BASE PLATE

BATTEN

BOARD

BOARD FEET (FOOT)

BEVEL

BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION

BIFOLDING DOORS

BITUMINOUS

BACKING

BUILD

BUILDING

BEAM OR BENCHMARK

BOTTOM

BRACING

BRIDGING

BRIDGING JOIST

BEARING

BEARING PLATE

BRACKET

BRONZE

BASEMENT

BETWEEN

BUILT-UP ROOFING

CAST CONCRETE

CENTER TO CENTER

CABINET

CEILING ATTENUATION CLASS

CATCH BASIN OR CORNER BEAD

CEMENTITIOUS (BACKER) BOARD

CONSTRUCTION CHANGE DIRECTIVE

CLOSED CIRCUIT TELEVISION

COUNTERCLOCKWISE

CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS

CEMENT

CEMENT PLASTER

CERAMIC

CONTRACTOR FURNISHED

CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CONTRACTOR FURNISHED/OWNER INSTALLED

COUNTERFLASHING

COLD-FORMED METAL FRAMING

CORNER GUARD

CERAMIC GLAZED STRUCTURAL FACING UNITS

COAT HOOK

CHEMICAL

CHAMFER

CHECK

CAST IRON

CAST-IN-PLACE

CIRCLE

CIRCULAR

CONSTRUCTION JOINT OR CONTROL JOINT

CENTER LINE

CLADDING

CEILING

CLEAR

CONSTRUCTION MANAGEMENT

CONCRETE MASONRY UNIT

CNR

CNTR

CRTP

CO

CO2

COL

COM

COMB

COMM

COMP

CONC

CONC FLR

COND

CONF

CONN

CONSTR

CONT

CONTR

COORD

CORR

CPM

CPRS

CR

CRS

CRSI

CSB

CSG

CSI

CSK

CSMT

CSWK

CTG

CTR

CTRL

CTV

CU FT

CU IN

CU YD

CURT

CYL

CYL L

D

DAT

DBL

DBL GLZ

DCS

DP

DEG

DEL

DEMO

DEPT

DET

DF

DIA

DIAG

DIFF

DIM

DIR

DISP

DIST

DIV

DL

DOC

DR

DR CL

DR FR

DR OPNG

DS

DSGN

DW

DWG

E

EA

EFF

EFS

EIFS

EJ

EL

ELAST

ELEC

ELEC DR OP

ELEV

EMER

EMER SHR

ENCL

ENGR

ENVIR

EO

EPA

EPDM

EPO

EPS

EQ

EQL SP

EQUIP

EQUIV

ERD

ESC

ESMT

ESP

EST

ETC

EW

EWC

EWS

EXH

EXIST

EXP

EXP BT

EXST GR

EXT

EXT GR

CORNER

COUNTER

COUNTERTOP

CARBON MONOXIDE

CARBON DIOXIDE

COLUMN

COMMON

COMBINATION, COMBINED

COMMUNICATION

COMPONENT

CONCRETE

CONCRETE FLOOR

CONDENSER OR CONDITION

CONFERENCE

CONNECT

CONSTRUCTION

CONTINUE

CONTRACTOR

COORDINATE

CORRIDOR

CRITICAL PATH METHOD

COMPRESSIBLE

CRASH RAIL

COLD ROLLED STEEL

CONCRETE REINFORCING STEEL INSTITUTE

CONCRETE SPLASH BLOCK

CASING

CONSTRUCTION SPECIFICATIONS INSTITUTE

COUNTER SUNK

CASEMENT

CASEWORK

COATING

CENTER

CONTROL

CABLE TELEVISION

CUBIC FEET

CUBIC INCH

CUBIC YARD

CURTAIN

CYLINDER

CYLINDER LOCK

DEPTH OR PENNY (NAIL)

DATUM

DOUBLE

DOUBLE GLAZE

DIAPER CHANGING STATION

DECORATIVE PANEL

DEGREE

DELETE

DEMOLITION

DEPARTMENT

DETAIL

DRINKING FOUNTAIN

DIAMETER

DIAGONAL

DIFFERENCE OR DIFFUSER

DIMENSION

DIRECTION

DISPENSER

DISTANCE

DIVIDE OR DIVISION

DEAD LOAD

DOCUMENT

DOOR, DRAIN, DRESSING ROOM, OR DRIVE

DOOR CLOSER

DOOR FRAME

DOOR OPENING

DOWNSPOUT

DESIGN

DISHWASHER

DRAWING

EAST

EACH

EFFICIENCY

EXTERIOR FINISH SYSTEM

EXTERIOR INSULATION AND FINISH SYSTEM

EXPANSION JOINT

ELEVATION

ELASTOMERIC

ELECTRIC

ELECTRIC DOOR OPENER

ELEVATOR

EMERGENCY

EMERGENCY SHOWER

ENCLOSURE

ENGINEER

ENVIRONMENT

ELECTRICAL OUTLET

ENVIRONMENTAL PROTECTION AGENCY

ETHYLENE PROPYLENE DIENE MONOMER

EMERGENCY POWER OFF

EXPANDED POLYSTYRENE BOARD (INSULATION)

