VISN 2 Industry Day Presentation - Final REV - 11-19-26 R1.pptx

PPTX presentation 12 MB Posted

Attached to
Y1DA--VISN 2 EHRM Industry Day
Solicitation number
36C77627Q0002
Issued by

About this file

This file is a PowerPoint presentation from the VISN 2 Electronic Health Records Modernization (EHRM) Industry Day held on November 19, 2026, at the James J. Peters VA Medical Center in Bronx, New York. The presentation outlines seven major EHRM infrastructure upgrade projects across VISN 2 (New York/New Jersey) facilities: Bronx, Canandaigua, Manhattan, Northport, St. Albans, Buffalo, and East Orange. Five projects are anticipated for FY27 solicitation and award (Bronx, Canandaigua, Manhattan, Northport, and St. Albans), while Buffalo and East Orange will be solicited in FY27 but awarded in early FY28. The primary scope across all sites includes upgrading fiber optic networks and power distribution to comply with EHRM design standards, with work encompassing telecommunications room renovations or relocations, installation of new data centers with redundant pathways, Category 6A cabling upgrades, electrical distribution improvements, HVAC systems, physical security enhancements, and hazardous material abatement.

Each project presents unique site-specific challenges requiring phased construction to maintain operations at active healthcare facilities. Key procurement considerations include determining whether to use Invitation for Bid (IFB), Lowest Price Technically Acceptable (LPTA), or Trade-Off evaluation methods, with the VA noting that FY26 projects received limited interest from Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and considering broader competition strategies for FY27. The presentation covers post-award administration requirements, including use of Autodesk Build for all project documentation, Davis-Bacon Act wage compliance with certified weekly payrolls, infection control risk assessments (ICRA), coordinated utility shutdowns, and security badging procedures. Performance periods are anticipated at two to three years, with potential Project Labor Agreements (PLAs) required for projects near or exceeding $35 million. The VA emphasized the need for prebid site visits, detailed phasing plans, coordination with infection control and IT departments, and understanding of dense urban access constraints and existing building conditions at each location.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VISN 2 EHRM

Industry Day November 19, 2026

August 30, 2017

VA

Key Leaders Meeting

Donny Marsh, Division Chief Joe Rossano, Pre Award CO Sam Cornwell, Pre Award CS Chris Yong, Post Award CO Freddy Flores, Post Award CS

Introductions - OFA PCAC Team

Special Engineering Projects (SEP) National Office:

Jim Cullum, Capital Support Engineer, FRO-SEP Jo Jo Todd, Deployment Manager Prab Mathone, Construction Manager Mike Neese, Integration Engineer, CM Support

Introductions – Facilities Requirements & Oversight Team (FRO)

Bronx VAMC: Amir Elgabari, Mike Pilsbury Northport VAMC: Mike Kulak, John Yousseff, Khalid Nagidi & Brian Eichhorn East Orange VAMC: Lukasz Romaniecki and Mike Kaleda Manhattan VAMC: Danielle Fix St. Albans: John Situ

Introductions - VISN 2 Site Engineers

Goals of Industry Day Present the VA’s objectives and requirements for the upcoming VISN 2 EHRM Infrastructure projects, engage industry partners of all sizes, and gather market insight needed to determine the most effective procurement and set-aside strategy for these complex efforts.

Legacy VISN 2 (New York/New Jersey) has five EHRM projects that are anticipated to be solicited and awarded in FY 2027 and four in FY 2028.

The five planned projects for FY27 are at the Bronx, Canandaigua, Manhattan, Northport, and St. Albans. The Buffalo and East Orange projects will be started in FY27 but awarded in early FY28.

FY27 EHRM Projects

EHRM Program Overview FY27 EHRM Projects Site Walk – Bronx Procurement Discussion Post Award Administration Q&A Closing Remarks Networking *We will try to wrap up around 3 PM Today’s Agenda

Jim Cullum, Capital Support Engineer

Facilities Requirements and Oversight – Special Engineering Projects (FRO-SEP) is the program office responsible for the entire lifecycle administration of EHRM infrastructure upgrades Collaborates with internal experts and VA stakeholders to optimize constructability and consistency in standards application Drive cost-efficient project outcomes

EHRM Program Overview Ensure schedule compliance and optimization Risk/Issue management What SEP does:

Roles and Responsibilities Special Engineering Projects (SEP) National Office:

Jim Cullum, Capital Support Engineer, FRO-SEP Jo Jo Todd, Deployment Manager Prab Mathone, Construction Manager Mike Neese, Integration Engineer, CM Support Binisha Shrestha, Integration Engineer

EHRM Site Overview

General Narrative Summary

OVERALL GOALS & MAJOR DESIGN ELEMENTS

This campus-wide project focuses on upgrading the VAMC’s fiber network and power distribution in compliance with EHRM design guides.

Major Design Elements:

Fiber network upgrades with redundant routes to IT closets and the demarcation room Telecommunications room expansions or relocations and installation of 100 IT outlets and 75 electrical outlets Power distribution and HVAC upgrades Physical security improvements and hazardous material abatement

Canandaigua VAMC

Project Scope Key Strategies / Project Scope:

Risk Management: Utilization of a risk register to proactively identify and mitigate potential challenges.

Infrastructure optimization: Expansion or relocation of existing Telecommunication Rooms, with minimal impact on the facility's ongoing operations and staff.

Security Integration: Ensuring high-level security for data cabinets, fiber infrastructure, and telecommunication rooms, including the installation of lockable manhole covers for underground fiber pathways.

Phased Implementation: Development of a detailed phasing plan, including dust control and infection control risk assessments, to minimize disruptions to the facility during construction.

Key Challenges, Unique Aspects, or Site-Specific Conditions Early contractor considerations

Canandaigua VAMC Coordinate phased construction to minimize disruptions to daily campus operations Expansion or relocation of existing Telecommunication Rooms, with minimal impact on the facility’s ongoing operations and staff Detailed phasing plan, including dust control and infection control risk assessments, to minimize disruptions during construction Hazardous material abatement

Key Challenges, Unique Aspects, or Site-Specific Conditions Key project details

Site Layout – Canandaigua VAMC

Project Summary and Scope

Upgrades electrical and telecommunication infrastructure at the Buffalo VAMC to support the EHRM program without disrupting ongoing operations.

Replaces fiber, telecom cable trays, conduits, cabling, and performs HVAC/electrical upgrades in new and renovated Telecommunications Rooms.

Provides full recabling across multiple campus buildings, including new TRs, redundant site infrastructure, and improvements to the main computer room (new CRAC units, racks, and fiber landing).

Delivers comprehensive modernization of communications systems: new fiber and CAT6a cabling, work area outlets, racks, UPS units, power distribution, HVAC, CCTV, fire protection and alarm, utility monitoring, PACS, and door systems.

Buffalo VAMC

Key Challenges, Site Conditions, and Distinguishing Features Extensive phasing and critical path scheduling required to maintain network uptime and ensure no more than two buildings are disrupted at once.

Third‑party inspections and building-specific commissioning must be integrated into the construction schedule.

LIDAR scans provided to bidders for accurate pre‑bid review; monthly LIDAR surveys support progress documentation and digital twin development.

Contract documents include detailed requirements for phasing, ILSM, hazmat handling, and commissioning.

Buffalo VAMC

Site Layout - Buffalo VAMC

Project Overview Modernizes telecommunications and IT infrastructure across Buildings 1, 2, 3, and 6 at the Margaret Cochran Corbin VA Campus.

Relocates and builds a new campus data center with redundant fiber pathways, dedicated cooling, and 2N UPS/electrical redundancy.

Renovates 53 telecommunications rooms and enclosures and upgrades pathways, cabling, and fiber distribution.

Major scope includes:

Data center build-out with fire protection, physical security, and year‑round cooling Category 6A cabling, redundant WAN/fiber pathways, telecom room upgrades Standalone chilled‑water system and ductless fan‑coil units for TR cooling Electrical distribution improvements supporting telecom and mechanical loads Architectural renovations, rooftop equipment protection, hazmat abatement, and civil coordination with existing flood barriers

Manhattan VAMC

Key Challenges & Unique Aspects

Dense urban campus with limited access for material staging, deliveries, hoisting, worker parking, and equipment logistics.

Relocated data center requires carefully sequenced construction, commissioning, migration, and cutover to maintain uninterrupted operations.

Renovation of 53 TRs demands phased access in occupied clinical buildings with close coordination with VA IT and clinical departments.

