Pikes Peak Janitorial Vendor Questions Response.rtf
RTF text file 139 KB Posted
- Solicitation number
- 36C78627Q0040
About this file
This document is a Questions and Answers (Q&A) response file for a janitorial services solicitation at Pikes Peak National Cemetery issued by the Department of Veterans Affairs National Cemetery Administration under solicitation number 36C78627Q0040. The responses clarify evaluation criteria, contract performance requirements, and pricing structure for the base period of December 15, 2026, through December 14, 2027, with four one-year option periods.
Key clarifications include: (1) Past performance evaluation will consider only the prime contractor and its employees, not subcontractor experience, though an offeror with fewer than three qualifying corporate projects may supplement with documented key personnel experience and will receive a neutral rating if insufficient; (2) the on-site supervisor must be a prime contractor employee with at least three years of direct janitorial supervisory experience and may also perform routine cleaning; (3) CLIN 4 (Semi-Annual Floor Maintenance Services) encompasses both hard-floor maintenance and carpet restorative cleaning in April and October; (4) Memorial Day service runs 8:00 a.m. to typically 12:00 p.m., while Veterans Day and other federal holidays require no janitorial staff; (5) routine daily cleaning operates 8:00 a.m. until all tasks are complete, not to exceed 4:30 p.m., with the contractor establishing appropriate staffing levels; (6) exterior window services begin in December (pending weather, no later than January) and continue every other month thereafter for six total annual services; and (7) the incumbent contractor is Federal Medical Services under contract 36C78621D0111 with a base and four option years valued at $267,576.00. The facility covers approximately 6,380 square feet across three buildings (Administration, Maintenance, and Honor Guard) with approximately 30 government staff and 150 average daily visitors; no historical consumables data is available, but contractor-provided dispensers are permitted alongside government-owned equipment, and no after-hours work, background investigations, or government ID issuance is required.
Text of this file
Vendor 1
| 1. | Past Performance: Attachment C requires three comparable projects completed within the past five years. Can an offeror use the relevant past performance of a proposed subcontractor to meet this requirement? We are evaluating the performance of the prime. |
| 2. | On-Site Supervisor: The PWS requires the prime contractor's on-site supervisor to have at least three years of direct janitorial supervisory experience. Can this position be filled by a qualified supervisor employed by the proposed subcontractor? Prime contractor's on-site supervisor |
| 3. | Floor Maintenance Pricing: The PWS lists semiannual hard-floor maintenance and carpet restorative cleaning as separate requirements under Sections 6.4 and 6.5, but Attachment B includes only one semiannual floor-maintenance CLIN. Could you confirm whether both services should be included in that single CLIN? CLIN 4 Semi Annual Floor Maintenance Services includes both 6.4 Semi-Annual Hard Floor Maintenance and 6.5 Semi-Annual Carpet Restorative Cleaning. |
Vendor 2
| 1. | Past performance for a new offeror — Attachment C, Factor 2. CTZ does not have three comparable completed janitorial contracts in its own name. If an offeror has no relevant company past-performance record, will it receive a neutral evaluation and remain eligible for award, or are descriptions of at least three comparable company projects within the last five years a mandatory acceptability requirement? We are evaluating the performance of the prime. |
| 2. | Experience attributable to proposed personnel or subcontractors. May an offeror submit comparable projects performed by a proposed key employee for a prior employer, or by a proposed subcontractor, if the proposal clearly identifies the performing entity, the individual's role, and the work each party will perform under this contract? If so, what reference, résumé, and commitment documentation is required? We are evaluating the performance of the prime, and employees of the prime. |
| 3. | Supervisor duties and relief — PWS 3.1 and Attachment C. If CTZ proposes an employee whose résumé demonstrates at least three years of direct janitorial supervision, may that on-site supervisor also perform routine cleaning? Must an alternate covering absences independently meet the same three-year requirement? Please also clarify whether continuous staffing throughout the 8:00 a.m.–4:30 p.m. window is required, or whether those are permitted performance hours subject to completion of all tasks and the response requirements. We are evaluating the performance of the prime, and employees of the prime, coverage is what is important / WORK BEGINS AT 8:00am AND GOES UNTIL COMPLETE. |
