250508 Los Angeles CA 898-034 Maintenance Plans 8 of 10.pdf
PDF 9 MB Posted
- Attached to
- Y1EB--Los Angeles National Cemetery construct a new Maintenance Complex and Corrects FCA Deficie
- Solicitation number
- 36C78625B0024
About this file
These electrical engineering plans detail the construction of a new Maintenance Facility at the Los Angeles National Cemetery. The documents include multiple technical drawings covering electrical symbols, lighting layouts, power plans, and building electrical configurations across several sheets (E-004 through E-105). The plans specify electrical installation requirements including transformer locations, power distribution, lighting fixture schedules, and construction notes for electrical systems.
Key technical specifications include a lighting fixture schedule with LED fixtures from manufacturers like Metalux and Cooper Lighting, ranging from 2.2 to 44.3 watts, with color temperatures of 4000K. The electrical plans outline detailed requirements for wiring, grounding, circuit management, and power distribution throughout the maintenance complex. Construction notes provide guidance on temporary power during construction, coordination with utility providers, and specific installation requirements for electrical infrastructure.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
20230524
LOS ANGELES NATIONAL CEMETERY
CONSTRUCT MAINTENANCE FACILITY
File details come from the government source that posted it. Updated .