Dedicated chilled‑water system must operate independently of the main campus system; rooftop equipment requires structural and environmental planning.

Flood barriers and site constraints affect civil routing and exterior access.

Early identification needed for dependencies with third‑party vendors, concurrent station projects, and incomplete record drawings.

Manhattan VAMC

Site Layout – Manhattan VAMC

General Project Summary

Upgrade the Northport VAMC network cable plant to Category 6A structured cabling and a robust fiber‑optic backbone to meet EHRM reliability and bandwidth requirements.

Construct a new standalone data center building, including generator capacity to power the data center and restore emergency power to Building 12. Existing generator to be removed after installation of the new generator.

Project scope includes:

New Telecommunications Rooms (TRs) throughout the facility New fiber backbone, Cat6A cabling, TR adjustments (keep/relocate/remove) across multiple buildings.

New data center with associated physical security upgrades.

Electrical infrastructure corrections and hazardous materials abatement.Detailed LAN and data center phasing to minimize downtime.

Northport VAMC

Key Challenges, Site Conditions, and Distinguishing Features

Highly congested building connectors complicate routing of new fiber, power, and infrastructure—critical for bidders to review existing pathways.

Strongly recommended pre‑bid site visit to assess congested pathways, TR locations, obsolete electrical panels (e.g., Federal Pacific), and field constraints; electrical one‑lines must match verified arc‑flash study conditions.

Unique campus layout: interconnected buildings via partially underground connectors, creating complex routing, phasing, and congestion challenges.

Six outbuildings require new underground duct banks for fiber connectivity to the new data center/backbone.

Distinguishing features include:

Standalone data center with coordinated emergency power restoration for Building 12 Extensive multi‑building TR right‑sizing and selective scope reductions due to occupancy changes and concurrent projects (ICU, ED, Boiler Plant).

Rigorous multi‑phase LAN/data center migration plan with temporary fiber routes, dual fiber runs, 90‑day relocation windows, and close coordination with OIT and BioMed to maintain continuous operations.

Northport VAMC

Site Layout – Northport VAMC

General Project Summary

Provides full Architect‑Engineer design services to upgrade campus‑wide infrastructure at St. Albans VAMC in support of the EHRM system.

Overall goals include:

Upgrading network cable plant to Category 6A and a modernized fiber‑optic backbone, including new outlets and patch panels Designing a new small data center attached to Building 89 with full MEP, power, UPS, HVAC, finishes, and cable management Designing a new Telecommunications Room (TR) tower at Building 89 to support critical network infrastructure High‑level project scope:

Electrical upgrades (panels, normal/emergency power, bonding, UPS, BMS interfaces) HVAC assessment and system upgrades Reconfiguration and renovation of existing spaces (demolition, new construction, finishes, cabling) Construction of a new TR tower and new data center with all supporting infrastructure Campus‑wide communications improvements (Cat6A, patch panels, new outlets) Physical security enhancements and hazardous materials abatement Backbone fiber upgrades within and between buildings, including diversified WAN pathways Scope spans Buildings 88, 89, 86, 85, 87, 92, 173, 60, 64, 91, 93, plus site work St. Albans VAMC

Key Challenges, Site Conditions & Distinguishing Features

Building 89 contains lathe‑and‑plaster ceilings above existing suspended ceilings, complicating routing for new infrastructure and requiring careful field coordination.

Thorough pre‑bid site visits are strongly recommended to assess above‑ceiling conditions, access limitations, and existing infrastructure constraints.

Multi‑story connector corridors between buildings create unique campus‑wide routing, phasing, and coordination challenges for cable pathways and utilities.T Two outbuildings require underground construction; an additional building (energy plant) connects via underground steam tunnel, impacting pathway design and construction sequencing.

St. Albans VAMC

Site Layout – St. Albans VAMC

General Summary

EHRM initiative supports national VA efforts to strengthen cybersecurity and modernize telecommunications infrastructure.

Project scope at East Orange includes:

Renovation and modernization of the Data Center in Building 1 Installation of a campus‑wide, fully redundant fiber‑optic backbone Renovation and modernization of Telecommunications Rooms across all campus buildings Upgrading all buildings to Category 6A cabling East Orange VAMC

Key Challenges & Site‑Specific Conditions

Construction of a 15‑story Telecommunications Room tower to create ~170 SF of new TR space per floor due to limited existing capacity in Building 1. Access to create footing in C-level maybe difficult. Crane staging maybe a challenge SHPO‑driven design requirements to match the historic exterior façade of Building 1 Phased renovation of the existing Data Center to maintain continuous network operations Use of existing utility tunnels for backbone installation to minimize parking disruption and avoid extensive trenching or new duct bank work. All trenching will be mainly for Buildings 2,15-18 and 11.

Building 1 work will require awareness of Infection Control and proper phasing when running/ replacing cables with emphasis to most critical areas for example Inpatient floors, Mental Health, SCI, O.R., SPS, ED, Dialysis.

East Orange VAMC

Site Layout – East Orange VAMC

Bronx VAMC

PROJECT OVERVIEW

Modernizes the campus technology backbone and supports EHRM implementation at the James J. Peters VAMC.

Includes construction of two new telecommunications towers requiring coordinated structural, civil, architectural, MEP, and telecom design.

Includes repurposing an abandoned dumbwaiter shaft as a new tower by removing existing equipment, adding floors and providing access through housekeeping rooms.

Renovates and expands existing data center and new TR spaces; upgrades power, cooling, fiber, security, and life‑safety systems.

Campus-wide improvements include:

– New Category 6A cabling and fiber backbone

– Data center power, cooling, and cable‑management enhancements

– Electrical system installations (normal/emergency power, UPS, panels, bonding)

– New HVAC for the towers and other spaces, and BMS integration

– Architectural renovation, fire protection, physical security, and hazmat abatement

Bronx VAMC

KEY CHALLENGES & UNIQUE ASPECTS

• Three new telecom towers are a major project differentiator requiring precise alignment with existing hospital elevations.

• Tower connections at the basement level require detailed access and interface coordination.

• Existing smokestack demolition by another contractor must occur before tower construction can begin.

• Active healthcare environment requires early planning for access controls, outages, telecom cutovers, and infection‑control requirements.

• Existing conditions and hazmat may influence sequencing; extensive field verification recommended.

• Limited TR space requires close coordination with VA stakeholders and concurrent projects.

Site Layout – Bronx VAMC

Site Walk Stay together as a group Please refrain from asking questions, submit in writing Changes to the solicitation can only be implemented via amendments After site walk, we will break for lunch Are there any Bronx specific parts to add?

PLEASE COME BACK WITHIN 1 HOUR

SPECIFIED TIME WILL BE GIVEN AFTER WALK

LUNCH

Procurement Discussion Joseph Rossano and Samuel Cornwell

Market Research and Set-Aside Determination Procurement Method – IFB vs RFP (LPTA or Tradeoffs) FY26 Procurement Examples / Factors Period of Performance Project Labor Agreement (PLA)

General Discussion Points

Sources Sought Notice - typically issue a sources sought notice on SAM.gov. It’s important you look out for this and respond with your interest and capabilities related to EHRM projects.

Small Business SBA.gov Search Email – we generate a list of verified SDVOSBs and/or Small Businesses with specific criteria (NAICS, bonding level etc.).

Lack of responses from capable contractors, may result in a non-SDVOSB set-aside or an unrestricted procurement.

This Industry Day is to promote further interest and competition FY26 had limited interest in some sites Market Research and Set-Aside Determination

Invitation For Bid (IFB) Sealed Bidding Process – Publicly solicited, competitive bids, no discussions or negotiations Award based on lowest price; responsibility determination will be conducted on the apparent low bidder Clear and defined requirements as per the specifications; no technical factors Most streamlined of the procurement methods and typically quicker timeframe Bid opening; offerors must follow the IFB or risk being determined nonresponsive

Procurement Method

Lowest Price Technically Acceptable (LPTA) Award based on the lowest priced technically acceptable offer Technical factors can help ensure offerors better understand the project requirements The proposals must meet the minimum acceptability standards for the established technical factors A competitive range may be established in order to conduct negotiations

Trade-Off Evaluates price and non price factors Allows consideration of technical approach, experience, past performance, etc.

