Renovations at the BNC Administration Building at Baltimore National Cemetery.
Solicitation number
36C78619B0002
Issued by

About this file

36C78619B0002 802-NRM-19-05 SOW Summary - 12-28-18.pdf

View the file

Other files

File Type Posted
36C78619B0002-0004000.docx DOCX document
36C78619B0002-0003011.pdf PDF
36C78619B0002-0003003.pdf PDF
36C78619B0002-0003005.pdf PDF
36C78619B0002-0003006.pdf PDF
36C78619B0002-0003004.pdf PDF
36C78619B0002-0003009.pdf PDF
36C78619B0002-0003001.pdf PDF
36C78619B0002-0003012.pdf PDF
36C78619B0002-0003007.pdf PDF
36C78619B0002-0003000.docx DOCX document
36C78619B0002-0003008.pdf PDF
36C78619B0002-0003002.pdf PDF
36C78619B0002-0003013.pdf PDF
36C78619B0002-0003010.pdf PDF
36C78619B0002-0002000.docx DOCX document
802-NRM19-05_Treatment_Plan.pdf PDF
36C78619B0002_0001.docx DOCX document
802-NRM19-05_Full_Specifications_red_12-28-18.pdf PDF
802-NRM19-05_Hazardous_Materials_Investigation.pdf PDF
36C78619B0002.docx DOCX document
802-NRM19-05_Full_Drawings.pdf PDF
36C78619B0002_Presol.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Location: BALTIMORE NATIONAL CEMETERY

Project Title: Renovate Administration Building

Project Control #: 802-NRM19-05

Statement of Work Summary:

Contractor shall furnish all tools, labor, materials, equipment, and services to perform work described below, in the specification sections, and on the drawings at the Baltimore

National Cemetery.

A. General

1. Contractor is strongly encouraged to survey the project area prior to bidding to adequately understand the full scope of work and all requirements. Contractor is required to submit any questions or clarifications prior to bid. A bid submitted will be taken as agreement that the work shall be performed to meet the requirements herein based on the existing conditions in the field.

2. The specifications and drawings have the following project number on them which corresponds to the design project number: 802-NRM18-03. Contractor shall note that this differs from the scope of work project control number listed above which is being used for this construction project: 802-NRM19-05.

3. The contractor shall submit submittals including shop drawings and any other specification requirements to the COR for review and approval prior to fabrication/installation. Submittals approved by the owner (VA/NCA) are required prior to starting on the corresponding work.

4. The contractor shall submit a draft invoice/payment request concurrently to the field COR and the Project Engineer for dual approval. Only when the field COR and the Project Engineer approve of the draft invoice may it then be submitted for formal payment.

B. Specific work items:

1. Perform all work in accordance with the contract drawings and specifications below and attached.

SPECIFICATION SECTIONS:

DIVISION 01 – GENERAL REQUIREMENTS

01 00 02 GENERAL REQUIREMENTS

01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

01 42 19 REFERENCE STANDARDS

01 45 29 TESTING LABORATORY SERVICES

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 CONSTRUCTION WASTE MANAGEMENT

DIVISION 02 – EXISTING CONDITIONS

02 41 10 DEMOLITION AND SITE CLEARING

TREATMENT PLAN

LIMITED HAZARDOUS MATERIAL SURVEY REPORT

02 83 33.13 LEAD BASED PAINT REMOVAL AND DISPOSAL

DIVISION 03 – CONCRETE

03 30 53 CAST-IN-PLACE CONCRETE

DIVISION 04 – MASONRY

DIVISION 05 – METALS

05 50 00 METAL FABRICATIONS

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 31 26 SLATE SHINGLES – ALTERNATE BID NO. 1

07 60 00 FLASHING AND SHEET METAL – ALTERNATE BID NO. 1

07 92 00 JOINT SEALANTS

DIVISION 08 – OPENINGS

08 11 13 HOLLOW METAL DOORS AND FRAMES

08 14 00 INTERIOR WOOD DOORS – ALTERNATE BID NO. 2

08 33 00 COILING DOORS AND GRILLES

08 71 00 DOOR HARDWARE

04 05 13 MASONRY MORTARING

04 05 16 MASONRY GROUTING

04 05 31 MASONRY TUCK POINTING

04 43 00 NATURAL STONE VENEER

DRAWINGS:

G-100 Title Sheet and Site Plan G-200 Occupancy, Life Safety Plan, and Building Code Analysis A-100 First Floor Plan, Second Floor Plan, Roof Plan & Demo Detail A-200 Elevations & Details A-600 Door & Window Schedules, Window Details

ADDITIONAL REFERENCE FOR REQUIREMENTS:

TREATMENT PLAN. 78 pages. Dated August 2018. Follow all requirements therein.

08 80 00 GLAZING

DIVISION 08 – OPENINGS (Continued)

08 90 00 LOUVERS AND VENTS

DIVISION 09 – FINISHES

09 24 00 PORTLAND CEMENT PLASTERING

09 91 00 PAINTING

DIVISION 10 – SPECIALTIES (Not Used)

DIVISION 11 – EQUIPMENT (Not Used)

DIVISION 12 – FURNISHINGS (Not Used)

DIVISION 13 – SPECIAL CONSTRUCTION (Not Used)

DIVISION 14 – CONVEYING EQUIPMENT (Not Used)

DIVISION 15-21 (Not Used)

DIVISION 22 - PLUMBING (Mot Used)

DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING (Not Used)

DIVISION 24-25 (Not used)

DIVISION 26 – ELECTRICAL

26 05 11 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS

26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

26 56 00 EXTERIOR LIGHTING

DIVISION 27-30 (Not Used)

DIVISION 31 – EARTHWORK (Not Used)

DIVISION 32 – UTILITIES

DIVISION 33 – EXTERIOR IMPROVEMENTS (Not Used)

DIVISION 34 – 49 (Not Used) -

32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS

32 12 16 ASPHALT PAVING

32 90 00 PLANTING

HAZARDOUS MATERIALS INVESTIGATION. 11 pages. Dated 6/20/18. Reference this document for detailed information on asbestos containing materials and lead paint containing materials at the site.

Pre-Bid Site Visit: Bidders are strongly urged to inspect, site investigate by observation, and Request for Information (RFI) and responses through the Contracting Office to satisfy their understanding of the work to be done, all general, local and technical conditions that may affect the cost and the feasibility of their proposal. In no event shall failure to inspect the site constitute grounds for a claim after award. Visitors planning to conduct a site visit shall contact the Cemetery Director or Foreman to make arrangements:

PRICE SCHEDULE

DESCRIPTION QTY UNIT TOTAL PRICE

Contractor shall provide all labor, tools, materials, equipment, and supervision necessary to perform all work detailed above at the Baltimore National Cemetery (BASE BID).

1 JOB $ _____________

Contractor shall provide all labor, tools, materials, equipment, and supervision necessary to perform all work detailed above in accordance with the attached specifications and drawings at the Baltimore National Cemetery WITH THE EXCEPTION OF the ALTERNATE No. 1 work. This price would therefore exclude the roof repairs, ice and water shield, and flashing work. See further detail in the specifications such as in section 010002-1.2 and the relevant material specification sections.

1 JOB $ _____________

Contractor shall provide all labor, tools, materials, equipment, and supervision necessary to perform all work detailed above in accordance with the attached specifications and drawings at the Baltimore National Cemetery WITH THE EXCEPTION OF the ALTERNATE No. 1 and the ALTERNATE No. 2 work. This price would therefore exclude both the roof repairs, ice and water shield, and flashing work (ALTERNATE No. 1) and revise the Portico and other door replacement work (ALTERNATE No. 2).

See further detail in the specifications such as in section 010002-1.2 and the relevant material specification sections.

1 JOB $ _____________

Duration: Term of the contract shall be one hundred and eighty days (180 days) from date of award. The Contractor shall complete all work within 180 calendar days after receipt of Notice of Award, subject to all terms, conditions, provisions and schedules of the contract.