S06 36C77625Q0137 0001.pdf

PDF 270 KB Posted

Attached to
Q702--Brainerd Multi-Specialty Clinic IOT&A
Solicitation number
36C77625Q0137
Issued by

About this file

This document is an Amendment (0001) to Solicitation 36C77625Q0137 for the Brainerd Multi-Specialty Clinic, issued by the Department of Veterans Affairs Program Contracting Activity Central. The amendment includes a series of vendor questions and government responses regarding the project, which involves constructing a new 41,000 square foot clinic that will expand the existing facility's footprint by 15,000 square feet. Key details include clarifications on design requirements, such as utilizing BIM (Building Information Modeling) for 3D mockups, Revit model provisions, warehousing specifications within 5 miles of the clinic site, and activation services.

The amendment addresses multiple technical aspects of the project, including design submittal timelines, change management processes, equipment warehousing, and logistics. Significant points include: no physical mockups are required, VA Logistics will handle barcode inventory and asset management, the IOTA contractor must develop a storage and re-use plan for equipment, and a certified Biomedical Equipment Technician (BMET) must be onsite during installation. The project involves creating a new build-to-suit lease replacement facility for the St. Cloud Veterans Healthcare System in Brainerd, Minnesota, with a focus on improving veterans' access to comprehensive medical services.

View the file

Other files

File Type Posted
ATTACHMENT A - Brainerd IOTA PWS revised.pdf PDF
ATTACHMENT M - Procurement Package Template and 6500 12.16.2024.pdf PDF
ATTACHMENT B - Brainerd Multi-Specialty Activation Project Timelines.xlsx XLSX spreadsheet
ATTACHMENT C - Travel Authorization Request.pdf PDF
ATTACHMENT D - Contract Staff Roster.pdf PDF
ATTACHMENT E - Risk Management Plan and Register Template.xlsx XLSX spreadsheet
ATTACHMENT G - WBS Template.pdf PDF
ATTACHMENT O - PDAT Summary - Brainerd.pdf PDF
ATTACHMENT Q - Wage Determination.pdf PDF
ATTACHMENT R - Brainerd Equipment List.xlsx XLSX spreadsheet
S02 36C77625Q0137.pdf PDF
Addendum to 52.212-2 Brainerd Evaluation Factors.docx DOCX document
ATTACHMENT H - Contents Acq Plan Template 9.21.2023.xlsx XLSX spreadsheet
ATTACHMENT J - Integrated Move Plan Template.xlsx XLSX spreadsheet
ATTACHMENT S - Pricing Worksheet.xlsx XLSX spreadsheet
Addendum to 52.212-1 - Brainerd Instructions.docx DOCX document
ATTACHMENT I - Equipment Inventory_ReUse and Disposal Plan Template.xlsx XLSX spreadsheet
ATTACHMENT K - Proposed FTE Report.xlsx XLSX spreadsheet
ATTACHMENT N - QASP.docx DOCX document
ATTACHMENT A - Brainerd IOTA - Final PWS.pdf PDF
ATTACHMENT F - Change Management Plan and Log Template.xlsx XLSX spreadsheet
ATTACHMENT L - Furniture IDIQ Templates.pdf PDF
ATTACHMENT P - VSC Security Package 3.11.2025.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 4

0001 06-25-2025

656-25-3-896-0009

36C776

Department of Veterans Affairs

Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490

Independence OH 44131

Lejane Baker, Contract Specialist

Lejane.Baker@va.gov

36C776

Department of Veterans Affairs

Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490

Independence OH 44131

To all Offerors/Bidders

36C77625Q0137

X

X X

656-3650152-896-841300-2514-2514 SPY009167

X 1

The above referenced solicitation in block 9A for the required services of the Brainerd Multi-Specialty Clinic for St.

Cloud Veterans Healthcare System Brainerd, MN is hereby amended as follows:

1. Vendor questions are in Black and Government answers are in Red; see below.

2. Attachment A - Performance Work Statement (PWS) Section 16.2.9 has been revised; see attached.

3. Please note Technical Questions are no longer being excepted.

Mercedes Blanton

Contracting Officer

VA-VHA-RPOE-2022-221832

mailto:Lejane.Baker@va.gov

1. Question: The project describes a new 41,000 sf clinic expanding the existing footprint by 15,000sf. Is this a stand-alone new facility and will not connect with any other existing facility?

a. Answer: Correct, this is a new build-to-suit lease replacement facility.

2. Question: What is the current design schedule so we know when DD1, DD2, is to occur so we can determine our schedule to support the requirements in the PWS that our comments?

a. Answer: A CFM IMS schedule will be provided post award to awarded IOTA vendor. This will include all design milestone dates.

3. Question: Who has the responsibility to ensure SCM and BIOMED participate in user group meetings?

a. Answer: The contract COR/ACOR.

4. Question: Can the 3D mockups be done digitally if everything can show via technology including ceiling mounted items, wall mounted, utilities etc.?

a. Answer: 3-D mockups should utilize BIM capability, 3-D modeling via a rending platform like AutoDesk (Revit/AutoCAD). There is no requirement for physical mock-ups in this PWS.