Tradeoffs may be applied when justified, to award to a higher rated offeror at a higher price Overall objective remains to select the proposal that provides the best value to the government based on the solicitation's evaluation criteria, regardless of the use of Tradeoffs or LPTA

IFB (Price only) Bath, Syracuse, Brooklyn, Castle Point

RFP LPTA Lyons – Qualifications, Key Subcontractors, Price (minimum acceptability for non price related factors)

RFP TRADEOFF - Montrose - Past Performance

FY26 Procurement Examples / Factors

Anticipated Period of Performance for these EHRM projects is between 2 and 3 years Communicate to us if these timeframes are too short What issues unique to New York may increase the performance period?

Period of Performance

Required for construction projects over $35M by Executive Order 14063 and RFO 22.502-1(b) Exemption memo is required if we do not include one For projects near or over $35M, the Sources Sought Notices includes a PLA Questionnaire Size, complexity, labor availability, impact on competition Providing thorough responses to the PLA questions help us make a clear determination on whether to include or not Goal remains to promote competition

Project Labor Agreement (PLA)

Post Award Administration Chris Yong, Post Award Contracting Officer

Transition into post-award administration. Explain that the rest of the session covers how the government and contractors work together after award.

Who's Who After Award

Contracting Officer (CO) Changes the contract, approves payments, and handles disputes.

COR

Oversees daily work on site. Cannot change the contract.

Project Manager and Contract Specialist Handle day-to-day coordination and contract paperwork.

Walk through the three roles and when to call each one. Share the org chart with names and phone numbers on the handout, and remind contractors to confirm names at the kickoff meeting.

Only the CO Changes the Contract Only a written modification signed by the CO changes the contract.

Verbal direction from site staff is not a contract change.

If something sounds like new work, ask the CO to confirm it in writing before you start.

Key message: verbal direction from site staff is not a contract change. If you receive a request that sounds like new work, ask the CO to confirm it in writing before you start. Share one real example of a verbal request that became a dispute, without naming anyone.

Notice to Proceed and Kickoff

Notice to Proceed The formal start date. The contract schedule clock begins.

Kickoff Meeting Agree on the schedule, submittal list, safety plan, and points of contact.

First 30 Days Agree in advance on the key deliverables due in the first month.

The notice to proceed date starts the contract clock, so planning should begin before it. Share a sample kickoff agenda so contractors can prepare their schedule, submittal list, and safety plan before the meeting.

File Sharing Requirement: Autodesk Build Contractors must use Autodesk Build, provided by the VA in VISN 2, for all project documents.

RFIs Submit all requests for information here.

Submittals Upload all submittal packages here.

Daily Logs and Reports Post all daily logs, progress reports, and other project records here.

Access and training: [insert how contractors request accounts]

Explain that Autodesk Build is the single system of record for project documents, so everything on the project lives in one place. Emphasize that the requirement covers RFIs, submittals, daily logs, and reports. Before presenting, confirm with the program office how contractors get accounts and training, and fill in the highlighted placeholder. Do not present a deadline that is not in the contract.

Davis-Bacon Act: Pay workers at least the locally prevailing wages listed in the wage determination.

Certified payrolls: Submit certified payrolls weekly for every worker on the project.

Subcontractors: The same wage rules apply at every tier. Primes are responsible for their subs.

Labor Compliance

Recommend that primes audit subcontractor payrolls before submitting them. Errors caught early are much easier to correct than errors found during a government review.

Safety in an Operating Hospital

Infection Control Each project uses an infection control risk assessment (ICRA) that sets controls for each work area.

Dust, Noise, Vibration Control dust, noise, and vibration, and keep barriers in place at all times.

Life Safety Interim life safety measures are required when fire protection is out of service.

This is the topic first-time VA contractors most often underestimate. Give one concrete example of a dust event and what it cost in delays and cleanup. Patients come first; every control exists to protect them.

Plan around patients: Sequence work in phases so patient services continue without interruption.

Request outages early: Utility shutdowns need advance requests and approval from facility staff.

Build in lead time: Approvals take time. Add them to your schedule from the start.

Phasing and Shutdowns

Recommend that contractors build phasing into their schedules from day one. Confirm the utility shutdown approval lead time from the contract before presenting.

Security steps: Every worker must complete the required security and background investigation steps before starting.

Badging: Submit worker names for badging in the first week of the contract.

Backup crew: Workers without approved access cannot work on site. Plan backup crew members.

Site Access and Badging

Badging approvals can take time, so submit names early. Tell contractors to plan backup workers for anyone whose clearance is pending. Confirm the current investigation requirements with the security office before presenting.

Questions Received in advance Question / Topic 1 - Any challenges involving division 27 for the 7 sites proposed would be helpful?

Question / Topic 2 - For the St. Albans project, will the Division 27 telecom and data center scope be designed to a level where subcontractors can price it at bid, and is the VA planning a set-aside for St. Albans?

Question / Topic 3 – Will the structured cabling, fiber optics, telecommunications, and data center infrastructure work be included within the overall construction contracts or procured separately?

Q&A

Badging approvals can take time, so submit names early. Tell contractors to plan backup workers for anyone whose clearance is pending. Confirm the current investigation requirements with the security office before presenting.

Question / Topic 4 - Will these projects be entirely standalone new construction or include renovations and/or tie-in to existing facilities?

Question / Topic 5 - Discuss site logistics for these projects.

Question / Topic 6 - As a part of the site walks for these projects, we'd like to see where the building utilities will tie-into existing, and any new utility runs required?

Question / Topic 7 - Will these projects include any IOT services and equipment procurement or will the PCAC contract that separately through SAM.gov?

Badging approvals can take time, so submit names early. Tell contractors to plan backup workers for anyone whose clearance is pending. Confirm the current investigation requirements with the security office before presenting.

Question / Topic 8 - Will these projects have a small business or SDVOSB set-aside? Or will they be open market?

Question / Topic 9 - We are attending as a prospective subcontractor and would like to understand the set-aside strategy for the FY27 projects. What is needed for the VA to set aside these opportunities for Veterans?

Question / Topic 10 - What acquisition strategies and small business set-asides are being considered for the individual projects, including potential opportunities for 8(a) firms?

Question / Topic 11 - Will a list of interested or prequalified contractors be available at any point on SAM.gov? Will the VA facilitate networking or share an attendee list to help specialty contractors connect with prospective prime contractors for teaming and subcontracting opportunities?

Question / Topic 12 - Is there an estimated date as to when these solicitations will be published?

Badging approvals can take time, so submit names early. Tell contractors to plan backup workers for anyone whose clearance is pending. Confirm the current investigation requirements with the security office before presenting.

Closing Remarks Sam Cornwell, Contract Specialist

Next Steps for each EHRM project Sources sought notice - market research Pre-sol notice - procurement method / set-aside Solicitation Networking Session - Feel free to speak to other participants and VA representatives for an informal networking session

Closing Remarks image3.png

Microsoft_Word_Document.docx Project scoping and funding

Advisory modification review/approval

Advisory design review

Stakeholder coordination

Schedule analysis

Advise COR/Contracting for issue resolution image4.emf image5.png image6.png image7.png image8.png image9.png

BUILDING 100

PROPOSED

DATA CENTER

EXISTING

BUILDING 8

EXISTING

BUILDING 37

UP

ENCLOSED WALKWAY

EN

CL

OS

ED

W

AL

KW

AY

TRAILER

CW

CONSTRUCTION SIGN

(SEE DETAIL 13 ON CS8003)

SAFETY SIGN

(SEE DETAIL 12 ON CS8003)

CONSTRUCTION FENCE

(SEE DETAIL 7 ON CS8003)

STABILIZED CONSTRUCTION ENTRANCE

(SEE DETAIL 8 ON CS8003)

PEDESTRIAN ACCESS TO BE

MAINTAINED DURING CONSTRUCTION

(SEE NOTES 10 & 11)

"SIDEWALK CLOSED" SIGN

MOUNTED ON FENCE

(SEE DETAIL 10 ON CS8003)

"SIDEWALK CLOSED" SIGN

MOUNTED ON FENCE

(SEE DETAIL 10 ON CS8003)

"NO PARKING ANYTIME" CONSTRUCTION

ENTRANCE SIGN TO BE MOUNTED ON

CONSTRUCTION FENCE (SEE DETAIL 11 ON CS8003)

12 FT WIDE DOUBLE SWING GATE

3 ACCESSIBLE PARKING SPACES TO BE

BARRICADED FROM USAGE DURING

CONSTRUCTION (SEE NOTE 10)

JERSEY BARRIER (TYP.)

(SEE DETAIL 6 ON CS8003)

PRELIMINARY STAGING AREA, EXISTING

CONDITIONS TO BE VERIFIED AND FINAL

STAGING AREA TO BE DETERMINED

CONSTRUCTION FENCE

(SEE DETAIL 7 ON CS8003)

BLDG 50

BLDG 37

BLDG 8

BLDG 9

BLDG 36

BLDG 118

BLDG

20 FT WIDE CONSTRUCTION

ENTRANCE (SEE NOTE 10 & 11)

STEAM

STEAM

TREE PROTECTION FENCE (TYP.)

(SEE DETAIL 4 ON CS8003)

INLET PROTECTION (TYP.)

(SEE DETAIL 1 ON CS8003)

LIGHT DUTY STORAGE AREA (SEE NOTE 8)

HEAVY DUTY STORAGE

AREA (SEE NOTE 8)

DOUBLE SWING GATE,

12 FT WIDE

D

APPROXIMATE LOCATION OF

SHALLOW STEAM TUNNEL

(SEE NOTE 8)

30.00'

.00

125.00'

110.00'

.00

150.00'

114.00'

CONSTRUCTION FENCE TO BE

LOCATED A MINIMUM OF 5 FT

FROM FACE OF CURB (TYP.)

EXISTING CHILLED

WATER LINES

TO REMAIN

LOOP ROAD

EXISTING TELECOM

DUCT BANKS

TO REMAIN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

CONSTRUCTION STAGING PLAN

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

400 FORT HILL AVE, CANANDAIGUA, NY 14424

09.21.2026 CM MR# Revisions Date

Sprinkler Status

AE Works, LTD.

418 Beaver Street Sewickley, PA 15143 Phone: 412-287-7333 www.aeworks.comAE WORKS®

100% BID DOCUMENTS

CONSTRUCTION AREA KEY MAP

00 40' 80'

CONSTRUCTION FENCE WITH SCREEN

G002

0 20' 40'

528A5-22-700

1. MATERIALS TO BE INSTALLED IN THE UPCOMING 48 HOURS MAY BE STAGED IN

CONSTRUCTION/STAGING AREA #1, THE MAJORITY OF THE CONSTRUCTION MATERIALS ARE TO

BE LOCATED IN CONSTRUCTION/STAGING AREA #2.

2. CONSTRUCTION ACTIVITIES SHALL BE PERFORMED DURING NORMAL WORKING HOURS (MON. - FRI. 8:00am - 4:30pm, EXCLUDING FEDERAL HOLIDAYS) UNLESS INDICATED OTHERWISE IN THE

CONTRACT DOCUMENTS OR AS FOLLOWS.

3. CERTAIN ACTIVITIES SUCH AS UTILITY SHUT DOWNS, RIGGING OF EQUIPMENT TO THE ROOF, NOISE VIBRATION GENERATING ACTIVITIES (INCLUDING DEMOLITION DRILLING FOR AN ANCHOR INSTALLATION, ETC.) WILL BE COORDINATED WITH THE COR AND WILL HAVE TO BE DONE DURING

OFF-HOURS/WEEKENDS EVEN IF NOT EXPLICITLY CALLED OUT IN THE CONTRACT DOCUMENTS.

THE DETERMINATION WILL BE MADE DURING THE COORDINATION WITH THE FACILITY.

4. IF IT IS DETERMINED THAT THE CONSTRUCTION ACTIVITIES NEED TO TAKE PLACE DURING

OFF-HOURS, THE CONTRACTOR SHALL SUBMIT AN OFF-HOURS REQUEST WITH THE DATE, START

AND FINISH TIMES, A BRIEF DESCRIPTION OF THE WORK TO BE DONE AND A JUSTIFICATION TO

THE COR. THE REQUEST SHALL INCLUDE THE PHRASE "THIS REQUEST IS AT NO ADDITIONAL

COST TO THE GOVERNMENT."

5. LOCATIONS OF THE CONSTRUCTION FENCE, TRAILER AND DUMPSTER ARE PROPOSED,

TENTATIVE LOCATIONS. EXISTING CONDITIONS TO BE VERIFIED AND FINAL LOCATIONS TO BE

APPROVED BY THE CONTRACTOR.

6. REFER TO THE GENERAL NOTES AND SOIL EROSION CONTROL PLAN CS6001 AND IMPLEMENT

EROSION AND SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH THE PLANS PRIOR TO ANY

LAND DISTURBANCE.

7. FOR CONSTRUCTION/STAGING AREA #1 AND CONSTRUCTION/STAGING AREA #2 ENTRANCE

PROVIDE TRAFFIC SIGN, 'TWO WAY ACTIVE ROADWAY AHEAD, DO NOT IMPEDE ROADWAY

TRAFFIC', PROVIDE A FLAG MAN TO DIRECT TRAFFIC WHEN CONSTRUCTION VEHICLES ARE

ENTERING AND LEAVING.

8. CONTRACTOR TO VERIFY SHALLOW STEAM TUNNEL LOCATION AND DEPTH IN

CONSTRUCTION/STAGING AREA #2, DELINEATE IN FIELD, AND LIMIT TRAFFIC AND STORAGE OF

ITEMS ON IT TO LIGHT DUTY EQUIPMENT AND ITEMS.

9. CONTRACTOR TO VERIFY LOCATION OF UNDERGROUND CHILLED WATER LINES, TELECOM DUCT

BANKS, AND OTHER UNDERGROUND LINES TO PREVENT THEM FROM BEING DAMAGED.

10. SIDEWALK, CURB, ASPHALT PAVEMENT, AND PARKING/PAVEMENT STRIPING IN THE AREA OF THE

CONSTRUCTION ENTRANCE IS TO BE REPLACED AT THE END OF CONSTRUCTION.

11. ASPHALT PAVEMENT REPLACEMENT INDICATED ON THE PLANS IS TO BE STANDARD DUTY

PAVEMENT IN AREAS OF PARKING SPACES AND HEAVY DUTY PAVEMENT IN DRIVE AISLES AND

ROADWAYS.

NOTES

1 1' = 40'

CONSTRUCTION/STAGING AREA #1 PLAN2 1' = 20'

SAFETY SIGN

CONSTRUCTION SIGN

CONCRETE WALKWAY

BUILDING AREA

GRAVEL

PROPOSED LEGENDEXISTING LEGEND

Pennoni Engineering & Surveying of New York, P.C.

130 West 29th Street, 11th Floor New York, NY 10001 Phone: 212-239-7610

TELECOM MANHOLE

SIGN

AIR CONDITIONING UNIT

CLEAN OUT

CATCH BASIN

ROOF DRAIN

DRAINAGE/STORM MANHOLE

SANITARY SEWER MANHOLE

SHRUB/TREE

BUILDING/CORRIDOR

AE Works Proj. #: VCAN-004

STONE CONSTRUCTION ENTRANCE

SOIL STOCKPILE

LAWN

LIMIT OF DISTURBANCE

ASPHALT PAVEMENT

CONSTRUCTION/STAGING

AREA #1

STEAM MANHOLE

SILT FENCE/FILTER SOCK

CONCRETE WASHOUTCW

WATER LINE

DRAINAGE LINE

STEAM TUNNEL

SANITARY SEWER LINE

CONSTRUCTION/STAGING

AREA #2

(SEE NOTE 1)

DUMPSTERD

HYDRANT

LIGHT POLE

TREE PROTECTION FENCE

CHILLED WATER LINE

JERSEY BARRIER

TELECOM DUCT BANK

N u:

\A cc ou nt s\

LA

\a ew la

- c an an da ig ua n y va e hr m u pg ra de s\

S

IG

H

TS

\A

LA

- G

0.

dw g

6/

/2

:3

9:

P M image10.emf

BAILEY AVE

W W W W

W W

W W W W W W

LEBRUN RD

O

U

G

UGE UGE

UGE UGE UGE

UGE

UGEUGEUGEUGEUGEUGEUGEUGE

UGEUGEUGE

UGEUGEUGEUGEUGE

UG

UGE UGE UGE UGE UGE

COMM

EUGE

UGE UGE UGE UGE

AS

GA

WWWWW

WWWWWW

GASGASGASGAS

GAS GAS

WWWWWWWW

W W W W W W W W W W W W W W

WWWWWWW

SD

W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W

SS

SDSD

SS SS SS SS

UGE UGE UGE UGE UGE

COMM COMM

CP1 - ELECTRICAL MANHOLE

N:1075076.5759 E:1087100.4808

ELEV=693.50'

CP3 - ELECTRICAL MANHOLE

N:1075534.6859 E:1086762.4064

ELEV=689.52'

CP2 - WATER GATE VALVE

N:1075208.2930 E:1086812.4337

ELEV=689.26'

PARKING

GARAGE

EX

. E

LE

CT

RI

CA

L

EX. ELECTRICAL

EX. FIRE WATER

. F

IR

AT

ER

. S

AN

. S

EW

EX. SAN. SEWER

SE

RV

IC

PR

OV

ID

. G

EX. S

TO

RM

EX. GAS

EX. GAS

. W

EX. FIRE WATER EX

. W

9A

681682

EX. FENCE LINE

EX. FENCE LINE EX. FENCE LINE

. C

OM

MU

NI

TI

ON

Office of Construction and Facilities Management

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

02/12/2026

3495 Bailey Avenue, Buffalo, NY 14215

528-22-700

SITE

Revisions: Date:

A/E:

TRIPLE C -The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

35% SCHEMATIC DESIGN

NOT FOR CONSTRUCTION

CIVIL SITE SURVEY PLAN

VF101

K.STRUBLEM.PERKINS

CIVIL SITE SURVEY PLAN

1"=40'F1

NOTE

CONTRACTOR TO HAND DIG OR HYDRO-EXCAVATE WITHIN 5' OF ALL EXISTING

UTILITY LOCATIONS.

