This document is a Request for Proposal (RFP) for a construction project at the Tuscaloosa VA Medical Center. The solicitation (36C77625R0025) is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with a project value between $20 million and $50 million. The project involves comprehensive infrastructure upgrades, including demolition of the existing Greenhouse Building 101 and construction of a new standalone Data Center Building 151, with work encompassing electrical systems, power distribution, building management system interfaces, HVAC, communication infrastructure, physical security upgrades, and campus-wide fiber infrastructure.
The contract has a base performance period of 730 calendar days from the notice to proceed, with a total project scope including civil site work, mechanical enclosures, utility connections, landscaping, and new security features such as reinforced concrete ram-proof walls and bollards. The solicitation requires a bid guarantee of 20% of the proposal price (not exceeding $3,000,000) and performance and payment bonds. Proposals are due by 3:00 pm CDT on 04-22-2025, with a trade-off evaluation approach focusing on past performance and price. Bidders must be certified in the SBA Veteran Small Business Certification database and comply with specific limitations on subcontracting.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 86
36C77625R0025
X
03-11-2025
679-20-104
36C776
Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
Department of Veterans Affairs Program Contract Activity Central 6100 Oak Tree Blvd, Suite 490
Independence OH 44131
Dawn Schydzik dawn.schydzik@va.gov
In accordance with 38 U.S.C. § 8127 (Public Law 109-461), this procurement is set aside for SDVOSBs in a trade off evaluation approach.
The contractor shall provide all tools, equipment, materials, labor, supervision, and personnel, and shall do all things necessary, that will result in the completion of the EHRM Infrastructure Upgrades construction project, in accordance with the attached Specifications and Drawings.
This project is located at:
Tuscaloosa VA Medical Center (VAMC) 3701 Loop Road East Tuscaloosa, AL 35404
VAAR Magnitude of Construction: $20,000,000 to $50,000,000 NAICS Code 236220 and PSC Y1BG
Contractor is required to fill in Unique Identifier in Block No. 14 on Standard Form (SF) 1442.
All references in the Specs and Drawings to CLIN shall be replaced with the term "Line Item".
PLEASE NOTE: The Contractor agrees to attend any Post AwardConference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.
10 (TEN) 730
X X 52.211-10
X 10 (Ten)
0 (ZERO) 3:00pm CDT
04-22-2025
X
90 (NINETY)
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
36C776
Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
VAFSC
Department of Veterans Affairs Financial Services Center Invoices to be Submitted Electronically https://www.fsc.va.gov/einvoice.asp e-Invoice Setup Info Phone 877-489-6135 877-353-9791 512-460-5429
Jennifer Braaten
Table of Contents
PART I - THE SCHEDULE ............................................................... Error! Bookmark not defined.
SECTION A - SOLICITATION/CONTRACT FORM ......................... Error! Bookmark not defined.
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) .............................................................................. Error! Bookmark not defined.
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,
ALTERATION, OR REPAIR)– BACK ................................ Error! Bookmark not defined.
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
INFORMATION REGARDING PROPOSAL MATERIAL, BID GUARANTEE AND BONDS
1.1 BID MATERIAL:
1.2 BID GUARANTEE:
1.3 PAYMENT & PERFORMANCE BONDS:
1.4 TAXES:
INSTRUCTIONS, CONDITIONS, AND OTHER STATEMENTS TO OFFERORS
2.1 AVAILABILITY OF SOLICITATION DOCUMENTS
2.2 REQUEST FOR PROPOSAL:
2.3 SDVOSB SET-ASIDE
2.4 PRE-PROPOSAL SITE VISIT:
2.5 TECHNICAL QUESTIONS:
2.6 AMENDMENTS
2.7 PREPARATION OF PROPOSALS
2.8 PROPOSAL REQUIREMENTS
2.9 DETERMINATION OF RESPONSIBILITY
2.10 VETS 4212
2.11 SYSTEM FOR AWARD MANAGEMENT (SAM)
2.12 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE
ASSESSMENT REPORTING SYSTEM (CPARS)
2.13 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS
2.14 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER, OR PROJECT
MANAGER
2.15 52.216-1 TYPE OF CONTRACT (APR 1984)
2.16 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY
SITE OF THE WORK (MAY 2014)
2.17 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO
ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
2.18 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)
2.19 52.228-1 BID GUARANTEE (SEP 1996)
2.20 52.233-2 SERVICE OF PROTEST (SEP 2006)
2.21 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB
1995)
2.22 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
(FEB 1998)
2.23 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND
VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)
