36C78620Q0185-0002000.docx
DOCX document Posted
- Attached to
- S208--Eagle Point & Roseburg Shrine Project Federal contract opportunity
- Solicitation number
- 36C78620Q0185
About this file
36C78620Q0185 0002 36C78620Q0185 0002.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C78620Q0185-0001000.docx | DOCX document | |
| 36C78620Q0185-007.docx | DOCX document | |
| 36C78620Q0185-011.docx | DOCX document | |
| 36C78620Q0185-009.docx | DOCX document | |
| 36C78620Q0185-020.docx | DOCX document | |
| 36C78620Q0185-002.docx | DOCX document | |
| 36C78620Q0185-006.docx | DOCX document | |
| 36C78620Q0185-019.docx | DOCX document | |
| 36C78620Q0185-010.docx | DOCX document | |
| 36C78620Q0185-012.docx | DOCX document | |
| 36C78620Q0185-001.docx | DOCX document | |
| 36C78620Q0185-003.docx | DOCX document | |
| 36C78620Q0185-013.docx | DOCX document | |
| 36C78620Q0185-018.docx | DOCX document | |
| 36C78620Q0185-015.docx | DOCX document | |
| 36C78620Q0185-014.docx | DOCX document | |
| 36C78620Q0185-017.docx | DOCX document | |
| 36C78620Q0185-016.docx | DOCX document | |
| 36C78620Q0185-008.docx | DOCX document | |
| 36C78620Q0185-005.docx | DOCX document | |
| 36C78620Q0185-004.docx | DOCX document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) None 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 To all Offerors/Bidders
36C78620Q0185
X X X May 18, 2020 @ 1630 PST X The purpose of this amendment is to extend the RFQ response date and to include Q&A.
The RFQ is extended until 05/18/20 @ 1630 PST.
Q&A dated 05/12/20 are included as part of this amendment.
There are no other changes to the solicitation as a result of this amendment.
Brian Trahan Contracting Officer Q&A 05/12/2020
1. At Roseburg we were under the assumption that is was not just a minor finish grade but to import soil and compact on areas that were pooling or holding water.
CONTRACTOR WILL BE RESPONSIBLE FOR ANY ADDITIONAL CUT AND/OR FILL REQUIRED TO ENSURE THAT THE SITE IS GRADED TO CONFORM TO ELEVATIONS AS DETERMINED BY THE COR/CEMETERY DIRECTOR.
THE AREA SHALL BE EXPERTLY GRADED AND RE-SODDED RESULTING IN A UNIFORM STAND OF TURF, HIGH QUALITY IN APPEARANCE, WITH THE TOPS OF ALL FLAT MARKER HEADSTONES 1-INCH ABOVE THE FINISHED GRADE OF THE SOIL; AND THE TOPS OF ALL UPRIGHTS HEADSTONES AT A CONSTANT ELEVATION RELATIVE TO FINISH GRADE BETWEEN 26 INCHES (MAXIMUM) AND 24 INCHES (MINIMUM) ABOVE FINISHED GRADE OF THE SOIL AS DIRECTED BY THE COR/CEMETERY DIRECTOR.
PLACE IMPORTED TOPSOIL TO DEPTHS REQUIRED TO ELIMINATE DEPRESSIONS IN THE SECTION; TO ESTABLISH POSITIVE DRAINAGE; AND TO ESTABLISH UNIFORM FINISH GRADES AS INDICATED: FINISH GRADES SHALL BE 1-INCH BELOW FLAT MARKERS; 1-1/2 TO 1-1/4 INCHES BELOW TOPS OF CURBS; AND A CONSTANT GRADE RELATIVE TO THE TOPS OF UPRIGHT HEADSTONES BETWEEN 26 INCHES (MAXIMUM) AND 24-INCHES (MINIMUM) BELOW TOPS OF UPRIGHT HEADSTONES AS DIRECTED BY THE COR/CEMETERY DIRECTOR.
1. It was stated that the turf is to be killed with and herbicide and removed. We assume removal is by stripping sod and peeling out, not rotilling and raking spoils.
POWER RAKE OR VERTICUT THE ENTIRE AREA TO LOOSEN RESIDUAL PLANT DEBRIS, TAKING CARE NOT TO DISTURB THE HEADSTONE SUPPORT SYSTEMS WHERE NOTED TO BE PROTECTED. REMOVE PLANT DEBRIS AND DISPOSE OF LEGALLY OFF SITE. THE PLANT DEBRIS IS NOT TO BE TILLED INTO THE SOIL.
1. If equipment authorized is based on pounds per foot. If a track machine is used that can distribute weight to strip sod what is the engineers weight recommendation per square foot. Keep in mind that it will also be fine graded after with a lighter track-based grader.
THE CONTRACTOR SHALL NOT OPERATE TRUCKS, TRACTORS, AND OTHER HEAVY EQUIPMENT IN EXCESS OF FIVE TONS ON ANY TURF AREA EXCEPT WHEN AUTHORIZED IN WRITING BY THE COR/CEMETERY DIRECTOR.
1. On page 57 3.10 C. States to Haul and stockpile unsuitable soil materials and excess excavated soil materials to a designated cemetery location after fill and backfill operations are completed, or as directed by COR. Does that mean excess soils are not to be removed from property or is 3.11 page 57 in cleanup it is to be removed from property.
THE CONTRACTOR MAY DISPOSE OF SOILS AND ORGANIC MATTER GENERATED BY CONSTRUCTION ACTIVITIES IN DESIGNATED CEMETERY SPOILS AREA AS DIRECTED BY THE COR. PLASTIC, GLASS, METAL, PAPER WASTE AND CONCRETE MUST BE DISPOSED OF OFF-SITE IN A LEGAL MANNER. REMOVE ALL DEBRIS, RUBBISH, AND EXCESS MATERIALS UNLESS NOTED OTHERWISE, FROM CEMETERY PROPERTY.
1. It clearly states that in the RFP that replacement and installation of new headstone support system not in scope of work. I assume that is correct.
THIS IS A TURF RENOVATION/REPLACEMENT PROJECT. THE UPRIGHT HEADSTONE AND FLAT MARKER SUPPORT SYSTEMS ARE TO BE PROTECTED IN PLACE. ANY DAMAGE TO THE SUPPORT SYSTEMS SHALL BE REPAIRED BY THE CONTRACTOR THROUGH HEADSTONE RAISE & REALIGNMENT THE SATISFACTION OF THE COR AT NO ADDITIONAL COST TO THE GOVERNMENT.
End of Document