This is a comprehensive set of 100% Construction Documents for the Upgrade Chiller Plant project at Building 200, located at 79 Middleville Road, Northport, NY 11768, prepared for the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management. Project Number 632-25-101, Building Number 200, dated May 8, 2026, with design by an A/E firm as the Designer of Record.
The project encompasses architectural, structural, mechanical, electrical, plumbing, and fire alarm systems work in the sub-basement areas, specifically the Chiller Plant, Chiller Pump Room, Medical Gas Room, and Climate Control Room. Key construction components include: demolition of existing equipment and infrastructure; installation of new 5-inch thick concrete floor slabs with vapor barriers and resinous urethane/epoxy mortar finishes; new 4-inch high housekeeping pads; new ramps with anti-skid surfaces and 36-inch handrails; structural work including concrete walls, masonry walls, and new concrete stairs; electrical systems including 480V/3-phase power distribution, variable frequency drives (VFDs) for multiple pump systems (P-1 through P-12), chillers (CH-1 through CH-4), and miscellaneous equipment; mechanical systems featuring four new chillers with associated piping, pumps, control valves, and chilled water distribution; medical gas and vacuum systems with new cabinetry; fire alarm devices and smoke detectors; and plumbing systems including floor drains, condensate management, and medical gas equipment. The document specifies extensive coordination requirements among trades, construction phasing notes, water balancing procedures, control system integration with existing Johnson FX controls, and detailed equipment schedules including chillers, pumps, heat exchangers, air handlers, and associated mechanical components. The project is identified as partially sprinklered and requires compliance with all applicable ANSI, ASTM, IBC, IESNA, IEEE, ISO, JCAHO, NFPA, NEMA, and UL codes and standards.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATCH LINE
SEE DWG. A-111 PLAN 1 FOR CONTINUATION
MER
CLIMATE CONTROL
ROOM
UP
UP
FACE OF EXISTING
CONCRETE
FOUNDATION WALL
EXISTING COLUMN
FOOTING (TYPICAL)
EXISTING COLUMN
(TYPICAL)
EXISTING COLUMN
FOOTING (TYPICAL)
EXISTING COLUMN
FOOTING (TYPICAL)
EXISTING COLUMN
FOOTING (TYPICAL)
EXISTING COLUMN
FOOTING (TYPICAL)
EXISTING
HOUSEKEEPING
PAD TO REMAIN
MER
PIT
2 4
EXISTING CLIMATE
CONTROL MODULAR
PARTITION WALL
EXISTING CLIMATE
CONTROL MODULAR
PARTITION WALL
MA
TC
H
LIN
E
SE
E D
WG
. A -11
1 P
LA
N 1 F
OR
C
ON
TIN
UA
TIO
N
UPS ROOM
EXISTING
SLAB TO
REMAIN
EXISTING FOUNDATION
WALL
EDGE OF EXISTING
SLAB
EXISTING COLUMN
FOOTING (TYPICAL)
EXISTING COLUMN
(TYPICAL)
MER
EXISTING
SLAB TO
REMAIN
(U.O.N.)
EXISTING COLUMN
FOOTING (TYPICAL)
EXISTING COLUMN
(TYPICAL)
3 3
5 4 3 2
21'-8" 21'-8" 21'-8" 21'-8"
7 6 5
21'-8" 21'-8"
S
R
Q.8
'-8
7'-
1"
P
N
'-8
'-8
P
N
'-8
'-8
3 2
21'-8"
MER
CLIMATE CONTROL
ROOM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Fi le
P at h
/1 5/
1:
:0
AM
100% CONSTRUCTION
DOCUMENTS
PARTIALLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E firm name A/E firm street address A/E firm city, state, zip code A/E firm phone number A/E firm POC engineering discipline <EDIT TEXT>:
Consultant firm name Consultant firm street address Consultant firm city, state, zip code Consultant firm phone number Consultant POC
UPGRADE CHILLER PLANT
BUILDING 200
79 MIDDLEVILLE RD, NORTHPORT, NY 11768
632-25-101
Revisions: Date:
MAY 8, 2026
B200
AREA OF
WORK
SCALE:
KEY PLAN
SUB-BASEMENT
1:100
KP
DEMOLITION KEYED NOTES:
1. EXCAVATE FOR THE INSTALLATION OF THE NEW FLOOR SLAB. COORDINATE SLAB
INSTALLATION WITH STRUCTURAL DRAWINGS.
2. EXCAVATE FOR THE INSTALLATION OF THE FLOOR SLAB HAUNCH. COORDINATE INSTALLATION
WITH STRUCTURAL DRAWINGS.
3. EXCAVATE AND PREPARE AS REQUIRED FOR THE INSTALLATION OF THE NEW RAMP.
COORDINATE INSTALLATION WITH STRUCTURAL DRAWINGS.
4. REMOVE INDICATED FAN, MOTOR AND EQUIPMENT HOUSING. COORDINATE THE REMOVAL OF
THE EXISTING FAN, MOTOR, EQUIPMENT HOUSING WITH MECHANICAL AND ELECTRICAL
DRAWINGS. FOLLOWING EQUIPMENT REMOVAL, REMOVE EMBEDDED EQUIPMENT FRAME AND
SUPPORTS AND PREPARE WALL FOR NEW INSTALLATIONS. SEE DETAIL 3 ON DRAWING A-601.
5. SAW-CUT EXISTING HOUSEKEEPING PAD, REMOVE A PORTION OF THE HOUSEKEEPING PAD AND
PREPARE THE FLOOR FOR THE NEW FLOOR FINISH.
6. REMOVE THE EXISTING QUARRY TILE FLOOR FINISH AND MUD BASE. INSTALL CONCRETE AS
REQUIRED TO MATCH FLOOR LEVEL OF THE MER FLOOR SLAB. PREPARE THE FLOOR SURFACE
FOR THE NEW FLOOR FINISH.
7. SAWCUT THE EXISTING SLAB AND REMOVE THE PORTION BETWEEN THE EXISTING MER AND
THE SAW-CUT. PREPARE THE AREA FOR NEW INSTALLATIONS. COORDINATE WITH NEW WORK
PLANS, PLUMBING AND STRUCTURAL DRAWINGS FOR NEW INSTALLATIONS.
8. PREPARE AS REQUIRED THE PREFABRICATED PARTITION WALL AND ASSOCIATED DOOR
PANELS FOR NEW FINISHES. BEFORE NEW FINISHES ARE APPLIED, DOOR HARDWARE SHALL BE
REMOVED AND RETAINED FOR REINSTALLATION.
9. PATCH ALL OPENINGS IN WALL NO LONGER REQUIRED OR USED IN THE PROJECT. PATCH TO
MATCH EXISTING WALL CONSTRUCTION.
10. PREPARE EXISTING GUARD RAIL FOR NEW FINISHES
11. PREPARE EXISTING STAIR FOR NEW FINISHES.
12. EXISTING CEILING GRID, TILES, FIXTURES, DIFFUSERS, REGISTERS AND SPRINKLERS TO BE
REMOVED. COORDINATE WORK WITH M.E.P. AND FIRE PROTECTION DRAWINGS.
15. PREPARE EXISTING CURB FOR REPAIRS AND NEW FINISHES.
SCALE:
ARCHITECTURAL SUB-BASEMENT DEMOLITION CHILLER PUMP ROOM
1/4" = 1'-0"
SCALE:
ARCHITECTURAL SUB-BASEMENT DEMOLITION MEDICAL GAS AND CLIMATE CONTROL ROOM
1/4" = 1'-0"
GENERAL DRAWING NOTES:
1. SEE DRAWING A-001 FOR GENERAL PROJECT REQUIREMENTS, GENERAL PROTECTION NOTES,
AND DEMOLITION NOTES.
2. SEE DRAWING A-001 FOR ARCHITECTURAL SYMBOLS AND MATERIAL LEGEND.
3. SEE DRAWING A-002 FOR ARCHITECTURAL SPECIFICATIONS.
4. EXCAVATIONS SHALL NOT UNDERMINE EXISTING BUILDING FOOTINGS/FOUNDATIONS.
5. CONTRACTOR SHALL PREPARE ALL SURFACES TO RECEIVE NEW FINISH AS RECOMMENDED IN
MANUFACTURES PUBLISH INSTALLATION INSTRUCTIONS.
A-112
SGSG
ARCHITECTURAL SUB-BASE CHILLER PUMP AND
MEDICAL AIR AND VACUUM ROOM DEMO PLAN
SCALE:
ARCHITECTURAL SUB-BASEMENT DEMOLITION CLIMATE CONTROL CEILING
1/4" = 1'-0"
ADDENDUM #01 9/11/2026
AutoCAD SHX Text A-301
AutoCAD SHX Text
AutoCAD SHX Text 8'-6"
AutoCAD SHX Text 19'-6"
AutoCAD SHX Text 22'-11"
AutoCAD SHX Text 10'-8"
AutoCAD SHX Text 4'-3 "12"
AutoCAD SHX Text 1'-7"
AutoCAD SHX Text 15'-9 "12"
AutoCAD SHX Text 38'-11 "12"
AutoCAD SHX Text 5'-6"
AutoCAD SHX Text 3'-7 "12"
AutoCAD SHX Text 11'-3 "12"
AutoCAD SHX Text 2'-0"
AutoCAD SHX Text 4'-6"
AutoCAD SHX Text 12'-8"
AutoCAD SHX Text 4'-6"
AutoCAD SHX Text 4'-6"
AutoCAD SHX Text 11'-7 "14"
AutoCAD SHX Text 5'-6"
AutoCAD SHX Text 6'-7"
MATCH LINE
SEE DWG. A-114 FOR CONTINUATION
MER CLIMATE CONTROL
ROOM
UP
UP
FACE OF EXISTING
CONCRETE
FOUNDATION WALL
ALIGNEXISTING COLUMN
(TYPICAL)
EXISTING
HOUSEKEEPING
PAD TO REMAIN
MER
PIT
ALIGN
MER FIN. FL.
ELEV. @ 0'-0"
MED. VAC./AIR FIN. FL.
ELEV. @ -1'-1"
3 4
CODP
FD FD
TYP.
TYP.
TYP.
MEDICAL GAS
ROOM
CLIMATE CONTROL
FIN. FL. ELEV. @ 0'-0"
EXISTING CLIMATE
CONTROL MODULAR
PARTITION WALL
EXISTING CLIMATE
CONTROL MODULAR
PARTITION WALL
TYP.
TYP.
TYP.
TYP.
4 4 444
B
B B
B5
20202020
FD
MA
TC
H
LIN
E
SE
E D
WG
. A -11
4 F
OR
C
ON
TIN
UA
TIO
N
UPS ROOM
EXISTING
SLAB TO
REMAIN
EXISTING FOUNDATION
WALL
EXISTING COLUMN
(TYPICAL)
MER
EXISTING
SLAB TO
REMAIN
EXISTING COLUMN
(TYPICAL)
UP
EXISTING
SLAB TO
REMAIN
MER FIN. FL.
ELEV. @ 0'-0"
CHILLER PUMP RM.
FIN. FL. ELEV. @ 0'-0"
CHILLER PUMP RM.
FIN. FL. ELEV. @ 0'-0"
CHILLER PUMP
ROOM
DN
ALIGN
STAIR LANDING PAD
FIN. FL. ELEV. @ 0'-0"
T.O. EXISTING SLAB
FIN. FL. ELEV. @ -1'-3"(+/-)
T.O. SLAB
FIN. FL. ELEV. @ -1'-3"(+/-)
FD
FD
LANDING PAD
FIN. FL. ELEV. @ 0'-0"
A A
A
A
5 4 3 2
21'-8" 21'-8" 21'-8"
7 6 5
21'-8" 21'-8"
S
R
Q.8
'-8
7'-
1"
P
N
'-8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Fi le
P at h
/1 5/
1:
:0
AM
100% CONSTRUCTION
DOCUMENTS
PARTIALLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E firm name A/E firm street address A/E firm city, state, zip code A/E firm phone number A/E firm POC engineering discipline <EDIT TEXT>:
Consultant firm name Consultant firm street address Consultant firm city, state, zip code Consultant firm phone number Consultant POC
UPGRADE CHILLER PLANT
BUILDING 200
79 MIDDLEVILLE RD, NORTHPORT, NY 11768
632-25-101
Revisions: Date:
MAY 8, 2026
B200
AREA OF
WORK
SCALE:
KEY PLAN
SUB-BASEMENT
1:100
KP
SCALE:
ARCHITECTURAL SUB-BASEMENT CHILLER PUMP ROOM
1/4" = 1'-0"
SCALE:
ARCHITECTURAL SUB-BASEMENT MEDICAL GAS AND CLIMATE CONTROL ROOM
1/4" = 1'-0"
DRAWING KEYED NOTES:
1. NEW 4” HIGH HOUSEKEEPING PAD. COORDINATE ACTUAL SIZE AND LOCATION WITH APPROVED EQUIPMENT VENDOR SHOP DRAWINGS.
COORDINATE INSTALLATION AND REINFORCEMENT WITH STRUCTURAL DRAWINGS. FINISH ALL SURFACES OF THE HOUSEKEEPING PAD WITH RESINOUS URETHANE/EPOXY MORTAR FLOOR FINISH AND COVED BASE (RES-6B). SEE FINISH SCHEDULE ON DRAWING A-601. COORDINATE
INSTALLATION WITH DETAIL 6 ON DRAWING A-601.
2. NEW FLOOR DRAIN AND PIPING. ALL PLUMBING INSTALLATIONS SHALL BE INSTALLED BY A LICENSED PLUMBER. INSTALLATION OF DRAINS AND ASSOCIATED UNDER-SLAB PLUMBING WILL REQUIRE BACKFILLING, COMPACTION AND INSTALLATION OF THE SLAB. COORDINATE THE LOCATIONS, AND THE FULL SCOPE OF WORK WITH PLUMBING AND STRUCTURAL DRAWINGS. REFER TO DETAIL 2 ON DRAWING A-501.
3. ON ROOM SIDE OF CMU WALLS APPLY A BASE COAT OF BLOCK FILLER AND FINISH WITH AN EPOXY WALL COATING (MPI-82). INSTALL A 4" HIGH RESINOUS URETHANE/EPOXY MORTAR COVED BASE (RES-6B). COORDINATE COVED BASE INSTALLATION WITH DETAIL 6 ON DRAWING A-601. ALL
FINISHES ON THE ROOM SIDE OF WALL ONLY.
4. FINISH CONCRETE WALLS AND COLUMNS WITH EPOXY WALL COATING (MPI-82). INSTALL A 4" HIGH RESINOUS URETHANE/EPOXY MORTAR COVED BASE (RES-6B). COORDINATE COVED BASE INSTALLATION WITH DETAIL 6 ON DRAWING A-601. ALL FINISHES ON THE ROOM SIDE OF WALL ONLY.
5. NEW 5” THICK CONCRETE FLOOR SLAB. COORDINATE INSTALLATION WITH STRUCTURAL AND PLUMBING DRAWINGS. INSTALL 6MIL. VAPOR BARRIER BELOW NEW SLAB. PREPARE SUBSTRATE AS REQUIRED AND INSTALL NEW RESINOUS URETHANE/EPOXY MORTAR FLOOR FINISH AND
COVED BASE (RES-6B). COORDINATE INSTALLATION WITH DETAIL 5 ON DRAWING A-601.
6. MODIFY FAN OPENING TO FIT NEW EQUIPMENT. INSTALL CMU TO REDUCE OPENING SIZE AND INSTALL A NEW THROUGH WALL FRAME. SEE DETAIL "3" ON DRAWING A-601. INSTALL NEW FAN ASSEMBLY AS INDICATED ON MECHANICAL AND ELECTRICAL DRAWINGS.
7. INSTALL A CONTINUOUS PERIMETER ISOLATION JOINT BETWEEN THE EXISTING AND NEW CONSTRUCTION.
8. MODIFY GRADE TO -4" MAX. BELOW ADJACENT FINISHED CONCRETE. EXTEND GRADE LEVEL TO 3'-0" BEYOND THE EDGE OF THE SLABS. TAPER AT
3:12 MAXIMUM TAPER, BEYOND THE 3'-0" MARK, TO EXISTING GRADE.
9. NEW CONCRETE RAMP AND LANDING PAD. INSTALL CONCRETE SEALER TO CONCRETE SURFACES (MPI-99). FURNISH AND INSTALL ANTI-SKID ADDITIVE ON ALL WALKING SURFACES OF THE RAMP AND LANDING PAD SURFACES. SEE STRUCTURAL DRAWINGS FOR INSTALLATION DETAILS.
10. NEW 36” HIGH HANDRAIL, COORDINATE INSTALLATION WITH STRUCTURAL DRAWINGS. FINISH WITH METAL COATING (MPI-81). FINISH COLOR SHALL
BE SAFETY YELLOW.
11. PREPARE SUBSTRATE AS REQUIRED AND INSTALL NEW RESINOUS URETHANE/EPOXY MORTAR FLOOR FINISH. INSTALL RESINOUS URETHANE/EPOXY MORTAR FLOOR FINISH AND COVED BASE ON THE EXPOSED SURFACES OF THE EXISTING HOUSEKEEPING PADS TO REMAIN.
COORDINATE INSTALLATION WITH DETAIL 6 ON DRAWING A-601.
12. TRANSITION BETWEEN FLOOR FINISHES. SEE DETAIL 7 ON DRAWING A-601.
13. EJECTOR PUMP PIT. COORDINATE WITH PLUMBING DRAWINGS FOR INSTALLATION REQUIREMENTS.
14. PREPARE METAL SUBSTRATE AND INSTALL NEW PRIME AND FINISH COATS OF METAL COATING (MPI-81) AS RECOMMENDED IN THE MANUFACTURERS PUBLISHED INSTALLATION INSTRUCTIONS. PATCH METAL BASE OF THE THE CLIMATE CONTROL ROOM MODULAR WALL PARTITIONS AS REQUIRED TO INSTALL THE RESILIENT BASE (RB-1) ON EACH SIDE OF THE PARTITIONS. COLUMNS, CONCRETE AND MASONRY WALLS SHALL RECEIVE 4" HIGH RESINOUS URETHANE/EPOXY MORTAR COVED BASE (RES-6B). COORDINATE INSTALLATION WITH DETAIL 6 ON
DRAWING A-601.
15. AS RECOMMENDED IN THE MANUFACTURERS PUBLISHED INSTALLATION INSTRUCTIONS, PREPARE WOOD SUBSTRATE AND INSTALL NEW PRIME AND FINISH COATS OF WOOD SURFACE COATING (MPI-54). ALLOW COATINGS TO FULLY DRY BEFORE DOOR HARDWARE IS REINSTALLED.
16. PREPARE STAIR FOR NEW FINISHES. PREPARE METAL SUBSTRATE AS RECOMMENDED IN THE MANUFACTURERS PUBLISHED INSTALLATION INSTRUCTIONS AND INSTALL NEW PRIME AND FINISH COATS OF METAL COATING (MPI-81) ON STAIR RUNNERS, HANDRAILS AND ALL STAIR TREAD NOSING. (DO NOT APPLY FINISHES TO METAL GRATING.) FINISH COLOR SHALL BE SAFETY YELLOW AND ALL STAIR TREAD NOSING SHALL RECEIVE
A NON-SLIP TREATMENT.
17. PREPARE RAILINGS, LADDER AND OTHER METAL COMPONENTS SURROUNDING MER PIT FOR NEW FINISHES. PREPARE METAL SUBSTRATE AS RECOMMENDED IN THE MANUFACTURERS PUBLISHED INSTALLATION INSTRUCTIONS AND INSTALL NEW PRIME AND FINISH COATS OF METAL COATING (MPI-81) ON RAILINGS, LADDER AND OTHER METAL COMPONENTS. FINISH COLOR SHALL BE SAFETY YELLOW AND ALL LADDER RUNGS
SHALL RECEIVE A NON-SLIP TREATMENT.
18. CONTRACTOR SHALL PATCH TO MATCH EXISTING CONCRETE CURB SURROUNDING THE MER PIT TO MAKE IT CONTINUOUS. PREPARE SUBSTRATE AS REQUIRED AND INSTALL NEW RESINOUS URETHANE/EPOXY MORTAR FLOOR FINISH (RES-6B) TO COVER THE CONCRETE CURB. FINISH SHALL EXTEND OVER THE TOP AND INTO THE MER PIT, 6" DOWN FROM THE TOP OF THE CURB . INSTALL RESINOUS URETHANE/EPOXY MORTAR COVED BASE AROUND THE OUTER PERIMETER OF THE CURB. COORDINATE INSTALLATION WITH DETAIL 6 ON DRAWING A-601. COLOR OF FINISH SHALL
MATCH THE COLOR SELECTED FOR THE COVED BASES AT THE HOUSEKEEPING PADS.
19. NEW CONCRETE STAIR. INSTALL CONCRETE SEALER TO CONCRETE SURFACES. FURNISH AND INSTALL ANTI-SKID ADDITIVE ON ALL WALKING
SURFACES. SEE STRUCTURAL DRAWINGS FOR INSTALLATION DETAILS.