2.24 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)
2.25 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
2.26 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE
RESOLUTION (OCT 2018)
2.27 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY
ACCESSIBILITY NOTICE (FEB 2023)
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)
3.2 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025) ... 26
3.3 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS
AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
3.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
3.5 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—
CERTIFICATION (NOV 2021)
3.6 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND
REPRESENTATION (JUN 2020)
GENERAL CONDITIONS
4.1 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021)
4.2 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR
INFORMATION SYSTEMS (NOV 2021)
4.3 52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—
PROHIBITION (DEC 2023)
4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984)
4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(FEB 2024)
4.6 52.223-20 AEROSOLS (MAY 2024)
4.7 52.223-21 FOAMS (MAY 2024)
4.8 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE
AGREEMENTS (NOV 2023)
4.9 52.228-11 INDIVIDUAL SURETY—PLEDGE OF ASSETS (FEB 2021)(DEVIATION
APR 2020)
4.10 52.228-15 PERFORMANCE AND PAYMENT BONDS—CONSTRUCTION (JUN
2020)(DEVIATION APR 2020)
4.11 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
4.12 52.236-4 PHYSICAL DATA (APR 1984)
4.13 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
4.14 SUPPLEMENTAL INSURANCE REQUIREMENTS
4.15 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.16 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)
4.17 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR
PERSONNEL (MAY 2020)
4.18 VAAR 852.204-71 INFORMATION AND INFORMATION SYSTEMS SECURITY
(FEB 2023)
4.19 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)
4.20 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV
2018)
4.21 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(APR 2019)
4.22 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (APR
2019) ALTERNATE I (APR 2019)
4.23 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)
4.24 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)
ALTERNATE I (APR 2019)
4.25 VAAR 852.236-90 RESTRICTION ON SUBMISSION AND USE OF EQUAL
PRODUCTS (APR 2019)
4.26 VAAR 852.239-76 INFORMATION AND COMMUNICATION TECHNOLOGY
ACCESSIBILITY (FEB 2023)
4.27 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) .. 78
4.28 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT
(SEP 2019)
4.29 MANDATORY WRITTEN DISCLOSURES
4.30 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
4.31 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED
SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)
(DEVIATION)
4.32 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—
CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)
(DEVIATION)
4.33 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019)
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBE
R
DESCRIPTION OF
SUPPLIES/SERVI
CES
QUANTI
TY
UNI
T UNIT PRICE AMOUNT
1.00 JB _______________
Contractor shall supply all materials, supervision, and labor to complete Project 679-20-104 EHRM Infrastructure Upgrades – Tuscaloosa, AL per contract drawings and specifications. Work includes the demolition, installation, and new upgrades of the following infrastructure: Electrical (electrical panel upgrade, power (normal and emergency)), Bonding, UPS, Overhead power distribution in new Data Center, Building Management System interfaces, HVAC, expansion, and renovation of existing space, communication (Data outlets, patch panels, upgrade to Cat 6A cable), physical security upgrades, fiber infrastructure backbone campus wide within and between buildings, install diversified path to new Data Center for WAN, hazardous material abatement, demolition of Greenhouse Building 101, and construction of new stand-alone Data Center Building 151.
• Greenhouse Building 101: Work includes the demolition of existing Greenhouse Building 101, all existing utilities, site features, and septic system connected to the building.
• New Data Center Building 151: Work includes but not limited to civil site work, mechanical enclosures, walls, new sidewalks, site grading, drainage system, utility connections, landscaping, signage, and new gravity sewer pipe with manholes. New physical security features such as reinforced concrete ram-proof wall, fix-in-place bollards, and removable bollards.
• New Fiber duct bank network: Work includes but not limited to demolition and replacement of various site hardscapes such as asphalt roads, parking lots, concrete sidewalks, landscaping, signage, lighting, etc.
• Building locations include: 1, 2, 3, 4, 5, 6, 12, 17, 18, 38, 39, 40, 41, 46, 61, 63,101, 135, 137, 138, 143, 145, 146, 147, 149, 151, and site.