EQUAL

EQUALLY SPACED

EQUIPMENT

EQUIVALENT

EXISTING ROOF DRAIN

ESCAPE OR ESCUTCHEON

EASEMENT

ESPECIALLY

ESTIMATE

AND SO FORTH OR ET CETERA

EACH WAY

ELECTRIC WATER COOLER

EYE WASH STATION

EXHAUST

EXISTING

EXPANSION OR EXPOSED

EXPANSION BOLT

EXISTING GRADE

EXTERIOR, EXTERNAL, OR EXTINGUISHER

EXTERIOR GRADE

F

FA

FAB

FAC

FACIL

FAS

FAS BD

FCU

FCO

FCTY

FD

FDC

FDV

FDTN

FE

FEC

FF

FF EL

FF&E

FHC

FHP

FIG

FIL

FIN

FIN FLR

FIN GR

FIN WD

FIXT

FL

FLASH

FLDG

FLEX

FLG

FLR

FLR FIN

FLR SK

FLUOR

FLUOR FIX

FM

FM-G

FO

FOC

FOF

FOM

FOS

FOUNT

FOW

FP

FR

FR SNK

FREQ

FRMG

FRP

FRZ

FS

FSB

FSTNR

FT

FTG

FURG

FURN

FUT

FVC

GA

GAL

GALV

GALV STL

GB

GC

GD

GDR

GEN

GFRC

GFRG

GFRP

GI

GL

GL BLK

GLU LAM

GP

GR FL

GRAN

GRTG

GSB

GSM

GSU

GT

GUAR

GUT

GYP

GYP BD

GYP PLAS

H

HAZ MAT

HB

HC

HCWD

HDBD

HDO

HDR

HDW

HDWD

HEPA

HEX

HGR

HM

HMD

HMDF

HMF

HNDRL

HO

HORIZ

HOSP

HP

HPD

HPDL

HQ

HS

HSE

HSKPG

FAHRENHEIT OR FEMALE

FIRE ALARM

FABRIC

FACTOR

FACILITY

FASCIA

FASCIA BOARD

FAN COIL UNIT

FLOOR CLEANOUT

FACTORY

FLOOR DRAIN

FIRE DEPARTMENT CONNECTION

FIRE DEPARTMENT VALVE

FOUNDATION

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FINISH FACE

FINISH FLOOR ELEVATION

FURNITURE, FIXTURE, AND EQUIPMENT

FIRE HOSE CABINET

FULL HEIGHT PARTITION

FIGURE

FILLET

FINISH

FINISH FLOOR

FINISH GRADE

FINISH WOOD

FIXTURE

FLOORLINE

FLASHING

FOLDING

FLEXIBLE

FLOORING

FLOOR

FLOOR FINISH

FLOOR SINK

FLUORESCENT

FLUORESCENT FIXTURE

FACTORY MUTUAL

FACTORY MUTUAL GLOBAL

FINISHED OPENING

FACE OF CONCRETE OR FACE OF CURB

FACE OF FINISH

FACE OF MASONRY

FACE OF SLAB OR FACE OF STUD

FOUNTAIN

FACE OF WALL

FIRE PROTECTION OR FIREPROOF

FIRE RATING, FIRE RESISTANT, OR FRAME

FLUSHING RIM SINK

FREQUENCY

FRAMING

FIBERGLASS REINFORCED PLASTIC

FREEZER

FEDERAL SPECIFICATION

FOLDING SHOWER BENCH

FASTENER

FEET OR FOOT

FOOTING

FURRING

FURNISH OR FURNITURE

FUTURE

FIRE VALVE CABINET

GAGE OR GYPSUM ASSOCIATION

GALLON

GALVANIC OR GALVANIZED

GALVANIZED STEEL

GRAB BAR

GENERAL CONTRACTOR

GUARD

GUARD RAIL

GENERAL OR GENERATOR

GLASS-FIBER-REINFORCED CONCRETE

GLASS-FIBER-REINFORCED GYPSUM

GLASS-FIBER-REINFORCED PLASTIC

GALVANIZED IRON

GLASS

GLASS BLOCK

GLUED LAMINATED WOOD

GRAB BAR

GROUND FLOOR

GRANITE

GRATING

GYPSUM SHEATHING BOARD

GALVANIZED SHEET METAL

GLAZED STRUCTURAL UNIT

GROUT

GUARANTEE

GUTTER

GYPSUM

GYPSUM BOARD

GYPSUM PLASTER

HIGH OR HUMIDISTAT

HAZARDOUS MATERIALS

HOSE BIBB

HOLLOW CORE

HOLLOW CORE WOOD DOOR

HARDBOARD

HIGH DENSITY OVERLAY

HEADER

HARDWARE

HARDWOOD

HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HEXAGON

HANGER

HOLLOW METAL

HOLLOW METAL DOOR

HOLLOW METAL DOOR AND FRAME

HOLLOW METAL FRAME

HANDRAIL

HOLD OPEN

HORIZONTAL

HOSPITAL

HIGH PRESSURE

HYGIENE PRODUCT DISPOSAL

HIGH PRESSURE DECORATIVE LAMINATE

HEADQUARTERS

HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH

HOUSE

HOUSEKEEPING

HST

HSS

HT

HVAC

HVY

HW

HYD

HYDR

IAQ

IBC

IC

ICW

ID

ID NO

ILLUM

INCL

IND

INFO

INSUL

INT

INTL

IWH

JAN

KD

KIT

KO

KPL

L

LAB

LAD

LAM

LAM GL

LAU

LAV

LBR

LBS

LCS

LD BRG

LDR

LED

LF

LIB

LIN

LIQ

LKR

LKR RM

LL

LMST

LRG

LRV

LT

LT GA

LT SW

LT WT

LTG

LTNG

LVD

LVR

LWC

LWIC

LYR

MACH

MACH RM

MAINT

MAN

MATL

MATV

MAX

MBD

MCB

MD

ME

MEAS

MECH

MECH RM

MED

MEK

MEMB

MEMO

MEZZ

MF

MFD

MFG

MFR

MFR REC

MGT

MIC

MID

MIL STD

MIN

MIR

MISC

MIT

MKR

ML

MLDG

MLWK

mm

MO

MOD

MOD BIT

MON

MOPR

MR

MS

MTD

MTG

MTL

MULL

MW

MWP

HOIST

HOLLOW STRUCTURAL STEEL

HEIGHT

HEATING, VENTILATING, AND AIR CONDITIONING

HEAVY

HOT WATER

HYDRANT

HYDRAULIC

INDOOR AIR QUALITY

INTERNATIONAL BUILDING CODE

INFECTION CONTROL

INFECTION CONTROL WALL

INSIDE DIAMETER

IDENTIFICATION NUMBER

ILLUMINATION

INCLUDED

INDEPENDENT OR INDUSTRIAL

INFORMATION

INSULATION

INTERIOR

INTERNATIONAL

INSTANTANEOUS WATER HEATER

JANITOR

KILN DRIED OR KNOCKED DOWN

KITCHEN

KNOCKOUT

KICKPLATE

ANGLE

LABORATORY

LADDER

LAMINATE

LAMINATED GLASS

LAUNDRY

LAVATORY

LUMBER

POUND

LOCKABLE CHARTING STATION/MED CABINET

LOAD-BEARING

LEADER

LIGHT EMITTING DIODE

LINEAR FEET (FOOT)

LIBRARY

LINEAR

LIQUID

LOCKER

LOCKER ROOM

LEAD LINED

LIMESTONE

LARGE

LOUVERED ROOF VENT

LIGHT

LIGHT GAGE

LIGHT SWITCH

LIGHTWEIGHT

LIGHTING

LIGHTNING

LOUVERED

LOUVER

LIGHTWEIGHT CONCRETE

LIGHTWEIGHT INSULATING CONCRETE

LAYER

MACHINE

MACHINE ROOM

MAINTENANCE

MANUAL

MATERIAL

MASTER ANTENNA TELEVISION SYSTEM

MAXIMUM

MARKER BOARD

METAL CORNER BEAD

DECK

MECHANICAL ENGINEER

MEASURE

MECHANICAL

MECHANICAL ROOM

MEDICAL, MEDIUM

METHYL ETHYL KETONE

MEMBRANE

MEMORANDUM

MEZZANINE

MILL FINISH

MANUFACTURED

MANUFACTURING

MANUFACTURER

MANUFACTURER'S RECOMMENDATION

MANAGEMENT

MICROPHONE

MIDDLE

MILITARY STANDARD

MINIMUM

MIRROR

MISCELLANEOUS

MITER

MARKER

METAL LATH

MOLDING (MOULDING)

MILLWORK

MILLIMETER

MASONRY OPENING

MODEL, MODIFY OR MODULE

MODIFIED BITUMEN

MONITOR

MOP RACK

MOISTURE RESISTANT

MOP SINK

MOUNTED

MOUNTING

METAL

MULLION

MICROWAVE

MEMBRANE WATERPROOFING

N

NA

NAT

NATL

NC

NCOMBL

NEC

NEG

NEMA

NEUT

NFC

NFPA

NIC

NO

NOM

NR

NRC

NRCA

NRP

NS

NUM

O/O O

OA

OC

OCC

OCT

OD

OD

OF/CI

OFD

OFF

OF/OI

OH

OH DR

OPH

OPNG

OPP

OPR

OPT

OR

ORD

ORG

ORIG

ORN

OSHA

OUT

OZ

P

PAR

PARA

PART

PAT

PB

PBD

PC

PCA

PCC

PCCP

PCD

PCF

PCP

PCT

PED

PEN

PEND

PERF

PERIM

PERP

PHAR

PHOTO

PKG

PL

PL GL

PLAM

PLAS

PLBG

PLYWD

PMTL

PNEU

PNL

PO

POLY

PP

PR

PRCST

PREFAB

PREFIN

PRELIM

PREP

PRESS

PREV

PRKG

PRMLD

PROJ

PROP

PSF

PSI

PT

PTD

PTN

PTS

PVC

PVG

PWR

QA

QC

QRY

QTR

QTY

QUAD

QUAL

R

RA

RAD

RBM

RBR

NORTH

NOT APPLICABLE

NATURAL

NATIONAL

NOISE CRITERIA OR NURSE CALL

NONCOMBUSTIBLE

NATIONAL ELECTRICAL CODE

NEGATIVE

NATIONAL ELECTRICAL MANUFACTURERS ASSN

NEUTRAL

NATIONAL FIRE CODE

NATIONAL FIRE PROTECTION ASSOCIATION

NOT IN CONTRACT

NUMBER

NOMINAL

NOISE REDUCTION

NOISE REDUCTION COEFFICIENT

NATIONAL ROOFING CONTRACTORS ASSOCIATION

NONREMOVABLE

NARROW STILE

NUMERAL

OUT TO OUT

OXYGEN

OUTSIDE AIR OR OVERALL

ON CENTER

OCCUPY

OCTAGON

OUTSIDE DIAMETER, OUTSIDE DIMENSION

OUTSIDE DIAMETER/OUTSIDE DIMENSION

OWNER FURNISHED/CONTRACTOR INSTALLED

OVERFLOW DRAIN

OFFICE

OWNER FURNISHED/OWNER INSTALLED

OVERHANG

OVERHEAD (COILING) DOOR

OPPOSITE HAND

OPENING

OPPOSITE

OPERABLE

OPTIONAL

OPERATING ROOM OR OUTSIDE RADIUS

ORDNANCE OR OVERFLOW ROOF DRAIN

ORGANIC

ORIGINAL

ORNAMENTAL

OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION

OUTLET

OUNCE

PAINT

PARALLEL OR PARAPET

PARAGRAPH

PARTIAL

PATTERN

PUSHBUTTON

PARTICLEBOARD

PIECE, POLYCARBONATE OR PORTLAND CEMENT

PORTLAND CEMENT ASSOCIATION

PRECAST CONCRETE

CONCRETE PAVEMENT

PAPER CUP DISPENSER

POUNDS PER CUBIC FOOT

PORTLAND CEMENT PLASTER

PRIVACY CURTAIN TRACK

PEDESTAL

PENETRATE

PENDANT

PERFORATED

PERIMETER

PERPENDICULAR

PHARMACY

PHOTOGRAPH

PACKAGE

PROPERTY LINE

PLATE GLASS

PLASTIC LAMINATE

PLASTER OR PLASTIC

PLUMBING

PLYWOOD

PAINTED METAL

PNEUMATIC

PANEL

POST OFFICE, PURCHASE ORDER

POLYETHYLENE (PLASTIC)