BENCHMARK

THREE EXISTING CONTROL POINTS ARE USED TO SET TOPOGRAPHY ELEVATIONS BASED ON NAVD 88.

CONTROL POINT 1 BEING EXISTING ELECTRICAL MANHOLE RIM CENTER.

N:1075076.5759 E:1087100.4808

ELEV=693.50'

CONTROL POINT 2 BEING EXISTING WATERLINE GATE VALVE CENTER CENTER.

N:1075208.2930 E:1086812.4337

ELEV=689.26'

CONTROL POINT 3 BEING EXISTING ELECTRICAL MANHOLE RIM CENTER.

N:1075534.6859 E:1086762.4064

ELEV=689.52'

F/F FACE TO FACE

FF EL FINISH FLOOR ELEVATION

FG FINISH GRADE

FH FIRE HYDRANT

FL FLOW LINE

FOC FACE OF CURB

FT FEET OR FOOT

FTG FOOTING

HC HANDICAP

HCP HANDICAPPED

HDPE HIGH DENSITY POLYETHYLENE

HNDRL HANDRAIL

HORIZ HORIZONTAL

ID INSIDE DIAMETER OR INSIDE DIMENSION

INFO INFORMATION

INV INVERT

INV EL INVERT ELEVATION

LAT LATITUDE

LF LINEAR FEET (FOOT)

LOC LOCATION

LP LOW POINT

LS LUMP SUM

MATL MATERIAL

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MON MONUMENT

MTG MEETING

MULT MULTIPLE

N NORTH

NA NOT APPLICABLE

NO NUMBER

NTS NOT TO SCALE

OC ON CENTER

PC POINT OF CURVE

PCT PERCENT

PI POINT OF INTERSECTION

PL PROPERTY LINE

PRKG PARKING

PROJ PROJECT

PROP PROPOSED

PSI POUNDS PER SQUARE INCH

PVC POLYVINYL CHLORIDE (PLASTIC)

QTY QUANTITY

R RADIUS

RCB REINFORCED CONCRETE BOX

RCP REINFORCED CONCRETE PIPE

RD ROAD OR ROOF DRAIN

REQD REQUIRED

ROW RIGHT OF WAY

RT RIGHT

RW ROADWAY

ABBRV ABBREVIATION

ABC AGGREGATE BASE COURSE

AC ASPHALTIC CONCRETE

ACP ASPHALTIC CONCRETE PAVING

ADA AMERICANS WITH DISABILITIES ACT

AGGR AGGREGATE

APPROX APPROXIMATE

ASPH ASPHALT

ASSY ASSEMBLY

AVE AVENUE

BC BACK OF CURB

BDRY BOUNDARY

BITUM BITUMINOUS

BLDG BUILDING

BLVD BOULEVARD

BM BENCHMARK

BRG BEARING

CB CATCH BASIN

CFS CUBIC FEET PER SECOND

CL CENTER LINE

CLASS CLASSIFICATION

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNIT

CO SEWER CLEAN OUT

CONC CONCRETE

CONSTR CONSTRUCTION

COORD COORDINATE

CORR CORRIDOR

CU FT CUBIC FEET

CU YD CUBIC YARD

DA DRAINAGE AREA

DAT DATUM

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DESCR DESCRIPTION

DET DETAIL

DI DROP INLET

DIA DIAMETER

DIFF DIFFERENCE

DIM DIMENSION

DIP DUCTILE IRON PIPE

DIR DIRECTION

DIST DISTANCE

DWG DRAWING

E EAST

EA EACH

EC EDGE OF CURB

EG EXISTING GRADE

EL ELEVATION

ENGR ENGINEER

ENTR ENTRANCE

EP EDGE OF PAVEMENT (PAVING)

EPA ENVIRONMENTAL PROTECTION

AGENCY

EQUIP EQUIPMENT

ERD EXISTING ROOF DRAIN

ES EDGE OF SHOULDER

ESMT EASEMENT

EST ESTIMATE

EX EXISTING

EXIST EXISTING

SD STORM DRAIN

SDMH STORM DRAIN MANHOLE

SECT SECTION

SF SQUARE FOOT (FEET)

SHLDR SHOULDER

SMH STEAM MANHOLE

SP EL SPOT ELEVATION

SPEC SPECIFICATION

SQ YD SQUARE YARD

SS SANITARY SEWER

SSMH SANITARY SEWER

MANHOLE

ST STREET

STLT STREETLIGHT

STA STATION

STD STANDARD

STM STEAM

SURF SURFACE

SURV SURVEY

SW SIDEWALK

SWR SEWER

SYM SYMBOL

TAN TANGENT

TC TOP OF CURB

TD TRENCH DRAIN

TE TOP ELEVATION

TEMP TEMPORARY

THK THICKNESS

THRU THROUGH

TMH TOP OF MANHOLE

TOC TOP OF CURB

TOC WALL TOP OF CONCRETE WALL

TOF TOP OF FOOTING

TOP TOP OF WALL

TOPO TOPOGRAPHY

TOS TOP OF SLAB

TYP TYPICAL

UGND UNDERGROUND

UNO UNLESS NOTED

OTHERWISE

UNPV RD UNPAVED ROAD

UTIL UTILITY

VAR VARIES

VC VERTICAL CURVE

VERT VERTICAL

VIC VICINITY

VOL VOLUME

W WEST

W/ WITH

W/O WITHOUT

CIVIL SHEET ABBREVIATIONS

LEGEND

CAMPUS BOUNDARY

UNDERGROUND ELECTRICAL LINE

CURB

STORM DRAIN MANHOLE

SANITARY SEWER MANHOLE

FIRE HYDRANT

STREETLIGHT

WATER GATE VALVE

SIDEWALK

EXISTING NEW

COMMTELECOMMUNICATIONS

STORM DRAIN INLET

W W

GAS

WATERLINE

SANITARY SEWER LINE

STORM DRAIN LINE

FENCE LINE

UNDERGROUND GAS LINE

SURVEY DISCLAIMER

SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS; PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. GROUND PENETRATING RADAR (GPR) CONDUCTED BY GPRS INC. GNSS/GPS LOCATORS USED BY GPRS INC. ARE CERTIFIED FOR SUB-METER ACCURACY.

CONSTRUCTION MAY HAVE OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS EXPENSE.

ELECTRICAL MANHOLE

COMMUNICATION MANHOLE

BUILDING

OVERHEAD ELECTRICAL LINE OHU

1' MINOR CONTOUR

5' MAJOR CONTOUR

TRUE NORTH

GRAPHIC SCALE

1" = 40'

20' 40' 80'40' image11.emf

1-AE409

B3

54 SF

TELE. CLOS.

ELEC. CLOS.

PHYSICIAN

1-AE409

D3

1-AE406

1-AE406

1-AE410

D1

1-AE410

D5

1-AE407

1-AE407

1-AE408

1-AE408

CHIEF OF AUDIOLOGY

PROGRAM ASSISTANT

AUDIOLOGY

AUDIO OFF.

AURAL REHAB ROOM

W/C TOIL.

ENGINEERING

SND.STE.DIAG. EVAL

SND.STE.CONTROL

2544A

2548A

SND. STE. EXAM

SND. STE. EXAM

G613

G614

PHOTOCOPY

SND. STE.EXAM RM.