Contract Period: Base POP Begin: 730 calendar days from NTP POP End:
GRAND TOTAL _______________
NOTICE
1. Line Item 0001 (Base) contains all the work for this project.
2. Offerors must provide a lump sum price for Line Item 0001 (Base). Failure to do so may render their offeror as unacceptable.
3. Award will be made on Grand Total (Line Item 0001- Base).
4. Pricing shall be submitted in whole dollar values. Please do NOT include pricing in cents.
5. Contractor is required to fill in their Unique Entity Identifier number associate with SAM.gov in
Block No. 14 on Standard Form (SF) 1442.
6. PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.
INFORMATION REGARDING PROPOSAL MATERIAL, BID
GUARANTEE AND BONDS
1.1 BID MATERIAL:
Proposal materials consisting of drawings, specifications, and contract forms are included and/or attached as part of this Request For Proposal (RFP). The VA will not provide printed copies of drawings or specifications. It is the responsibility of the offeror to obtain the proposal materials in a time and manner sufficient to respond to this solicitation by the specified due date.
1.2 BID GUARANTEE:
A Bid Guarantee, Standard Form 24 (SF 24), is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for receipt of proposals, may result in the proposal being deemed unacceptable. Copies of the SF 24 may be obtained from https://www.gsa.gov/forms.
1.3 PAYMENT & PERFORMANCE BONDS:
The offeror to whom award is made will be required to furnish two bonds. A Payment Bond shall be provided on Standard Form 25A (SF 25A) and a Performance Bond shall be provided on Standard Form 25 (SF 25). Both bonds shall be submitted in accordance with FAR 52.228-15 Performance and Payment Bonds - Construction. Copies of SFs 25A and 25 may be obtained from https://www.gsa.gov/forms.
1.4 TAXES:
Contractor must take into account FAR 52.229-3; “Federal, State and Local Taxes” and its Special Note in their pricing. The FAR clause and its Special Note provide guidance on taxes being applied to pricing.
https://www.gsa.gov/forms https://www.gsa.gov/forms
INSTRUCTIONS, CONDITIONS, AND OTHER STATEMENTS TO
OFFERORS
2.1 AVAILABILITY OF SOLICITATION DOCUMENTS
All solicitation-related documents will be published to Contract Opportunities at https://sam.gov/.
2.2 REQUEST FOR PROPOSAL:
This is a Request for Proposal (RFP) in accordance with FAR Part 15. Award will be made to the offeror whose proposal represents the “best value” to the Government utilizing a Trade-offs method of evaluation.
An offer must be determined to meet the minimum requirements technically based on Factor 1- Past Performance submitted by the offeror in relevancy and confidence ratings compared with the SOW, Specs and Plans. The responsibility determination will be made in accordance with FAR 9.1, Responsible Prospective Contractors. All proposals shall be subject to evaluation by a team of Government personnel. The Government reserves the right to award without discussions based upon the initial evaluation of the proposals.
Evaluations will be based on the following evaluation factors:
1. Factor 1 Past Performance
2. Factor 2 Price
2.3 SDVOSB SET-ASIDE
This procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. Offers received from other than SDVOSBs will not be considered. All SDVOSBs must be listed as “certified” by the Small Business Administration (SBA) Veteran Small Business Certification (VetCert). Offerors must be certified in the SBA VetCert database (Veteran Small Business Certification (sba.gov)) at the time of proposal submission through the time of award. Failure to be certified from the time of proposal submission through the time of award will result in the offeror’s proposal being rejected.
2.4 PRE-PROPOSAL SITE VISIT:
A formal site visit has been scheduled for this project. This will be the only opportunity for potential offerors to visit the site. All potential offerors, subcontractors, and suppliers are strongly encouraged to attend this site visit.
All attendees are to meet at the following location:
Tuscaloosa VAMC 3701 Loop Road East Tuscaloosa, AL 35404 Building 5 Conference Rm. 210
At the following date and time: Wednesday, March 19, 2025, at 9:00 AM (CST)
If further direction is needed, please call to 205-554-2000 ext.3035.
https://sam.gov/ https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fveterans.certify.sba.gov%2F&data=05%7C01%7C%7C8e7e79ec26e24b76315a08dafed3d7c1%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638102483047735633%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=A6miKyttg2IAFGmDSciek4gm%2FPoHYc%2F0Uqk6dvC9Wlg%3D&reserved=0
2.5 TECHNICAL QUESTIONS:
Questions of a technical nature must be submitted by prospective offerors via e-mail to:
Dawn.Schydzik@va.gov and Jennifer.Braaten@va.gov . The subject line of each e-mail must read: EHRM Infrastructure Upgrades Construction project at the Tuscaloosa VAMC - Technical Questions. Oral questions of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS Friday, March 28, 2025, at 3:00 PM CST.