PUSH PLATE

PAIR

PRECAST

PREFABRICATE

PREFINISH

PRELIMINARY

PREPARATION

PRESSURE

PREVIOUS

PARKING

PREMOLDED

PROJECT

PROPERTY

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

PORCELAIN TILE OR PRESSURE TREATED

PAPER TOWEL DISPENSER

PARTITION

PNEUMATIC TUBE STATION

POLYVINYL CHLORIDE (PLASTIC)

PAVING

POWER

QUALITY ASSURANCE

QUALITY CONTROL

QUARRY

QUARTER

QUANTITY

QUADRANT

QUALITY

RADIUS OR RISER

RETURN AIR

RADIATOR

REINFORCED BRICK MASONRY

RUBBER

RC

RCP

RCVR

RD

REC

RECD

RECPT

RECT

REF

REFR

REG

REINF

REP

REPL

REQ

REQD

RET

REV

RFG

RFI

RFP

RFS

RL

RLG

RM

RM LT

RND

RO

ROW

RS

RSV

RT

RV

RVS

RWL

SA

SALV

SAMP

SAN

SB

SBS

SBSTR

SC

SCH

SCHED

SCHEM

SCP

SCRN

SCT

SCWD

SD

SDG

SECT

SEG

SEL

SEP

SF

SFTWD

SGD

SGL

SHR

SHR HD

SHRD

SHT

SHTHG

SHV

SIM

SJ

SJI

SK

SKLT

SLDG

SLNT

SM

SMK

SND INS

SPEC

SPKLR

SPKR

SPLY

SPR

SQ

SQ IN

SQ YD

SSF

SST

ST

STC

STD

STIF

STL JST

STL LNTL

STL PL

STL RF DK

STL TB

STL TR

STNLS

STOR

STR

STRUCT

STRUCT STL

SUB

SURF

SUSP

SUSP CLG

SW

SWDR

SYM

SYNTH

SYS

REMOTE CONTROL

REFLECTED CEILING PLAN

RECEIVER

ROAD OR ROOF DRAIN

RECESSED

RECEIVED

RECEPTACLE

RECTANGLE

REFERENCE OR REFRIGERATOR

REFRACTORY, REFRIGERATION

REGISTER

REINFORCE

REPAIR

REPLACE

REQUIRE

REQUIRED

RETURN

REVISION

ROOFING

REQUEST FOR INFORMATION

REQUEST FOR PROPOSAL

ROOM FINISH SCHEDULE

ROOF LEADER

RAILING

ROOM

NURSE CALL LIGHT/ROOM LIGHT

ROUND

ROUGH OPENING

RIGHT OF WAY

ROUGH SAWN

RESILIENT SHEET VINYL

RIGHT

ROOF VENT

REVERSE

RAIN WATER LEADER

SUPPLY AIR

SALVAGE

SAMPLE

SANITARY

SPLASH BLOCK

STYRENE BUTADIEN STYRENE

SUBSTRATE

SHARPS CONTAINER

SCHOOL

SCHEDULE

SCHEMATIC

SCUPPER

SCREEN

SHOWER CURTAIN TRACK

SOLID CORE WOOD DOOR

SMOKE DETECTOR/SOAP DISPENSER

SIDING

SECTION

SEGMENT

SELECT

SEPARATE

SQUARE FOOT (FEET)

SOFTWOOD

SLIDING GLASS DOOR

SINGLE

SHOWER

SHOWER HEAD

SHOWER DRAIN

SHEET

SHEATHING

SHELVING

SIMILAR

SCORED JOINT

STEEL JOIST INSTITUTE

SKETCH

SKYLIGHT

SLIDING

SEALANT

SHEET METAL

SMOKE

SOUND INSULATION

SPECIFICATION

SPRINKLER

SPEAKER

SUPPLY

SINGLE PLY ROOF SYSTEM

SQUARE

SQUARE INCH

SQUARE YARD

SOLID SURFACE

STAINLESS STEEL

STAIRS OR STREET

SOUND TRANSMISSION CLASS

STANDARD

STIFFENER

STEEL JOIST

STEEL LINTEL

STEEL PLATE

STEEL ROOF DECK

STEEL TUBE

STEEL TRUSS

STAINLESS

STORAGE

STRINGERS

STRUCTURAL

STRUCTURAL STEEL

SUBSTITUTE

SURFACE

SUSPEND

SUSPENDED CEILING

SWITCH

SWING DOOR

SYMBOL

SYNTHETIC

SYSTEM

T T&M

TB

TBD

TECH

TEL

TEMP

THERM

THK

THRES

THRU

THRUOUT

TMPD

TMPD GL

TN

TO

TO FDN

TOB

TOM

TOP

TOS

TOW

TPD

TRANS

TRTD

TS

TSTAT

TV

TYP

U

UC

UGND

UL

ULT

UNFIN

UNO

UPS

UR

UTIL

UV

VAC

VAR

VEH

VENT

VERT

VEST

VFD

VIC

VID

VIF

VNR

VOC

VOL

VR

VTR

W/ W/O

WBL

WC

WD

WDW

WF

WFR

WFS

WH

WHSE

WP

WPM

WR

WS

WSCT

WT

X BRACE

XPS

YD

TREAD OR THERMOSTAT

TIME AND MATERIALS

TOWEL BAR

TACK BOARD

TECHNICAL

TELEPHONE

TEMPERATURE OR TEMPORARY

THERMAL

THICKNESS

THRESHOLD

THROUGH

THROUGHOUT

TEMPERED

TEMPERED GLASS

TRUE NORTH

TOP OF ___

TOP OF FOUNDATION

TOP OF BEAM

TOP OF MASONRY

TOP OF PARAPET

TOP OF STEEL

TOP OF WALL

TOILET PAPER DISPENSER

TRANSOM

TREATED

TUBE STEEL

THERMOSTAT

TELEVISION

TYPICAL

HEAT TRANSFER COEFFICIENT

UNDERCUT

UNDERGROUND

UNDERWRITERS LABORATORIES

ULTIMATE

UNFINISH

UNLESS NOTED OTHERWISE

UNINTERRUPTIBLE POWER SUPPLY

URINAL

UTILITY

ULTRAVIOLET

VACUUM

VARIES

VEHICLE

VENTILATION

VERTICAL

VESTIBULE

VARIABLE FREQUENCY DRIVE

VICINITY

VIDEO

VERIFY IN FIELD

VENEER

VOLATILE ORGANIC COMPOUND

VOLUME

VAPOR RETARDER

VENT THROUGH ROOF

WITH

WITHOUT

WOOD BLOCKING

WATER CLOSET

WOOD

WINDOW

WIDE FLANGE

WOOD FRAME

WOOD FURRING STRIPS

WATER HEATER

WAREHOUSE

WATERPROOFING

WATERPROOF MEMBRANE

WEATHER RESISTANT

WEATHERSTRIP OR WALL SCONCE

WAINSCOT

WEIGHT OR WINDOW TREATMENT

CROSS BRACE

EXTRUDED POLYSTYRENE BOARD

YARD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCTION DOCUMENTS

AE PROJECT NUMBER: Dwg. of 78

C U s e rs \m p a rk e r\

D o c u m e n ts

\1

M in n e a p o lis

P h a rm a c y R e n o v a ti o n

R

C e n tr a l m o d e l_ m p a rk e rX U

R A

.r v t

/5

/2

:5

:5

A

M

1361-GI002

ABBREVIATIONS UPGRADE PHARMACY 18

MINNEAPOLIS, MN

618-16-120

06/04/19 LA/BB CD14849 3Revisions: Date:

FLOOR PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL

EXISTING DOOR

AND FRAME TO

REMAIN

DOOR

INTERIOR

BORROWED LIGHT

101B

101A

B3a

XXX

8'-0" DIMENSION LINE,

NOMINAL

8'-0" EXTENDED

DIMENSION LINE,

NOMINAL

AE2111A

INTERIOR

ELEVATION

INDICATOR TAG

2B

AE2O1

EXTERIOR

ELEVATION

INDICATOR TAG

1A

203 EQUIPMENT TAG

100 FLOOR ELEVATIONWALL TAG

OFFICE

ROOM NAME AND

NUMBER AE501

1A

DETAIL REFERENCE

TAG

AE2O1

EXTERIOR SECTION

REFERENCE TAG

1A

AE2O1

INTERIOR SECTION

REFERENCE TAG

1A

KEY NOTE

A

GRIDLINE

REVISION TAG

PR01

REVISION CLOUD

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

FP10

DEMOLITION PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL OR

PARTITION TO BE

REMOVED

EXISTING DOOR

AND FRAME TO

REMAIN

KEY NOTE

A

NEW GRIDLINE

A

EXISTING GRIDLINE

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

EXISTING DOOR

AND FRAME TO BE

DEMOLISHED

DASHED LINE

INDICATES ITEM TO

BE REMOVED (UNO)

DE10

REFLECTED CEILING PLAN

SYMBOLS

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

GBPD

CEILING /

SOFFIT

ACT CEILING

SYSTEM

EXISTING

ACT CEILING

SYSTEM

IV TRACK

CUBICLE

CURTAIN

TRACK

ACCESS

PANEL

2'-0" x 4'-0"

LIGHT FIXTURE

2'-0" x 2'-0"

LIGHT FIXTURE

PENDANT STRIP

LIGHT FIXTURE

PENDANT STRIP

LIGHT FIXTURE

RECESED LIGHT

FIXTURE

MECHANICAL

SUPPLY GRILL

MECHANICAL

RETURN GRILL

WALL SCONCE

LIGHT FIXTURE

MECHANICAL

LINEAR SUPPLY

GRILL

CEILING

ELEVATION AND

FINISH

9'-0" AFF

ACT

PRJ VIDPROJECTOR/DOCUMENT

CAMERA -

WALL/CEILING MOUNT

VIDEO CAMERA

- WALL/CEILING

MOUNT

EXIT SIGN

ACT ACOUSTICAL CEILING TILE

CPT MODULAR CARPET TILE

CT CERAMIC TILE

GYP BD GYPSUM BOARD

LVT LUXURY VINYL TILE

MMA METHYL METHACRYLATE FLOORING

P PAINT

PLAM PLASTIC LAMINATE

PT PORCELAIN TILE (FLOOR AND BASE)

RB RESILIENT BASE

RF RUBBER FLOORING

RWC RIGID VINYL WALL COVERING (WALL PROTECTION)

S SOLID SURFACE

SST STAINLESS STEEL

SC SPECIAL COATING

WSF WELDED SEAM SHEET FLOORING (HEAT WELDED

WITH ROD)

ROOM FINISH LEGEND &

ABBREVIATIONS

MATERIAL INSTALL

DIRECTION

KEYNOTECORNER GUARD

WALL

PROTECTION

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

CG

VCTCPT

AF10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCTION DOCUMENTS

AE PROJECT NUMBER: Dwg. of 78

C U s e rs \m p a rk e r\

D o c u m e n ts

\1

M in n e a p o lis

P h a rm a c y R e n o v a ti o n

R

C e n tr a l m o d e l_ m p a rk e rX U

R A

.r v t

/5

/2

:5

:5

A

M

1361-GI003

GENERAL NOTES & SYMBOLS UPGRADE PHARMACY 18

MINNEAPOLIS, MN

618-16-120

06/04/19 LA/BB CD14849 4Revisions: Date:

LIFE SAFETY SYMBOLS

SMOKE TIGHT

ASSEMBLY

1 HOUR FIRE

BARRIER

2 HOUR FIRE

BARRIER

3 HOUR FIRE

BARRIER

1 HOUR FIRE &

SMOKE BARRIER

2 HOUR FIRE &

SMOKE BARRIER

3 HOUR FIRE &

SMOKE BARRIER

HE

TRAVEL DISTANCE

100'-10"

TRAVEL DISTANCE

EA

EDEXIT EXIT

HORIZONTAL EXIT

EXIT DISCHARGE

EXIT ACCESS

FIRE

EXTINGUISHER

FE

FIRE

EXTINGUISHER

CABINET

FEC

LIMITS OF

CONSTRUCTION

SMOKE

COMPARTMENT

BOUNDRY

HEALTH CARE

SUITE

NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN

OCCUPANCY

SEPERATION

NOYES

APPLICABLE REGULATIONS

GENERAL TYPE OF PROJECT

NFPA NATIONAL FIRE CODES (EXCETION: NFPA 5000 & 900)

2010 FGI GUIDELINES

2015 NFPA 101 (LIFE SAFETY CODE)

ABA STANDARDS (2015) (ABAAS)

2012 IBC

REMODEL

ADDITION

NEW BUILDING

PROJECT DESCRIPTION

CODE SUMMARY

REMODELING OF EXISTING PHARMACY

CURRENTLY CLASSIFIED AS A BUSINESS OCCUPANCY

VA BARRIER FREE DESIGN STANDARD (PG-18-13)

NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)

THE JOINT COMMISSION (TJC)

CENTER FOR MEDICARE/MEDICAID SERVICES (CMS)

NOYES

TESTRATING (HRS)

NOYES

(IBC Chapter 6)

(Section 8.3)

CHANGE OF OCCUPANCY?

FIRE RESISTIVE CORRIDORS?

IBC II-B

(B)

EXTERIOR DOORS AND WINDOWS

SHAFTS AND EXIT PASSAGEWAYS

OTHER

ROOF CONSTRUCTION

PRIME & SEC. FLOOR BEAMS, JOISTS

FLOOR/CEILING ASSEMBLY

FLOOR CONSTRUCTION

INTERIOR

NON-BEARING WALLS AND PARTITIONS

BEARING WALLS

COLUMNS

GIRDERS

TRUSSES

ROOF/CEILING ASSEMBLY

PRIME & SEC. ROOF BEAMS, JOISTS

EXTERIOR

INTERIOR BEARING WALLS

EXTERIOR BEARING WALLS

STRUCTURAL FRAME

SEPARATED OCCUPANCIES?

AREA SEPARATIONS / FIRE WALLS

FIRE BARRIER RATING(S)

SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS)

INCIDENTAL USE AREA RATING(S)

FIRE-RESISTIVE REQUIREMENTS

SEE LIFE SAFETY PLANS

SEE PLANS

OCCUPANCY CLASSIFICATION(S)

TYPE(S) OF CONSTRUCTION

OCCUPANCIES

CONSTRUCTION TYPE(S)

MISCELLANEOUS

(If Remodeling)

2015 LSC (TABLE 6.1.14.1)

SEE LIFE SAFETY PLANS

See Life Safety Plans

AREAS OF REFUGE REQUIRED

MEANS OF EGRESS CAPACITY (width in inches)

EGRESS

20"

1 HR

INTERIOR FINISHES CLASSIFICATION A

NOYES

ACCESSIBLE MEANS OF EGRESS ("MOE") REQUIRED

ELEVATOR REQUIRED AS MEANS OF EGRESS

(LSC CH 12-42)

OSHA STANDARDS

VA SEISMIC DESIGN REQUIREMNTS H-18-8

NATIONAL ELECTRIC CODE (NEC)

ASME BIOLER AND PRESSURE VESSEL CODE

ASME CODE FOR RESSURE PIPING

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,

AMERICAN CONCRETE INSTITTE AND COMENTARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

ENERGY POLICY ACT OF 2005 (EPAct)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS

FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE

RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL

BUILDINGS, 10 CFR PARTS 433,434 AND 435

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE

BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION MANAGEMENT

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED

IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA

MASTER CONSTRUCTION SPECIFICATION

VENTILATION FOR ACCEPTDABLE INDOOR AIR QUALITY -

ASHRAE STANDARD 62.1-2004

SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE

STANDARD 15 -2007

VA FIRE PROTECTION DESIGN MANUAL

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA

NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER

GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)

EXITS

B EXIT ACCESS CORRIDORS

BOTHER SPACES

NFPA II

N/A

N/A

1 HR

1 HR

N/A

2 HR

2 HR

2 HR

N/A

N/A

N/A

USP 97 AND 800 STANDARD

FIRE RESISTIVE BARRIER

DD CC BB Z Y X W V

FDV

FEC

FEC

FEC

SMOKE CONTROL ZONE B-1

SPRINKLER ZONE 18

S M

O K

E C

O N

T R

O L

Z O

N E

B -1

SMOKE CONTROL ZONE B-2

S M

O K

E C

O N

T R

O L

Z O

N E

B -5

SMOKE CONTROL ZONE B-3

SPRINKLER ZONE 5

AA

EXTENT OF EXISTING 2

HOUR FIRE BARRIER HAS

BEEN REDUCED WITHIN

THIS SCOPE OF WORK

TO REDUCE DEAD END

CORRIDOR LENGTH

T R

A V

E L

D

IS

T A

N C

E

TO

TA

L

TR

AV

EL

D

IS

TA

NC

E

DE

AD

E

ND

0'

CO

M

M O

N

PA

TH

O

F

TR

AV

EL

5'

TOTAL TRAVEL DISTANCE = 105'

TRAVEL DISTANCE

FDV

PLAN

NORTH

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCTION DOCUMENTS

AE PROJECT NUMBER:

KEY PLAN

BUILDING 70

Dwg. of 78

C U s e rs \m p a rk e r\

D o c u m e n ts

\1

M in n e a p o lis

P h a rm a c y R e n o v a ti o n

R

C e n tr a l m o d e l_ m p a rk e rX U

R A

.r v t

/5

/2

:5

:5

A

M

1361-GI004

LOWER LEVEL LIFE SAFETY PLAN UPGRADE PHARMACY 18

MINNEAPOLIS, MN

618-16-120

06/04/19 LA CD14849 5

1/8" = 1'-0"

LOWER LEVEL LIFE SAFETY PLAN

0 8' 16'4'

NOYES

APPLICABLE REGULATIONS

GENERAL TYPE OF PROJECT

NFPA NATIONAL FIRE CODES (EXCETION: NFPA 5000 & 900)

2010 FGI GUIDELINES

2015 NFPA 101 (LIFE SAFETY CODE)

ABA STANDARDS (2015) (ABAAS)

2012 IBC

REMODEL

ADDITION

NEW BUILDING

PROJECT DESCRIPTION

CODE SUMMARY

REMODELING OF EXISTING PHARMACY

CURRENTLY CLASSIFIED AS A BUSINESS OCCUPANCY

VA BARRIER FREE DESIGN STANDARD (PG-18-13)

NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)

THE JOINT COMMISSION (TJC)

CENTER FOR MEDICARE/MEDICAID SERVICES (CMS)

NOYES

TESTRATING (HRS)

NOYES

(IBC Chapter 6)

(Section 8.3)

CHANGE OF OCCUPANCY?

FIRE RESISTIVE CORRIDORS?

IBC II-B

(B)

EXTERIOR DOORS AND WINDOWS

SHAFTS AND EXIT PASSAGEWAYS

OTHER

ROOF CONSTRUCTION

PRIME & SEC. FLOOR BEAMS, JOISTS

FLOOR/CEILING ASSEMBLY

FLOOR CONSTRUCTION

INTERIOR

NON-BEARING WALLS AND PARTITIONS

BEARING WALLS

COLUMNS

GIRDERS

TRUSSES

ROOF/CEILING ASSEMBLY

PRIME & SEC. ROOF BEAMS, JOISTS

EXTERIOR

INTERIOR BEARING WALLS

EXTERIOR BEARING WALLS

STRUCTURAL FRAME

SEPARATED OCCUPANCIES?

AREA SEPARATIONS / FIRE WALLS

FIRE BARRIER RATING(S)

SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS)

INCIDENTAL USE AREA RATING(S)

FIRE-RESISTIVE REQUIREMENTS

SEE LIFE SAFETY PLANS

SEE PLANS

OCCUPANCY CLASSIFICATION(S)

TYPE(S) OF CONSTRUCTION

OCCUPANCIES

CONSTRUCTION TYPE(S)

MISCELLANEOUS

(If Remodeling)

2015 LSC (TABLE 6.1.14.1)

SEE LIFE SAFETY PLANS

See Life Safety Plans

AREAS OF REFUGE REQUIRED

MEANS OF EGRESS CAPACITY (width in inches)

EGRESS

20"

1 HR

INTERIOR FINISHES CLASSIFICATION A

NOYES

ACCESSIBLE MEANS OF EGRESS ("MOE") REQUIRED

ELEVATOR REQUIRED AS MEANS OF EGRESS

(LSC CH 12-42)

OSHA STANDARDS

VA SEISMIC DESIGN REQUIREMNTS H-18-8

NATIONAL ELECTRIC CODE (NEC)

ASME BIOLER AND PRESSURE VESSEL CODE

ASME CODE FOR RESSURE PIPING

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,

AMERICAN CONCRETE INSTITTE AND COMENTARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

ENERGY POLICY ACT OF 2005 (EPAct)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS

FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE

RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL

BUILDINGS, 10 CFR PARTS 433,434 AND 435

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE

BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION MANAGEMENT

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED

IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA

MASTER CONSTRUCTION SPECIFICATION

VENTILATION FOR ACCEPTDABLE INDOOR AIR QUALITY -

ASHRAE STANDARD 62.1-2004

SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE

STANDARD 15 -2007

VA FIRE PROTECTION DESIGN MANUAL

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA

NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER

GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)

EXITS

B EXIT ACCESS CORRIDORS

BOTHER SPACES

NFPA II

N/A

N/A

1 HR

1 HR

N/A

2 HR

2 HR

2 HR

N/A

N/A

N/A

USP 97 AND 800 STANDARD

FIRE RESISTIVE BARRIER

LIFE SAFETY SYMBOLS

SMOKE TIGHT

ASSEMBLY

1 HOUR FIRE

BARRIER

2 HOUR FIRE

BARRIER

3 HOUR FIRE

BARRIER

1 HOUR FIRE &

SMOKE BARRIER

2 HOUR FIRE &

SMOKE BARRIER

3 HOUR FIRE &

SMOKE BARRIER

HE

TRAVEL DISTANCE

100'-10"

TRAVEL DISTANCE

EA

EDEXIT EXIT

HORIZONTAL EXIT

EXIT DISCHARGE

EXIT ACCESS

FIRE

EXTINGUISHER

FE

FIRE

EXTINGUISHER

CABINET

FEC

LIMITS OF

CONSTRUCTION

SMOKE

COMPARTMENT

BOUNDRY

HEALTH CARE

SUITE

NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN

OCCUPANCY

SEPERATION

SMOKE CONTROL ZONE 3-58

SPRINKLER ZONE 76

CONSTRUCTION LIMITS

PLAN

NORTH

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCTION DOCUMENTS

AE PROJECT NUMBER:

KEY PLAN

BUILDING 70

Dwg. of 78

C U s e rs \m p a rk e r\

D o c u m e n ts

\1

M in n e a p o lis

P h a rm a c y R e n o v a ti o n

R

C e n tr a l m o d e l_ m p a rk e rX U

R A

.r v t

/5

/2

:5

:5

A

M

1361-GI005

THIRD LEVEL LIFE SAFETY PLAN UPGRADE PHARMACY 18

MINNEAPOLIS, MN

618-16-120

06/04/19 LA JT14849 6

1/8" = 1'-0"

THIRD LEVEL LIFE SAFETY PLAN

INFECTION CONTROL GENERAL NOTES

1. THE INTENT OF INFECTION CONTROL ISOLATION IS TO PROTECT PATIENTS IN THE HOSPITAL WHICH HAVE LOW IMMUNE LEVELS. THEREFORE, CONSTRUCTION OPERATIONS NEED TO BE DIRECTED TO CONTAIN DUST AND PARTICULATE MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA PERIMETER NEEDS TO BE SEALED COMPLETELY WITH MIN 4 MIL POLY AND DUCT TAPE DURING CLASS II, III, OR IV OPERATIONS.

2. PROVIDE TRIATEK ISOLATION MONITORS DURING CLASS III OR CLASS IV CONSTRUCTION OPERATIONS. EACH AREA TO BE UNDER NEGATIVE PRESSURE (0.02"WC) DURING THESE OPERATIONS. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA R.E.

3. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C (SEE SPECIFICATION SECTION "INFECTION CONTROL") AND THEREON, PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF CONSTRUCTION. PROVIDE AT LEAST 10

DAYS NOTICE FOR EACH PERMIT.

4. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER FROM FLOOR TO DECK/FLOOR ABOVE. EXCEPTION.

IF BARRIER IS ADJACENT SMOKE, FIRE, OR EXISTING WALL CONSTRUCTION WHICH WILL NOT BE DEMOLISHED AND TERMINATES TO FLOOR OR DECK ABOVE, THEN CONSTRUCT IC BARRIER FROM FLOOR TO ABOVE CORRIDOR CEILING WITH 4 MIL POLY BEING SEALED ON ALL EDGES: FLOOR, TOP OF WALL, SIDES, AND ALL PENETRATIONS.

SEE DETAILS THIS SHEET.

5. REFER TO 1/GI005 FOR TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION DETAIL. GENERAL CONTRACTOR SHALL PROVIDE NEW CONSTRUCTION ACCESS DOORS AND PROXIMITY CARD READERS AT ALL BARRIERS. MAINTAIN ALL INFECTION CONTROL STANDARDS. CONTROL BARRIERS ARE TO BE INSTALLED AND

REMOVED ONLY BEFORE 7:00 A.M. AND AFTER 8:00 P.M.

6. HVAC CONTRACTOR SHALL ADJUST THE VARIABLE FREQUENCY DRIVES FOR AHU AS NECESSARY PRIOR TO STARTING ANY CONSTRUCTION OR DEMOLITION OPERATIONS TO ENSURE PROPER INFECTION CONTROL MEASURES. ADJUST VFD FOR BALANCING SUPPLY TO MEET INFECTION CONTROL MEASURES AS INDICATED

HEREAFTER.

7. PROVIDE BALANCING DAMPERS IN THE MAIN SUPPLY AND EXHAUST DUCT WORK SERVING THESE AREAS.

TEMPORARILY BALANCE AIR FLOW TO PROVIDE NEGATIVE AIR FLOW IN CONSTRUCTION ZONE AT ALL TIMES AS INDICATED BELOW. DAMPERS TO REMAIN IN DUCT AFTER CONSTRUCTION IS COMPLETE AND IS TO BE SECURED IN

FINAL BALANCING POSITION PRIOR TO TURNING SYSTEM OVER FOR OCCUPANCY.

8. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE ISOLATION MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE

FOR AREAS BETWEEN 5000 SF AND 10000 SF.

9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR. PROVIDE A STANDBY

UNIT IN THE EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA.

10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED WALLS, CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED WALLS PER NEW PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE BARRIER..

11. ALL CONSTRUCTION DEBRIS, WASTE, AND TRANSPORTATION OF DEMOLITION ITEMS SHALL BE CONVEYED IN A COVERED DUMPSTER CONTAINER SUCH THAT NO DEBRIS/ITEMS ARE VISIBLE. ALL CONTAINERS SHALL BE TRANSPORTED DOWN THE 'F' BANK FREIGHT ELEVATORS (A DESIGNATED ELEVATOR WILL NOT BE PROVIDED FOR TRANSPORTATION.) A MINIMUM OF ONE RUNOFF MAT ON THE INSIDE AND MINIMUM OF TWO RUNOFF MATS ON THE

OUTSIDE SHALL BE PROVIDED FOR THE CONSTRUCTION ACCESS DOORS.

NON-PATIENT AREAS - ALL BUILDINGS

CONSTRUCTION PROJECT ACTIVITY TYPE - D

PATIENT RISK GROUP - _HIGH_ RISK

CONTROL PROCEDURE CLASS - _IV__

PATIENT AREAS - ALL BUILDINGS

CONSTRUCTION PROJECT ACTIVITY TYPE - D

PATIENT RISK GROUP - _HIGH _ RISK

CONTROL PROCEDURE CLASS - IV

INFECTION CONTROL RISK ASSESSMENT (ICRA) BY PROJECT AREA USE

ICRA LEGEND

INFECTION CONTROL RISK ASSESSMENT

(ICRA) BY PROJECT AREA USE

LEGEND

NON-PATIENT

HOSPITAL AREAS

NO WORK

REFER TO ALL FLOOR PLAN SHEETS , PLUMBING

INSULATION INFORMATION, PLUMBING DEAD LEG

INFORMATION AND PLUMBING KEYNOTES

INFORMATION TABLE FOR DETERMINATION OF

INFECTION CONTROL PROCEDURES REQUIRED

AT EACH BID ITEM.

NEW OR EXISTING CEILING

CONTINUOUS DUCT

TAPE SEAL EACH SIDE

AT CEILING

COMPRESSIBLE

INSULATION

CONTINUOUS DUCT

TAPE SEAL EACH

SIDE

EXISTING FINISHED

FLOOR

(1) LAYER 5/8" GYP BD EACH

SIDE. FINISH OCCUPIED SIDE

WITH GLOSS PAINT

3 5/8" STEEL STUDS @ 16"

OC WITH FULL BATT SOUND

ATTENUATING INSULATION

CONTINUOUS FIRE

RETARDANT TREATED

WOOD NAILER

CLOSE INTERSTITIAL SPACE WITH

6 MIL POLYETHYLENE

BARRIER. SEAL ALL JOINTS,

PENETRATIONS AND ENTIRE

PERIMETER OF BARRIER

WITH CONTINUOUS DUCT TAPE

CLOSE OPEN DUCTS WITH

6 MIL POLYETHYLENE

BARRIER. SEAL EDGES

WITH CONTINUOUS DUCT

TAPE

"WORK" SIDE OF BARRIER OCCUPIED SIDE OF BARRIER

3 5/8" STEEL STUDS @ 16"

OC WITH FULL BATT SOUND

ATTENUATING INSULATION

3 5/8" STEEL STUDS @ 16"

OC WITH FULL BATT SOUND

ATTENUATING INSULATION

COMPRESSIBLE INSULATION

INTERSITIAL BARRIER

SEALANT WITH FOAM

ROD BACKUP

6 MIL POLY OVER

CEILING PENETRATION

NOTES:

1. ALL CORNERS TO FORM 90 ANGLE WITH NO RADIUS

2. SEAL ALL SIDES OF POLY WITH DUCT TAPE

3. SEAL ALL CRACKS WITH DUCT TAPE.

6 MIL POLY OVER

EQUIPMENT OR

FURNISHING

6 MIL POLY OVER

WALL PROTRUSION

FLOOR

DOOR

BEYOND

WINDOW

BEYOND

CEILING

6 MIL POLY OVER

WALL OPENINGS

6 MIL POLY OVER

DOORS & WINDOWS

CEILING

DD CC BB Z Y X W V

AA

PLAN

NORTH

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCTION DOCUMENTS

AE PROJECT NUMBER:

KEY PLAN

BUILDING 70

Dwg. of 78

C U s e rs \m p a rk e r\

D o c u m e n ts

\1

M in n e a p o lis

P h a rm a c y R e n o v a ti o n

R

C e n tr a l m o d e l_ m p a rk e rX U

R A

.r v t

/5

/2

:0

:0

P

M

1361-GI006

INFECTION CONTROL RISK

ASSESSMENT PLAN

UPGRADE PHARMACY 18

MINNEAPOLIS, MN

618-16-120

06/04/19 LA CD14849 7

1/2" = 1'-0"

TYP DUST PROOF BARRIER

12" = 1'-0"

CRITICAL BARRIER PREPARATION / INSTALLATION

1/16" = 1'-0"

LOWER LEVEL INFECTION CONTROL RISK ASSESSMENT PLAN

0 16' 32'8' 1/16" = 1'-0"

THIRD LEVEL INFECTION CONTROL RISK

ASSESSMENT PLAN

0 16' 32'8'

PHASE 1B

PHASE 5

PHASE 7

PHASE 6

PHASE 3

PHASE 1A

PROVIDE SECURE

TEMPORARY

CONSTRUCTION

ENTRANCE FOR

PHASE 5

PROVIDE SECURE TEMPORARY

CONSTRUCTION ENTRANCE FOR

PHASE 1A

PROVIDE SECURE TEMPORARY

CONSTRUCTION ENTRANCE FOR

PHASE 1A & 1B

PROVIDE SECURE TEMPORARY

CONSTRUCTION ENTRANCE FOR

PHASE 1C, 2, 3, 4, AND 6

BC-67

CORRIDOR

PHASE 2

PHASE 4

CONSTRUCTION PHASING

DESCRIPTION

1A- MEN'S TOILET, CBOC, RECEIVING, STORAGE HD DRUGS, HD BUFFER

ROOM, AND PORTION OF GENERAL PHARMACY

1B- ANTEROOM, NON HD BUFFER ROOM, MECH ROOM, OFFICE BR-111B, AND

PORTION OF GENERAL PHARMACY

UPON THE RECEIPT OF THE NOTICE TO PROCEED AND PRIOR TO THE START

OF PHASE 2, THE CONTRACTOR SHALL CONSTRUCT TEMPORARY BARRIERS,

START DEMOLITION AND COMPLETE ALL CONTRACTUAL WORK INVOLVED IN

PHASE 1 AREAS INCLUDING ALL TEMPORARY SIGNAGE TO DIRECT

(VETERANS, PATIENT, PEDESTRIAN) FLOW.

PHASE 1A WORK WILL BEGIN FIRST HOWEVER THE TIMING OF PHASES 1B

WORK WILL COORDINATE BETWEEN THE CONTRACTOR AND VA COR, PHASES

1A & 1B WORK IS REQUIRED TO BE SUBSTANTIALLY COMPLETE AND READY

FOR OCCUPANCY PRIOR TO NOV. 1 2019. THE REMAINING PHASE OF WORK

SHALL BE SUBSTANTIALLY COMPLETE AND READY FOR OCCUPANCY AT TIME

OF SUBSTANTIAL COMPLETION FOR EACH PHASE OF WORK.

PHASE 1.

WOMEN 'S TOILET, BULK STORAGE, AND GENERAL PICKING

UPON OWNER INSPECTION AND APPROVAL OF PHASE 2 AND PRIOR TO THE

START OF PHASE 3, THE CONTRACTOR SHALL CONSTRUCT TEMPORARY

BARRIERS, START DEMOLITION AND COMPLETE ALL CONTRACTUAL WORK

INVOLVED IN PHASE 3 AREAS INCLUDING ALL TEMPORARY PROVISIONS AND

SIGNAGE

PHASE 3.

PORTION OF GENERAL PICKING, BULK STORAGE, UNIT DOSE, AND

REMAINDER OF GENERAL PHARMACY

UPON OWNER INSPECTION AND APPROVAL OF PHASE 3 AND PRIOR TO THE

START OF PHASE 4, THE CONTRACTOR SHALL CONSTRUCT TEMPORARY

BARRIERS, START DEMOLITION AND COMPLETE ALL CONTRACTUAL WORK

INVOLVED IN PHASE 4 AREAS INCLUDING ALL TEMPORARY PROVISIONS AND

SIGNAGE

PHASE 4.

PICK-UP WINDOW, HSKG, STAFF LOUNGE, CONFERENCE/TRAINING ROOM,

WORK STATIONS, CORRIDOR EXTENSIONS, ROOM BR-110A, BR-110B, AND

BR-111

UPON OWNER INSPECTION AND APPROVAL OF PHASE 4 AND PRIOR TO THE

START OF PHASE 5, THE CONTRACTOR SHALL CONSTRUCT TEMPORARY

BARRIERS, START DEMOLITION AND COMPLETE ALL CONTRACTUAL WORK

INVOLVED IN PHASE 5 AREAS INCLUDING ALL TEMPORARY PROVISIONS AND

SIGNAGE

PHASE 5.

ADMINISTRATIVE OFFICES

UPON OWNER INSPECTION AND APPROVAL OF PHASE 5 AND PRIOR TO THE

START OF PHASE 6, THE CONTRACTOR SHALL CONSTRUCT TEMPORARY

BARRIERS, START DEMOLITION AND COMPLETE ALL CONTRACTUAL WORK

INVOLVED IN PHASE 6 AREAS INCLUDING ALL TEMPORARY PROVISIONS AND

SIGNAGE

PHASE 6.

INVESTIGATIONAL DRUG SERVICES

UPON OWNER INSPECTION AND APPROVAL OF PHASE 6 AND PRIOR TO THE

START OF PHASE 7, THE CONTRACTOR SHALL CONSTRUCT TEMPORARY

BARRIERS, START DEMOLITION AND COMPLETE ALL CONTRACTUAL WORK

INCLUDING ALL TEMPORARY PROVISIONS AND SIGNAGE

PHASE 7.

PHARMACY, PATIENT TOILET & OFFICE

WORK ON THIRD FLOOR SHOULD BE SCHEDULED TO FOLLOW THE PHASED-

WORK ON THE LOWER LEVEL ONCE COMPLETED AND INSPECTED. THE

CONTRACTOR SHALL CONSTRUCT TEMPORARY BARRIERS, START

DEMOLITION AND COMPLETE ALL CONTRACTUAL WORK INCLUDING ALL

TEMPORARY PROVISIONS AND SIGNAGE

THIRD FLOOR.

PHASE 2. INPATIENT NARCOTICS VAULT

UPON OWNER INSPECTION AND APPROVAL OF PHASE 1 AND PRIOR TO THE

START OF PHASE 2, THE CONTRACTOR SHALL CONSTRUCT TEMPORARY

BARRIERS, START DEMOLITION AND COMPLETE ALL CONTRACTUAL WORK

INVOLVED IN PHASE 3 AREAS INCLUDING ALL TEMPORARY PROVISIONS AND

SIGNAGE

CONSTRUCTION PHASING

GENERAL NOTES

1. THE WORK UNDER THIS CONTRACT SHALL BE

DIVIDED INTO PHASES. A PHASE CAN

INVOLVE MULTIPLE LOCATION AREAS.

2. THE GENERAL CONTRACTOR SHALL COORDINATE

ALL PHASING AND SEQUENCING WITH ALL

TRADES AND THE OWNER. THE GENERAL CONTRACTOR

SHALL PROVIDE A WRITTEN NARRATIVE TO OUTLINE

CONSTRUCTION PHASING AND SEQUENCE PLANS, VALIDATING

AND ELABORATING ON THIS PHASING DESCRIPTION.

3. THE GENERAL CONTRACTOR SHALL COOPERATE

FULLY WITH THE OWNER SO WORK MAY BE

CARRIED OUT SMOOTHLY, WITHOUT

INTERFERING WITH OR DELAYING WORK UNDER

THIS CONTRACT, OR OTHER CONTRACTS ON THE

PROJECT SITE OR WORK BY OWNER.

4. THE GENERAL CONTRACTOR'S CONSTRUCTION

SCHEDULE SHALL INDICATE THE SEQUENCE,

COMMENCEMENT AND COMPLETION DATES,

OWNER INSPECTION AND APPROVAL DATES

AND MOVE-OUT AND MOVE-IN DATES OF OWNER'S

PERSONNEL FOR ALL PHASES OF THE WORK.

5. THE GENERAL CONTRACTOR SHALL PERFORM

THE WORK IN EACH PHASE IN THE SEQUENCE

SHOWN ON THE PHASING PLAN (DRAWING

1/GI005) AND CONSTRUCTION PHASING

DESCRIPTION.

6. THE GENERAL CONTRACTOR MUST COMPLETE

ALL WORK IN EACH PHASE WITH THE VA

INSPECTING AND ACCEPTING THE WORK PRIOR

TO VA OCCUPANCY AND THE CONTRACTOR

PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON

COMPLETION OF A PARTICULAR PHASE, THE ENTIRE AREA

COVERED BY THAT PHASE CAN BE OCCUPIED BY THE VA

PERSONNEL WITH ALL SYSTEMS FUNCTIONING PROPERLY.

7. BEFORE COMMENCING WORK ON EACH

SUCCESSIVE PHASE, THE GENERAL

CONTRACTOR SHALL SUBMIT AN UPDATED

COPY OF THE SCHEDULE.

8. ANY DUST PARTITIONS CONSTRUCTED BY

THE CONTRACTOR PRIOR TO THE START OF

DEMOLITION MUST REMAIN IN PLACE UNTIL THE

COMPLETION OF THAT PHASE OR

SUBSEQUENT PHASE WHERE REQUIRED.

9. THE CONTRACTOR SHALL PERFORM ALL WORK

ADJACENT TO VA OCCUPIED AREAS IN SUCH A

MANNER TO ENSURE THE CONTINUOUS AND

UNINTERRUPTED USE OF ALL OCCUPIED AREAS,

INCLUDING THE APPLICABLE MECHANICAL AND

ELECTRICAL SYSTEMS SERVING THESE AREAS.

10. FOR ADDITIONAL NOTES AND INFORMATION

REFER TO INFECTION CONTROL DRAWING

GI006 & DEMOLITION PLANS.

11. ANY INFORMATION REGARDING SEQUENCING

PROVIDED IN THE DOCUMENTS IS FOR

ARCHITECT-OWNER PLANNING PURPOSES ONLY.

12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN

REQUIRED MEANS OF EGRESS THROUGHOUT ALL PHASING.

13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME

BETWEEN PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY

ACCEPTED SPACE AND VACATE THE FOLLOW-ON PHASES. THE VA

WILL ACCELERATE THIS TIME WHEN POSSIBLE AND WILL NOTIFY

THE CONTRACTOR IF THIS OCCURS. SEE SPECIFICATIONS SECTION

01 00 00 1.6.G PHASING.