SND.STE.DIAG. EVAL

2567A

VIDEOFLUOROS.

HOUSEKEEPING

CONFERENCE ROOM

ABR CONTROL ROOM

EARMOLD FAB.

DIAG CONTROL RM.

2566A

AUDIO STORAGE

SPECIAL PROCEED

SPEECH PATH. OFF.

PSYCHOLOGIST

M.H.C.

PSYCHIATRIST

M.H.C.

SOCIAL WORKER

SOCIAL WORK

PSYCHIATRY

PSYCHIATRY

PSYCHIATRIST

SECRETARY

DIRECTOR PSYCHIATRY

0212P

DAY PROGRAM M.D

2694F

DAY PROGRAM

NURSE

2694D

NURSE

2694C

PSYCOLOGY

TRAINEE

CHIEF M.H.C

2682A

COPY

CHIEF D.T.C

2669A

AUDITORY STARTLE

TOILET

EDUCATIONAL THERAPY ROOM

CLOZAPINE CLINIC

DIETICIAN

GROUP THERAPY

NURSE PRACTC.

QUIET ROOM

MEN S ROOM

TRAINEE CUBICLES

0212Q

PTDS OFF.

2580A

PSYCOLOGY

NURSE CLINICIAN

ADMINSTRATOR

HBPC

G695

PTDS.PTC

PTDS.PTC

2578A GROUP THERAPY

MHBPC

OCCUPATIONAL THER.

PSYCHOLOGY

NURSE PRACTION.

AMBULATORY CARE

G760

TIOLET

NIDA PHARMACY

RESEARCH

RESEARCH

G776

G779

RESEARCH PSYCH.

SUPPORT SERV.

G592 ELECTRIC RM.

TELE. ROOM

PHYSICIANS OFF.

EXAM TREATMENT

NURSE ENT

2512 PHYSICIANS OFF.

RESIDENT

CHF.OPTHAL.

OPTHALOFFICE

OPTHALOFFICE

DARK ROOM

MINOR SURGERY ROOM

VISUAL FLD. DARK ADPT

EXAM ROOM

2502A

OPTHAMOLOGY CLINIC

2502B

RECORD STORAGE

2502C

2529 EXAM TREATMENT

SECRETRY RECEPTION

C215B

RETINAL CLINIC

CLOSET

C215C

FINANCIAL DISCLOSURE

STERILE PREP.

SOCIAL ACTIVITIES ROOM

0212U

H.A.V

STORAGE

2694A

KITCHEN

2694B

MEDICAL CARE

PHYSICIAN ACOS

NURSES OFFICE

C2-13B

M. TIOLET

W. TOILET

MAIL LOCKER

BATHROOM

MEDICAL CARE MGR.

HEALTH SYSTEMS SPEC.

2608NURSE COOR.

G687

EXAM/TREATMENT

NURSING

2602PHYSICIAN C+P

2600PHYSICIAN C+P

RECEPTION

LINEN CHUTE

G696

H.A.C

MEN

2593NEW TR

ELECT.CT.

MENS ROOM

CONFERENCE

PHARMACY

2599A

FEMALE LOCKERS

G712

H.R.M TRAINING

2597A

PATIENT TOIL.

STAFF TOIL.

RECEPTION CONTROL

H.A.C

WOMENS

ROOM

PROGRAM ASST.

NEW DATA CENTER

2135AS

READING

2135S

COMPUTER RM.

2139S

WORK RM.

2140S

OFFICE

FAST FD. SERVICE

2143S

BARBER SHOP

2104S

MECHANICAL RM.

2070W

ADP WORK AREA NO.1

2049W

BATH RM.

2074W

COMPUTER EQUIPMENT

2075W

M.R.I. OOF.

2044W

2042W

LAVATORY

2051W

2003W

I.R.M. OFF.

2083W

M.R.I. WORK SHOP

2086W

BATHROOM

2053W

M.R.I. OFFICE

2095W

M.R.I. STORAGE

2096W

CREDIT UNION

2097W

2099W

2099BW

WOMEN S TOILET

2099AW

LOUNGE

2060S

VENDING MACHINES

2058S

2007W

2034W

DENTAL ADMINSTRATION

0212CC

PATIENTS WAITING RM.

2154C

COMPUTER SPECIALIST ASM

2078W

ENTRANCE

2088W

BATH

0212DD

BATH

2006W

PRINTER STORAGE

2004W

2008W

LOUNGE / LOCKER

2013W

2009W

2011W

SUPPLIES

2037W

JANITOR

2038W

ELEC. CAB.

2039W

Room

2099II

2099JJ

2099KK

2099LL

P.C. WORK SHOP

2091W

ELEC. CLOSET

2001C

ELEV. SHAFT

STUDY & CONFERENCE

2167C

2166C

DENTAL LABORATORY

2193C

FEMALE LOCKER

2169C

ORAL HYGIENE

2164C

ORAL HYGIENE

2164AC

ORAL EXAM

2163C

ORAL EXAM

2162C

ENDO. RM

2161C

ENDO. RM

2160AC

GENERAL DENT.

2159C

2158C

DECONT.RM.

2597N

X-RAY

2156C

CHIEF DENTAL SVC

2178C

MAX. FACIAL PROS.

2192C

MAX. FACIAL PROS.

2191C

PROS

2190C

2189C

LINEN STR.

2597U

PROSTH

2187C

PERIO

2186C

2185C

ORAL SURGERY

2184C

2183C

0212FF

EAST STAIR

2156E

MALE LOCKER

2168D

2155C

PATIENTS LIBRARY

2225N

2225O

2225P

2225Q

DENTAL STORAGE

2166N

LIBRARY OFFICE

2168N

WOMEN VET COORD.

2173N

2176N

CONFERENCE ROOM

2186N

KITCHEN

2199N

DENTAL OFFICE

2202N

PROGRAM SUP.

MED.LIBRARY

2210AMED.LIBRARIAN

2215N

GENRAL LIBRARIAN

2219N

TLT

2219AN

PAT. COMPUTER RM.

2222N

GENERAL TR. RM

2170C

2171C

GENERAL TR. RM

2173C

PROS.

2172C

GENERTAL DENT.

2177C

2176C

GENERAL DENT

2174C

PROS.

2175C

2181C

DELICARESSEB DINNING ROOM

0212II

FOOD PREPARATION

2593A

ATRIUM BELOW

0212JJ

MENS ROOM

2181C

2179C

ASST. CHIEF

2179AC

ADMINISTRATION

2109C

TR DISPOSITION

DECOMMISSION

EXISTING TR TO BE EXPANDED

EXISTING TR TO REMAIN

1-AE411

D5

1-AE411

D1

69 SF

TELE. CLOS.

2012W

109 SF

NEW TR

2147C

2165C

MECH. RM.

2131S

EL. CAB.

2073S

TELECOM

2110GA

READING RM

2110FS

2110ES

2110DS

2110CS

2110BS

2110AS

2110S

CIRCULATION

2105S

NORTH STAIRWAY

- DUCT SHAFT

2160C

COMPUTER ROOM

2052W

FIRE BARRIER, 3 HOUR

FIRE BARRIER, 2 HOUR

FIRE BARRIER, 1 HOUR

SMOKE BARRIER

NEW PARTITION

EXISTING PARTITION

EXISTING CMU

DEMOLITION

WATER BARRIER

PARTITION LEGEND

5 5 10 15 20 25 30

3/64" = 1'-0"

FEETSCALE

R

T

TRUE

NORTH

of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

SHEET NOTES:

to d s k o c s /M a h tt

/M h tt

.r v t

:1

1-AE102

OVERALL FLOOR PLAN - 2ND FLOOR

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria , VA 22314

01/26/2026

READINESS BLDG 1 AND 6

423 EAST 23rd STREET, NY, NY 10010

630-22-700

100% CONSTRUCTION DOCUMENTS

100% CONSTRUCTION

DOCUMENTS

TR RECOMMENDATIONS

NUMBER

ROOM NUMBER ROOM NAME BOD COMMENTS

2nd Floor

BLDG 1 AND 6 2012W TELE. CLOS. EXISTING TR TO BE EXPANDED

BLDG 1 AND 6 2135AS

NEW DATA

CENTER

BLDG 1 AND 6 2147C NEW TR EXISTING TR TO BE EXPANDED

BLDG 1 AND 6 2589 NEW TR EXISTING TR TO BE EXPANDED

BLDG 1 AND 6 2679 TELE. CLOS. EXISTING TR TO REMAIN

DECOMMISSION SCHEDULE

NUMBER

ROOM NUMBER ROOM NAME BOD COMMENTS

2nd Floor

BLDG 1 AND 6 2052W COMPUTER ROOM DECOMMISSION

BLDG 1 AND 6 2576 TELE. ROOM DECOMMISSION

Revisions: Date: SHEET 71 of 598 image12.emf

UTILITY KEYED NOTES:

1. INSTALL NEW 8" PVC C-900 WATER LINE.

2. INSTALL NEW 8" 90 DEGREE ELBOW GATE VALVE AND THRUST

BLOCKING.

3. INSTALL 8" 45 DEGREE ELBOW AND THRUST BLOCKING.

4. INSTALL 8" 22.5 DEGREE ELBOW AND THRUST BLOCKING.

5. INSTALL NEW 8" PVC SERVICE LINE TO BUILDING WITH PIV (POST

INDICATOR VALVE) AND FOUR BOLLARDS.

6. TIE NEW 8" LINE INTO EXISTING VALVE WITH NON-RISING STEM.

7. TIE NEW ROOF DRAIN INTO EXISTING STORM DRAIN.

8. INSTALL NEW 8" STORM DRAIN LINE WITH RISERS TO SURFACE FOR

ROOF DRAINING.

9. INSTALL 4" CLEANOUTS AT SURFACE.

10. INSTALL NEW 8" PVC STORM DRAIN AND CONNECT TO EXISTING

STORM DRAIN MANHOLE.

11. INSTALL NEW 77' 8" PVC SANITARY SEWER FROM BUILDING TO NEW

MANHOLE. MAINTAIN MINIMUM 0.4% SLOPE.

12. INSTALL NEW 4' 0" SANITARY SEWER MANHOLE. MANHOLE 12A

13. INSTALL 354' NEW 8" PVC SANITARY SEWER FROM NEW MANHOLE

TO EXISTING MANHOLE 12.

GENERAL NOTES:

1. EXISTING UTILITIES ARE SHOWN TO THE BEST AVAILABLE

INFORMATION. CONTRACTOR TO VERIFY UTILITY LOCATIONS W/

GPR AND POTHOLING.

2. WHERE A SEWER LINE CROSSES OR PARALLELS A POTABLE WATER

OR FIRE WATER LINE, SEWER LINE MUST BE CONCRETE ENCASED

FOR TWENTY-FIVE (25') FEET ON EACH SIDE OF THE WATER LINE, OR

AS REQUIRED BY THE AHJ OR THE GOVERNMENT. WATER LINE

SHALL BE SLEEVED WITH LARGER PIPE FOR A MINIMUM OF

TWENTY- FIVE (25') FEET FROM THE CROSSING POINT.

77 LF 8" SCH40

BLDG TIE-IN

INV 156.57 MH 12A

RIM

INV (E) 153.60

INV (S) 153.60

354 LF 8" SCH40

@0.4% FALL MH 12

RIM 155.42

INV (N)

INV ( )

1" CONDUIT (ELECT)

8" PVC (WATER)

1 SANITARY SEWER PROFILE

NTS

1 SITE PLAN - NEW DATA CENTER

SCALE: 1" = 20'-0"

EX-W EX-W EX-W EX-W

K

W-ABD W-ABD W-ABD

SIG

SI

-C

EX-E

EX-E EX-E

-E

-W

BLDG. 300

FUEL TANK

FIN. FLR. 1

@ 160.57'

FIN. FLR. T

@ 155.46'

SA

SAS SAS SAS

EX-W

W EX-W EX-W EX-W EX-W EX-W EX-W EX-W

SS-ABN

-S

EX-SS

EX-S

X-SS

EX-SS EX-SS EX-SS EX-SS EX-SS EX-SS EX-SS EX-SS

EX-SS EX-SS EX-S

MH. 12

EL. 136.59

MH. 13

EL. 138.28

MH. 13AB

EL. 134.50

MH. 22

FR.EL. 155.12

MH. 21

FR.EL. 160.27

MH. 29

FR.FL. 156.00

MH. 12A

IE(E) 153.60

IE(S) 153.50

MH. 12

FR.EL. 155.42

13MH. 13AA

FR EL. 134.48

BLDG. 12

BLDG. 11

300-C-120

SANITARY SEWER -

RAC, HR

NA

DrawnCheckedIssue Date

21 3 4 5 6 7 8 9 10

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com

632-22-700VA EHRM INFRASTRUCTURE

UPGRADE

79 Middleville Rd Northport, NY 11768

CONSTRUCTION AGENT

US Army Corps of Engineers

NOT FOR

CONSTRUCTION

5/24/2024

0 20' 40' 60'

100% BID

-'^ -3 lvio u?h VA A N V d I/M □ 0A N V d I/M □ □

8UL /a/ ✓3HQNV fIN ^

II

ij*1 r \k rv ^/ //////////// V////////// /////// \□□

□ □ /////////////// n / //////////////// /

OOooo oo

1 oV ////// /////// / /o

(3oooooo

(3ooooo o r///// ////////// / ////////////////□□

//////////////// h□ ///////////////

(3Ooooo o ssA

Hooo ooo o

7-TTTTTTTTTTZ

^/ //// ////////// V ////// nr? ////// x

/////////// x

/ //////// A image13.emf

0 10' 20' 30'

1 NEW CONCRETE WALK

SCALE: 1" = 10'-0"

BW29.22

BW29.57

BW32.54

BW33.39

BW34.72

BW34.53

BW34.08

BW34.50

BW34.68

BW34.31

BW33.91

BW33.28

BW33.52

BW33.41

BW33.50

BW35.44

BW33.68

BW34.39

BW34.72

BW34.90

BW35.21

BW34.95

BW35.09

BW35.29

BW35.31

BW35.27

BW35.27

BW35.24

BW35.25

BW35.22

BW35.31

BW33.34

BW33.35

BW33.38

BW34.11

BW34.22

BW34.07

BW34.04

TW35.00

TW34.95

TW34.92

TW34.54

TW34.49

TW34.55

TW35.08

TW35.08

TW35.10

TW35.11

TW35.04

TW35.06

TW35.04

TW35.06

TW34.42

TW35.75

TW38.39

TW38.15

TW38.14

TW35.01

TW34.99

TW35.03

TW35.01

TW35.41

TW35.39

TW35.39

TW35.44

TW35.67

TW35.65

TW35.66

TW35.71

TW35.79

TW35.71

TW35.75

TW35.79

CONCRETE WALK

PAVEMENT

CONCRETE RAMP

ET

AM

WINDOW WELL

ELEV TO BOTTOM: 27.1

ELEV TO BOTTOM: 27.0

2'x2'GRATE (EX)

ELEV:25.32

(A)INV:22.69

(B)INV:22.64

ENCLOSED

STAIRS

UTILITY BOX

ON CONC.

PAD

A.C. UNIT

GRATE

ELEV:33.71

INV:26.88

ELEV:33.18

CONCRETE W

ALK

MULTI-STORY

BRICK & CONC.

ONE STORY

SILL33.48

SILL 34.76

SILL37.87

SILL37.81

SILL23.77

SILL 34.83

BW25.59

BW25.72

BW34.23

BW34.24

TW37.89

N:190850E:

MANHOLE

(FIRE)

A.C. UNIT

CONCRETE

CONCRETE WALL

N:190850E:

N:191050E:

N:191050E:

ELEV:23.18

BUILDING 89

BUILDING 91

29'-6''

15'-0''

10'-0''

11"

11''

5' -4

"4' -0

9'-0"

9' -0

11''

DrawnCheckedIssue Date

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

630A4-22-710

08/07/2026

St. Albans VA Medical Center - EHRM Infrastructure Upgrades

179-00 Linden Boulevard Queens, NY 11424-14-68

KEYED NOTES

CONCRETE

C-300

NEW SITE PLAN

DM

DATA CENTER

NJA

1. ALL INFORMATION SHOWN TO THE BEST OF

KNOWN ACCURACY BASED ON TOPOGRAPHIC,

GROUND-PENETRATING RADAR AND VISUAL

ONSITE SURVEYS IN ADDITION TO ASBUILT

INFORMATION.

2. CONTRACTOR SHALL PROVIDE AND MAINTAIN A

STORM WATER POLLUTION PREVENTION PLAN

(SWPPP) COMPLIANT WITH VA AND EPA

REQUIREMENTS. PLAN TO BE UPDATED AND

MAINTAINED ONSITE FOR INSPECTIONS.