2.6 AMENDMENTS
Amendments to this solicitation will be posted at https://sam.gov/. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential offerors are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in a proposal being considered ineligible for award as incomplete.
2.7 PREPARATION OF PROPOSALS
The Government will not pay for any costs incurred in the preparation and submission of proposals.
2.8 PROPOSAL REQUIREMENTS
A. General:
1. Proposal Submission: Offerors must submit their proposals via e-mail to Dawn.Schydzik@va.gov and Jennifer.Braaten@va.gov. Proposals must be based on solicitation documents issued for RFP number 36C77625R0025.
Proposals will be in the format set forth in this document. Proposals shall be received on or before the date and time specified in Block 13 of the SF 1442.
There will be no public opening of the proposals. Only proposals submitted by email will be accepted. Hard-copy proposals will not be accepted.
B. Proposal Format:
1. Technical, Price and Administrative sections of the Offerors proposals will be evaluated independently; therefore, the Offeror must submit the proposal in three
(3) Volumes: Volume I Technical, Volume II Price and Volume III Administrative.
Offerors must send Volumes I, II and III as attachments in separate e-mails.
Each volume must be labeled with the Offeror's organization, business address, and VA Solicitation Number. Each volume must be submitted as searchable PDF documents attached to an e-mail. Portions of proposals submitted via drop-box, hyperlink, or format rather than a searchable PDF attached to an email will not be considered, which may render the proposal incomplete. The proposal, in its entirety, shall not exceed three (3) e-mails (one e-mail for each volume). Each e-mail, including its attachments, must be less than 5MB in size. Offerors must Include page numbers and its company name in the header or footer of each page of all attachments.
2. Volume I Technical: Offerors shall format Volume I Technical proposal as listed below. The specific evaluation criteria and methodology is below.
a. Volume I, Technical must include a title page, detailed table of contents and preface Volume I Technical shall be submitted in one
(1) PDF document for Volume I Technical and shall not exceed a total of 50 pages. The title page, table of contents and preface are excluded from the page limits. Offerors must not include any price or price related material in the Volume I Technical proposal. Use mailto:Dawn.Schydzik@va.gov mailto:Jennifer.Braaten@va.gov https://sam.gov/ mailto:Dawn.Schydzik@va.gov mailto:Jennifer.Braaten@va.gov graphic presentations where such use will contribute to the compactness and clarity of the proposal.
b. A page is defined as each face of an 8.5 X 11-inch sheet of paper with 1-inch margins around the page perimeter containing information. All information (except for document numbers, page numbers, etc.) must be provided in an image area of 7 X 9 inches.
The background color of each page of the submission shall be white or ivory stock and each page shall count as one (1) page. Excess pages will not be evaluated. Text lines must be single-spaced, and proposals shall be submitted using Times New Roman, with font no smaller than 12 point with normal proportional spacing. A smaller font size for any graphics presented in a proposal is permitted as long as the information is legible to the human eye. Fonts other than Times New Roman are permissible in the presentation of graphic material only.
c. The Offeror’s proposal must address each evaluation factor and subfactor listed in this solicitation. Failure to submit a proposal in the format required that addresses each factor and subfactor may result in the proposal being deemed ineligible for award.
3. Volume II Price: Offerors shall provide a breakdown of their base bid line item on the price breakdown form provided as a solicitation attachment 17. Offerors shall provide pricing on each line item on the SF1442 continuation price sheet.
Note: In accordance with (IAW) FAR 28.101-1, a bid-bond is required; therefore, a performance and payment bond is required. Offerors shall format the Volume II Price proposal as listed below. The specific evaluation criteria and methodology is below.
a. Volume II Price shall not exceed a total of FIFTY (50) pages in Times New Roman size 12 font.
b. Offerors shall complete the Price Schedule in part A of this solicitation.
c. Offerors shall ensure the Signed Standard Form (SF) 1442 is provided.