| 4. | Holiday cleaning — PWS 7.3 and Attachment B, A.4. PWS 7.3 requires service on Memorial Day and Veterans Day, including when those holidays fall on a weekend, while Attachment B generally excludes Federal holidays. Please confirm that the PWS holiday-specific requirements govern and that this work is included in the monthly janitorial CLIN. For other holidays, please clarify how moving work to the day before or after applies to daily cleaning. MEMORIAL DAY ALWAYS FALLS ON A MONDAY; JANITORIAL HOURS WILL BE 8:00AM TO TYPICALLY 12:00PM. VETERANS DAY AND OTHER FEDERAL HOLIDAYS NO JANITORIAL STAFF REQUIRED. |
5. Floor-maintenance pricing. Do CLIN 0004 and the corresponding option-year CLINs include both the semiannual hard-floor maintenance and carpet deep cleaning/restoration described in the PWS? Please identify any periodic floor or carpet work that should instead be included in the monthly janitorial CLIN. CLIN 4 Semi Annual Floor Maintenance Services includes both 6.4 Semi-Annual Hard Floor Maintenance and 6.5 Semi-Annual Carpet Restorative Cleaning. Monthly, follow the daily Routine Facility Cleaning Services 4.1 Non-Carpeted Floors and 4.2 Carpeted Floors.
| 6. | First exterior-window service. The price schedule includes six exterior-window services per year, and the PWS calls for service every other month during the first week. With the planned December 15 start, what is the first required service month, and should offerors price six complete services during the base period? FIRST REQUIRED SERVICE MONTH WILL BE THAT DECEMBER, PENDING WEATHER. NO LATER THAN JANUARY. THEN EVERY OTHER MONTH AFTER THAT. |
| 7. | Start date and base-year quantities. The base period is stated as December 15, 2026 or date of award through December 14, 2027, with 12 monthly units. If award or commencement occurs after December 15, will the base end date and CLIN quantities be adjusted, or will a partial month be prorated? Please confirm the quantity and pricing basis offerors should use for evaluation. Please price for monthly CLINs, the start may be adjusted depending on when the contract starts. |
| 8. | Site-visit and question instructions. Please confirm that the revised combined solicitation's November 19, 2026, 11:00 a.m. MST site visit, no-RSVP instruction, restriction on additional tours, and November 19, 11:00 p.m. MST question deadline supersede the blank dates and different notification/additional-visit instructions in Attachment B, A.3. This error was corrected on the solicitation. |
| 9. | Labor-cost information. Please confirm whether an incumbent collective bargaining agreement applies and, if so, provide the applicable agreement or wage determination. If available, please provide non-personally identifying predecessor-service tenure information needed to estimate vacation obligations for any incumbent employees hired. This is up to the vendor to work out, without government input. |
Vendor 3
1. Consumables: Can the Government provide historical usage data for restroom consumables (toilet tissue, paper towels, hand soap, trash liners), such as monthly quantities or annual spend? If not, please provide the approximate number of Government staff assigned to each building and average daily visitor counts, so offerors can estimate usage. NO HISTORICAL USAGE DATA AVAILABLE. APPROXIMATE NUMBER OF GOVERNMENT STAFF: 30. AVERAGE DAILY VISITOR COUNT: 150 PER DAY.
2. Dispensers: Are the existing restroom dispensers Government-owned? Do they require a specific brand or proprietary refill, or may the contractor install its own dispensers? GOVERNMENT OWNED DISPENSERS, HOWEVER CONTRACTOR MAY PROVIDE THEIR OWN DISPENSERS.
3. Incumbent: Is this requirement currently performed under contract? If so, please provide the current contract number, contractor, and contract value? Federal Medical Services under 36C78621D0111 Base and 4 $267,576.00
4. Personnel security: The solicitation includes FAR 52.204-9, Personal Identity Verification of Contractor Personnel. What background investigation, badging, or escort requirements apply to contractor employees at the cemetery? No government ID will be issued, or need to enter the property.
5. Past performance: Under Factor 2, will the Government consider the past performance of a proposed subcontractor that will perform a portion of the work, in addition to the prime? We are evaluating the performance of the prime.
