VISN 2 Bronx - Civil SIte Plan.pdf

PDF 473 KB Posted

Attached to
Y1DA--VISN 2 EHRM Industry Day
Solicitation number
36C77627Q0002
Issued by

About this file

This is a campus site plan drawing for the Electronic Health Record Management (EHRM) Infrastructure Upgrades project at the James J. Peters VA Medical Center in Bronx, New York. The project, numbered 526-22-700, involves telecommunications room (TR) and telecommunications enclosure (TE) infrastructure modifications across multiple buildings on the VA medical center campus.

The scope of work includes decommissioning and adding telecommunications infrastructure across ten buildings and Fisher Houses. Building 100 requires the most extensive work: decommissioning 42 existing TRs and adding 30 new TRs utilizing 2 new towers and existing dumbwaiter stacks, plus adding 1 TR on levels 00, 01, 02, and 03 to support Wing D. Building 105 requires decommissioning 11 existing TRs and adding 1 TE on level 00 and 1 TR on each of levels 00 through 05. Building 106 requires decommissioning 4 existing TRs, adding 1 TE on levels 01 and 02, and adding 1 TR on level 02. Additional work includes decommissioning TRs in Buildings 016, 107, and modifications to Buildings 101, 110, 113, 114, 115, 118, and Fisher Houses. Critical infrastructure requirements include maintaining ambulance access, establishing a 50-foot minimum distance from data centers to unsecured curb access to the south, and securing 5-foot standoff distance and secured access to the north of data centers. The project architect/engineer of record is Awen Solutions Group, Alexandria, Virginia. The document is dated October 29, 2025, and marked as Final Bid Documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASKETBALL

COURT

CLOSET

CLOSET

STUCCO

STUCCO

STUCCO

LANDSCAPE

LANDSCAPE

FHCP

FHCP

FHCP

MAIN ENTRY

BUILDING 100

FISHER HOUSE 1

FISHER HOUSE 2

BUILDING 105

BUILDING 106

BUILDING 110

CHAPEL

BUILDING 101

BUILDING 107

BUILDING 016

TRAILERS

TRAILER

BUILDING 113

BUILDING 114

BUILDING 118

WEBB AVENUE

SEDGWICK AVENUE

K

IN

G S

B R

ID

G

E R

O A

D

BLDG 100

* DECOMMISSION 42 EXISTING TRs

* ADD 30 NEW TRs UTILIZING 2 NEW TOWERS AND

EXISTING DUMBWAITER STACK

* 1 EXISTING BIOMED TR TO REMAIN

* 2 DATA CENTERS TO REMAIN

* ADD 1 TR ON LEVELS 00, 01, 02, & 03 EACH

TO SUPPORT WING D

BLDG 105

* DECOMMISSION 11 EXISTING TRs

* ADD 1 TE ON L00

* ADD 1 TR ON EACH LEVEL (00, 01, 02, 03, 04 & 05)

* 1 EXISTING EXTERNAL DATA CENTER TO REMAIN

BLDG 106

* DECOMMISSION 4 EXISTING TRs

* ADD 1 TE ON LEVELS 01 & 02 EACH

* ADD 1 TR ON L02

BLDG 115

* REQUIRES NEW FIBER

* EXISTING TR TO REMAIN

FISHER HOUSES

* REQUIRES NEW FIBER

* EXISTING TR TO REMAIN

BLDG 016

* DECOMMISSION 1

EXISTING TR

* ADD 1 TE ON LEVELS

00, 01 & 02 EACH

BLDG 101

* ADD TE ON LEVEL 01

* REQUIRES NEW FIBER

BLDG 107

* DECOMMISSION 2 EXISTING TRs

* ADD TR ON LEVEL 01

BLDG 110

*ADD TE ON LEVEL 01

BLDG 113

*RECEIVE CABLE

DISTRIBUTION FROM

ADJACENT TE OR TR

FROM BUILDING 101

BLDG 114

*RECEIVE CABLE

DISTRIBUTION FROM

ADJACENT TE OR TR

FROM BUILDING 100

BLDG 118

*RECEIVE CABLE

DISTRIBUTION FROM

ADJACENT TE OR TR

FROM BUILDING 100

AMBULANCE ACCESS NEEDS TO

BE MAINTAINED

50FT MIN. DISTANCE FROM DATA

CENTER TO CURB (UNSECURED

ACCESS) TO THE SOUTH.

SECURED ACCESS TO THE

NORTH OF DATA CENTER AND

STANDOFF DISTANCE OF 5FT.

LEGEND

BUILDINGS IN SCOPE

BLDG 016

BLDG 100

BLDG 101

BLDG 105

BLDG 106

BLDG 107

BLDG 110

BLDG 113

BLDG 114

BLDG 118

FISHER HOUSES

RESEARCH TRAILER

VACANT (NON-CLINICAL)

MAIN HOSPITAL (CLINICAL)

SERVICE/BOILER/ENERGY CENTER (NON-CLINICAL)

RESEARCH BUILDING (CLINICAL)

EXTENDED CARE FACILITY/NURSING (CLINICAL)

CHAPEL/OCC HEALTH (CLINICAL)

THERAPEUTIC POOL (CLINICAL)

MOTOR POOL (CLINICAL)

MRI (CLINICAL)

LINEAR ACCELERATOR (CLINICAL)

VISN (NON-CLINICAL)

(NON-CLINICAL)

CAMPUS BUILDING IDENTIFICATION LEGEND

PLAN

NORTH TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

NOT FOR CONSTRUCTION

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY

A u to d e s k D o c s /J a m e s J

P e te rs V

A M e d ic a l C e n te r (J

J P

V A

M C

B ro n x V

A M

C /5

-2

-7

.G

.B R

X .r v t

/2 /2

:0

:1

P M

00-GS101

CAMPUS SITE PLAN

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

10/29/2025

EHRM INFRASTRUCTURE

UPGRADES

130 W KINGSBRIDGE ROAD

BRONX, NY 10468

526-22-700

FINAL BID DOCUMENTS

FINAL BID DOCUMENTS

60 60 120

1" = 60'-0"

FEETSCALE

Revisions: Date: SHEET 12 of 639

File details come from the government source that posted it. Updated .