Offerors shall acknowledge receiving amendments by filling out section 19 of the SF 1442.
d. Bid Guarantee: The Offeror shall furnish a bid guarantee as stipulated in the solicitation (see FAR 52.228-1). Pricing shall be Firm Fixed Price.
The bid guarantee shall be provided on Standard Form 24. The bid bond shall be submitted as part of the electronic submission. In accordance with Class Deviation from the Federal Acquisition Regulation to Eliminate Hard Copy Original Documents, Signatures, Notarization, Seals on Bonds, and Other Seals for Certain Contract Requirements issued by the VA Executive Director, Office of Acquisition and Logistics and the Senior Procurement Executive on May 11, 2020, the requirement for an original bond, with the original signatures, notarization and seals has been eliminated.
e. Failure to furnish the required bid guarantee on the proper form and for the proper amount by the time specified in Block 13 of SF 1442, may result in rejection of the proposal.
4. Volume III Administrative Information: If an offeror fails to include all of the below information in its proposal, then the proposal may be deemed incomplete and ineligible for award.
a. Representations & Certifications:
As the provision at FAR 52.204-7 is included in the solicitation, FAR 52.204-8 (d) applies and the fill-in for FAR 52.204-8 (b)(2) does not need to be completed. The offeror is required to complete the annual representations and certifications electronically at https://www.sam.gov.
https://www.sam.gov/
b. Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment:
Offeror shall provide their response to FAR 52.204-24 (d) Representation.
c. Information Regarding Responsibility Matters:
Offeror shall provide their response to FAR 52.209-7 (b) Information Regarding Responsibility Matters.
d. Violation of Arms Controls Treaties or Agreements:
Offeror shall provide their response to FAR 52.209-13 (b) Violation of Arms Controls Treaties or Agreements.
e. Tax on Certain Foreign Procurements – Notice and Representation:
The offeror shall provide their response to FAR 52.229-11 (d).
f. Post Award Small Business Program Representations:
Offeror shall provide their response to FAR 52.219-28 (h), if applicable.
g. Limitations on Subcontracting:
The offeror shall complete and sign the VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction required in VAAR 852.219-75 and return it with their proposal submission attached as a separate document (Limitations on Subcontracting Attachment - 13). The completed and signed form will become part of the official award documentation.
h. Notice to SDVOSB Joint Venture/Mentor Protegee: Any offeror submitting a proposal as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture
(1) have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR § 128.402 and (2) will perform the contract in compliance with the joint venture agreement. Failure to submit the certification with the offeror’s proposal, may result in the rejection of the proposal.
C. Technical Proposal Requirements: The proposal must address the following submission requirements for Factor 1 Past Performance.
1. Factor 1 The Past Performance evaluation will assess the relative risks associated with an Offeror's likelihood of success in fulfilling the solicitation's requirements as indicated by that Offeror's record of past performance. In this context, “Offeror” refers to the proposed prime SDVOSB. A single past performance rating will be based on the total package submitted by the offeror.
The Government will conduct a performance risk assessment based on the relevancy and recency of the Offeror's past performance, as it relates to the probability of successful accomplishment of the required effort for project #679- 20-104. Offerors are cautioned that the Government will review available past performance data available in the Contractors Performance Assessment Reporting System (CPARS). The Government reserves the right to obtain past performance information from any available source and may contact customers other than those identified by the Offeror when evaluating past performance.
The Government will review aspects of the offeror’s past performance by the final costs, project schedule, and performance. Areas to be evaluated may include but are not limited to quality of construction service, timeliness of performance or adherence to performance schedules, controlling project cost, and/or effectiveness in program management (to include use and control of subcontractors).
Per FAR 15.305(a)(2)(iv), an Offeror without a record of relevant past performance or for whom information on past performance is not available, the Offeror may not be evaluated favorably or unfavorably on past performance.
Recent Successful Past Performance: Offerors are required to provide their recent, substantially complete (>75% complete), successful performance under contracts that demonstrate performance of telecommunications infrastructure to standards equal or similar to the VA Infrastructure Standard for Telecommunication Spaces (ISTS) and construction. Similar in the scope of work related to the Tuscaloosa VAMC scope of Project #679-20-104, as the prime contractor within the last six (6) years from the date this solicitation was issued.
Offeror shall provide a detailed summary of the most recent three (3) projects that includes:
1. Owner Government Agency/Company which awarded contract and their contact information (Name, Title, Telephone Number, Email);
2. Contract Number;
3. Location (physical address) of project performance;
4. Project Name;
5. Project Description (Details of construction requirements, challenges, and solutions);
6. Project Cost and Cost Control Measures (original and final contract costs, contract mods, cost containment measures, value engineering, etc.);
7. Project Performance Period (Initial and actual, schedule impacts and efficiencies); and
8. Subcontractors (Name, Roles, Responsibilities, Percent of work).
9. In addition, for each project submitted, Offerors shall provide a narrative that describes recent successful performance in the construction of infrastructure upgrades similar in scope of work to “Project 679-20-104 EHRM Infrastructure Upgrades – Tuscaloosa, AL. Information shall include details on complexity, magnitude, challenges, and degree of success. Offeror is encouraged to include supporting documents such as photographs that support the narrative. The narrative should discuss items such as challenges with schedule, unforeseen site conditions, or other unusual factors, and provide details on how the offeror overcame those challenges.
Since the Government may not necessarily interview all the sources provided by the Offerors, it is incumbent upon the Offerors to explain the relevance of the data provided. Offerors are reminded that the burden of proving low performance risk rests with the Offerors.
D. Volume II – Price Proposal Requirements
Offerors shall provide a breakdown of their base bid line item on the price breakdown form provided as a solicitation Attachment 17. Offerors shall provide pricing on each line item on the SF1442 continuation price sheet. Note: Note: In accordance with FAR
28.101-1, this solicitation requires both a bid guarantee and a performance and payment bond.
To be eligible for award, Offerors are required to be SDVOSB certified by SBA.
• 2-page SF1442 completed and signed by the signatory authority. The signature shall be a wet signature, and then the document may be scanned and submitted electronically. Microsoft Word “signatures” in different fonts, digital signatures, and scanned jpeg signatures are not allowed. All blocks under section “OFFER” on page 2 of SF1442 (Item 14 thru 20C) shall be completed.
• SF1442 Continuation Price Sheet and Price breakout form shall be submitted.
• Reps and Certs and any provisions/clauses that require offeror’s responses shall be submitted.
• Acknowledgement of ALL Amendments.
• Proof VETS 4212 has been filed for 2024.
• Duly executed Bid Bond/Guarantee: Offerors shall use form SF24 Bid Bond. Bid bonds that are found noncompliant with bid guarantee requirements will result in the rejection of the proposal. See clause 52.228-1 Bid Guarantee for additional information on the compliance with bid guarantee requirements. This requirement shall be emailed as part of VOLUME II. The Contracting Officer may request a physical copy of the bid bond be mailed later.
• It is solely the responsibility of the offerors to ensure the Government receives the proposal before or on the exact due date and time set forth in this solicitation.
• VETS-4212: Title 38, USC Section 4212(d) and Public Law 105-339, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. This VETS-4212 report can be submitted per the instructions at https://www.dol.gov/agencies/vets/programs/vets4212. For assistance contact VETS4212 customer support at 1-866-237-0275 or vets4212-customersupport@dolncc.dol.gov. For procurement awards in excess of $150,000, this report must be completed and accepted prior to any Federal contract award.
Therefore, all potential contractors are encouraged to file every year.
All inquiries about this solicitation shall be directly submitted in writing via email to all three points of contacts listed here Dawn.Schydzik@va.gov and Jennifer.Braaten@va.gov. No phone or faxed inquiry will be accepted. Government’s responses to inquiries will be issued in the form of Amendment(s) to be posted on the same website where this solicitation is posted: www. SAM.gov. All interested offerors including those submitting inquiries are required to monitor the above website for any posted amendments and acknowledge them in accordance with the instructions provided in the amendments as well as in this solicitation.
E. Evaluation Methodology:
Factor 1, Past Performance: Past performance demonstrating higher levels of success and quality on recent and relevant projects similar in scope and magnitude to this mailto:Dawn.Schydzik@va.gov mailto:Jennifer.Braaten@va.gov solicitation present lower levels of risk and will be more favorably rated. Offerors should make every attempt to provide past performance for projects cited in factor 1 by furnishing a Past Performance Questionnaire completed by the customer or a CPARS rating, if applicable and available.
Contractors without relevant past performance or for whom past performance information is not available, the offeror cannot be evaluated favorably nor unfavorably on past performance. Past performance evaluations may also be conducted using information obtained from CPARS and any other sources deemed appropriate by the CO. Other sources may include, but are not limited to, inquiries of owner representative(s), Contractor Performance Assessment Reporting System (CPARS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
Factor 2, Price: The total evaluated price will be determined by the Offeror's price provided on the Price Schedule in include base line item.
Note: If none of the offerors are within the available funding limitation or is otherwise determined to be other than fair and reasonable, the VA reserves the right to enter into discussions with those offerors who are determined to be within the competitive range.
If the Offeror communicates in its proposal any qualifications, exceptions, exclusions, or conditions to the proposed prices in the Offerors proposal documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.
2.9 DETERMINATION OF RESPONSIBILITY
A Determination of Responsibility will be conducted for the apparent successful offeror prior to award of the project. The above information, along with other information obtained from Government systems, such as, but not limited to the OSHA and EPA online inspection history databases, as well as any other information the Contracting Officer has determined to be valid, will be used to make the Determination of Responsibility. NOTE: Any information received by the Government that would be cause for a negative Determination of Responsibility may make the offeror ineligible for award.
2.10 VETS 4212
Title 38, USC Section 4212(d), codified at 41 CFR Section 61-300, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS-4212 reporting information can be done electronically at:
http://www.dol.gov/vets/vets4212.htm. Award cannot be made unless the awardee has filed their VETS-4212 report. Therefore, all offerors are encouraged to file every year. The Contracting Officer may request a copy of the email confirmation of receipt notification prior to awarding the project.
2.11 SYSTEM FOR AWARD MANAGEMENT (SAM)
Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at https://sam.gov/ and enter all mandatory information into the system. Offerors are required to be registered in SAM at the time an offer is submitted in order to comply with the annual representations and certifications requirements (see FAR 52.204-7).
http://www.dol.gov/vets/vets4212.htm https://sam.gov/
2.12 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR
PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS)
As prescribed in Federal Acquisition Regulation (FAR) Part 42.1502(e), the Department of Veterans Affairs (VA) evaluates contractor past performance on all construction contracts that exceed $750,000 and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement, VA uses an online database, CPARS, which is maintained by the Naval Seal Logistics Center in Portsmouth, Virginia. CPARS is available to all Federal agencies and is the system used to collect and retrieve performance assessment reports used in source selection determinations. CPARS also includes access to the federal awardee performance and integrity information system (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information.
Each contractor whose contract award is estimated to exceed $750,000 is required to register with CPARS database at the following web address: http://www.cpars.gov/. Help in registering can be obtained by contacting Customer Support Desk @ DSN: 684-1690 or COMM: 207- 438- 1690. Registration should occur no later than thirty days after contract award and must be kept current should there be any change to the contractor’s registered representative.
For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, the contracting officer will evaluate the contractor’s performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor’s designated representative for comment. The contractor representative will have thirty days to submit any comments and re-assign the report to the VA contracting officer.
Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government’s evaluation being placed on file in the database with a statement that the contractor failed to respond.
2.13 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT
CHECKS
All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation is commensurate with the level of access needed to perform all work as identified in the solicitation documents. This requirement is applicable to all subcontractor personnel requiring the same access. As per VA Directive 0710, costs of background investigations will be borne by the contractor. Please be advised that the awardee will need to coordinate with the VA Medical Center concerning badging requirements.
2.14 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER, OR
PROJECT MANAGER
Any reference contained within the solicitation/contract specifications and/or drawings to the “VA Engineer,” “Resident Engineer,” or “Project Manager,” or their abbreviations shall be replaced with “Contracting Officer’s Representative (COR).”
http://www.cpars.gov/
2.15 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.16 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—
SECONDARY SITE OF THE WORK (MAY 2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.17 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO
ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION
(FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
20.6 % 6.9 %
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is
Alabama
(End of Provision)
2.18 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—
CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "designated country construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials Under Trade Agreements" (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.19 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
2.20 52.233-2 SERVICE OF PROTEST (SEP 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
CO - William Henkel
William.Henkel@va.gov Hand-Carried Address:
William Henkel
Department of Veterans Affairs Progam Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence, OH 44131 Mailing Address:
Department of Veterans Affairs
Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.21 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I
(FEB 1995)
(a)…
This is the start of the file's text. The full file is on GovTribe.