6. Janitor closets: Is a janitor closet or storage space available in each of the three buildings, or in a single location? ADMIN HAS TWO JANITORIAL CLOSETS, MAINTENANCE HAS ONE. HONOR GUARD HAS SMALL JANITORIAL CLOSET AND TWO WALL LOCKERS.
7. Clarifications:
a. The Contract Type paragraph refers to "Richmond National Cemetery and its satellite cemeteries." Please confirm that this requirement covers Pikes Peak National Cemetery only. COVERS ONLY PIKES PEAK NATIONAL CEMETERY
b. Section A.3 of Attachment B (pre-proposal conference/site visit) is blank. Please confirm the November 19, 2026, 11:00 a.m. MST site visit in the combined synopsis is the only one. The time for the site visit has passed
c. The combined synopsis/solicitation PDF appears to have been removed from SAM.gov on November 16, 2026. Will a revised version or amendment be issued? It was added back.
Vendor 4
1. SAM.gov shows the solicitation was updated on 11/14 and 11/16/2026 and an earlier version was deleted. Do these updates constitute amendments that quoters must sign and return with Volume A? If so, please identify what changed. They corrected errors, and where replaced, they do not have to be signed.
2. PWS Section D lists Attachments 1 through 8, but only Attachments 1–3 are included. Will Attachment 4 (Site Map), Attachment 5 (Floor Plans), Attachment 6 (Work Summary and Progress Report), Attachment 7 (CDR) and Attachment 8 (Janitorial Checklist) be provided? It is located in attachment A
Scope and Price Schedule
3. PWS 6.5 requires semi-annual carpet restorative cleaning (April and October), but the Price Schedule (Attachment B) has no separate CLIN for it. Should carpet cleaning be priced within CLIN x004, Semi-Annual Floor Maintenance Services? CLIN 4 Semi Annual Floor Maintenance Services includes both 6.4 Semi-Annual Hard Floor Maintenance and 6.5 Semi-Annual Carpet Restorative Cleaning.
4. Should monthly high dusting (PWS 6.1) and monthly air register/diffuser/grille cleaning (PWS 6.2) be priced within CLIN x001, Monthly Janitorial Services? YES
5. For PWS 6.4, which floor areas require strip/seal/wax: VCT only, or should porcelain tile and concrete areas be scrubbed only? CONCRETE AREAS CLEANED AND SCRUBBED.
6. For CLIN x002 (exterior windows), please provide the approximate number of exterior windows and confirm whether any are above ground level or require a lift. THIS IS WHAT THE SITE VISIT WAS FOR.
7. Attachment 2 lists "4.11 – Ashtrays – Daily," but PWS 4.11 addresses facility defects and no ashtray requirement appears in the PWS. Is ashtray cleaning required, and if so, where are they located? ASHTRAYS HAVE BEEN REMOVED.
8. PWS 3.2 lists two locker rooms in the Maintenance Building and one in the Honor Guard Building, but Attachment 3 lists only the Honor Guard locker room. Please confirm the number of locker rooms and showers to be serviced. MAINTENANCE HAS TWO LOCKER ROOMS AND SHOWERS. HONOR GUARD JUST HAS LOCKER ROOM.
9. Please provide the make/model of the existing toilet tissue, paper towel and soap dispensers so quoters can price compatible contractor-furnished supplies. THIS IS WHAT THE SITE VISIT WAS FOR.
10. Does the Government provide dumpsters and recycling containers/hauling at the designated disposal areas referenced in PWS 4.10? DUMPSTER AND RECYCLING CONTAINERS LOCATED AT MAINTENANCE. JANITORIAL STAFF RESPONSIBLE FOR HAULING ITEMS TO DUMPSTER.
Schedule and Access
11. PWS 7.3 states that when a holiday falls on a scheduled workday, the workday moves to the day before or after. Since routine service is daily Monday–Friday, does this mean the holiday's service is performed in addition to the regular service on the adjacent day, or is the holiday service simply skipped? SKIPPED, FEDERAL HOLIDAYS NO JANITORIAL STAFF REQUIRED, EXCEPT FOR MEMORIAL DAY.