20. NEW 5” THICK CONCRETE FLOOR SLAB. COORDINATE INSTALLATION WITH STRUCTURAL AND PLUMBING DRAWINGS. INSTALL 6MIL. VAPOR BARRIER BELOW NEW SLAB. FINISH WITH CONCRETE PROTECTIVE SEALER (MPI-99). COORDINATE INSTALLATION WITH DETAIL 7 ON DRAWING A-601.
21. NEW 4” HIGH HOUSEKEEPING PAD. COORDINATE ACTUAL SIZE AND LOCATION WITH EQUIPMENT OR APPROVED EQUIPMENT VENDOR SHOP DRAWINGS. COORDINATE INSTALLATION AND REINFORCEMENT WITH STRUCTURAL DRAWINGS. FINISH ALL SURFACES OF THE HOUSEKEEPING PAD WITH CONCRETE PROTECTIVE SEALER (MPI-99). SEE FINISH SCHEDULE ON DRAWING A-601.
A-114
SGSG
ARCHITECTURAL SUB-BASEMENT CHILLER
PUMP AND MEDICAL AIR AND VACUUM ROOM
PLAN
GENERAL DRAWING NOTES:
1. SEE DRAWING A-001 FOR GENERAL PROJECT REQUIREMENTS, GENERAL PROTECTION NOTES, AND DEMOLITION NOTES.
2. SEE DRAWING A-001 FOR ARCHITECTURAL SYMBOLS AND MATERIAL LEGEND.
3. SEE DRAWING A-002 FOR ARCHITECTURAL SPECIFICATIONS.
4. EXCAVATIONS SHALL NOT UNDERMINE EXISTING BUILDING FOOTINGS/FOUNDATIONS.
5. SEE DRAWING A-501 FOR ARCHITECTURAL DETAILS AND FIRE STOPPING.
6. SEE DRAWING A-601 FOR ARCHITECTURAL SCHEDULES AND DETAILS.
ADDENDUM #01 9/11/2026
AutoCAD SHX Text A-301
AutoCAD SHX Text
AutoCAD SHX Text A-301
AutoCAD SHX Text
AutoCAD SHX Text 2'-6"
AutoCAD SHX Text 5'-10"
AutoCAD SHX Text 5'-10"
AutoCAD SHX Text 2'-11"
AutoCAD SHX Text 9'-2"
AutoCAD SHX Text 2'-11"
AutoCAD SHX Text 9'-2"
AutoCAD SHX Text 12'-11"
AutoCAD SHX Text 5'-10"
AutoCAD SHX Text 9'-3 "12"
AutoCAD SHX Text 6'-6 "12"
AutoCAD SHX Text 21'-1 "12"
AutoCAD SHX Text 19'-9 "12"
AutoCAD SHX Text
AutoCAD SHX Text A-601
AutoCAD SHX Text 14'-0"
AutoCAD SHX Text 19'-7"
AutoCAD SHX Text 1'-8"
AutoCAD SHX Text 2'-11"
AutoCAD SHX Text 2'-11"
AutoCAD SHX Text 5'-6"
AutoCAD SHX Text 19'-6"
AutoCAD SHX Text 11'-1"
AutoCAD SHX Text 5'-5 "12"
AutoCAD SHX Text 9"
AutoCAD SHX Text 1'-3"
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text 1'-6"
AutoCAD SHX Text 2'-6"
AutoCAD SHX Text 11'-0"
AutoCAD SHX Text 5'-3"
AutoCAD SHX Text 3'-1"
AutoCAD SHX Text 31'-9"
AutoCAD SHX Text 11"
AutoCAD SHX Text 1'-6"
AutoCAD SHX Text 4'-3 "12"
AutoCAD SHX Text 38'-4"
AutoCAD SHX Text 5'-2"
AutoCAD SHX Text 5'-0"
AutoCAD SHX Text 11"
AutoCAD SHX Text 5'-11"
AutoCAD SHX Text 5'-0 "12"
AutoCAD SHX Text 5'-7"
AutoCAD SHX Text 4'-8 "12"
AutoCAD SHX Text 5'-3 "12"
AutoCAD SHX Text 25'-5 "12"
AutoCAD SHX Text 7'-0"
AutoCAD SHX Text 4'-6"
AutoCAD SHX Text 8'-5 "12"
AutoCAD SHX Text 2'-6 "12"
AutoCAD SHX Text 1'-11 "12"
AutoCAD SHX Text 9'-10 "12"
AutoCAD SHX Text 2'-3"
AutoCAD SHX Text 6'-7"
AutoCAD SHX Text 1'-2"
AutoCAD SHX Text 10'-0"
AutoCAD SHX Text 21'-10"
AutoCAD SHX Text 7'-5"
AutoCAD SHX Text 3'-0 "12"
AutoCAD SHX Text 3'-8"
6'-5"
MER
CLIMATE CONTROL
ROOM
MEDICAL GAS ROOM
TYP.
1 TYP.2
4 TYP.
4TYP.
4TYP.4 TYP.
4TYP.
5 TYP.
TYP.
EQ
1'- 7"
EQ
6"
TYP.
4TYP.
4TYP.
4TYP.4TYP.
5TYP.
CHILLER PUMP ROOM
5TYP.
5 4 3 2
21'-8" 21'-8" 21'-8"
7 6 5
21'-8" 21'-8"
S
R
Q.8
'-8
7'-
1"
P
N
'-8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Fi le
P at h
/1 5/
1:
:0
AM
100% CONSTRUCTION
DOCUMENTS
PARTIALLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E firm name A/E firm street address A/E firm city, state, zip code A/E firm phone number A/E firm POC engineering discipline <EDIT TEXT>:
Consultant firm name Consultant firm street address Consultant firm city, state, zip code Consultant firm phone number Consultant POC
UPGRADE CHILLER PLANT
BUILDING 200
79 MIDDLEVILLE RD, NORTHPORT, NY 11768
632-25-101
Revisions: Date:
MAY 8, 2026
B200
AREA OF
WORK
SCALE:
KEY PLAN
SUB-BASEMENT
1:100
KP
SCALE:
ARCHITECTURAL SUB-BASEMENT CHILLER PUMP ROOM
1/4" = 1'-0"
SCALE:
ARCHITECTURAL SUB-BASEMENT MEDICAL GAS AND CLIMATE CONTROL REFLECTED CEILING PLAN 1/4" = 1'-0"
DRAWING KEYED NOTES:
1. NEW WALK-ABLE CEILING FRAMING AT 16" O.C. COORDINATE INSTALLATION WITH
STRUCTURAL, MECHANICAL DRAWINGS AND WITH APPROVED VENDOR SHOP DRAWINGS FOR
NEW EQUIPMENT INSTALLATIONS. PREPARE METAL FRAMING AND DECK COMPONENTS AS
RECOMMENDED IN THE MANUFACTURERS PUBLISHED INSTALLATION INSTRUCTIONS AND
INSTALL NEW PRIME AND FINISH COATS OF METAL COATING (MPI-81). COLOR SHALL BE
BENJAMIN MOORE, WHITE (01), OR AN APPROVED EQUAL. SEE DRAWING A-301, SECTIONS 2
AND 3 FOR ADDITIONAL INSTALLATION REQUIREMENTS FOR THE WALK-ABLE CEILING.
2. NEW WALKABLE CEILING FRAMING TRACK SECURELY FASTENED TO WALLS. COORDINATE
INSTALLATION WITH STRUCTURAL DRAWINGS.
3. MECHANICAL EQUIPMENT AND FIXTURES. PROVIDE OPENINGS IN WALKABLE DECK AS
REQUIRED FOR MECHANICAL INSTALLATIONS. COORDINATE SIZE AND LOCATION WITH
MECHANICAL DRAWINGS. VERIFY REQUIRED FRAMING OF OPENING WITH STRUCTURAL
DRAWINGS.
4. NEW LIGHT FIXTURE. COORDINATE INSTALLATION WITH ELECTRICAL DRAWINGS. FIXTURE
LOCATION AND ORIENTATION MAY VARY, COORDINATE FIXTURE LOCATION WITH APPROVED
VENDOR SHOP DRAWINGS FOR NEW EQUIPMENT INSTALLATIONS. SUBMIT INSTALLATION
DRAWING FOR VA REVIEW AND APPROVAL.
5. INSTALL NEW SPRINKLERS. COORDINATE WITH FIRE PROTECTION DRAWINGS.
6. FURNISH AND INSTALL NEW CEILING GRID AND ACOUSTIC CEILING TILE (AC-1).
7. NEW DIFFUSERS AND REGISTERS. COORDINATE INSTALLATION WITH MECHANICAL DRAWINGS.
8. NEW CEILING LIGHTING TROFFER. COORDINATE INSTALLATION WITH ELECTRICAL DRAWINGS
AND APPROVED CEILING GRID SYSTEM.
A-115
SGSG
ARCHITECTURAL SUB-BASEMENT
REFLECTED CEILING PLANS
GENERAL DRAWING NOTES:
1. SEE DRAWING A-001 FOR GENERAL PROJECT REQUIREMENTS, GENERAL PROTECTION
NOTES, AND DEMOLITION NOTES.
2. SEE DRAWING A-001 FOR ARCHITECTURAL SYMBOLS AND MATERIAL LEGEND.
3. SEE DRAWING A-002 FOR ARCHITECTURAL SPECIFICATIONS.
4. EXCAVATIONS SHALL NOT UNDERMINE EXISTING BUILDING FOOTINGS/FOUNDATIONS.
5. SEE DRAWING A-501 FOR ARCHITECTURAL DETAILS AND FIRE STOPPING.
6. SEE DRAWING A-601 FOR ARCHITECTURAL SCHEDULES AND DETAILS.
ADDENDUM #01 9/11/2026
AutoCAD SHX Text A-301
AutoCAD SHX Text
AutoCAD SHX Text A-301
EXISTING BOTTOM OF PIT
EXCAVATE EXISTING DIRT FLOOR AS REQUIRED
FOR THE INSTALLATION OF THE NEW FLOOR
SLAB. COORDINATE SLAB INSTALLATION AND
REINFORCING WITH STRUCTURAL DRAWINGS.
EXISTING FAN , FAN HOUSING AND
OPENING FRAME TO BE REMOVED.
PREPARE ROUGH OPENING FOR
NEW INSTALLATIONS.
EXISTING DIRT
FLOOR TO BE
MODIFIED AS
REQUIRED FOR
THE VACUUM
ROOM
INSTALLATION.
EXISTING WALL FOOTING
BEYOND
EXISTING COLUMN FOOTING
BEYOND
48" x 48" EXHAUST FANS EXISTING COLUMN
SHIPS LADDER TO
BASEMENT LEVEL
UP
FACE OF EXISTING WALL
MER FIN. FL
@ ELEV. 0'-0"
FIN. FL.
@ ELEV. 1'-1" (+)
N4
N4
B.O. JOISTS
@ ELEV. 8'-1" MIN.
MER FIN. FL
@ ELEV. 0'-0"
FIN. FL.
@ ELEV. 1'-1" (+)
9'- 4"
6"14'-6"
1'- 4"
7'-
1/ 2"
9'- 0"
MI
NI
MU
M
CL
EA
RA
NC
E R
EQ
UI
RE
D
2'- 0"
2'- 0"
4'-0"
7'- 2"
MI
NI
MU
M
CL
EA
RA
NC
E R
EQ
UI
RE
D
EXISTING BOTTOM OF PIT
EXISTING WALL FOOTING
BEYOND
EXISTING FINISHED FLOOR
OF THE MECHANICAL
EQUIPMENT ROOM (MER)
INFILL EXISTING OPENING AS
REQUIRED FOR NEW FAN
INSTALLATION. COORDINATE
OPENING TO REMAIN WITH
MECHANICAL DRAWINGS.
SEE DETAIL "3" ON DWG.
A-601.
NEW EXHAUST FANS, SEE DETAIL "3" ON
DWG. A-601. COORDINATE INSTALLATION
WITH MECHANICAL
BENT METAL FLASHING AT PERIMETER
WALL (TYP.)
WALKABLE CEILING STRUCTURE AND DECK
SHALL SLOPE 1/4:12 OR GREATER.
COORDINATE INSTALLATION REQUIREMENTS
WITH STRUCTURAL DRAWINGS AND SECTION
3 ON THIS SHEET.
DASHED LINE INDICATES THE HEIGHT OF
THE NEW CMU WALL. (BEHIND THE
SECTION MARK)
SEE STRUCTURAL
DRAWINGS AND
REFLECTED CEILING
PLAN #3 ON DRAWING
A-115 FOR FRAMING
AND DECK
INSTALLATIONS.
MEDICAL GAS
ROOM
EXISTING COLUMN FOOTING
BEYOND
48" x 48" EXHAUST FANS EXISTING COLUMN
SHIPS LADDER TO
BASEMENT LEVEL
UP
FACE OF EXISTING WALL
B
4'-4 1/2"
HAUNCH CENTERED
UNDER CMU WALL
HAUNCH AND
REINFORCING AT
EDGE OF SLAB (TYP.)
COORDINATE WITH
STRUCTURAL
DRAWINGS AND
REFER TO SECTION 3
ON THIS SHEET FOR
REINFORCING (TYP.)
MEDICAL GAS
ROOM
EXIST. 20" DIA. CWR
PIPE W/ DRAIN TO
REMAIN.
NEW EXHAUST FANS,
COORDINATE INSTALLATION
WITH MECHANICAL DRAWINGS.
INFILL EXISTING OPENING AS
REQUIRED FOR NEW FAN
INSTALLATION. SEE DETAIL "3"
ON DWG. A-601.
EXIST. CAST-IN-PLACE
CONCRETE WALL
EXIST. CHILLER
PLANT FLOOR AT
ELEV. 0'-0"
EXISTING WALL
FOOTING
METAL JOISTS AT 16" O.C.
COORDINATE WITH
STRUCTURAL
DRAWINGS FOR SIZE
EXISTING 60" x 24" DUCTWORK TO
REMAIN.
INFILL TO ALIGN FLUSH
WITH EXISTING WALL.
(EACH SIDE)
6" CMU WALL. HORIZONTAL
REINFORCEMENT W1.7
@16" O.C.
TOP OF CMU WALL BOND
BEAM, SEE STRUCTURAL
DRAWINGS FOR DETAIL.
PATCH ALL WALL PENETRATIONS
NO LONGER IN USE. TYPICAL
FOR ALL.
PATCH ALL WALL PENETRATIONS
NO LONGER IN USE. TYPICAL
FOR ALL.
FACE OF EXISTING WALL
(BEYOND)
6 MIL. VAPOR BARRIER BELOW
SLAB. (TYPICAL)
#4 @ 16" O.C.
6" COMPACTED STONE
6 x 6 - W2.9 x w2.9 W.W.F.
#4 DOWEL WITH 9"
EMBEDMENT
(2) #5 BAR CONT.
3/4" FIRE RATED PLYWOOD
1-1/2" TYPE "F" METAL DECK
FASTEN 7 1/4" METAL
RIM TRACK WITH (2)
HILTI KH-EZ 3/4" DIA.
3" EMBEDMENT AT
EACH JOIST WITH CLIP
ANGLE
FASTEN METAL RIM
TRACK WITH
(2) HILTI KH-EZ 3/4" DIA.
3" EMBEDMENT AT
EACH JOIST WITH CLIP
ANGLE
7 1/4" METAL RIM
TRACK (EACH SIDE)
METAL RIM TRACK
(EACH SIDE)
COORDINATE WITH
STRUCTURAL
DRAWINGS FOR SIZE
CONTINUOUS PERIMETER
EXPANSION JOINT AT
EXISTING WALLS
#5 @ 24" O.C.
T.O. WALL @ 10'-8"
ABOVE NEW FLOOR SLAB
B
DIMENSIONED TO
FACE OF WALL
(2) #5 BAR CONTINUOUS
(TYPICAL)
#5 @ 24" O.C.
HAUNCH CENTERED
UNDER CMU WALL. SEE
DETAIL "A" ON DRAWING
SB-101 (TYP.)
HAUNCH AND REINFORCING
AT EDGE OF SLAB. SEE
DETAIL "D" ON DRAWING
SB-101 (TYP.)
(2) #5 BAR CONTINUOUS
(TYPICAL)
B.O. JOISTS
@ ELEV. 8'-1" MIN.
MER FIN. FL
@ ELEV. 0'-0"
FIN. FL.
@ ELEV. 1'-1" (+)
5 4
21'-8"
SCALE:
SECTION 2 - NEW WORK
3/8" = 1'-0"
A-301
SGSG
SECTIONS - MEDICAL
GAS ROOM
SCALE:
SECTION 3 - NEW WORK
3/8" = 1'-0"
SCALE:
SECTION 1 - DEMOLITION WORK
3/8" = 1'-0"
GENERAL DRAWING NOTES:
1. SEE DRAWING A-001 FOR GENERAL PROJECT REQUIREMENTS, GENERAL PROTECTION NOTES,
AND DEMOLITION NOTES.
2. SEE DRAWING A-001 FOR ARCHITECTURAL SYMBOLS AND MATERIAL LEGEND.
3. SEE DRAWING A-002 FOR ARCHITECTURAL SPECIFICATIONS.
4. EXCAVATIONS SHALL NOT UNDERMINE EXISTING BUILDING FOOTINGS / FOUNDATIONS.
B200
SCALE:
KEY PLAN
SUB-BASEMENT
1:100
KP
AREA OF
WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Fi le
P at h
/1 5/
1:
:0
AM
100% CONSTRUCTION
DOCUMENTS
PARTIALLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E firm name A/E firm street address A/E firm city, state, zip code A/E firm phone number A/E firm POC engineering discipline <EDIT TEXT>:
Consultant firm name Consultant firm street address Consultant firm city, state, zip code Consultant firm phone number Consultant POC
UPGRADE CHILLER PLANT
BUILDING 200
79 MIDDLEVILLE RD, NORTHPORT, NY 11768
632-25-101
Revisions: Date:
MAY 8, 2026
ADDENDUM #01 9/11/2026
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text
AutoCAD SHX Text A-601
AutoCAD SHX Text 1'-0"
AutoCAD SHX Text 10'-8"
AutoCAD SHX Text 1'-1"
AutoCAD SHX Text 8'-1"
AutoCAD SHX Text 21'-7"
AutoCAD SHX Text 11'-0"
AutoCAD SHX Text 22'-1"
5"
E-001
ELECTRICAL SYMBOLS,
ABBREVIATIONS AND NOTES
MR
GENERAL PROJECT NOTES:
1. INSTALLATION SHALL COMPLY WITH ALL APPLICABLE ANSI, ASTM, IBC, IESNA, IEEE, ISO, JCAHO, NFPA, NEMA AND UL CODES AND STANDARDS.
2. ALL CONDUCTORS, TRANSFORMER WIDINGS, AND BUSSING IN ELECTRICAL POWER
DISTRIBUTION SYSTEM COMPONENTS SHALL BE COPPER.
3. ALL FINAL LOCATIONS AND ARRANGEMENTS OF LIGHTING FIXTURES SHALL BE OBTAINED
FROM THE ARCHITECTURAL REFLECTED CEILING PLAN.
4. LIGHTING FIXTURES WITH MORE THAN TWO LAMPS SHALL HAVE TWO OUTER LAMPS
CONTROLLED WITH ONE SWITCH AND INNER LAMP(S) CONTROLLED BY A SECOND
SWITCH.
5. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS. EACH
BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED EQUIPMENT
GROUNDING CONDUCTOR.
6. NEUTRAL SHARING FOR MULTI-WIRE BRANCH CIRCUITS SHALL NOT BE ALLOWED.
7. MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES AND TYPES OF EMERGENCY AND
NORMAL BRANCH WIRING DEVICES SHALL HAVE DIVIDERS BETWEEN DEVICES.
8. ALL WIRING DEVICES SHALL BE PROVIDED WITH PERMANENT ADHESIVE LABEL LISTING
PANEL AND CIRCUIT SUPPLYING THE WIRING DEVICE.
GENERAL NOTES - DEMOLITION:
1. FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES, CONDUITS, ETC., SHOWN ON PLANS TO BE REMOVED, COMPLETELY CUT/CAP CONDUITS AT THE AREA OF
WORK PERIMETER AND REMOVE CONDUIT WITHIN THE WORK AREA, DISCONNECT WIRING AT
THE OVERCURRENT PROTECTIVE DEVICE AND REMOVE WIRING COMPLETELY FROM THE
ABANDONED CONDUITS.
2. DISCONNECT ALL ABANDONED WIRING OF ALL TYPES AT THE OVERCURRENT PROTECTIVE
DEVICE. COMPLETELY REMOVE ALL ABANDONED WIRING.
3. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS PASSING
THROUGH RENOVATED AREAS AND SERVICING UNDISTURBED AREAS. ALL CIRCUITS SERVICE
AREAS ADJACENT TO THE CONSTRUCTION AREA THAT ARE MODIFIED, AS PART OF THE
CONSTRUCTION PROJECT, SHALL BE RE-CIRCUITED AS PART OF THE CONSTRUCTION
PROJECT.
4. PROVIDE TEMPORARY AND/OR MODIFY EXISTING LIGHTING AND POWER, AND RELATED
SERVICES AS REQUIRED FOR CONSTRUCTION-PERIOD'S INTERIM LIFE SAFETY MEASURES.
5. PRIOR TO REMOVAL OF EXISTING ELECTRICAL COMPONENTS, CONTRACTOR SHALL
COORDINATE WITH COR AND HOUSE ELECTRICIAN IF ANY EQUIPMENT SHALL BE RETAINED BY
THE GOVERNMENT. COORDINATION ITEMS SHALL INCLUDE BUT NOT BE LIMITED TO
DISCONNECTS OF 100A OR LARGER, FIRE ALARM DEVICES, PANELBOARDS AND CIRCUIT
BREAKERS, SPECIAL LIGHTING FIXTURES, SPECIAL RECEPTACLES, TRANSFORMERS, POWER
COMPONENTS TO PROVIDE TEMPORARY CONSTRUCTION ELECTRICAL SERVICES (IF NOT THE
PROPERTY OF THE CONTRACTOR). ANY EQUIPMENT NOT REQUESTED TO BE RETAINED SHALL
BE REMOVED IN ACCORDANCE WITH CONTRACT REQUIREMENTS.
SWITCH ON LIGHTING PLANS:
BLANK = SINGLE POLE 2 = DOUBLE POLE
3 = THREE-WAY 4 = FOUR-WAY
D = DIMMER K = KEY OPERATED
LV= LOW VOLTAGE P = WITH PILOT LIGHT
LM= LOW VOLTAGE MASTER RC= REMOTE CONTROL
PB= PUSH BUTTON STATION WP= WEATHER PROOF
T = TIMER OPERATED Mo= OCCUPANCY SENSOR a,b,c... = CONTROL ZONE
INDICATES EQUIPMENT TO BE DEMOLISHED, UON.
ELECTRICAL ABBREVIATIONS
ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION
1P SINGLE POLE FA FIRE ALARM PEND PENDANT
2/C TWO-CONDUCTOR FAAP FIRE ALARM ANNUNCIATOR PANEL PF POWER FACTOR
3/C THREE-CONDUCTOR FACP FIRE ALARM CONTROL PANEL PH PHASE
3PH THREE-PHASE FC FOOT CANDLE PNL PANEL
4/C FOUR-CONDUCTOR FIXT FIXTURE PT POTENTIAL TRANSFORMER
4W FOUR WIRE FLA FULL LOAD AMPS PVC POLYVINYL CHLORIDE (PLASTIC)
A/C UNIT AIR CONDITIONING UNIT FP FIRE PROTECTION PWR POWER
A/E ARCHITECT / ENGINEER FT FEET OR FOOT RCP REFLECTED CEILING PLAN
AAP ALARM ANNUNCIATOR PANEL FU SW FUSED SWITCH REC RECESSED
AC ALTERNATING CURRENT OR ARMORED CABLE G ELECTRICAL GROUND RECPT RECEPTACLE
ACC ACCESSIBLE GFCI GROUND FAULT CIRCUIT INTERRUPTER RM ROOM
ADDL ADDITIONAL HOA HAND-OFF-AUTO RMS ROOT MEAN SQUARE
ADJ ADJACENT, ADJOINING HP HORSEPOWER REQD REQUIRED
AF AMPERE FRAME OR AMP FUSE HT HEIGHT SCC SHORT CIRCUIT CURRENT
AFF ABOVE FINISHED FLOOR HZ HERTZ SD SMOKE DETECTOR
AFG ABOVE FINISHED GRADE IMC INTERMEDIATE METAL CONDUIT SF SQUARE FOOT (FEET)
AHJ AUTHORITY HAVING JURISDICTION IR INFRARED SHT SHEET
AIC AMPERE INTERRUPTING CAPACITY J-BOX JUNCTION BOX SI INTERNATIONAL SYSTEM OF UNITS
ALT ALTERNATE kV KILOVOLT SPEC SPECIFICATION
AMP AMPERE kVA KILOVOLT AMPERE SPST SINGLE POLE SINGLE THROW
AT AMPERE TRIP kVAh KILOVOLT AMPERE PER HOUR SURF SURFACE
AUTO AUTOMATIC kVAR KILOVOLT AMPERE REACTIVE SW SWITCH
BLDG BUILDING kW KILOWATT SWBD SWITCHBOARD
BRKR BREAKER kWh KILOWATT HOUR SWGR SWITCHGEAR
C CONDUIT kWhM KILOWATT HOUR METER TEL TELEPHONE
CAB CABINET LED LIGHT EMITTING DIODE TYP TYPICAL
CALC CALCULATE LF LINEAR FEET (FOOT) UGND UNDERGROUND
CAP CAPACITY LRA LOCKED ROTOR AMPS UL UNDERWRITERS LABORATORY
CAT CATALOG LT LIGHT UON UNLESS OTHERWISE NOTED
cd CANDELA LTG LIGHTING UPS UNINTERRUPTIBLE POWER SUPPLY
CD CONSTRUCTION DOCUMENTS LTG PNL LIGHTING PANEL UTIL UTILITY
CF CONTRACTOR FURNISHED LTNG LIGHTNING V VOLT
CKT CIRCUIT LV LOW VOLTAGE VA VOLT AMPERE
CKT BRKR OR C/B CIRCUIT BREAKER MAX MAXIMUM VAR VOLT AMPERE REACTIVE
CLF CURRENT LIMITING FUSE MC METAL-CLAD VFD VARIABLE FREQUENCY DRIVE
CLG CEILING MCA MINIMUM CIRCUIT AMPACITY VOLT VOLTAGE
COMPT COMPARTMENT MCB MAIN CIRCUIT BREAKER W WATT
CONT CONTINUE MCC MOTOR CONTROL CENTER WH WATER HEATER
CONTR CONTRACTOR MECH MECHANICAL WP WEATHERPROOF
CRI COLOR RENDERING INDEX MH MANHOLE XFMR TRANSFORMER
CT CURRENT TRANSFORMER MIN MINIMUM
CU COPPER MOCP MAXIMUM OVERCURRENT PROTECTION
dB DECIBEL MLO MAIN LUGS ONLY
DC DIRECT CURRENT MT MOUNT
DEG C DEGREES CELCIUS MTD MOUNTED
DEG F DEGREES FAHRENHEIT MTG MOUNTING
DEMO DEMOLITION MTS MANUAL TRANSFER SWITCH
DIAG DIAGRAM MV MEDIUM VOLTAGE
DISC DISCONNECT MVA MEGAVOLT-AMPERE
DISTR PNL DISTRIBUTION PANEL MW MEGAWATT
DMR SW DIMMER SWITCH NA NOT APPLICABLE
DPDT DOUBLE POLE DOUBLE THROW NC NORMALLY OPEN
DPST DOUBLE POLE SINGLE THROW NEC NATIONAL ELECTRICAL CODE
DS DISCONNECT SWITCH NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
DWG DRAWING NEUT OR N NEUTRAL
EL ELEVATION NFPA NATIONAL FIRE PROTECTION ASSOCIATION
ELEC ELECTRIC OR ELECTRICAL NIC NOT IN CONTRACT
ELEV ELEVATOR NL NIGHT LIGHT
EMER EMERGENCY NO NORMALLY OPEN
EMT ELECTRICAL METAL TUBING NTS NOT TO SCALE
ENCL ENCLOSURE OD OUTSIDE DIAMETER
EPO EMERGENCY POWER OFF OL OVERLOAD
EWC ELECTRIC WATER COOLER P POLE
EWH ELECTRIC WATER HEATER PB PULL BOX
EXIST OR (E) EXISTING PEC PHOTOLELECTRIC CELL
AUTOMATIC TRANSFER SWITCH
- INDICATES EMPTY DUCT.
- INDICATES NEW FEEDER.
- INDICATES EXISTING FEEDER TO BE REMOVED.
- INDICATES EXISTING FEEDER TO REMAIN.
CONDUIT BANK SECTION (2x2 CONDUIT BANK/DUCT BANK INDICATED)
- INDICATES FEEDER INSTALLED IN CONDUIT.
- INDICATES EMPTY SPARE CONDUIT. PROVIDE MUELTAPE
AND TAG BOTH ENDS OF CONDUIT RUN WITH ENGRAVED
TAGS INDICATING POINT AT OTHER END OF MULETAPE.
- INDICATES VITALINK CABLE
A
PPEQ1
PANELBOARD WITH MAIN CIRCUIT BREAKER.
KD
SWITCH, SINGLE BREAK
FUSE WITH RATING
CIRCUIT BREAKER
DRAWOUT AIR CIRCUIT BREAKER
MOTOR, SINGLE-PHASE
MOTOR, THREE-PHASE
DELTA CONNECTION
TRANSFORMER
WYE CONNECTION
EARTH GROUND
JUNCTION BOX
PULL BOX
TRANSFORMER, PLAN
DISTRIBUTION PANEL
PANELBOARD, FLUSH MOUNTED
PANELBOARD, SURFACE MOUNTED
RECEPTACLE, DUPLEX
RECEPTACLE, DUPLEX ON EMERGENCY POWER
RECEPTACLE, DUPLEX WITH GROUND FAULT CIRCUIT INTERRUPTER
RECEPTACLE, QUADRAPLEX
RECEPTACLE, SINGLE
RECEPTACLE, SPECIAL PURPOSE
A = 120V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 5-20R.
B = 208V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 6-20R.
C = 120V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 5-30R.
D = 208V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 6-30R.
E = 208V, 60A, 1 PHASE, 3-POLE, 4W, NEMA 14-60R.
F = 208V, 30A, 3 PHASE, 3-POLE 4W, NEMA 15-30R.
G = 208V, 50A, 3 PHASE, 3 POLE, 4W, NEMA 15-30R.
H = 208V, 60A, 3 PHASE, 3 POLE, 4W, NEMA 15-60R.
SWITCH
F = FUSED SWITCH K = KEY OPERATED
L = LOCK LM= LOW VOLTAGE MASTER
M = MANUAL MOTOR STARTING MC= MOMENTARY CONTACT
MP= MOTOR SNAP WITH PILOT LIGHT P = WITH PILOT LIGHT
(THERMAL TYPE)
PB= PUSH BUTTON STATION RC= REMOTE CONTROL
WP= WEATHER PROOF X = EXPLOSION PROOF
BRANCH CIRCUIT HOMERUN. ONE SEPARATE GREEN GROUNDING
CONDUCTOR SHALL BE PROVIDED FOR EACH HOMERUN
/ / / INDICATES EQUIPMENT TO BE DEMOLISHED, UON.
DISCONNECT SWITCH, FUSED. '30AS' DENOTES SWITCH RATING.
'30AF' DENOTES FUSE SIZE. '3P' DENOTES NUMBER OF POLES.
DISCONNECT SWITCH, FUSED. '30AS' DENOTES SWITCH RATING.
'3P' DENOTES NUMBER OF POLES.
STARTER, COMBINATION WITH DISCONNECT SWITCH. '30AS'
DENOTES SWITCH RATING. '1' DENOTES NEMA STARTER SIZE.
SYMBOL DESCRIPTION
ELECTRICAL SYMBOLS
CONDUIT/CABLE CUT/INTERCEPTION POINT:
- WHERE "1" IS SHOWN CONTRACTOR SHALL REMOVE CONDUIT
AND CABLE IN DIRECTION OF ARROW SHOWN.
- WHERE "2" IS SHOWN CONTRACTOR SHALL REMOVE CONDUIT
ONLY IN THE DIRECTION OF ARROW, CABLES SHALL BE CUT AND
PROTECTED FROM THIS POINT FOR FOR SPLICING INTO NEW
FEEDERS.
- WHERE "X" IS SHOWN IT INDICATES END OF CONDUIT REMOVAL
- WHERE "3" IS SHOWN CONTRACTOR SHALL INTERCEPT AND
EXTEND CONDUIT AS SHOWN.
- WHERE "4" IS SHOWN IT INDICATES PVC SCHEDULE 40 CONDUITS
ENCASED IN MINIMUM 2" CONCRETE.
- WHERE "5" IS SHOWN IT INDICATES END OF CONDUIT CONCRETE
ENCASEMENT.
EXISTING DUCT BANK SECTION (2x2 CONDUIT BANK/DUCT BANK
INDICATED)
STARTER OR MOTOR CONTROLLER. '1' DENOTES
NEMA STARTER SIZE.
PANELBOARD WITH MAIN LUGS ONLY.
KEY INTERLOCK.
DRAWOUT DEVICE, 3 POLE U.O.N.
LIGHTING FIXTURE SCHEDULE
FIXTURE ID SYMBOL MOUNTING VOLTAGE / WATTAGE DESCRIPTION
A SUSPENDED /
SURFACE
UNV (120-277V)
54.1W
LED, CCT 3500K, CRI 80, LUMEN SELECTION SHALL PROVIDE XXFC AT 30"AFF WITH UNIFORMITY 3:1 (AVG/MIN)
BASIS OF DESIGN:
SIGNIFY DAY-BRITE MOD# FSS470L835-UNV-DIM
B SURFACE UNV (120-277V)
14W
LED, CCT 3500K, CRI 80
BASIS OF DESIGN:
SIGNIFY STONCO MOD# VWXL-14-NW-G1-8
C TROFFER UNV (120-277V)
XXW
LED, CCT 3500K, CRI 80
BASIS OF DESIGN:
SIGNIFY STONCO MOD# XXXX
EX SUSPENDED UNV (120-277V)
4.7W
LED, DIE-CAST ALUMINUM, FIELD CONFIGURABLE SINGLE OR DOUBLE FACE OPTION,
BASIS OF DESIGN:
SIGNIFY SC SERIRES, MOD# SC-N-U-R-W-ICTA-DL
EM
SUSPENDED /
SURFACE (WALL
OR CEILING)
UNV (120-277V)
14W
LED, POLYCARBONATE HIGH-IMPACT HOUSING,
BASIS OF DESIGN:
SIGNIFY TRU-PATH, MOD# TPU-D-N-LM7-W-ICTA
LP-1 POLE MOUNT UNV (120-277V) LED, POLE MOUNT
BASIS OF DESIGN:
NOTES:
1. ALL LIGHTING FIXTURE SHALL BE BAA APPROVED.
2. LIGHTING FIXTURES LUMEN SELECTION SHALL BE BASED ON PHOTOMETRIC STUDY PROVIDED BY CONTRACTOR.
3. ALL LIGHTING FIXTURES DESIGNATED WITH 'EM' SHALL BE PROVIDED WITH MIN. 90-MINUTE BATTERY BACKUP.
SWITCH, MEDIUM VOLTAGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Fi le
P at h
/1 5/
1:
:0
AM
100% CONSTRUCTION
DOCUMENTS
PARTIALLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E firm name A/E firm street address A/E firm city, state, zip code A/E firm phone number A/E firm POC engineering discipline <EDIT TEXT>:
Consultant firm name Consultant firm street address Consultant firm city, state, zip code Consultant firm phone number Consultant POC
UPGRADE CHILLER PLANT
BUILDING 200
79 MIDDLEVILLE RD, NORTHPORT, NY 11768
632-25-101
Revisions: Date:
MAY 8, 2026 MR
ELECTRICAL SPLICE BOX
HEAT TRACE CONTROLLER PANEL
ELECTRICAL CRITICAL SUBMITTALS:
26 05 13 - MEDIUM VOLTAGE CABLES (1.5.A.1)
26 05 73 - OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY (1.4.A.1)
26 08 00 - COMMISSIONING OF ELECTRICAL SYSTEMS (1.6.A)
26 12 19 - PAD-MOUNT, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS (1.5.A.1)
26 24 13 - DISTRIBUTION SWITCHBOARDS (1.5.A.1)
MECHANICAL EQUIPMENT ELECTRICAL CONNECTION SCHEDULE
UNIT TAG UNIT DESCRIPTION VOLTAGE /
PHASE HP LOAD
KW FLA MCA MOCP
UNIT DISCONNECT SWITCH
FEEDER REMARKS
SIZE TYPE FURNISHED
BY
CH-1, CH-2,
CH-3, CH-4 CHILLER 480V/3 - - 619 774 1200 1200AS INTEGRAL MANUF. (3) SETS OF 600KCMIL, 3/0G IN 4" CONDUIT
P-1, P-2, P-3, P-4 PRIMARY CHILLER PUMPS 480V/3 50 - 65 125 200AF/125AT VFD DIV.26 3#1, #8G IN 1-1/2"
CONDUIT
P-5, P-5A SECONDARY CHILLER
PUMPS 480V/3 150 - 180 300 400AF/300AT VFD DIV.26 3#350KCMIL, #4G IN
3" CONDUIT
P-6, P-6A CHILLER PUMPS 480V/3 40 - 52 100 100AF/100AT VFD DIV.26 3#3, #8G IN 1-1/4"
CONDUIT
P-7, P-7A CHILLER PUMPS 480V/3 100 - 124 200 200AF/200AT VFD DIV.26 3#3/0, #8G IN 2"
CONDUIT
P-8, P-8A CHILLER PUMPS 480V/3 40 - 52 100 100AF/100AT VFD DIV.26 3#3, #8G IN 1-1/4"
CONDUIT
P-9, P-10, P-11, P-12
CONDENSATE CHILLER
PUMPS 480V/3 100 - 124 200 200AF/200AT VFD DIV.26 3#3/0, #8G IN 2"
CONDUIT
AH-1 AIR HANDLER 208V/3 5 - 14 18 30 30AF/30AT VFD DIV.26 3#10, #10G IN 3/4"
CONDUIT
PR3A, PR3B FAN 208V/3 0.75 - 3.5 20 30AF/20AT VFD DIV.26 3#12, #12G IN 3/4"
CONDUIT
F-1 FAN 120V/1 - - 1.4 20 MSW DIV.26 2#12, #12G IN 3/4"
CONDUIT
MV-1, MV-2,
MV-3, MV-4 VACUUM PUMPS 480V/3 10 - 14 100AS NFU SW DIV.26 4 PUMPS W/ SINGLE
POINT OF CONNECTION.
MA-1, MA-2,
MA-3, MA-4 MEDICAL AIR PUMPS 480V/3 10 - 14 100AS NFU SW DIV.26 4 PUMPS W/ SINGLE
POINT OF CONNECTION.
EP-1, EP-2 PIT EJECTOR PUMPS 480V/3 1 - 2 30AS NFU SW DIV.26 2 PUMPS W/ SINGLE
POINT OF CONNECTION.
VALVE VALVE 120V/1 - 0.1 MSW DIV.26 2#12, #12G IN 3/4"
CONDUIT
PROVIDE 120V-24VAC
TRANSFORMER
NOTES:
1. ABBREVIATIONS: VFD - VARIABLE FREQUENCY DRIVE, FU SW - FUSIBLE DISCONNECT SWITCH, NFU SW - NON-FUSIBLE DISCONNECT SWITCH, MSW - MOTOR RATED SWITCH.
ADDENDUM #01 9/11/2026
AutoCAD SHX Text J
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text J
AutoCAD SHX Text
PB
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
30AS
AutoCAD SHX Text 3P
AutoCAD SHX Text
30AS
AutoCAD SHX Text 3P
AutoCAD SHX Text
30AF
AutoCAD SHX Text
30AS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GFI
AutoCAD SHX Text
DP#____
AutoCAD SHX Text
AutoCAD SHX Text
KI
AutoCAD SHX Text
EM
AutoCAD SHX Text
EX
AutoCAD SHX Text
EX
AutoCAD SHX Text 4-4"
AutoCAD SHX Text 4-4"
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text
LP
AutoCAD SHX Text C
HT
CBL-A#4
2 2
RELOCATED
AIR
COMPRESSOR
NHKD2#1 NHKD2#2 NHKD2#3 NHKD2#4
NHSB-A
NHSB-A2
NHKD2#5 NHKD2#6
NHKD#3
NHKD#3
KD-1 KD
TEMP A/C 22
EX
NHKD2#8
NHKD2#7
NHKD#1
NHKD#7NHKD#5 NHKD#6 NHKD#8
NHKD#2
GFI
CBL-A#4
NLB#17
NLB-A#13
NLB-A#13
20 20 7.5
CLB-A#2
AC-11
CONTROL
PANEL
AC-11
HV-11
PANEL
60AS
60AS
CP1&CP2
CONTROL
PANEL
30AS
CP2
CP1
VFD
VFD AC-11 FED
FROM NMCCSB-A
1 1 1
EX
EX
EX
EX
EX
EX
VFD
P-9
VFD
P-5 2
VFD
P-5A
VFD
P-7A
VFD
P-7
VFD
P-6A
VFD
P-6
VFD
P-8
VFD
P-8A
2 2 2
VFD
P-1
VFD
P-2
VFD
P-3
VFD
P-4
'3-NO-200-RTU-1'
SQUARE D POWER LOGIC
(2) VFDS FOR HWP-1 & HWP-1
30AS
30AS
HWP-1HWP-2
(2) 30A DISCONNECT SWITCHES
FOR HWP-1 & HWP-1
1 1
EXISTING
BMS PANEL
EXISTING
LADDER
30AS
'UPS AC'
DISCONNECT
SWITCH
CHILLER
CONTROL ROOM
STEAM
CONDENSATE PIT
CMCCSB-A NMCCSB-A
GFI
MEDICAL
VACUUM
SYSTEM
10HP
10HP
10HP
10HP
GFI
CLB-A4#22,24,26
2#10,#10G-3/4"C
100AS
PR3B
CLB-A4#29,31,33
3#12,#12G-3/4"C
GFI
CLB-A4#7
2#12,#12G-3/4"C
CLB-A4#7
CLB-A4#7
FM
FM
FM
FM
FM
FM
FM
1200AS1200AS
MEDICAL AIR
SYSTEM
10HP
10HP
10HP
10HP
100AS
VFD
P-10
VFD
P-11
VFD
P-12
GFIGFI
GFI GFI
GFI
GFI
GFI
GFIGFI
GFI
GFI
FM
FM
FM
FM
EJECTOR
PUMP
SYSTEM
1HP1HP
30AS
CLB-A4#5
2#12,#12G-3/4"C
CLB-A4#5
CLB-A4#5
CLB-A4#5
CLB-A4#5
CLB-A4#5
CLB-A4#5
CLB-A4#5 CLB-A4#5 CLB-A4#5 CLB-A4#5
CLB-A4#9
2#12,#12G-3/4"C
CLB-A4#9
CLB-A4#9
CLB-A4#9
CLB-A4#9
CLB-A4#9
CLB-A4#11
2#12,#12G-3/4"C
CLB-A4#11
CLB-A4#11 CLB-A4#11
CLB-A4#13
2#12,#12G-3/4"C
CLB-A4#13
CLB-A4#15
2#12,#12G-3/4"C
CLB-A4#17
2#12,#12G-3/4"C
CLB-A4#19
2#12,#12G-3/4"C
CLB-A4#19 CLB-A4#17
CLB-A4#17
CLB-A4#21
2#12,#12G-3/4"C
CLB-A4#21
'F-1'
M
FM
CLB-A4#5
VFD
PR3B
VFD
PR3A
PR3A
CLB-A4#23,25,27
3#12,#12G-3/4"C
CLB-A4#2
2#12,#12G-3/4"C
CMCCSB-A#8
VFD
AH-1
7 6 5 4 3 2 1
S
R
Q.8
Q
P
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Fi le
P at h
/1 5/
1:
:0
AM
100% CONSTRUCTION
DOCUMENTS
PARTIALLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E firm name A/E firm street address A/E firm city, state, zip code A/E firm phone number A/E firm POC engineering discipline <EDIT TEXT>:
Consultant firm name Consultant firm street address Consultant firm city, state, zip code Consultant firm phone number Consultant POC
UPGRADE CHILLER PLANT
BUILDING 200
79 MIDDLEVILLE RD, NORTHPORT, NY 11768
632-25-101
Revisions: Date:
MAY 8, 2026
B200
AREA OF
WORK
SCALE:
KEY PLAN
SUB-BASEMENT
1:100
KP
ELECTRICAL NEW WORK PLAN -
SUB-BASEMENT
E-121
MRMR
NOTES:
1. EXISTING MECHANICAL EQUIPMENT TO REMAIN.
CONTRACTOR SHALL MAINTAIN AND PROTECT
EXISTING POWER CIRCUITRY DURING
CONSTRUCTION.
2. PROVIDE VARIABLE FREQUENCY DRIVE FOR
MECHANICAL PUMP AS INDICATED. VFD SHALL BE
PROVIDED WITH INDEPENDENT SUPPORTS AND
SHALL BE PROVIDED WITH WORKING CLEARANCE
PER NEC 110.26.
3. PROVIDE 120V POWER JUNCTION BOX FOR
MECHANICAL VALVES AND METERING EQUIPMENT.
COORDINATE FINAL POWER REQUIREMENTS AND
LOCATION WITH MECHANICAL CONTRACTOR.
4. PROVIDE 120V POWER JUNCTION BOX FOR
MECHANICAL ALARM HORN AND STROBE.
COORDINATE FINAL POWER REQUIREMENTS AND
LOCATION WITH MECHANICAL CONTRACTOR.
5. PROVIDE 120V POWER JUNCTION BOX FOR
MECHANICAL DAMPER. COORDINATE FINAL POWER
REQUIREMENTS AND LOCATION WITH MECHANICAL
CONTRACTOR.
6. ELECTRICAL PULLBOX FOR CIRCUITS AND FEEDERS
FROM DISTRIBUTION PANELS ON THE BASEMENT
LEVEL, SERVING CHILLER PLANT. COORDINATE
EXACT DIMENSION AND LOCATION WITH
MECHANICAL SYSTEM PIPING.
7. REFER TO MECHANICAL AND PLUMBING DRAWINGS
FOR ANY ADDITIONAL COMMUNICATIONS AND
CONTROLS RACEWAYS REQUIREMENTS.
ADDENDUM #01 9/11/20261
AutoCAD SHX Text
XAC-11
AutoCAD SHX Text
EXISTING AIR HANDLER SUSPENDED FROM UNDERSIDE OF MEZZANINE DECK
AutoCAD SHX Text
CH-1
AutoCAD SHX Text
CH-2
AutoCAD SHX Text
CH-3
AutoCAD SHX Text
CH-4
AutoCAD SHX Text P-1
AutoCAD SHX Text P-2
AutoCAD SHX Text P-3
AutoCAD SHX Text P-4
AutoCAD SHX Text P-7
AutoCAD SHX Text P-7A
AutoCAD SHX Text P-6
AutoCAD SHX Text P-6A
AutoCAD SHX Text P-5
AutoCAD SHX Text P-10
AutoCAD SHX Text P-8
AutoCAD SHX Text P-9
AutoCAD SHX Text P-5A
AutoCAD SHX Text P-8A
AutoCAD SHX Text
EF-4
AutoCAD SHX Text P-12
AutoCAD SHX Text P-11
AutoCAD SHX Text
AIR HANDLER SUPPORT
AutoCAD SHX Text
RM-1
AutoCAD SHX Text
TO FM3
AutoCAD SHX Text
TO FM1
AutoCAD SHX Text
TO FM4
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text M
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AH-1
PANEL NAME: KD1 BUS RATING
400A
PANEL LOCATION:
CLIMATE CONTROL ROOM
DESCRIPTION:
NORMAL POWER PANEL
VOLTS:
277/480V
PHASE:
WIRE:
CONNECTION
300A MCB
MOUNTING:
SURFACE
MINIMUM INTERRUPTING RATING:
N/A
CIRCUIT
NUMBER TRIP CIRCUIT DESCRIPTION LTG APP/
MECH REC VA
Ø A
VA
Ø B
VA
Ø B REC APP/
MECH LTG CIRCUIT DESCRIPTION TRIP CIRCUIT
NUMBER
ELECTRICAL LOAD
(BREAKER IN OFF POSITION)
EXISTING LOAD 60
3 ### 4
5 ### 6
20 SPARE
SPARE 30
9 ### 10
11 ### 12
CHR#4
(BREAKER IN OFF POSITION)
CHWP#4
(BREAKER IN OFF POSITION) 110
15 ### 16
17 ### 18
RECEPTACLE LOAD IN VA UP TO 10,000VA @100% ##### ### ### TOTAL DEMAND LOAD IN VA #####
RECEPTACLE LOAD IN VA OVER 10,000VA @50% TOTAL VA PER PHASE TOTAL LOAD + 25% SPARE #####
TOTAL LIGHTING IN VA @125% ##### ##### TOTAL LOAD IN KVA ###
MECHANICAL / APPLIANCE LOAD IN VA @100% # TOTAL CONNECTED
LOAD IN VA TOTAL LOAD IN AMPERES + 25% SPARE #
PANEL NAME: KD BUS RATING
400A
PANEL LOCATION:
CLIMATE CONTROL ROOM
DESCRIPTION:
NORMAL POWER PANEL
VOLTS:
277/480V
PHASE:
WIRE:
CONNECTION
MLO
MOUNTING:
SURFACE
MINIMUM INTERRUPTING RATING:
N/A
CIRCUIT
NUMBER TRIP CIRCUIT DESCRIPTION LTG APP/
MECH REC VA
Ø A
VA
Ø B
VA
Ø B REC APP/
MECH LTG CIRCUIT DESCRIPTION TRIP CIRCUIT
NUMBER
1 300 NHSB-K
SUB-BASEMENT BY PILLAR 7H
NLSB-E TRANSFORMER
(SUB-BASEMENT BETWEEN PILLAR 6D & 7D) 300 2###
3 20 SPACE
PANEL KD1 300 4###
RECEPTACLE LOAD IN VA UP TO 10,000VA @100% ##### ### ### TOTAL DEMAND LOAD IN VA #####
RECEPTACLE LOAD IN VA OVER 10,000VA @50% TOTAL VA PER PHASE TOTAL LOAD + 25% SPARE #####
TOTAL LIGHTING IN VA @125% ##### ##### TOTAL LOAD IN KVA ###
MECHANICAL / APPLIANCE LOAD IN VA @100% # TOTAL CONNECTED
LOAD IN VA TOTAL LOAD IN AMPERES + 25% SPARE #
NOTES:
1. INSTALL NEW CIRCUIT BREAKERS AS INDICATED. NEW BREAKER SHALL BE SUITABLE FOR INSTALLATION WITHIN THE EXISTING
ELECTRICAL PANEL.
PANEL NAME: CLB-AD BUS RATING
225A
PANEL LOCATION:
ELECTRICAL ROOM
DESCRIPTION:
PANEL
VOLTS:
120/208V
PHASE:
WIRE:
CONNECTION
225A MCB
MOUNTING:
SURFACE
MINIMUM INTERRUPTING RATING:
N/A
CIRCUIT
NUMBER TRIP CIRCUIT DESCRIPTION LTG APP/
MECH REC VA
Ø A
VA
Ø B
VA
Ø B REC APP/
MECH LTG CIRCUIT DESCRIPTION TRIP CIRCUIT
NUMBER
50 3P-208 VOLT FEED
FOR PANEL CL2-A
###### ISO GROUND RECEPT CHILLER CONTROL ROOM 20 2
3 ###### SPARE 20 4
5 ##### ISO GROUND RECEPT CHILLER CONTROL ROOM 20 6
40 3P-208 VOLT FEED
FOR PANEL CLB-A
3P-208 VOLT FEED
FOR PANEL CL4-A 40
9 ### 10
11 ### 12
13 20 F.A. FEED ###
3P-208 VOLT FEED
FOR PANEL CL1-A 100
15 20 OUTSIDE LOADING DOCK 2-RECEPTACLE ### 16
17 20 UNIT HEATER #3 ### 18
RECEPTACLE LOAD IN VA UP TO 10,000VA @100% ###### ###### ##### TOTAL DEMAND LOAD IN VA ######
RECEPTACLE LOAD IN VA OVER 10,000VA @50% TOTAL VA PER PHASE TOTAL LOAD + 25% SPARE ######
TOTAL LIGHTING IN VA @125% ##### ###### TOTAL LOAD IN KVA ####
MECHANICAL / APPLIANCE LOAD IN VA @100% ###### TOTAL CONNECTED
LOAD IN VA TOTAL LOAD IN AMPERES + 25% SPARE ##
PANEL NAME: CHB-A BUS RATING
100A
PANEL LOCATION:
ELECTRICAL ROOM
DESCRIPTION:
PANEL
VOLTS:
277/480V
PHASE:
WIRE:
CONNECTION
100A MAIN SWITCH
MOUNTING:
SURFACE
MINIMUM INTERRUPTING RATING:
N/A
CIRCUIT
NUMBER TRIP CIRCUIT DESCRIPTION LTG APP/
MECH REC VA
Ø A
VA
Ø B
VA
Ø B REC APP/
MECH LTG CIRCUIT DESCRIPTION TRIP CIRCUIT
NUMBER
20 3P-208 AIR COMPRESSOR
FOR GENERATOR
###### LIGHTING - CHILLER PLANT SUB-BASEMENT 20 2
3 ###### LIGHTING - CHILLER PLANT SUB-BASEMENT 20 4
5 ##### SPARE 20 6
15 3P-208 UNIT HEATER
REAR OF GENERATOR
### LIGHTS ROOMS A0-2, A0-4, A0-6, A0-10, A0-12, A0-14 20 8
9 ### LIGHTS ROOMS AO-11C (ELEC. CLOS.), A0-9, A0-8, A0-7, A0-5, A0-3 20 10
11 ### LIGHTS FOR CATWALK AREA A0-1 AROUND MEN'S TOILET 20 12
13 20 LIGHTS ROOMS A0-20A, A0-20, A0-21 ### LIGHTS ROOMS A0-28 & ASSOCIATED AUTOPSY ROOMS 20 14
RECEPTACLE LOAD IN VA UP TO 10,000VA @100% ###### ###### ##### TOTAL DEMAND LOAD IN VA ######
RECEPTACLE LOAD IN VA OVER 10,000VA @50% TOTAL VA PER PHASE TOTAL LOAD + 25% SPARE ######
TOTAL LIGHTING IN VA @125% ##### ###### TOTAL LOAD IN KVA ####
MECHANICAL / APPLIANCE LOAD IN VA @100% ###### TOTAL CONNECTED
LOAD IN VA TOTAL LOAD IN AMPERES + 25% SPARE ##
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Fi le
P at h
/1 5/
1:
:0
AM
100% CONSTRUCTION
DOCUMENTS
PARTIALLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E firm name A/E firm street address A/E firm city, state, zip code A/E firm phone number A/E firm POC engineering discipline <EDIT TEXT>:
Consultant firm name Consultant firm street address Consultant firm city, state, zip code Consultant firm phone number Consultant POC
UPGRADE CHILLER PLANT
BUILDING 200
79 MIDDLEVILLE RD, NORTHPORT, NY 11768
632-25-101
Revisions: Date:
MAY 8, 2026
ELECTRICAL SCHEDULES (1 OF 3) -
NEW
E-703
PANEL NAME: CLB-A4 BUS RATING
225A
PANEL LOCATION:
ELECTRICAL ROOM DESCRIPTION:
VOLTS:
120/208V
PHASE:
WIRE:
CONNECTION
MLO
MOUNTING:
SURFACE
MINIMUM INTERRUPTING RATING:
22KAIC
CIRCUIT
NUMBER TRIP CIRCUIT DESCRIPTION LTG APP/
MECH REC VA
Ø A
VA
Ø B
VA
Ø B REC APP/
MECH LTG CIRCUIT DESCRIPTION TRIP CIRCUIT
NUMBER
1 20 SPARE 500 500 LIGHTING 20 2
3 20 SPARE ##### SPARE 20 4
5 20 CHILLER PLANT - FLOW METERS 1000 1,000 SPARE 20 6
7 20 REC - MEDICAL AIR ROOM 720 1,920 1200 REC. A0-11 FOR DRYER (RELOCATED) 20 8
9 20 REC - CHILLER PLANT 1080 2,280 1200 REC A0-24 (MORGUE) ON REEL (RELOCATED) 20 10
11 20 REC - CHILLER PLANT 720 1,920 1200 EXISTING LOAD (RELOCATED) 20 12
13 20 HORN AND STROBE ALARMS 180 180 1,200 EXISTING LOAD (RELOCATED) 20 14
15 20 MOTORIZED DAMPERS 100 1,300 1200 110V REC. IN STAIR #5 20 16
17 20 CONTROL PANELS 800 2,000 1200
EXISTING LOAD (RELOCATED) 20
19 20 CONTROL PANELS 800 2,000 1200 20
21 20 CONTROL PANELS 800 2,480 1680
AH-1 30
20 PR3A - FAN
550 2,230 1680 24
25 550 2,230 1680 26
27 550 3,050 2500
HEAT TRACE PANEL - TEMP PIPING 30
20 PR3B-FAN
550 3,050 2500 30
31 550 3,050 2500
HEAT TRACE PANEL - TEMP PIPING 30
33 550 3,050 2500 34
35 20 SPARE 2,500 2500
HEAT TRACE PANEL - TEMP PIPING 30
37 20 SPARE 2,500 2500 38
39 20 SPARE 2,500 2500
HEAT TRACE PANEL - TEMP PIPING 30
41 20 SPARE 2,500 2500 42
RECEPTACLE LOAD IN VA UP TO 10,000VA @100% 2,520 12,380 14,660 15,200 TOTAL DEMAND LOAD IN VA 23,620
RECEPTACLE LOAD IN VA OVER 10,000VA @50% TOTAL VA PER PHASE TOTAL LOAD + 25% SPARE 29,525
TOTAL LIGHTING IN VA @125% 500 42,240 TOTAL LOAD IN KVA 29.5
MECHANICAL / APPLIANCE LOAD IN VA @100% 23,120 TOTAL CONNECTED
LOAD IN VA TOTAL LOAD IN AMPERES + 25% SPARE 82
MRMR
AutoCAD SHX Text
ADDENDUM #01
9/11/2026
CHWP-3
CHWP-2
CHWP-1
CWP-3
CWP-2
CWP-1
CHILLER-1
CHILLER-3
CHILLER-4
CHILLER-2
HIGH VOLTAGE
MEDICAL AIRAS-1
CABINETS
XPHE-1
MV PUMP
MEDICAL VACCUM
EX
IS
TI
NG
C
HU
TE
C
ON
VE
YO
R
EX
IS
TI
NG
C
HU
TE
C
ON
VE
YO
R
CONTRACTOR SHALL REMOVE A PORTION
OF THE EXISTING CHUTE CONVEYOR IN ITS
ENTIRETY BETWEEN COLUMNS LINES "7"
AND "Q" REMOVALS SHALL INCLUDE ALL
SERVICE CONNECTIONS BACK TO MAIN
ELECTRICAL PANELS, HANGERS, ETC.
EL PANEL EL PANEL
DOMESTIC
HOT WATER SYSTEM
EX
. A
IR
CO
MP
RE
SS
OR
MC
C
S
R
Q.8
Q
P
N
M
'-8
7'- 1"
'-7
'-8
'-8
'-8
7 6 5 4 3 2 1
21'-8" 21'-8" 21'-8" 21'-8" 21'-8" 21'-8"
7 6 5 4 3 2 1
21'-8" 21'-8" 21'-8" 21'-8" 21'-8" 21'-8" 21'-8"
S
R
Q.8
Q
P
N
M
'-8
7'-
1"
'-7
'-8
'-8
'-8
CHILLER-1
PUMP-9
CHILLER-2
CHILLER-3
CHILLER-4
PUMP-11
PUMP-5
PUMP-8
PUMP-10 PUMP-12 PUMP-5A PUMP-8A
PUMP-7A
PUMP-7
PU
MP
-6
PU
MP
-6 A
PU
MP
-1
PU
MP
-2
PU
MP
-3
PU
MP
-4
AS-1
ET-1
MEDICAL AIR MEDICAL VACCUM
MEDICAL GAS ROOM
CHILLER PUMP ROOM
MER
CLIMATE CONTROL ROOM
LINE WORK INDICATES
EQUIPMENT
MAINTENANCE ACCESS
AREA. MUST REMAIN
CLEAR (TYPICAL FOR ALL
EQUIPMENT)
EL PANEL EL PANEL
VFD
VFD
VFD VFD VFD VFD
VFD VFD
MCC
EL PANEL
EL PANEL
VFD VFD VFD VFD
VFD
VFD
VFDVFD
EL PANEL
DISC. SW.
DISC. SW.
FLASH TANK
RELOCATED AIR
COMPRESSOR
DOMESTIC
HOT WATER SYSTEM
RELOCATED
ACC
AH-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Fi le
P at h
/1 5/
1:
:0
AM
100% CONSTRUCTION
DOCUMENTS
PARTIALLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E firm name A/E firm street address A/E firm city, state, zip code A/E firm phone number A/E firm POC engineering discipline <EDIT TEXT>:
Consultant firm name Consultant firm street address Consultant firm city, state, zip code Consultant firm phone number Consultant POC
UPGRADE CHILLER PLANT
BUILDING 200
79 MIDDLEVILLE RD, NORTHPORT, NY 11768
632-25-101
Revisions: Date:
MAY 8, 2026
B200
AREA OF
WORK
SCALE:
KEY PLAN
SUB-BASEMENT
1:100
KP
SCALE:
SUB-BASEMENT EQUIPMENT DEMOLITION PLAN
1/8" = 1'-0"
EQ-111
SGSG
SUB-BASEMENT
EQUIPMENT LAYOUT PLAN
SCALE:
SUB-BASEMENT NEW EQUIPMENT LAYOUT PLAN
1/8" = 1'-0"
GENERAL NOTES:
1. CONTRACTOR SHALL FURNISH HOUSEKEEPING PADS FOR ALL NEW
EQUIPMENT TO BE INSTALLED ON THE FLOOR.
ADDENDUM #01 9/11/2026
RELOCATED
AIR
COMPRESSOR
STEAM
CONDENSATE PIT
HV/2
HV/1
AC/11
AC/8
(E) (E) (E) (E)
(E) (E) (E)
(E) (E)
(E) (E)
CLIMATE CONTROL
ROOM
MEDICAL
GAS ROOM
CHILLER PUMP
ROOM
CHILLER ROOM (MER)
ELECT.
UPS ROOM
STAIR 5
TYP
SUPPLY
RETURN
AH/1
SHUTDOWN
7 6 5 4 3 2 1
S
R
Q.8
Q
P
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Fi le
P at h
/1 5/
1:
:0
AM
100% CONSTRUCTION
DOCUMENTS
PARTIALLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E firm name A/E firm street address A/E firm city, state, zip code A/E firm phone number A/E firm POC engineering discipline <EDIT TEXT>:
Consultant firm name Consultant firm street address Consultant firm city, state, zip code Consultant firm phone number Consultant…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .