This document is an Amendment (Standard Form 30) for Solicitation 36C78625B0024 issued by the Department of Veterans Affairs National Cemetery Administration for constructing a new Maintenance Complex at Los Angeles National Cemetery. The amendment, dated 7/29/2025, addresses six Requests for Information (RFIs) related to site preparation, including guidance on vegetation removal, tree handling, concrete thickness, and construction parameters.
Key details include the bid due date remaining 7/31/2025, with clarifications on specific site conditions such as: shrubs within the Limits of Disturbance must be removed, only specifically designated trees should be removed, existing concrete is 4"-5" thick, and no homeless people are present inside the cemetery. The amendment also notes that contractors must replace any removed vegetation "in kind" to the Contracting Officer's Representative's satisfaction, and alternative steel subcontractor certifications will not be evaluated at bid submission.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
7/29/2025
36C786
Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172
36C786
Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172
To all Offerors/Bidders
36C78625B0024
7/29/2025
X x x x 1
Amendment 1 to 36C78625B0024 Los Angeles National Cemetery construct a new Maintenance Complex and Corrects FCA
This amendment addresses RFIs see attached.
The bid due date remains 7/31/2025
Michael Giaquinto
RFI’s Amendment 1 to 36C78625B0024 Los Angeles National Cemetery construct a new Maintenance Complex and Corrects FCA
1. Should the bushes be removed or kept? Shrubs within the Limits of Disturbance are to be removed.
2. Tree outside fence. Leave or remove? Does it need a city permit? Only trees specifically called out for removal are to be removed. Trees outside the property limits will require permitting should it be required by the governing authority.
3. Please confirm what the existing concrete thickness is? Per the geotechnical report, the existing concrete ranges in thickness from 4” to 5”.
4. Who will be responsible for relocating the homeless people who live in this area? There are no homeless people inside the cemetery. NCA is not responsible for relocating homeless people outside the cemetery.
5. The existing hedges will be on the way to remove/replace the fence. Should we assume they need to be removed? In that case, should new bushes be planted? Should the contractor’s means and methods dictate removing any existing vegetation that is not specifically called out for removal, the contractor is to replace in kind to the satisfaction of the COR.
6. Can steel subcontractors with Los Angeles City Certification be used in lieu of AISC Certification? This certification meets or exceeds AISC quality safety standards? Proposed alternative certifications are not evaluated at bid submission.
| AMEND 1 |
| RFIs Amend 1 36C78625B0024 |