5. Question: If the answer is no where are these mockups to be built?

a. Answer: There is no requirement for physical mock-ups in this PWS.

6. Question: This is not a CLC it’s a clinic we are confused by the language about patient rooms in the CLC? (see below)

a. Answer: Attachment A - Performance Work Statement (PWS) Section 16.2.9 has been revised.

7. Question: The projects must meet certain timelines to any approvals for equipment or changes must be completed quickly what is the SLA with BIOMED, supply chain and the

CFM RE to approve or deny requests?

a. Answer: Please see PWS Section 16.1.5 Change Management Plan and Log for details regarding changes to equipment lists developed by IOTA/VAMC.

8. Question: Design Submittal 1 – what is the current estimated date for DD1? How much time prior to DD1 does our information have to be completed – same question for DD2?

a. Answer: A CFM IMS schedule will be provided post award to awarded IOTA vendor. This will include all design milestone dates.

9. Question: What is the requirement from the AE to provide us the latest version of the

Revit model showing any changes made as a result of user group meetings DD1, DD2?

We will need this information timely to adhere to the contract requirements.

a. Answer: Per CFM contract, Lessor must provide Revit model at DID2

Submission Approval – prior to CD1 drawing submission.

10. Question: Will we have to complete any TAC packages?

a. Answer: No.

11. Question: 16.2 When will we receive the Revit model?

a. Answer: Per CFM contract, Lessor must provide Revit model at DID2

Submission Approval – prior to CD1 drawing submission.

12. Question: Will we receive all utilities layers In Revit? pdf? AutoCAD?

a. Answer: All layers will be provided in each iteration of design submittal via pdf, once Revit model is available, IOTA shall work with COR to identify layers required for file transfer.

13. Question: Will the AE drawings also indicate where wall blocking is to be installed?

a. Answer: Yes.

14. Question: It has been our experience there is always requests for changes that will impact MEP, given the new approval process timelines. What is the remedy if the approval process takes so long that it impacts the construction schedule thus a delay?

a. Answer: IOTA contractor to work with COR on change management plan to address if MEP impacted change is prioritized as high importance with VAMC leadership to submit through the CFM user requested change management process.

15. Question: Master Key Plan—is there a local VA locksmith that will assist?

a. Answer: Yes, they will be available to consult on key scheduling development.

16. Question: 17.2 Warehousing - Why only 5 miles from the Brainard clinic site? What if there are no adequate solutions within 5 miles? WE do not have an address to even consider this. Will it be the IOTA contractor’s responsibility to conduct safety contractors all equipment, barcode everything and input into the Maximo system in the warehouse?

Will we get access and training to use Maximo?

a. Answer: VA requires the warehouse to be located in close proximity to the

Brainerd Lease site, government reserves the right to distinguish what is geographically acceptable at time of awardee’s warehouse submittal if availability is located greater than the required 5-mile radius. VA Logistics will provide the

Contractor with barcode labels to attach to incoming warehoused equipment after

Contractor provides receiving report. Contractor will be required to adhere to equipment once they deploy it to site and original packaging is removed. VA

Logistics captures product data to satisfy internal and government inventory management requirements. VA logistics team will be responsible for inputting into the VA asset management system. VA Logistics shall provide the contractor with the barcoding inventory, for site verification as equipment is deployed and for ease of updating acquisition information required for maintaining in the VHA

Activation Project SharePoint page.

17. Question: How much space will IT to store the equipment?

a. Answer: IOTA contractor to develop storage plan based on non-imaged OIT end user equipment planning during UGM process.

18. Question: 17.3 Activation Services – is there any specific reuse equipment planned other that the general phrase in the PWS?

a. Answer: VAMC is requiring IOTA contractor to develop a Re-Use plan during acquisition planning efforts of this contract. This is TBD, however….

19. Question: Is it the IOTA contractor scope to have a certified BMET onsite during the installation to support the VA BioMed?

a. Answer: Yes, please see PWS Section 17.4.

20. Question: So that we can estimate the potential reuse please provide an existing inventory of the current equipment.

a. Answer: VAMC is requiring IOTA contractor to develop a Re-Use plan during acquisition planning efforts of this contract. An existing Brainerd Clinic

Equipment Inventory List will be provided to awarded vendor post-award.

21. Question: IF we have already installed barcodes as part of the warehousing requirements, why would we add more barcodes in this section from logistics?

a. Answer: VA Logistics will provide the Contractor with barcode labels to attach to incoming warehoused equipment after Contractor provides receiving report.

Contractor will be required to adhere to equipment once they deploy it to site and original packaging is removed. VA Logistics captures product data to satisfy internal and government inventory management requirements. VA logistics team will be responsible for inputting into the VA asset management system. VA

Logistics shall provide the contractor with the barcoding inventory, for site verification as equipment is deployed and for ease of updating acquisition information required for maintaining in the VHA Activation Project SharePoint page.

ATTACHMENT A - Brainerd IOTA PWS revised.

End of Document

Amendment 0001

File details come from the government source that posted it. Updated .