12. For Memorial Day and Veterans Day (PWS 7.3), is the full daily scope required, and during what hours? MEMORIAL DAY ALWAYS FALLS ON A MONDAY; JANITORIAL HOURS WILL BE 8:00AM TO TYPICALLY 12:00PM. VETERANS DAY AND OTHER FEDERAL HOLIDAYS NO JANITORIAL STAFF REQUIRED.
13. PWS 8.1 states no keys will be provided. How will contractor personnel access the buildings for periodic work required after hours (4:30–10:00 p.m.) or on weekends (PWS 6.4 and 6.5)? NO AFTER HOURS WORK (4:30-10:00PM). COR WILL BE PRESENT WITH STAFF ON SCHEDULED WEEKENDS.
14. The period of performance begins December 15, 2026 or upon award. If award occurs after December 15, will CLIN x001 be prorated for the partial first month? Please price for monthly CLINs, the start may be adjusted depending on when the contract starts.
Personnel and Security
15. PWS 3.1 requires a "Prime contractor on-site Supervisor." Must the supervisor be on site full-time during all service hours, or is a working supervisor/lead (who also performs cleaning), or a supervisor who conducts scheduled on-site inspections, acceptable? Is the "Contractor Superintendent" in PWS 20.1 the same position? It can be, that is to be determined by the by the contractor.
16. FAR 52.204-9 (PIV) is included. Will contractor employees require background investigations, fingerprinting or PIV badges before starting work, and what is the expected processing time? No government ID or security screening will be conducted.
17. Please provide the minimum insurance coverage amounts required under FAR 52.228-5. $500,000 would be enough
Incumbent and Wages
18. Is this a new requirement or a follow-on? If a follow-on, please provide the incumbent contractor, current contract number and whether the incumbent's workforce is covered by a collective bargaining agreement. Federal Medical Services under 36C78621D0111 Base and 4 $267,576.00
19. Please provide the FAR 52.222-42 Statement of Equivalent Rates for Federal Hires (the fill-in table is not included).
FAR 52.222-42 requires contractors to provide an informational statement comparing contract service employee compensation to equivalent federal rates, but it does not establish actual wage requirements.
Proposal Preparation
20. Are there page limits or formatting requirements for Volume B (Technical)? NO.
21. For past performance (Attachment C, Factor 2), will commercial (non-federal) janitorial contracts be accepted, and may past performance of the proposed on-site supervisor be considered? We are evaluating the performance of the prime, and employees of the prime.
Vendor 5 The evaluation criteria request at least three recent comparable projects and an on-site supervisor with three years of janitorial supervisory experience; the PWS refers to the prime contractor on-site supervisor. May a named certified SDVOSB first-tier subcontractor's relevant project references and employee supervisor be used in evaluating the proposed team's acceptability, with that subcontractor performing its assigned work using its own employees, or must the three references and supervisor employment be held by the prime legal entity? We are evaluating the performance of the prime, and employees of the prime.
Vendor 6
1. Past performance (Evaluation Factor 2): May an offeror cite the past performance of a proposed similarly situated SDVOSB/VOSB subcontractor that will perform the on-site work? If an offeror has no relevant past performance of its own, will it be rated neutral (neither favorable nor unfavorable) rather than technically unacceptable under the LPTA evaluation? We are evaluating the performance of the prime, and employees of the prime , It would be neutral.
2. On-site supervisor (PWS 3.1 and Factor 1): PWS 3.1 refers to the "Prime contractor on-site Supervisor." May the on-site supervisor be an employee of a similarly situated SDVOSB/VOSB subcontractor, provided the prime retains contract management responsibility? The supervisor must be an employee of the prime.
3. Wage determination: The RFQ lists FAR 52.222-55 (Executive Order 14026), which was revoked by Executive Order 14236 in March 2025. Please confirm that SCA Wage Determination 2015-5417, Revision 34 (Attachment D) controls wage rates for this award. SCA Wage Determination 2015-5417, FAR 52.222-55 will be removed from the final contract.
4. Solicitation text: The Combined Synopsis Solicitation's general description references "janitorial services at Richmond National Cemetery and its satellite cemeteries." Please confirm this RFQ covers only the Administration, Maintenance, and Honor Guard buildings at Pikes Peak National Cemetery (approximately 6,380 sq ft). ONLY ADMINISTRATION, MAINTENANCE AND HONOR GUARD BUILDINGS AT PIKES PEAK NATIONAL CEMETERY.
5. Incumbent: Is this a new requirement or a recompete? If a recompete, please provide the current contract number and the current annual contract value. Federal Medical Services under 36C78621D0111 Base and 4 $267,576.00
6. Workload: Approximately how many staff and visitors use the three buildings on a typical day, and how many restrooms, showers, and locker rooms are in each building? APPROXIMATE NUMBER OF GOVERNMENT STAFF: 30. AVERAGE DAILY VISITOR COUNT: 150 PER DAY. MAINTENANCE HAS TWO LOCKER ROOMS AND SHOWERS. HONOR GUARD JUST HAS LOCKER ROOM.
Vendor 7
1. Offer due date. The combined synopsis states that quotes are due no later than 8:00 a.m. Mountain Time on Tuesday, December 1, 2026. The SAM.gov notice currently lists Date Offers Due as December 2, 2026, 8:00 a.m. MST. Please confirm the controlling date and time, including time zone, for receipt of quotes. This was corrected.
2. Period of performance. The combined synopsis describes a twelve-month base year and four one-year options "from Dec 11 or upon award." Attachment B states a base period of "December 15, 2026 or Date of award through December 14, 2027," with option years on the same December 15 to December 14 cycle. Please confirm the official base and option dates. Please price for monthly CLINs, the start may be adjusted depending on when the contract starts.
3. Contract-type paragraph. The combined synopsis identifies this requirement as janitorial services at Pikes Peak National Cemetery, but the contract-type paragraph refers to "janitorial services at Richmond National Cemetery and its satellite cemeteries." Please confirm that Pikes Peak National Cemetery is the sole place of performance and that the Richmond reference is inadvertent. ONLY FOR PIKES PEAK NATIONAL CEMETERY.
4. Insurance and bonds. The solicitation incorporates FAR 52.228-5, Insurance, Work on a Government Installation, and the PWS requires licenses, vehicle insurance, liability insurance, and workers' compensation before work begins. Please identify the required coverages and dollar limits, when proof must be submitted, and the certificate holder. Please also confirm whether any performance or payment bond is required and, if so, the amount or percentage and the applicable form. $500,000 would be enough
5. Semi-annual carpet work. PWS paragraph 6.5 requires semi-annual carpet restorative cleaning in April and October. Attachment B includes a line for "Semi-Annual Floor Maintenance Services" but does not separately name carpet restorative work. Please confirm whether the floor-maintenance CLIN includes the PWS carpet work, or whether carpet work should be priced as a separate line. CLIN 4 Semi Annual Floor Maintenance Services includes both 6.4 Semi-Annual Hard Floor Maintenance and 6.5 Semi-Annual Carpet Restorative Cleaning.
Vendor 8
The evaluation criteria request at least three recent comparable projects and an on-site supervisor with three years of janitorial supervisory experience; the PWS refers to the prime contractor on-site supervisor. May a named certified SDVOSB first-tier subcontractor's relevant project references and employee supervisor be used in evaluating the proposed team's acceptability, with that subcontractor performing its assigned work using its own employees, or must the three references and supervisor employment be held by the prime legal entity? We are evaluating the performance of the prime, and employees of the prime
Vendor 9
1. Consumables: Can the Government provide historical usage data for restroom consumables (toilet tissue, paper towels, hand soap, trash liners), such as monthly quantities or annual spend? If not, please provide the approximate number of Government staff assigned to each building and average daily visitor counts, so offerors can estimate usage. NO HISTORICAL USAGE DATA AVAILABLE. APPROXIMATE NUMBER OF GOVERNMENT STAFF: 30. AVERAGE DAILY VISITOR COUNT: 150 PER DAY.
2. Dispensers: Are the existing restroom dispensers Government-owned? Do they require a specific brand or proprietary refill, or may the contractor install its own dispensers? GOVERNMENT OWNED DISPENSERS, HOWEVER CONTRACTOR MAY PROVIDE THEIR OWN DISPENSERS.
3. Incumbent: Is this requirement currently performed under contract? If so, please provide the current contract number, contractor, and contract value. Federal Medical Services under 36C78621D0111
4. Personnel security: The solicitation includes FAR 52.204-9, Personal Identity Verification of Contractor Personnel. What background investigation, badging, or escort requirements apply to contractor employees at the cemetery? No government ID needed
5. Past performance: Under Factor 2, will the Government consider the past performance of a proposed subcontractor that will perform a portion of the work, in addition to the prime? We are evaluating the performance of the prime, and employees of the prime
6. Janitor closets: Is a janitor closet or storage space available in each of the three buildings, or in a single location? ADMIN HAS TWO JANITORIAL CLOSETS, MAINTENANCE HAS ONE. HONOR GUARD HAS SMALL JANITORIAL CLOSET AND TWO WALL LOCKERS.
7. Clarifications:
a. The Contract Type paragraph refers to "Richmond National Cemetery and its satellite cemeteries." Please confirm that this requirement covers Pikes Peak National Cemetery only. COVERS PIKES PEAK NATIONAL CEMETERY
b. Section A.3 of Attachment B (pre-proposal conference/site visit) is blank. Please confirm the November 19, 2026, 11:00 a.m. MST site visit in the combined synopsis is the only one. There was only one and the error was corrected on the solicitation prior to the site visit.
c. The combined synopsis/solicitation PDF appears to have been removed from SAM.gov on November 16, 2026. Will a revised version or amendment be issued? It was corrected.
Vendor 10
Past performance for a new offeror — Attachment C, Factor 2. CTZ does not have three comparable completed janitorial contracts in its own name. If an offeror has no relevant company past-performance record, will it receive a neutral evaluation and remain eligible for award, or are descriptions of at least three comparable company projects within the last five years a mandatory acceptability requirement? We are evaluating the performance of the prime, and employees of the prime.
Experience attributable to proposed personnel or subcontractors. May an offeror submit comparable projects performed by a proposed key employee for a prior employer, or by a proposed subcontractor, if the proposal clearly identifies the performing entity, the individual's role, and the work each party will perform under this contract? If so, what reference, résumé, and commitment documentation is required? We are evaluating the performance of the prime, and employees of the prime.
Supervisor duties and relief — PWS 3.1 and Attachment C. If CTZ proposes an employee whose résumé demonstrates at least three years of direct janitorial supervision, may that on-site supervisor also perform routine cleaning? Must an alternate covering absences independently meet the same three-year requirement? Please also clarify whether continuous staffing throughout the 8:00 a.m.–4:30 p.m. window is required, or whether those are permitted performance hours subject to completion of all tasks and the response requirements. Start at 8am, and stay till all cleaning is done.
Holiday cleaning — PWS 7.3 and Attachment B, A.4. PWS 7.3 requires service on Memorial Day and Veterans Day, including when those holidays fall on a weekend, while Attachment B generally excludes Federal holidays. Please confirm that the PWS holiday-specific requirements govern and that this work is included in the monthly janitorial CLIN. For other holidays, please clarify how moving work to the day before or after applies to daily cleaning.
MEMORIAL DAY ALWAYS FALLS ON A MONDAY; JANITORIAL HOURS WILL BE 8:00AM TO TYPICALLY 12:00PM. VETERANS DAY AND OTHER FEDERAL HOLIDAYS NO JANITORIAL STAFF REQUIRED.
Floor-maintenance pricing. Do CLIN 0004 and the corresponding option-year CLINs include both the semiannual hard-floor maintenance and carpet deep cleaning/restoration described in the PWS? Please identify any periodic floor or carpet work that should instead be included in the monthly janitorial CLIN.
Monthly, follow the daily Routine Facility Cleaning Services 4.1 Non-Carpeted Floors and 4.2 Carpeted Floors.
First exterior-window service. The price schedule includes six exterior-window services per year, and the PWS calls for service every other month during the first week. With the planned December 15 start, what is the first required service month, and should offerors price six complete services during the base period? FIRST REQUIRED SERVICE MONTH WILL BE THAT DECEMBER, PENDING WEATHER. NO LATER THAN JANUARY. THEN EVERY OTHER MONTH AFTER THAT.
Start date and base-year quantities. The base period is stated as December 15, 2026 or date of award through December 14, 2027, with 12 monthly units. If award or commencement occurs after December 15, will the base end date and CLIN quantities be adjusted, or will a partial month be prorated? Please confirm the quantity and pricing basis offerors should use for evaluation. Please price for monthly CLINs, the start may be adjusted depending on when the contract starts.
Site-visit and question instructions. Please confirm that the revised combined solicitation's November 19, 2026, 11:00 a.m. MST site visit, no-RSVP instruction, restriction on additional tours, and November 19, 11:00 p.m. MST question deadline supersede the blank dates and different notification/additional-visit instructions in Attachment B, A.3. Solicitation was correct and site visit happened.
Labor-cost information. Please confirm whether an incumbent collective bargaining agreement applies and, if so, provide the applicable agreement or wage determination. If available, please provide non-personally identifying predecessor-service tenure information needed to estimate vacation obligations for any incumbent employees hired. This is for the contractor to decide.
Attachment C, Factor 2(b), references contractor past-performance descriptions of a minimum of three recent projects of similar size and scope.
Would the Government please clarify whether an offeror with fewer than three qualifying corporate past-performance projects may submit all available relevant projects and supplement them with documented experience of proposed key personnel?
Additionally, would providing fewer than three corporate projects result in an automatic technically unacceptable rating, or would the Government evaluate the available information using the other methods identified under Factor 2? We are evaluating the performance of the prime, and employees of the prime, non-experience will be seen as neutral.
Vendor 11
Would the Government please clarify whether an offeror with fewer than three qualifying corporate past-performance projects may submit all available relevant projects and supplement them with documented experience of proposed key personnel? We are evaluating the performance of the prime, and employees of the prime.
Additionally, would providing fewer than three corporate projects result in an automatic technically unacceptable rating, or would the Government evaluate the available information using the other methods identified under Factor 2? Neutral
Vendor 12 Past Performance: Attachment C requires three comparable projects completed within the past five years. Can an offeror use the relevant past performance of a proposed subcontractor to meet this requirement? We are evaluating the performance of the prime, and employees of the prime.
On-Site Supervisor: The PWS requires the prime contractor's on-site supervisor to have at least three years of direct janitorial supervisory experience. Can this position be filled by a qualified supervisor employed by the proposed subcontractor? Must be an employee of the prime.
Floor Maintenance Pricing: The PWS lists semiannual hard-floor maintenance and carpet restorative cleaning as separate requirements under Sections 6.4 and 6.5, but Attachment B includes only one semiannual floor-maintenance CLIN. Could you confirm whether both services should be included in that single CLIN?
CLIN 4 Semi Annual Floor Maintenance Services includes both 6.4 Semi-Annual Hard Floor Maintenance and 6.5 Semi-Annual Carpet Restorative Cleaning.
Vendor 13
1. Attachment C, Factor 2 requires a minimum of three recent projects of similar size and scope. Will the Government accept projects performed by a proposed subcontractor or teaming partner, or by the proposed on site supervisor, toward this requirement? We are evaluating the performance of the prime, and employees of the prime.
We are evaluating the performance of the prime, and employees of the prime.
2. Will commercial (non federal) janitorial projects be accepted as comparable past performance? Yes
3. Is there an incumbent contractor for these services? If so, please provide the current contract number. Federal Medical Services under 36C78621D0111
4. PWS 6.5 requires semi annual carpet restorative cleaning, but Attachment B has no separate CLIN for it. Should it be priced within CLIN x004 (Semi Annual Floor Maintenance) or within CLIN x001 (Monthly Janitorial Services)? CLIN 4 Semi Annual Floor Maintenance Services includes both 6.4 Semi-Annual Hard Floor Maintenance and 6.5 Semi-Annual Carpet Restorative Cleaning.
5. For CLIN x002 (Bi Monthly Exterior Window Services), please provide the approximate exterior glass area or window count, and confirm whether any exterior glass is above the first story. THIS IS WHAT THE SITE VISIT WAS FOR.
6. PWS 16.1 requires the Contract Manager or an alternate to meet at the cemetery within one hour during duty hours. Is a local onsite supervisor acceptable as the designated alternate? If this is what the contractor decides as the coverage for alternate.
Vendor 14
| Attachment C requests a minimum of three recent projects of similar size and scope within the last five years. May relevant past performance of a proposed subcontractor be considered under Factor 2 when the subcontractor will perform a portion of the janitorial requirement? If yes, what supporting information should be included with the quotation? We are evaluating the performance of the prime, and employees of the prime. |
| PWS paragraph 3.1 requires the on-site supervisor's resume to demonstrate at least three years of direct janitorial supervisory experience. May a qualified employee of an identified subcontractor serve as the required on-site supervisor, subject to compliance with all applicable limitations on subcontracting and other solicitation requirements? We are evaluating the performance of the prime, and employees of the prime. |
PWS paragraph 7.1 describes routine services during standard duty hours of 8:00 a.m. through 4:30 p.m. Please clarify whether this establishes a continuous onsite staffing requirement for that entire period or a permissible performance window within which the required daily services must be completed. DUTY STARTS AT 8:00AM AND GOES UNTIL ALL TASKINGS ARE COMPLETE. WORK WILL NOT CONTINUE PASS 4:30PM.
Is there a Government-mandated minimum number of janitorial employees required onsite for routine daily performance, or may the contractor establish appropriate staffing levels based upon its technical approach provided all required performance standards are met? NO, CONTRACTOR MAY ESTABLISH STAFFING LEVELS AS LONG AS STADARDS ARE MET.
The PWS requires certain replenishment and re-performance actions within two hours of notification. Please clarify whether the two-hour requirement applies only during standard duty hours or whether the Government requires this response capability outside standard duty hours, including nights, weekends, and Federal holidays. ONLY STANDARD DUTY HOURS.
For purposes of developing accurate Firm-Fixed-Price consumable costs, does the Government have historical or estimated usage quantities for contractor-furnished toilet tissue, paper towels, hand soap, and plastic trash bags/liners? If available, please provide the applicable usage information for the facilities covered by the PWS. We do not keep track of this.
Vendor 15
| 1. | Staffing Requirements: Are cleaning personnel required to be W-2 employees, or may properly classified independent contractors be utilized, provided all applicable labor and contract requirements are met? This is for the contractor to decide. |
| 2. | Workers' Compensation: Are there specific workers' compensation coverage requirements or minimum limits that proposed subcontractors must meet? This is for the contractor to decide. |
Vendor 16
| 1. | On-site Supervisor. PWS Section 3.1 states that the “Prime contractor on-site Supervisor” resume must demonstrate a minimum of three (3) years’ experience as a direct supervisor of janitorial services. Attachment C, Factor 1 requires a “Resume for On-site Supervisor(s)” with the same experience. Please confirm whether the on-site supervisor must be an employee of the prime contractor, or whether a subcontractor’s on-site supervisor who meets the experience requirement is acceptable. The supervisor must be an employee of the prime. |
| 2. | Past Performance. Attachment C, Factor 2 requires past performance descriptions of a minimum of three (3) recent projects (within the last 5 years) of similar size and scope. Please confirm whether past performance of a proposed subcontractor may be submitted to satisfy this factor. We are evaluating the performance of the prime, and employees of the prime. |
Other files
| File | Type | Posted |
|---|---|---|
| B. CLIN - Pikes Peak Janitorial.docx | DOCX document | |
| Combined Synopsis Solicitation 36C78627Q0040.pdf | ||
| Combined Synopsis Solicitation 36C78627Q0040.pdf | ||
| C. LPTA Eval Criteria.docx | DOCX document | |
| A. PWS - Pikes Peak Janitorial.docx | DOCX document | |
| B. CLIN - Pikes Peak Janitorial.docx | DOCX document | |
| D. SCA Wage Determination 2015-5417.pdf | ||
| Combined Synopsis Solicitation 36C78627Q0040.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file