SCOPE OF WORK DESCRIPTION

THE PROJECT INCLUDES THE LOWER LEVEL IP PHARMACY WORK IN ROOMS: BC-67,

BR-101, BR-101A THOUGH H, BR110A, BR-110B, BR-111 THROUGH BR-117, BR-118,

BR-118A, B&C, BR-119 THROUGH BR-128, BA-111, BA-112, BQ-110d, BQ-110e, BT-102 &

BT-104 ON THE LOWER LEVEL AND INTERSTITIAL SPACE ABOVE.

THE PROJECT ALSO INCLUDES THE HEM/ONC PHARMACY WORK IN ROOMS: C3-49,

C3-52, 3F-117, 3F-117A&B, 3F-120, 3F-120A, 3F-122a, 3F-122b, AND 3F-125 ON THE THIRD

LEVEL AND INTERSTITIAL SPACE ABOVE AND BELOW THE THIRD LEVEL.

THE PROJECT ALSO INCLUDES WORK IN ROOM 5N-101 ALONG WITH THE NORTH WING

OF THE PENTHOUSE (NEAR SHAFT #2) AND CENTER PENTHOUSE (NEAR SHAFT #7)

AND WITHIN THE ENTIRE LENGTH INSIDE OF SHAFT #7 ON THE FIFTH/ PENTHOUSE

LEVEL.

PLAN

NORTH

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCTION DOCUMENTS

AE PROJECT NUMBER:

KEY PLAN

BUILDING 70

Dwg. of 78

C U s e rs \m p a rk e r\

D o c u m e n ts

\1

M in n e a p o lis

P h a rm a c y R e n o v a ti o n

R

C e n tr a l m o d e l_ m p a rk e rX U

R A

.r v t

/5

/2

:0

:0

P

M

1361-GI007

CONSTRUCTION PHASING PLAN UPGRADE PHARMACY 18

MINNEAPOLIS, MN

618-16-120

06/04/19 LA/BB CD14849 8

1/8" = 1'-0"

CONSTRUCTION PHASING PLAN NEW

BR-102

BR-101

BR-104BR-103

BR-113ABR-113B

BR-117BR-117B

BR-117A

BR-108

BR-118

CB79CB81

CB78

CB16

BR-115 BR-114 BR-116

BR-118A

BR-113

BR-129

BR-128

BR-126 BR-127

BR-125

BR-123 BR-124

BR-82

BR-120BR-121

BR-119

BR-119A

BR-122

BR-122A

BR-130

BR-131

DE17

DE12

DE4

DE5

DE4

DE4

DE1

DE3

DE19

DE15DE8 DE9

DE8 DE9

DE10

DE8

DE5

DE1

DE1DE1

DE1 DE1

DE1

DE2

DE2

DE2 DE4DE2

DE2

DE4DE2

DE6

DE8

DE14

DE14

DE4

DE4

DE4

DE4

DE4

DE4

DE4

DE4

DE4

DE4 DE11

DE11

DE5 DE5DE5

DE5

DE5

DE5

DE5

DE5 DE5

DE5

DE5

DE5

DE5

DE5

DE4

DE5

DE5

DE5

DE5

DE5DE4

DE2

DE4DE4DE4

DD CC BB Z Y X W V

DE10

DE2

DE10

DE10

DE10

DE16

DE4

DE2

DE5

DE20

DE4 DE5

4'- 0"

LIMIT OF

DEMOLITION

DE12

DE5DE4

DE5

DE2

DE2

DE16

DE5DE4

DE21

DE18 DE4

DE5

DE4 DE5

DE4

DE5

AA

DE1

DE1

DE7

DE3

DE25

DE4

DE7

DE23

DE24

DE2 DE6

DE7

TYP.

DE29

DE7

DE1

DE1

DE7

DE22

DE25

DE26DE27

DE26DE27

DE26DE27

DE26

DE27

DE26

DE27

DE26

DE2

DE28

DE1

DE2

DE3

DE1

DE3

DE3

DE2

DE6

DE6

DE17

DE30

DE22

DE34

DE34

DE31

DE33

DE35

DE3

DEMOLITION PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

DE1 REMOVE AND DISPOSE OF DOOR AND FRAME, INCLUDING HARDWARE.

DE2 REMOVE AND DISPOSE OF EXISTING FRAMED WALL PARTITIONS, INCLUDE

INSULATION, BRACING, AND WALL FINISHES.

DE3 REMOVE AND DISPOSE OF PORTION OF WALL AS REQUIRED FOR

INSTALLATION OF DOOR AND FRAME OR OPENING.

DE4 REMOVE AND DISPOSE OF SUSPENDED 2X4 ACOUSTICAL TILE CEILING IN

THIS AREA.

DE5 REMOVE ALL EXISTING FLOOR FINISHES TO EXISTING SLAB AND PREP FOR

NEW FLOORING.

DE6 REMOVE AND DISPOSE OF PARTITIONS, DOOR, AND WINDOWS.

DE7 PROVIDE TEMPORARY SUPPORT OF EXISTING CONSTRUCTION AT

LOCATION OF REMOVED PARTITION/WINDOW/DOOR FRAME.

DE8 REMOVE WALL TILES FROM PARTITION TO REMAIN AND PREPARE

SURFACE FOR FINISH

DE9 REMOVE FLOOR TILE, LEVEL SUBSTRATE AND PREPARE SURFACE FOR

FINISH

DE10 REMOVE AND DISPOSE OF EXISTING PLUMBING FIXTURE.

DE11 REMOVE LOCKERS

DE12 REMOVE DUMBWAITER AND SHAFT CONSTRUCTION TO ABOVE THE

INTERSTITIAL SPACE. CAP BOTTOM OF SHAFT.

DE13 REMOVE SUSPENDED GYP BD CEILING IN THIS AREA.

DE14 REMOVE GRAB BARS AND ALL TOILET ACCESSORIES.

DE15 REMOVE FLOOR SINK

DE16 REMOVE SINK AND PREP WALL FOR FINISHES

DE17 REMOVE PORTION OF EXISTING PARTITION AS REQUIRED FOR

MECHANICAL, PLUMBING AND/OR ELECTRICAL.

DE18 REMOVE PORTION OF EXISTING GYP BD CEILING THIS AREA AS REQUIRED

FOR PARTITIONS, MECHANICAL, AND ELECTRICAL.

DE19 REMOVE FIXTURE AND SALVAGE FOR REINSTALLATION

DE20 REMOVE EXISTING HANDRAIL.

DE21 REMOVE AND DISPOSE OF EXISTING MILLWORK.

DE22 REMOVE EXISTING CABINETS AND/OR SHELVING

DE23 REMOVE H.M. FRAME AND GLAZING.

DE24 REMOVE PNEUMATIC SYSTEM AND SALVAGE FOR REINSTALLATION.

DE25 MECH TO RELOCATE FDV -SEE MECH DRAWINGS.

DE26 SAWCUT CONCRETE SLAB TO REMOVE EXISTING PIPING. SEE 1/PD101.

DE27 SAWCUT CONCRETE SLAB AS REQUIRED TO INSTALL PLUMBING. SEE

1/P101.

DE28 REMOVE VAULT DOOR.

DE29 REMOVE EXISTING DAY GATE IN PREPARATION FOR NEW VAULT DOOR &

DAYGATE.

DE30 REMOVE EXISTING SHOWER BASE AND WALL TILE.

DE31 REMOVE PORTION OF FURRED PARTITION TO INSTALL FEC.

DE32 REMOVE EXISTING DOOR AND HM FRAME AND SALVAGE FRAME FOR

RE-USE.

DE33 REMOVE AREA OF RAISED CONCRETE HOUSEKEEPING CURB

CONSTRUCTION. VERIFY EXTENT.

DE34 REMOVE PLUMBING WALL SEE MECHANICAL DRAWING.

DE35 REMOVE EXISTING PASS-THRU.

DEMOLITION GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, PHASING AND SEQUENCING

WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THESE DOCUMENTS

IS FOR ARCHITECT - OWNER PLANNING PURPOSES ONLY, UNLESS NOTED OTHERWISE.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL TRADES FOR THE

DEMOLITION WORK REQUIRED FOR THIS PROJECT.

WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG WITH ALL ITEMS

CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE, SIDELIGHTS, WINDOWS,

MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO STRUCTURE ABOVE, UNLESS NOTED

OTHERWISE.

WHERE FLOOR FINISH IS INDICATED TO BE DEMOLISHED, REMOVE FINISH TO FLOOR SLAB AS

REQUIRED AND PREPARE SLAB SURFACE FOR SCHEDULED FINISHES WITHIN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.