VISN 2 Northport Data Center - Civil SIte Plan.pdf
PDF 737 KB Posted
- Attached to
- Y1DA--VISN 2 EHRM Industry Day
- Solicitation number
- 36C77627Q0002
About this file
This document is a construction drawing for sanitary sewer infrastructure at a new data center facility located at 79 Middleville Road, Northport, New York 11768. The project is titled "VA EHRM Infrastructure Upgrade" and is managed by the U.S. Department of Veterans Affairs Construction and Facilities Management with the U.S. Army Corps of Engineers serving as the Construction Agent. The drawing is classified as 100% Bid Documents/Construction Documents dated May 24, 2024, with project number 632-22-700 and drawing number 300-C-120.
The scope of work includes installation of 77 linear feet of 8-inch PVC Schedule 40 sanitary sewer line from the building to a new manhole (MH 12A) at invert elevation 153.60, and 354 linear feet of 8-inch PVC sanitary sewer line from the new manhole to an existing manhole (MH 12) at invert elevation 155.42, maintaining a minimum 0.4% slope throughout. Additional utility work encompasses installation of new 8-inch PVC water lines with gate valves, thrust blocking at multiple elbow angles, a service line with post indicator valve and protective bollards, roof drain connections to storm drain systems with cleanouts, and compliance with concrete encasement requirements for sanitary sewer crossings or parallels to potable or fire water lines (25 feet on each side). The contractor must verify existing utility locations through ground-penetrating radar and potholing before commencing work, and must comply with all Authority Having Jurisdiction and government requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VISN 2 St Albans -Queens- Data Center - Civil SIte Plan.pdf | ||
| VISN 2 Bronx - Civil SIte Plan.pdf | ||
| VISN 2 Canandaigua - Civil SIte Plan.pdf | ||
| VISN 2 East Orange - Civil SIte Plan.pdf | ||
| VISN 2 Industry Day - Site Instructions Bronx JA.docx | DOCX document | |
| 36C77627Q0002_0001.docx | DOCX document | |
| VISN 2 Buffalo - Civil SIte Plan.pdf | ||
| VISN 2 Manhattan - Floor Plan.pdf | ||
| 36C77627Q0002.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UTILITY KEYED NOTES:
1. INSTALL NEW 8" PVC C-900 WATER LINE.
2. INSTALL NEW 8" 90 DEGREE ELBOW GATE VALVE AND THRUST
BLOCKING.
3. INSTALL 8" 45 DEGREE ELBOW AND THRUST BLOCKING.
4. INSTALL 8" 22.5 DEGREE ELBOW AND THRUST BLOCKING.
5. INSTALL NEW 8" PVC SERVICE LINE TO BUILDING WITH PIV (POST
INDICATOR VALVE) AND FOUR BOLLARDS.
6. TIE NEW 8" LINE INTO EXISTING VALVE WITH NON-RISING STEM.
7. TIE NEW ROOF DRAIN INTO EXISTING STORM DRAIN.
8. INSTALL NEW 8" STORM DRAIN LINE WITH RISERS TO SURFACE FOR
ROOF DRAINING.
9. INSTALL 4" CLEANOUTS AT SURFACE.
10. INSTALL NEW 8" PVC STORM DRAIN AND CONNECT TO EXISTING
STORM DRAIN MANHOLE.
11. INSTALL NEW 77' 8" PVC SANITARY SEWER FROM BUILDING TO NEW
MANHOLE. MAINTAIN MINIMUM 0.4% SLOPE.
12. INSTALL NEW 4' 0" SANITARY SEWER MANHOLE. MANHOLE 12A
13. INSTALL 354' NEW 8" PVC SANITARY SEWER FROM NEW MANHOLE
TO EXISTING MANHOLE 12.
GENERAL NOTES:
1. EXISTING UTILITIES ARE SHOWN TO THE BEST AVAILABLE
INFORMATION. CONTRACTOR TO VERIFY UTILITY LOCATIONS W/
GPR AND POTHOLING.
2. WHERE A SEWER LINE CROSSES OR PARALLELS A POTABLE WATER
OR FIRE WATER LINE, SEWER LINE MUST BE CONCRETE ENCASED
FOR TWENTY-FIVE (25') FEET ON EACH SIDE OF THE WATER LINE, OR
AS REQUIRED BY THE AHJ OR THE GOVERNMENT. WATER LINE
SHALL BE SLEEVED WITH LARGER PIPE FOR A MINIMUM OF
TWENTY- FIVE (25') FEET FROM THE CROSSING POINT.
77 LF 8" SCH40
BLDG TIE-IN
INV 156.57 MH 12A
RIM
INV (E) 153.60
INV (S) 153.60
354 LF 8" SCH40
@0.4% FALL MH 12
RIM 155.42
INV (N)
INV ( )
1" CONDUIT (ELECT)
8" PVC (WATER)
1 SANITARY SEWER PROFILE
NTS
1 SITE PLAN - NEW DATA CENTER
SCALE: 1" = 20'-0"
EX-W EX-W EX-W EX-W
D
U N
K
W-ABD W-ABD W-ABD
SIG
SIG
SI
G
SI
G
SI
G
SI
G
EX
-C
O M
EX-E
EX-E
EX-E
EX-E
EX-E
EX-E EX-E
EX
-E
EX
-E
EX
-E
EX
-E
EX
-E
EX
-E
EX
-E
EX
-W
NEW DATA CENTER
BLDG. 300
FUEL TANK
FIN. FLR. 1
@ 160.57'
FIN. FLR. T
@ 155.46'
SA
S
SA
S
SA
S
SA
S
SA
S
SA
S
SA
S
SA
S
SA
S
SA
S
SA
S
SA
S
SA
S
SAS SAS SAS
EX
-W
EX
-W
EX
-W
EX
-W
EX
-W
EX
-W
EX
-W
EX
-W
EX
-W
EX
-W
EX
-W
EX-W
EX-W
EX-W
W EX-W EX-W EX-W EX-W EX-W EX-W EX-W
SS-ABN
SS-ABN
SS-ABN
SS-ABN
SS-ABN
SS-ABN
SS-ABN
SS-ABN
EX
-S
S
EX
-S S
EX
-S
S
EX
-S S
EX
-S
S
EX
-S S
EX
-S
S
EX
-S S
EX
-S
S
EX
-S S
EX-SS
EX-SS
EX-SS
EX-SS
EX-S
X-SS
EX-SS
EX-SS
EX-SS EX-SS EX-SS EX-SS EX-SS EX-SS EX-SS EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS EX-SS EX-S
EX-SS
SIG
SIG
SIG
SIG
SIG
SIG
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
MH. 12
EL. 136.59
MH. 13
EL. 138.28
MH. 13AB
EL. 134.50
MH. 22
FR.EL. 155.12
MH. 21
FR.EL. 160.27
MH. 29
FR.FL. 156.00
MH. 12A
IE(E) 153.60
IE(S) 153.50
MH. 12
FR.EL. 155.42
13MH. 13AA
FR EL. 134.48
BLDG. 12
BLDG. 11
300-C-120
SANITARY SEWER -
NEW DATA CENTER
RAC, HR
NA
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
FULLY SPRINKLERED
632-22-700VA EHRM INFRASTRUCTURE
UPGRADE
79 Middleville Rd Northport, NY 11768
CONSTRUCTION AGENT
US Army Corps of Engineers
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
NOT FOR
CONSTRUCTION
5/24/2024
100% CONSTRUCTION
DOCUMENTS
NORTH
GRAPHIC SCALE
0 20' 40' 60' Phase
100% BID
DOCUMENTS
-'^ -3 lvio u?h VA A N V d I/M □ 0A N V d I/M □ □
8UL /a/ ✓3HQNV fIN ^
II
M ij*1 r \k s rv ^/ //////////// V////////// /////// \□□
□ □ /////////////// n / //////////////// /
OOooo oo
1 oV ////// /////// / /o
(3oooooo
(3ooooo o r///// ////////// / ////////////////□□
//////////////// h□ ///////////////
(3Ooooo o ssA
Hooo ooo o
7-TTTTTTTTTTZ
^/ //// ////////// V ////// nr? ////// x
K
/////////// x
/ //////// A o
File details come from the government source that posted it. Updated .