3. CONTRACTOR SHALL MAINTAIN AND PROTECT

STORM DRAINAGE AT ALL TIMES.

4. CONTRACTOR SHALL KEEP SITE CLEAN AND FREE

OF TRASH OR OTHER DEBRIS. TRASH OR DEBRIS

TO BE PLACED AND SECURED IN COVERED BINS

OR DUMPSTER.

5. CONTRACTOR SHALL VERIFY ALL SITE UTILITIES

AND FEATURES IN THE FIELD PRIOR TO

EXCAVATION, AFTER CALLING FOR UTILITY

LOCATING SERVICES.

6. IF ANY DIFFERING SITE CONDITIONS ARE

ENCOUNTERED, CONTACT COR PRIOR TO

PERFORMING ANY WORK.

7. ALL UTILITY WORK TO COMPLY WITH VA AND

LOCAL UTILITY, CITY, OR STATE REQUIREMENTS.

8. CONTRACTOR SHALL PROVIDE TEMPORARY SITE

FENCING.

9. ALL EXCAVATIONS SHALL COMPLY WITH OSHA OR

MORE STRINGENT REQUIREMENTS, IF ANY. A

COMPETENT PERSON MUST INSPECT ALL

EXCAVATIONS EACH DAY PRIOR TO PERSONNEL

ENTRY.

10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL

AIR QUALITY OR OTHER REQUIRED PERMITS.

11. CONTRACTOR SHALL SET ALL UTILITY VAULTS,

MANHOLES, BOXES, AND INLETS FLUSH WITH NEW

PAVING.

12. CONTRACTOR SHALL PROVIDE FOR APPROVAL,

SHOP DRAWINGS OF NEW SIDEWALK AND CURBS

WHERE INDICATED TO BE COORDINATED WITH

COR. BEFORE STARTING WORK.

13. CONTRACTOR SHALL PROVIDE AND MAINTAIN

TEMPORARY TRAFFIC CONTROL FOR PEDESTRIAN

AND VEHICLE TRAFFIC THROUGHOUT

CONSTRUCTION.

14. CONTRACTOR SHALL RESTORE ALL AREAS

AFFECTED BY CONSTRUCTION ACTIVITIES TO

THEIR ORIGINAL CONDITION OR BETTER AFTER

COMPLETION OF WORK.

GENERAL NOTES

1. EXISTING CONCRETE WALK.

2. NEW CONCRETE WALK. REF.1/C-500

3. NEW CONCRETE WALK TO BE FLUSH WITH THE

NEW DATA CENTER CONCRETE STOOP.

4. NEW CURB RAMP REF. 2/C-500

5. CONTRACTOR SHALL BE RESPONSIBLE FOR

RESTORING ALL DISTURBED AREAS TO THEIR

ORIGINAL CONDITION UPON COMPLETION OF

CONSTRUCTION.

6. SAW CUT THE EXISTING CONCRETE WALK TO

MATCH THE NEW CONCRETE WALK

7. NEW CONCRETE WALK STEPS. REF.3/C-500

8. PROVIDE 9 INCHES DIAMETER BOLLARDS - M30 P1

RATED. DISTANCE OF 4 FEET BETWEEN THE

OUTSIDE EDGE OF EACH BOLLARD, 36" ABOVE

GRADE AND 48" BELOW GRADE WITH A CONCRETE

PIER 30" DIAMETER. BOLLARDS PAINTED YELLOW

REF.1/C-520

9. REMOVABLE BOLLARDS - M30 P1 RATED

BOLLARD

EX-SD EXISTING STORM DRAIN

STORM GRATE

7August 2026 image14.emf

CO

UT

UT UT

EE

COMCOM

COM

COM COM COM

COM COM COM

G G

GG

E E

CURBCUT

CURBCUT

SCALE: 1" = '

0 50 100

EXISTING CONDITIONS AND DEMO PLAN -

OVERALL

CD100117 STATE STREET, SUITE 201

BETTENDORF, IA

52722

PH: 563.344.0260

www.imegcorp.com

IMEG #23001093

ARCHITECT/ ENGINEER OF RECORD

STAMPCONSULTANT/ DISCIPLINE

DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032 VA NJ EAST ORANGE

385 TREMONT AVE., EAST ORANGE NJ 07018

UPGRADES - EAST ORANGE

561-22-700

LKS PTD

08/13/2026 Revisions: Date:

LINNEA K.

SHAW

062-074863

CD101

CD102 CD103

CD104

8/

1:

PM

image15.emf

BASKETBALL

COURT

STUCCO

LANDSCAPE

LANDSCAPE

FHCP

MAIN ENTRY

BUILDING 100

FISHER HOUSE 1

FISHER HOUSE 2

BUILDING 105

BUILDING 106

BUILDING 110

CHAPEL

BUILDING 101

BUILDING 107

BUILDING 016

TRAILERS

TRAILER

BUILDING 113

BUILDING 114

BUILDING 118

WEBB AVENUE

SEDGWICK AVENUE

IN

ID

BLDG 100

* DECOMMISSION 42 EXISTING TRs

* ADD 30 NEW TRs UTILIZING 2 NEW TOWERS AND

EXISTING DUMBWAITER STACK

* 1 EXISTING BIOMED TR TO REMAIN

* 2 DATA CENTERS TO REMAIN

* ADD 1 TR ON LEVELS 00, 01, 02, & 03 EACH

TO SUPPORT WING D

BLDG 105

* DECOMMISSION 11 EXISTING TRs

* ADD 1 TE ON L00

* ADD 1 TR ON EACH LEVEL (00, 01, 02, 03, 04 & 05)

* 1 EXISTING EXTERNAL DATA CENTER TO REMAIN

BLDG 106

* DECOMMISSION 4 EXISTING TRs

* ADD 1 TE ON LEVELS 01 & 02 EACH

* ADD 1 TR ON L02

BLDG 115

* REQUIRES NEW FIBER

* EXISTING TR TO REMAIN

FISHER HOUSES

* EXISTING TR TO REMAIN

BLDG 016

* DECOMMISSION 1

EXISTING TR

* ADD 1 TE ON LEVELS

00, 01 & 02 EACH

BLDG 101

* ADD TE ON LEVEL 01

BLDG 107

* DECOMMISSION 2 EXISTING TRs

* ADD TR ON LEVEL 01

BLDG 110

*ADD TE ON LEVEL 01

BLDG 113

*RECEIVE CABLE

DISTRIBUTION FROM

ADJACENT TE OR TR

FROM BUILDING 101

BLDG 114

FROM BUILDING 100

FROM BUILDING 100

AMBULANCE ACCESS NEEDS TO

BE MAINTAINED

50FT MIN. DISTANCE FROM DATA

CENTER TO CURB (UNSECURED

ACCESS) TO THE SOUTH.

SECURED ACCESS TO THE

NORTH OF DATA CENTER AND

STANDOFF DISTANCE OF 5FT.

BUILDINGS IN SCOPE

BLDG 016

BLDG 100

BLDG 101

BLDG 105

BLDG 106

BLDG 107

BLDG 110

BLDG 113

BLDG 114

FISHER HOUSES

RESEARCH TRAILER

VACANT (NON-CLINICAL)

MAIN HOSPITAL (CLINICAL)

SERVICE/BOILER/ENERGY CENTER (NON-CLINICAL)

RESEARCH BUILDING (CLINICAL)

EXTENDED CARE FACILITY/NURSING (CLINICAL)

CHAPEL/OCC HEALTH (CLINICAL)

THERAPEUTIC POOL (CLINICAL)

MOTOR POOL (CLINICAL)

MRI (CLINICAL)

LINEAR ACCELERATOR (CLINICAL)

VISN (NON-CLINICAL)

(NON-CLINICAL)

CAMPUS BUILDING IDENTIFICATION LEGEND

PLAN

NORTH TRUE

of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD

STAMP

FOR OFFICIAL USE ONLY

to k c s /J m

J te rs V ic l te r (J

J ro x

/5

-2

-7

.G

.B

X .r v t

:0

:1

00-GS101

CAMPUS SITE PLAN

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

10/29/2025

130 W KINGSBRIDGE ROAD

BRONX, NY 10468

526-22-700

FINAL BID DOCUMENTS

FINAL BID DOCUMENTS

60 60 120

1" = 60'-0"

FEETSCALE

Revisions: Date: SHEET 12 of 639 image16.emf image1.png…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .