36C78620Q0185-018.docx

DOCX document Posted

Attached to
S208--Eagle Point & Roseburg Shrine Project Federal contract opportunity
Solicitation number
36C78620Q0185
Issued by
Department of Veterans Affairs National Cemetery Administration

About this file

36C78620Q0185 ATTACHMENT Q Fillable Price Cost Schedule.docx

View the file

Other files for this federal contract opportunity

Other files attached to S208--Eagle Point & Roseburg Shrine Project, newest first.
File Type Posted
36C78620Q0185-0002000.docx DOCX document
36C78620Q0185-0001000.docx DOCX document
36C78620Q0185-007.docx DOCX document
36C78620Q0185-011.docx DOCX document
36C78620Q0185-009.docx DOCX document
36C78620Q0185-020.docx DOCX document
36C78620Q0185-002.docx DOCX document
36C78620Q0185-006.docx DOCX document
36C78620Q0185-019.docx DOCX document
36C78620Q0185-010.docx DOCX document
36C78620Q0185-012.docx DOCX document
36C78620Q0185-014.docx DOCX document
36C78620Q0185-017.docx DOCX document
36C78620Q0185-016.docx DOCX document
36C78620Q0185-008.docx DOCX document
36C78620Q0185-005.docx DOCX document
36C78620Q0185-004.docx DOCX document
36C78620Q0185-001.docx DOCX document
36C78620Q0185-003.docx DOCX document
36C78620Q0185-013.docx DOCX document
36C78620Q0185-015.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

?.## PRICE/COST SCHEDULE

ROSEBURG NATIONAL CEMETERY

CLIN
DESCRIPTION
EST

QTY

UNIT
UNIT PRICE
EST TOTAL PRICE
1001
Work Area Survey:

Professional Land Survey to quantify total square-footage of work area.

1
JB
1002
Agricultural Soil Testing and Recommendations:

On-Site Topsoils Tests.

3
EA
1003
Turf Renovation:

Replace Existing Cemetery Turf with New Sod 155,000 See notes (1 & 2)

SF

1004
Clean Upright Headstones:

Clean Upright Marble Headstones.

926
EA
1005
Clean Flat Markers:

Clean Flat Marker Granite Headstones.

3302
EA

ESTIMATED TOTAL – ROSEBURG NATIONAL CEMETERY

EAGLE POINT NATIONAL CEMETERY

CLIN
DESCRIPTION
EST

QTY

UNIT
UNIT PRICE
EST TOTAL PRICE
2001
Surveys; Headstone Realignment Plans; and Grading Plans:

Headstone location/elevation and topographic survey of existing site features within Limit-of-Work area; Headstone Realignment Plans; Site Grading Plan; and quantify total square-footage of turf renovation.

1
JB
2002
Earthwork:

Grade site to provide for positive drainage as indicated on Contractor-provided Grading Plan; Amend subgrade soils; Import topsoil to depths indicated; Compact soils and bases.

JB

2003
Soil Compaction Testing:

Subgrade and Topsoil laboratory and in place maximum dry density tests.

10
EA
2004
Base Compaction Testing:

Aggregate Base laboratory and in place maximum dry density tests.

6
EA
2005
R&R Flat Maker Headstones:

Remove, Reset, Realign & Backfill Flat Markers. Remove and Replace Existing Headstone Support System.

5,412

EA

2006
Clean Flat Markers:

Clean Flat Marker Granite Headstones.

5,412

EA

2007
Agricultural Soil Testing and Recommendations:

Imported Topsoil and On-Site Topsoil Tests

1
JB
2008
Turf Renovation:

Prepare Turf Area & Replace with New Sod including 2” of Imported Topsoil.

160,000 (See Notes 1 and 2)

SF

2009
Work Area Survey:

Professional Land Survey to quantify total square-footage of turf renovation.

1
JB
2010
Clean Flat Markers:

Clean Flat Marker Granite Headstones.

1,656

EA

2011
Agricultural Soil Testing and Recommendations:

On-site Topsoil Tests.

1
JB
2012
Turf Renovation:

Prepare Turf Area & Replace with New Sod.

91,000 (See Notes 1 and 2)

SF

ESTIMATED TOTAL – EAGLE POINT NATIONAL CEMETERY

ESTIMATED GRAND TOTAL – ROSEBURG + EAGLE POINT