VISN 2 Canandaigua - Civil SIte Plan.pdf
PDF 431 KB Posted
- Attached to
- Y1DA--VISN 2 EHRM Industry Day
- Solicitation number
- 36C77627Q0002
About this file
This document is a Construction Staging Plan for the EHRM Infrastructure Upgrades project at the U.S. Department of Veterans Affairs facility located at 400 Fort Hill Avenue, Canandaigua, New York 14424. The plan establishes the layout and operational procedures for construction activities related to the proposed Building 100 Data Center project. The document specifies two primary construction and staging areas with designated locations for equipment storage, material staging, construction fencing, vehicle access points, and utility protection measures. Construction activities are restricted to normal working hours (Monday through Friday, 8:00 AM to 4:30 PM, excluding federal holidays), with certain activities such as utility shutdowns, rigging, noise-generating work, and demolition requiring coordination with the Contracting Officer's Representative and approval for off-hours scheduling at no additional cost to the government.
Key operational requirements include maintaining pedestrian access during construction, protecting existing infrastructure including steam tunnels, chilled water lines, and telecom duct banks, implementing erosion and sediment control measures, and providing traffic control with flagmen during vehicle movement. The contractor must verify existing site conditions and confirm final locations for the construction fence, trailer, and dumpster. Specific finishing work is required at project completion, including replacement of sidewalks, curbs, asphalt pavement, and parking striping with standard-duty pavement in parking areas and heavy-duty pavement in drive aisles and roadways. The project document was prepared by AE Works, LTD. and Pennoni Engineering & Surveying of New York, P.C., and is designated as 100% Bid Documents with a project completion date of September 21, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VISN 2 St Albans -Queens- Data Center - Civil SIte Plan.pdf | ||
| VISN 2 Bronx - Civil SIte Plan.pdf | ||
| VISN 2 East Orange - Civil SIte Plan.pdf | ||
| VISN 2 Industry Day - Site Instructions Bronx JA.docx | DOCX document | |
| 36C77627Q0002_0001.docx | DOCX document | |
| VISN 2 Northport Data Center - Civil SIte Plan.pdf | ||
| VISN 2 Buffalo - Civil SIte Plan.pdf | ||
| VISN 2 Manhattan - Floor Plan.pdf | ||
| 36C77627Q0002.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 100
PROPOSED
DATA CENTER
EXISTING
BUILDING 8
EXISTING
BUILDING 37
UP
UP
ENCLOSED WALKWAY
EN
CL
OS
ED
W
AL
KW
AY
TRAILER
CW
CONSTRUCTION SIGN
(SEE DETAIL 13 ON CS8003)
SAFETY SIGN
(SEE DETAIL 12 ON CS8003)
CONSTRUCTION FENCE
(SEE DETAIL 7 ON CS8003)
STABILIZED CONSTRUCTION ENTRANCE
(SEE DETAIL 8 ON CS8003)
PEDESTRIAN ACCESS TO BE
MAINTAINED DURING CONSTRUCTION
(SEE NOTES 10 & 11)
"SIDEWALK CLOSED" SIGN
MOUNTED ON FENCE
(SEE DETAIL 10 ON CS8003)
"SIDEWALK CLOSED" SIGN
MOUNTED ON FENCE
(SEE DETAIL 10 ON CS8003)
"NO PARKING ANYTIME" CONSTRUCTION
ENTRANCE SIGN TO BE MOUNTED ON
CONSTRUCTION FENCE (SEE DETAIL 11 ON CS8003)
12 FT WIDE DOUBLE SWING GATE
3 ACCESSIBLE PARKING SPACES TO BE
BARRICADED FROM USAGE DURING
CONSTRUCTION (SEE NOTE 10)
JERSEY BARRIER (TYP.)
(SEE DETAIL 6 ON CS8003)
PRELIMINARY STAGING AREA, EXISTING
CONDITIONS TO BE VERIFIED AND FINAL
STAGING AREA TO BE DETERMINED
CONSTRUCTION FENCE
(SEE DETAIL 7 ON CS8003)
BLDG 50
BLDG 37
BLDG 8
BLDG 9
BLDG 36
BLDG 118
BLDG
20 FT WIDE CONSTRUCTION
ENTRANCE (SEE NOTE 10 & 11)
STEAM
STEAM
TREE PROTECTION FENCE (TYP.)
(SEE DETAIL 4 ON CS8003)
INLET PROTECTION (TYP.)
(SEE DETAIL 1 ON CS8003)
LIGHT DUTY STORAGE AREA (SEE NOTE 8)
HEAVY DUTY STORAGE
AREA (SEE NOTE 8)
DOUBLE SWING GATE,
12 FT WIDE
D
APPROXIMATE LOCATION OF
SHALLOW STEAM TUNNEL
(SEE NOTE 8)
30.00'
.00
125.00'
110.00'
.00
150.00'
114.00'
CONSTRUCTION FENCE TO BE
LOCATED A MINIMUM OF 5 FT
FROM FACE OF CURB (TYP.)
EXISTING CHILLED
WATER LINES
TO REMAIN
LOOP ROAD
EXISTING TELECOM
DUCT BANKS
TO REMAIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
CONSTRUCTION STAGING PLAN
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
400 FORT HILL AVE, CANANDAIGUA, NY 14424
09.21.2026 CM MR# Revisions Date
Sprinkler Status
AE Works, LTD.
418 Beaver Street Sewickley, PA 15143 Phone: 412-287-7333 www.aeworks.comAE WORKS®
100% BID DOCUMENTS
CONSTRUCTION AREA KEY MAP
00 40' 80'
CONSTRUCTION FENCE WITH SCREEN
G002
0 20' 40'
528A5-22-700
1. MATERIALS TO BE INSTALLED IN THE UPCOMING 48 HOURS MAY BE STAGED IN
CONSTRUCTION/STAGING AREA #1, THE MAJORITY OF THE CONSTRUCTION MATERIALS ARE TO
BE LOCATED IN CONSTRUCTION/STAGING AREA #2.
2. CONSTRUCTION ACTIVITIES SHALL BE PERFORMED DURING NORMAL WORKING HOURS (MON. - FRI. 8:00am - 4:30pm, EXCLUDING FEDERAL HOLIDAYS) UNLESS INDICATED OTHERWISE IN THE
CONTRACT DOCUMENTS OR AS FOLLOWS.
3. CERTAIN ACTIVITIES SUCH AS UTILITY SHUT DOWNS, RIGGING OF EQUIPMENT TO THE ROOF, NOISE VIBRATION GENERATING ACTIVITIES (INCLUDING DEMOLITION DRILLING FOR AN ANCHOR INSTALLATION, ETC.) WILL BE COORDINATED WITH THE COR AND WILL HAVE TO BE DONE DURING
OFF-HOURS/WEEKENDS EVEN IF NOT EXPLICITLY CALLED OUT IN THE CONTRACT DOCUMENTS.
THE DETERMINATION WILL BE MADE DURING THE COORDINATION WITH THE FACILITY.
4. IF IT IS DETERMINED THAT THE CONSTRUCTION ACTIVITIES NEED TO TAKE PLACE DURING
OFF-HOURS, THE CONTRACTOR SHALL SUBMIT AN OFF-HOURS REQUEST WITH THE DATE, START
AND FINISH TIMES, A BRIEF DESCRIPTION OF THE WORK TO BE DONE AND A JUSTIFICATION TO
THE COR. THE REQUEST SHALL INCLUDE THE PHRASE "THIS REQUEST IS AT NO ADDITIONAL
COST TO THE GOVERNMENT."
5. LOCATIONS OF THE CONSTRUCTION FENCE, TRAILER AND DUMPSTER ARE PROPOSED,
TENTATIVE LOCATIONS. EXISTING CONDITIONS TO BE VERIFIED AND FINAL LOCATIONS TO BE
APPROVED BY THE CONTRACTOR.
6. REFER TO THE GENERAL NOTES AND SOIL EROSION CONTROL PLAN CS6001 AND IMPLEMENT
EROSION AND SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH THE PLANS PRIOR TO ANY
LAND DISTURBANCE.
7. FOR CONSTRUCTION/STAGING AREA #1 AND CONSTRUCTION/STAGING AREA #2 ENTRANCE
PROVIDE TRAFFIC SIGN, 'TWO WAY ACTIVE ROADWAY AHEAD, DO NOT IMPEDE ROADWAY
TRAFFIC', PROVIDE A FLAG MAN TO DIRECT TRAFFIC WHEN CONSTRUCTION VEHICLES ARE
ENTERING AND LEAVING.
8. CONTRACTOR TO VERIFY SHALLOW STEAM TUNNEL LOCATION AND DEPTH IN
CONSTRUCTION/STAGING AREA #2, DELINEATE IN FIELD, AND LIMIT TRAFFIC AND STORAGE OF
ITEMS ON IT TO LIGHT DUTY EQUIPMENT AND ITEMS.
9. CONTRACTOR TO VERIFY LOCATION OF UNDERGROUND CHILLED WATER LINES, TELECOM DUCT
BANKS, AND OTHER UNDERGROUND LINES TO PREVENT THEM FROM BEING DAMAGED.
10. SIDEWALK, CURB, ASPHALT PAVEMENT, AND PARKING/PAVEMENT STRIPING IN THE AREA OF THE
CONSTRUCTION ENTRANCE IS TO BE REPLACED AT THE END OF CONSTRUCTION.
11. ASPHALT PAVEMENT REPLACEMENT INDICATED ON THE PLANS IS TO BE STANDARD DUTY
PAVEMENT IN AREAS OF PARKING SPACES AND HEAVY DUTY PAVEMENT IN DRIVE AISLES AND
ROADWAYS.
NOTES
1 1' = 40'
CONSTRUCTION/STAGING AREA #1 PLAN2 1' = 20'
SAFETY SIGN
CONSTRUCTION SIGN
CONCRETE WALKWAY
BUILDING AREA
GRAVEL
PROPOSED LEGENDEXISTING LEGEND
Pennoni Engineering & Surveying of New York, P.C.
130 West 29th Street, 11th Floor New York, NY 10001 Phone: 212-239-7610
TELECOM MANHOLE
SIGN
AIR CONDITIONING UNIT
CLEAN OUT
CATCH BASIN
ROOF DRAIN
DRAINAGE/STORM MANHOLE
SANITARY SEWER MANHOLE
SHRUB/TREE
BUILDING/CORRIDOR
AE Works Proj. #: VCAN-004
STONE CONSTRUCTION ENTRANCE
SOIL STOCKPILE
LAWN
LIMIT OF DISTURBANCE
ASPHALT PAVEMENT
CONSTRUCTION/STAGING
AREA #1
STEAM MANHOLE
SILT FENCE/FILTER SOCK
CONCRETE WASHOUTCW
WATER LINE
DRAINAGE LINE
STEAM TUNNEL
SANITARY SEWER LINE
CONSTRUCTION/STAGING
AREA #2
(SEE NOTE 1)
DUMPSTERD
HYDRANT
LIGHT POLE
D
TREE PROTECTION FENCE
CHILLED WATER LINE
JERSEY BARRIER
TELECOM DUCT BANK
N
N u:
\A cc ou nt s\
A E
W
LA
\a ew la
- c an an da ig ua n y va e hr m u pg ra de s\ D
E S
IG
N
S
H E
E
TS
\A E
W
LA
- G
0.
dw g
6/
/2
:3
9:
P M
File details come from the government source that posted it. Updated .