VBAY-001_ELEC_BULLETIN 1_STAMPED.pdf

PDF 19 MB Posted

Attached to
Y1DA--516-21-106 EHRM Infrastructure Upgrades Construction - Bay Pines VAMC
Solicitation number
36C77625B0023
Issued by

About this file

This document appears to be a technical drawing and specification set for an Electronic Health Record Management (EHRM) Infrastructure Upgrade project at the Bay Pines VA Healthcare System in St. Petersburg, Florida. The file contains multiple drawing sheets covering electrical and telecommunications systems across various buildings.

Key details include:

  1. Project Scope:
  • Infrastructure upgrades for multiple buildings on the VA healthcare campus
  • Comprehensive telecommunications and electrical system improvements
  • Focuses on creating physically diverse and redundant fiber optic micro-duct cabling pathways
  • Project number is 516-21-106
  • Located at 10000 Bay Pines Boulevard, St. Petersburg, FL
  1. Technical Highlights:
  • Provides air-blown fiber optic micro-duct cabling systems between buildings
  • Implements redundant "A" and "B" pathway segments for network reliability
  • Upgrades telecommunications rooms in multiple buildings
  • Includes data center infrastructure improvements in Building 02
  • Utilizes Sumitomo Future-Flex cabling solution
  • Involves modifications to existing electrical and communications systems
  1. Key Buildings Involved:
  • Building 01, 02, 100 and others
  • Includes first, second, and third floor system plans
  • Upgrades telecommunications rooms and data center infrastructure

The project appears to be in the final bid document stage, with the most recent bulletin dated 10/22/2025.

View the file

Other files

File Type Posted
36C77625B0023 Revised - 11-5-25.pdf PDF
ISTS_31_Apx_B_Pages.pdf PDF
36C77625B0023 0009.pdf PDF
36C77625B0023 Updated - 10-27-25.pdf PDF
2025-10-21 CU101-CU104_VBAY Revised.pdf PDF
36C77625B0023 0008.pdf PDF
PACS report.xlsx XLSX spreadsheet
Technical Questions_VBAY - RFI Responses - Final Responses 10.22.25.pdf PDF
2021 VAMC Asbestos Reinspection Report.pdf PDF
36C77625B0023 0007.pdf PDF
Technical Questions Spreadsheet - Bay Pines EHRM - REV 9-8-25.pdf PDF
36C77625B0023 0006.pdf PDF
Technical Questions Spreadsheet - Bay Pines EHRM - 9-5-25.docx DOCX document
0005 - SPEC 26 05 11.pdf PDF
36C77625B0023 0005.pdf PDF
Technical Questions Spreadsheet - Bay Pines EHRM - 8-29-25.docx DOCX document
36C77625B0023 0004.pdf PDF
36C77625B0023 0003.pdf PDF
36C77625B0023 0002.pdf PDF
Site Visit Sign-in Sheet - Bay Pines EHRM 7-15-25.pdf PDF
36C77625B0023 0001.pdf PDF
ATTACHMENT 4 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 1 - Specifications.pdf PDF
36C77625B0023 - 7-2-25.pdf PDF
ATTACHMENT 2 - Drawings.pdf PDF
ATTACHMENT 5 - Construction Wage Rates - Pinellas 5-23-25.pdf PDF
ATTACHMENT 6 - Site Visit Instructions.pdf PDF
ATTACHMENT 3 - Pre-Construction Risk Assessment.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1P 1 POLE (2P, 3P, 4P, ETC.)

A AMPERE

AC ABOVE COUNTER, AIR CONDITIONER

ACLG ABOVE CEILING

ADO AUTOMATIC DOOR OPENER

AF AMP FRAME

A.F.F. ABOVE FINISHED FLOOR

A.F.G. ABOVE FINISHED GRADE

AFI ARC FAULT CIRCUIT INTERRUPTER

AHU AIR HANDLING UNIT

AL ALUMINUM

ALT ALTERNATE

AMP AMPERE

AMPL AMPLIFIER

ANNUN ANNUNCIATOR

APPROX APPROXIMATELY

AQ-STAT AQUASTAT

ARCH ARCHITECT, ARCHITECTURAL

AS AMP SWITCH

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AWG AMERICAN WIRE GAUGE

BATT BATTERY

BD BOARD

BLDG BUILDING

BMS BUILDING MANAGEMENT SYSTEM

C CONDUIT, CENTER LINE

CAB CABINET

CAT CATALOG

CATV CABLE TELEVISION

CB CIRCUIT BREAKER

CCOFM CLINICAL CENTER OFFICE OF FACILITY

MANAGEMENT

CCTV CLOSED CIRCUIT TELEVISION

CIT CENTER FOR INFORMATION TECHNOLOGY

CKT CIRCUIT

CLG CEILING

COMB COMBINATION

CMPR COMPRESSOR

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUATION OR CONTINUOUS

CONTR CONTRACTOR

CONV CONVECTOR

CP CIRCULATING PUMP

CRT CATHODE-RAY TUBE

CT CURRENT TRANSFORMER

CTR CENTER

CU COPPER

DCP DOMESTIC WATER CIRCULATING PUMP

DDCM DIVISION OF DESIGN AND CONSTRUCTION

MANAGEMENT

DEPT DEPARTMENT

DET DETAIL

DEP DIVISION OF ENVIRONMENTAL

PROTECTION

DFOM DIVISION OF FACILITIES OPERATIONS AND

MAINTENANCE

DFM DIVISION OF THE FIRE MARSHAL

DFP DIVISION OF FACILITIES PLANNING

DFS DIVISION OF FACILITIES STEWARDSHIP

DIA DIAMETER

DISC DISCONNECT

DIST DISTRIBUTION

DN DOWN

DOHS DIVISION OF OCCUPATIONAL HEALTH AND

SAFETY

DPR DAMPER

DPSM DIVISION OF PHYSICAL SECURITY

MANAGEMENT

DRS DIVISION OF RADIATION SAFETY

DS SAFETY DISCONNECT SWITCH

DT DOUBLE THROW

DTR DIVISION OF TECHNICAL RESOURCES

DWG, DWGS DRAWING, DRAWING(S)

EC ELECTRICAL CONTRACTOR

ELEC ELECTRIC, ELECTRICAL

ELEV ELEVATOR

EM EMERGENCY

EMS ENERGY MANAGEMENT SYSTEM

EMT ELECTRICAL METALLIC TUBING

EP ELECTRIC PNEUMATIC

ETR EXISTING TO REMAIN

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXH EXHAUST

EXP EXPLOSION PROOF

FA FIRE ALARM

FABP FIRE ALARM BOOSTER POWER SUPPLY PANEL

FACNET FACILITIES NETWORK SYSTEM

FACP FIRE ALARM CONTROL PANEL

FCU FAN COIL UNIT

FIXT FIXTURE

FLR FLOOR

FLUOR FLUORESCENT

FT FEET

FU FUSE

FSS FUSED SAFETY SWITCH

GA GAUGE

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEN GENERATOR

GFCI, GFI GROUND FAULT CIRCUIT INTERRUPTER

GFP GROUND FAULT PROTECTOR

GND GROUND

GRS GALVANIZED RIGID STEEL (CONDUIT)

GYP BD GYPSUM BOARD

HOA HAND-OFF-AUTOMATIC

HORIZ HORIZONTAL

HP HORSEPOWER

HPF HIGH POWER FACTOR

HT HEIGHT

HTG HEATING

HTR HEATER

HV HIGH VOLTAGE

HVAC HEATING, VENTILATING, AND AIR

CONDITIONING

HWP HYDRONIC WATER PUMP

IC INTERRUPTING CAPACITY

IG ISOLATED GROUND

IMC INTERMEDIATE METAL CONDUIT

IN INCHES

INCAND INCANDESCENT

IR INFRARED

I/W INTERLOCK WITH

J-BOX JUNCTION BOX

KV KILOVOLT

KVA KILOVOLT-AMPERE

KVAR KILOVOLT-AMPERE REACTIVE

KW KILOWATT

KWH KILOWATT-HOUR

LOC LOCATE, LOCATION

LT LIGHT

LTG LIGHTING

LTNG LIGHTNING

LV LOW VOLTAGE

MAX MAXIMUM

MAG.S MAGNETIC STARTER

M/C MOMENTARY CONTACT

MC MECHANICAL CONTRACTOR

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDC MAIN DISTRIBUTION CENTER

MDP MAIN DISTRIBUTION PANEL

MFR MANUFACTURER

MFS MAIN FUSED DISCONNECT SWITCH

MH MANHOLE

MIC MICROPHONE

MIN MINIMUM

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MMS MANUAL MOTOR STARTER

MOA MULTIOUTLET ASSEMBLY

MSP MOTOR STARTER PANELBOARD

MSBD MAIN SWITCHBOARD

MT MOUNT

MT.C EMPTY CONDUIT

MTS MANUAL TRANSFER SWITCH

MTR MOTOR, MOTORIZED

N.C. NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURER'S

ASSOCIATION

NFSS NON-FUSED SAFETY SWITCH

NIC NOT IN CONTRACT

NIH NATIONAL INSTITUTES OF HEALTH

NL NIGHT LIGHT

N.O. NORMALLY OPEN

NPF NORMAL POWER FACTOR

NTS NOT TO SCALE

OH OVERHEAD

OHPE OFFICE OF HOSPITAL PHYSICAL ENVIRONMENT

OL OVERLOADS

P PLATE

PA PUBLIC ADDRESS

PB PULL BOX, PUSH BUTTON

PE PNEUMATIC ELECTRIC

PED PEDESTAL

PF POWER FACTOR

PH PHASE

PIV POST INDICATING VALVE

PNL PANEL

PO PROJECT OFFICER

PP POWER POLE

PR PAIR

PRI PRIMARY

PROJ PROJECTION

PRV POWER ROOF VENTILATOR

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE (CONDUIT)

ABBREVIATIONS LIST

PWR POWER

QTY., QUAN QUANTITY

RCPT RECEPTACLE

REQD REQUIRED

RM ROOM

RSC RIGID STEEL CONDUIT

RTU ROOF TOP UNIT

SC SURFACE CONDUIT

SEC SECONDARY

SHT SHEET

SIM SIMILAR

S/N SOLID NEUTRAL

SPEC SPECIFICATION

SPKR SPEAKER

SP SPARE

SR SURFACE RACEWAY

SS STAINLESS STEEL

SSW SELECTOR SWITCH

S/S STOP/START PUSHBUTTONS

STA STATION

STD STANDARD

SURF SURFACE MOUNTED

SW SWITCH

SWBD SWITCHBOARD

SYM SYMMETRICAL

SYS SYSTEM

TE TELECOMMUNICATIONS ENCLOSURE

TEL TELEPHONE

TERM TERMINAL

TL TWIST LOCK

TR TELECOMMUNICATIONS ROOM

T-STAT THERMOSTAT

TTC TELEPHONE TERMINAL CABINET

TV TELEVISION

TVTC TELEVISION TERMINAL CABINET

TYP. TYPICAL

UC UNDER COUNTER

UE UNDERGROUND ELECTRICAL

UEB UTILITIES ENGINEERING BRANCH

UG UNDERGROUND

UH UNIT HEATER

U.N.O. UNLESS NOTED OTHERWISE

UT UNDERGROUND TELEPHONE

UTIL UTILITY

UV UNIT VENTILATOR OR ULTRAVIOLET

V VOLT(S)

VA VOLT-AMPERE(S)

VDT VIDEO DISPLAY TERMINAL

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

W WATT(S)

W/ WITH

WAO WORK AREA OUTLET

WG WIRE GUARD

WH WATER HEATER

W/O WITHOUT

WP WEATHERPROOF

XFMR TRANSFORMER

XFR TRANSFER

@ AT

' FEET

" INCHES

# NUMBER

Ø, Φ PHASE

ELECTRICAL SYMBOLS LEGEND

PANELBOARD

REFER TO PANEL SCHEDULES FOR ADDITIONAL INFORMATION

PULL BOX

DIMENSIONS AS INDICATED ON DRAWINGS

DUPLEX WALL RECEPTACLE

NEMA 5-20R UNLESS NOTED OTHERWISE

DUPLEX WALL RECEPTACLE WITH ISOLATED GROUND

NEMA 5-20R UNLESS NOTED OTHERWISE

DUPLEX WALL RECEPTACLE ON EMERGENCY CIRCUIT

NEMA 5-20R UNLESS NOTED OTHERWISE

DUPLEX FLOOR RECEPTACLE

NEMA 5-20R UNLESS NOTED OTHERWISE

DUPLEX FLOOR RECEPTACLE WITH ISOLATED GROUND

NEMA 5-20R UNLESS NOTED OTHERWISE

DUPLEX FLOOR RECEPTACLE ON EMERGENCY CIRCUIT

NEMA 5-20R UNLESS NOTED OTHERWISE

QUADRAPLEX WALL RECEPTACLE

NEMA 5-20R UNLESS NOTED OTHERWISE

QUADRAPLEX WALL RECEPTACLE WITH ISOLATED GROUND

NEMA 5-20R UNLESS NOTED OTHERWISE

QUADRAPLEX WALL RECEPTACLE ON EMERGENCY CIRCUIT

NEMA 5-20R UNLESS NOTED OTHERWISE

QUADRAPLEX FLOOR RECEPTACLE

NEMA 5-20R UNLESS NOTED OTHERWISE

QUADRAPLEX FLOOR RECEPTACLE WITH ISOLATED GROUND

NEMA 5-20R UNLESS NOTED OTHERWISE

QUADRAPLEX FLOOR RECEPTACLE ON EMERGENCY CIRCUIT

NEMA 5-20R UNLESS NOTED OTHERWISE

SIMPLEX WALL RECEPTACLE

NEMA 5-20R UNLESS NOTED OTHERWISE

SIMPLEX FLOOR RECEPTACLE

NEMA 5-20R UNLESS NOTED OTHERWISE

NON-TYPICAL NEMA WALL RECEPTACLE

CONFIGURATION AS NOTED ON DRAWINGS

NON-TYPICAL NEMA FLOOR RECEPTACLE

CONFIGURATION AS NOTED ON DRAWINGS

A3-D SAFETY DISCONNECT SWITCH (NON-FUSED)

NUMBER OF POLES AND FRAME SIZE AS INDICATED

SAFETY DISCONNECT SWITCH (FUSED)

NUMBER OF POLES, FRAME SIZE, AND FUSE SIZE AS INDICATED

A3-D

1-PHASE MOTOR

EQUIPMENT TAG AS INDICATED

3-PHASE MOTOR

EQUIPMENT TAG AS INDICATED

DUPLEX FLOOR RECEPTACLE, ALL OUTLETS SWITCHED VIA LOCAL

OCCUPANCY SENSING

NEMA 5-20R UNLESS NOTED OTHERWISE

QUADRAPLEX FLOOR RECEPTACLE, ALL OUTLETS SWITCHED VIA

LOCAL OCCUPANCY SENSING

NEMA 5-20R UNLESS NOTED OTHERWISE

S S

DUPLEX WALL RECEPTACLE, ALL OUTLETS SWITCHED VIA LOCAL

OCCUPANCY SENSING

NEMA 5-20R UNLESS NOTED OTHERWISE

QUADRAPLEX WALL RECEPTACLE, ALL OUTLETS SWITCHED VIA LOCAL

OCCUPANCY SENSING

NEMA 5-20R UNLESS NOTED OTHERWISE

S S

1 KEYED NOTE

REFER TO KEYNOTE SCHEDULE ON DRAWING

DASHED GREY LINES AROUND EQUIPMENT INDICATE NEC

REQUIRED CLEARANCES

J J JUNCTION BOX

GREY SYMBOLS INDICATE ELEMENT EXISTING TO REMAIN

DASHED SYMBOLS INDICATE ELEMENT TO BE DEMOLISHED

CEILING FIRE ALARM SMOKE DETECTORWALL FIRE ALARM STROBEF

DIGITAL TIME SWITCH$

T

GROUND BAR

SYSTEMS SYMBOLS LEGEND

COMMUNICATIONS ELECTRONIC SAFETY AND SECURITY

COMMUNICATIONS WAO MOUNTED AT +18" AFF UNLESS NOTED

OTHERWISE.

XX - WAO CABLING CONFIGURATION TABLE TAG.

XX

FIXED SECURITY CAMERA.

WALL PHONE WAO MOUNTED AT +42" AFF UNLESS NOTED OTHERWISE.

XX - WAO CABLING CONFIGURATION TABLE TAG.

XX

COMMUNICATIONS FLOORBOX MOUNTED WAO.

XX - WAO CABLING CONFIGURATION TABLE TAG.

XX

CEILING MOUNTED WAO.

XX - WAO CABLING CONFIGURATION TABLE TAG.

XX

CATV WAO MOUNTED AT +80" AFF UNLESS NOTED OTHERWISE.

XX - WAO CABLING CONFIGURATION TABLE TAG.

XX

MODULAR FURNITURE WAO. ROUTE CABLES THROUGH FURNITURE

RACEWAYS DIRECTLY TO EACH WORKSTATION AND TERMINATE IN A

COMPATIBLE SNAP-IN FACEPLATE TO FURNITURE BASE.

XX - WAO CABLING CONFIGURATION TABLE TAG.

XX

WIRELESS ACCESS POINT (WAP) - ABOVE CEILING WAO WITH A 20'

TERMINATED WHIP.

XX - WAO CABLING CONFIGURATION TABLE TAG.

XX

DUAL AUTHENTICATION CARD READER / KEYPAD MOUNTED AT +46"

AFF UNLESS NOTED OTHERWISECR

ELECTRIC STRIKEES

DOOR / WINDOW CONTACTDC

MOTION DETECTORMD

RX REQUEST TO EXIT

D EXISTING COMMUNICATIONS WAO. REMOVE EXISTING CABLING IN ITS

ENTIRETY FROM THE TELECOMMUNICATIONS ROOM AND PROVIDE A

BLANK OUTLET FACEPLATE.

F

FIRE ALARM HORN-STROBE OR SPEAKER-STROBE

(MATCH EXISTING DEVICES IN BUILDING)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.aeworks.comAE WORKS ®

A u to d e s k D o c s

/V B

A Y

-0

B a y P in e s V

A M

C E

H R

M I n fr a s tr u c tu re U p g ra d e s /V

B A

Y -0

B a y P in e s

M E

P .r v t

/2 /2

:0

:3

A

M

ET001

SYSTEMS SYMBOLS AND ABBREVIATIONS EHRM Infrastructure Upgrades - Bay Pines VA Healthcare System - CWBY

10000 Bay Pines, Blvd. St. Petersburg FL 33714

516-21-106

SEE DRAWING TITLE

04.11.2025 SL, DS MH, CM, JC

FINAL BID DOCUMENTS

COMMUNICATIONS GENERAL NOTES

1 THE DIVISION 27 COMMUNICATIONS SPECIFICATIONS OUTLINE THE PROJECT PERFORMANCE REQUIREMENTS AND SHALL BE

USED IN COMBINATION WITH THE CONSTRUCTION DRAWINGS TO PROVIDE A COMPLETE INFORMATION AND COMMUNICATIONS TECHNOLOGY CABLING INFRASTRUCTURE, READY FOR USE. POWERED EQUIPMENT AND ELECTRONIC

DEVICES NOT IN CONTRACTOR SCOPE UNLESS NOTED OTHERWISE.

2 THE DRAWINGS ARE DIAGRAMMATIC, INTENDED TO CONVEY THE SCOPE OF WORK AND GENERAL ARRANGEMENTS AND LOCATIONS OF SUBSYSTEMS. COORDINATE WORK WITH FURNITURE, LOCAL CLIENT REPRESENTATIVES, AND OTHER

DISCIPLINES TO MEET THE DESIGN INTENT OF BEING PRACTICAL AND READILY ACCESSIBLE.

3 PATHWAYS PENETRATING FIRE-RATED BARRIERS SHALL BE SELF-SEALING UL LISTED MECHANICAL ASSEMBLIES RATED FOR USE AND THAT ALLOW RE-ENTRY WITHOUT THE NEED FOR FIRE-STOP PILLOWS, CAULK, PUTTY, ETC. CONTRACTOR SHALL SEAL USED AND UNUSED PENETRATIONS ALONG CABLING ROUTES. ALSO, NEW, EXISTING, AND/OR MODIFIED TELECOMMUNICATIONS ROOMS SHOWN ON DRAWINGS. SEAL FIRE-RATED BARRIERS AND REINSTALL CEILING TILES AT THE END OF EACH WORK SHIFT FOR WORK AREAS OUTSIDE OF A RATED CONSTRUCTION BARRIER. IF THE TILES CANNOT BE REPLACED, THE SPRINKLER SYSTEM MAY BE CONSIDERED OUT OF SERVICE IN THESE AREAS AND 1-HOUR FIRE RATED SEPARATION WILL BE REQUIRED BETWEEN THE CONSTRUCTION AREA AND THE OCCUPIED PORTIONS OF THE BUILDING.

4 THE CONTRACTOR SHALL SURVEY AND VERIFY EXISTING CONDITIONS PRIOR TO STARTING CONSTRUCTION TO FINALIZE AN

APPROACH FOR PERFORMING THE WORK.

5 CAMPUS BUILDINGS ARE ON CRAWLSPACES DEFINED AS CONFINED SPACES. COORDINATE ACCESS WITH LOCAL CLIENT REPRESENTATIVE. SEE CIVIL SERIES DRAWINGS FOR ADDITIONAL OUTSIDE PATHWAY INFORMATION.

6 REFER TO G-SERIES DRAWINGS AND DIVISION 1 SPECIFICATIONS FOR PROJECT PHASING REQUIREMENTS.

7 UTILIZE EXISTING CODE COMPLIANT BUILDING PATHWAYS TO THE EXTENT POSSIBLE AND PROVIDE NEW AS NOTED ON DRAWINGS, AND AS NECESSARY TO COMPLETE THE WORK PER INDUSTRY BEST PRACTICES. OPEN-TOP STRUCTURALLY SUPPORTED J-HOOKS APPROVED AS SUPPLEMENTAL MEANS IN WORK AREAS. CONTINUOUS HARDENED CONDUIT REQUIRED

IN EXPOSED OR HAZARDOUS AREAS, CRAWL SPACES, AND INTERSTITIAL SPACES.

8 RE-USE BUILDING RISER PATHWAYS IN EXISTING TELECOM ROOMS AND INTERSTITIAL SPACES IDENTIFIED ON DRAWINGS, AND AS NECESSARY TO COMPLETE THE WORK.

DRAWING INDEX

SHEET NO. SHEET NAME

ET001 SYSTEMS SYMBOLS AND ABBREVIATIONS

ET002 PARTIAL SYSTEMS SITE PLAN

ET003 PARTIAL SYSTEMS SITE PLAN

ET004 PARTIAL SYSTEMS SITE PLAN

ET005 PARTIAL SYSTEMS SITE PLAN

01-ET101 BUILDING 01 - FIRST FLOOR SYSTEMS PLAN

02-ET101 BUILDING 02 - FIRST FLOOR SYSTEMS PLAN

02-ET102 BUILDING 02 - SECOND FLOOR SYSTEMS PLAN

02-ET103 BUILDING 02 - THIRD FLOOR SYSTEMS PLAN

02-ET104 BUILDING 02 - SECOND FLOOR DATA CENTER POWER AND SYSTEMS PLAN

02-ET105 BUILDING 02 - SECOND FLOOR DATA CENTER DIAGRAMS

02-ET106 BUILDING 02 - SECOND FLOOR DATA CENTER LIGHTING PLAN

11-ET101 BUILDING 11 & 54 - FIRST FLOOR SYSTEMS PLAN

12-ET101 BUILDING 12 - FIRST FLOOR SYSTEMS PLAN

13-ET101 BUILDING 13 - FIRST FLOOR SYSTEMS PLAN

19-ET101 BUILDING 19 - FIRST FLOOR SYSTEMS PLAN

20-ET101 BUILDING 20 - FIRST FLOOR SYSTEMS PLAN

20-ET102 BUILDING 20 - SECOND FLOOR SYSTEMS PLAN

22-ET101 BUILDING 22 - FIRST FLOOR SYSTEMS PLAN

22-ET102 BUILDING 22 - SECOND FLOOR SYSTEMS PLAN

22-ET103 BUILDING 22 - THIRD FLOOR SYSTEMS PLAN

22-ET104 BUILDING 22 - FOURTH FLOOR SYSTEMS PLAN

23-ET101 BUILDING 23 & 23A - FIRST FLOOR SYSTEMS PLAN

23-ET102 BUILDING 23 & 23A - SECOND FLOOR SYSTEMS PLAN

24-ET101 BUILDING 24 - FIRST FLOOR SYSTEMS PLAN

24-ET102 BUILDING 24 - SECOND FLOOR SYSTEMS PLAN

24-ET103 BUILDING 24 - THIRD FLOOR SYSTEMS PLAN

35-ET101 BUILDING 35 - FIRST FLOOR SYSTEMS PLANS

36-ET101 BUILDING 36 - FIRST FLOOR SYSTEMS PLAN

37-ET101 BUILDING 37 - FIRST FLOOR SYSTEMS PLAN

37-ET102 BUILDING 37 - SECOND FLOOR SYSTEMS PLAN

37-ET103 BUILDING 37 - THIRD FLOOR SYSTEMS PLAN

71-ET101 BUILDING 71 - FIRST FLOOR SYSTEMS PLAN - WEST

71-ET102 BUILDING 71 - FIRST FLOOR SYSTEMS PLAN - CENTRAL

71-ET103 BUILDING 71 - FIRST FLOOR SYSTEMS PLAN - EAST

100-ET101 BUILDING 100 - FIRST FLOOR SYSTEMS PLAN - WING A NORTHWEST

100-ET102 BUILDING 100 - FIRST FLOOR SYSTEMS PLAN - WING A NORTHEAST

100-ET103 BUILDING 100 - FIRST FLOOR SYSTEMS PLAN - WING A SOUTHWEST

100-ET104 BUILDING 100 - FIRST FLOOR SYSTEMS PLAN - WING A SOUTHEAST

100-ET105 BUILDING 100 - FIRST FLOOR SYSTEMS PLAN - WING B NORTH

100-ET106 BUILDING 100 - FIRST FLOOR SYSTEMS PLAN - WING B CENTRAL

100-ET107 BUILDING 100 - FIRST FLOOR SYSTEMS PLAN - WING B SOUTH

100-ET108 BUILDING 100 - FIRST FLOOR SYSTEMS PLAN - WING C NORTHWEST

100-ET109 BUILDING 100 - FIRST FLOOR SYSTEMS PLAN - WING C NORTHEAST

100-ET110 BUILDING 100 - FIRST FLOOR SYSTEMS PLAN - WING C SOUTHWEST

100-ET111 BUILDING 100 - FIRST FLOOR SYSTEMS PLAN - WING C SOUTHEAST

100-ET112 BUILDING 100 - FIRST FLOOR TR LIGHTING PLANS

100-ET113 BUILDING 100 - SECOND FLOOR SYSTEMS PLAN - NORTHWEST

100-ET114 BUILDING 100 - SECOND FLOOR SYSTEMS PLAN - NORTHEAST

100-ET115 BUILDING 100 - SECOND FLOOR SYSTEMS PLAN - CENTRAL WEST

100-ET116 BUILDING 100 - SECOND FLOOR SYSTEMS PLAN - CENTRAL EAST

100-ET117 BUILDING 100 - SECOND FLOOR SYSTEMS PLAN - SOUTHWEST

100-ET118 BUILDING 100 - SECOND FLOOR SYSTEMS PLAN - SOUTHEAST

100-ET119 BUILDING 100 - THIRD FLOOR SYSTEMS PLAN - NORTHWEST

100-ET120 BUILDING 100 - THIRD FLOOR SYSTEMS PLAN - NORTHEAST

100-ET121 BUILDING 100 - THIRD FLOOR SYSTEMS PLAN - CENTRAL

100-ET122 BUILDING 100 - THIRD FLOOR SYSTEMS PLAN - SOUTHWEST

100-ET123 BUILDING 100 - THIRD FLOOR SYSTEMS PLAN - SOUTHEAST

100-ET124 BUILDING 100 - FOURTH FLOOR SYSTEMS PLAN - NORTHWEST

100-ET125 BUILDING 100 - FOURTH FLOOR SYSTEMS PLAN - NORTHEAST

100-ET126 BUILDING 100 - FOURTH FLOOR SYSTEMS PLAN - CENTRAL

100-ET127 BUILDING 100 - FOURTH FLOOR SYSTEMS PLAN - SOUTHWEST

100-ET128 BUILDING 100 - FOURTH FLOOR SYSTEMS PLAN - SOUTHEAST

100-ET129 BUILDING 100 - FIFTH FLOOR SYSTEMS PLAN - NORTHWEST

100-ET130 BUILDING 100 - FIFTH FLOOR SYSTEMS PLAN - NORTHEAST

100-ET131 BUILDING 100 - FIFTH FLOOR SYSTEMS PLAN - CENTRAL

100-ET132 BUILDING 100 - FIFTH FLOOR SYSTEMS PLAN - SOUTHWEST

100-ET133 BUILDING 100 - FIFTH FLOOR SYSTEMS PLAN - SOUTHEAST

100-ET134 BUILDING 100 - SECOND TO FIFTH FLOOR TR LIGHTING PLANS

101-ET101 BUILDING 101 - FIRST FLOOR SYSTEMS PLAN - WEST

101-ET102 BUILDING 101 - FIRST FLOOR SYSTEMS PLAN - CENTRAL

101-ET103 BUILDING 101 - FIRST FLOOR SYSTEMS PLAN - EAST

101-ET104 BUILDING 101 - FIRST FLOOR SYSTEMS PLAN - CAFETERIA

102-ET101 BUILDING 102 - FIRST FLOOR SYSTEMS PLAN - WING A

102-ET102 BUILDING 102 - FIRST FLOOR SYSTEMS PLAN - WING B

102-ET103 BUILDING 102 - FIRST FLOOR SYSTEMS PLAN - WING C

102-ET104 BUILDING 102 - FIRST FLOOR SYSTEMS PLAN - WING D

102-ET105 BUILDING 102 - FIRST FLOOR SYSTEMS PLAN - HUB

106-ET101 BUILDING 106 - FIRST FLOOR SYSTEMS PLAN

106-ET102 BUILDING 106 - SECOND FLOOR SYSTEMS PLAN

107-ET101 BUILDING 107 - FIRST FLOOR SYSTEMS PLAN

111-ET101 BUILDING 111 - FIRST FLOOR SYSTEMS - NORTH

111-ET102 BUILDING 111 - FIRST FLOOR SYSTEMS - SOUTH

111-ET103 BUILDING 111 - SECOND FLOOR SYSTEMS - NORTH

111-ET104 BUILDING 111 - SECOND FLOOR SYSTEMS - SOUTH

111-ET105 BUILDING 111 - THIRD FLOOR SYSTEMS - NORTH

111-ET106 BUILDING 111 - THIRD FLOOR SYSTEMS - SOUTH

300-ET101 BUILDING 300 - FIRST FLOOR SYSTEMS PLAN

FH1-ET101 FISHER HOUSE 1 - FIRST FLOOR SYSTEMS PLAN

FH2-ET102 FISHER HOUSE 2 - FIRST FLOOR SYSTEMS PLAN

ET201 COMMUNICATIONS RACK ELEVATIONS

ET202 COMMUNICATIONS CABINET ELEVATIONS

ET301 COMMUNICATIONS OUTLET DETAILS

ET302 COMMUNICATIONS PATHWAY DETAILS

ET303 ELECTRICAL DETAILS

ET304 ELECTRICAL DETAILS

ET305 ELECTRICAL DETAILS

ET306 ELECTRICAL DETAILS

ET307 ELECTRONIC SAFETY AND SECURITY DETAILS

ET401 ELECTRICAL SCHEDULES

ET402 PANEL SCHEDULES BUILDINGS 01, 02, 11

ET403 PANEL SCHEDULES BUILDINGS 12, 13, 19, 20, 22

ET404 PANEL SCHEDULES BUILDINGS 22, 23

ET405 PANEL SCHEDULES BUILDINGS 24, 35, 36, 37

ET406 PANEL SCHEDULES BUILDINGS 37, 71

ET407 PANEL SCHEDULES BUILDING 100, FIRST FLOOR

ET408 PANEL SCHEDULES BUILDING 100, FIRST FLOOR

ET409 PANEL SCHEDULES BUILDING 100, FIRST & SECOND FLOOR

ET410 PANEL SCHEDULES BUILDING 100, THIRD & FOURTH FLOOR

ET411 PANEL SCHEDULES BUILDING 100, FOURTH & FIFTH FLOOR

ET412 PANEL SCHEDULES BUILDING 101, 102

ET413 PANEL SCHEDULES BUILDING 102

ET414 PANEL SCHEDULES BUILDING 102, 107, 300

ET415 PANEL SCHEDULES BUILDING FH1, FH2

ET416 PANEL SCHEDULES BUILDING 02 DATA CENTER

ELECTRICAL GENERAL NOTES

1 THE FOLLOWING GENERAL NOTES AS LISTED BELOW SHALL APPLY TO ALL ELECTRICAL

REQUIREMENTS AS INDICATED ON ALL E SERIES CONTRACT DRAWINGS.

2 THE CONTRACTOR IS RESPONSIBLE FOR THE ENTIRE DOCUMENT SET. I.E. IF WORK IS SHOWN ON

OTHER DRAWINGS AS "BY CONTRACTOR," THE CONTRACTOR IS RESPONSIBLE FOR THAT WORK.

3 DRAWINGS FOR THIS WORK ARE DIAGRAMMATIC AND INTENDED TO CONVEY THE EXTENT,

GENERAL ARRANGEMENT AND LOCATIONS OF THE WORK. BECAUSE OF THE SCALE OF THE

DRAWINGS, CERTAIN BASIC ITEMS SUCH AS ACCESS PANELS, CONDUITS, CABINET SIZES,

PENETRATION SLEEVES, PULL BOXES, BACKBOXES AND JUNCTION BOXES MAY NOT BE SHOWN.

INCLUDE ALL ITEMS WHERE REQUIRED BY CODE, MANUFACTURER AND RELATED SPECIFICATION

SECTIONS FOR THE PROPER INSTALLATION OF ALL WORK.

4 DUE TO SCALE OF THE DRAWINGS, ALL ELECTRICAL DEVICE SYMBOLS ARE SHOWN ON

DRAWINGS AS CLOSE AS POSSIBLE TO THEIR INTENDED LOCATION. CONTRACTOR SHALL

COORDINATE IN THE FIELD THE PROPER INSTALLATION OF ALL EQUIPMENT, DEVICES, CONTROLS AND CONDUITS. REFER TO RELATED SPECIFICATION SECTIONS FOR ADDITIONAL REQUIREMENTS.

5 COORDINATE WITH ALL TRADES AND SYSTEM INTEGRATORS ANY CONDITIONS RELATED TO THE INSTALLATION OF ALL SYSTEMS. THE CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE

TRADE ALL INSTALLATION REQUIREMENTS IMPACTING THE PLACEMENT OF ALL SYSTEM

COMPONENTS TO THE SATISFACTION OF ALL CONCERNED TRADES.

6 COORDINATE EXACT LOCATION(S) OF ALL DATA AND TELEPHONE OUTLETS, ELECTRICAL

RECEPTACLES WITH THE ARCHITECTURAL PLANS, FURNITURE PLANS AND ALL AFFECTED

TRADES PRIOR TO INSTALLATION.

7 ALL CONDUITS SHALL BE SIZED AND INSTALLED IN ACCORDANCE WITH NFPA 70 AND PROJECT

SPECIFICATIONS. ALL CONDUITS SHALL BE A MINIMUM OF 3/4" UNLESS OTHERWISE NOTED.

8 PROVIDE ALL EQUIPMENT CLEARANCES IN ACCORDANCE WITH NEC REQUIREMENTS. ARRANGE

EQUIPMENT TO FACILITATE UNRESTRICTED ACCESS FOR MAINTENANCE AND SERVICE AROUND

ALL EQUIPMENT, COMPONENTS AND/OR CABLE TERMINATIONS.

9 WHERE EQUIPMENT AND/OR JUNCTION BOXES ARE INSTALLED ABOVE FINISHED CEILINGS, THE

CONTRACTOR SHALL PROVIDE ACCESS HATCHES LISTED FOR THE INTENDED APPLICATION.

ACCESS HATCHES SHALL BE LOCATED SO THAT SERVICE ACCESS TO THE EQUIPMENT AND/OR

JUNCTION BOXES IS UNIMPEDED.

10 ALL PENETRATIONS OF WALLS AND/OR FLOORS SHALL BE FIRE STOPPED IN ACCORDANCE WITH

THE ASTM AND NFPA REQUIREMENTS. REFER TO RELATED SPECIFICATION SECTIONS FOR

ADDITIONAL INFORMATION. INSTALLATION OF FIRE-STOPS SHALL BE PERFORMED BY

APPLICATOR/INSTALLER QUALIFIED AND TRAINED BY THE MANUFACTURER. INSTALLATION SHALL

BE PERFORMED IN STRICT ACCORDANCE WITH MANUFACTURER'S DETAILED INSTALLATION

PROCEDURES.

11 ALL EQUIPMENT ENCLOSURES LOCATED OUTSIDE OR IN ALL AREAS WITH HIGH MOISTURE OR A RELATIVE HUMIDITY OF 75% OR GREATER SHALL BE NEMA 4X STAINLESS STEEL AND RATED FOR

THAT APPLICATION.

12 ALL INTERIOR AND/OR EXTERIOR COMPONENTS, DEVICES OR SYSTEMS EQUIPMENT EXPOSED TO

THE GENERAL POPULATION SHALL BE INSTALLED IN SECURED EQUIPMENT ENCLOSURES WITH

TAMPER SWITCHES AND INSTALLED IN SUCH A MANNER THAT RESISTS TAMPERING AND/OR

REMOVAL WITHOUT THE USE OF SPECIALIZED TOOLS.

13 FOR EQUIPMENT INSTALLATIONS REQUIRING COORDINATION WITH OTHER TRADES, THE

CONTRACTOR SHALL PROVIDE ALL TEMPLATES, BACKBOXES AND EQUIPMENT ANCHOR BOLTS

FOR MOUNTING OR FLUSH MOUNTING PREPARATION (E.G. PEDESTALS OR OTHER DEVICES

REQUIRING MOUNTING ON WALLS, CONCRETE PADS OR OTHER MATERIALS). COORDINATE

DELIVERY OF TEMPLATES AND EQUIPMENT WITH ALL AFFECTED CONTRACTORS.

14 ALL ELECTRICAL WORK SHALL BE DONE IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE

(LATEST VERSION BEING ENFORCED) AND ALL OTHER APPLICABLE CODES AND STANDARDS

BEING ENFORCED BY THE AUTHORITY HAVING JURISDICTION.

15 THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS OR INSTRUCTIONS FOR

CONSTRUCTION SAFETY. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ANY WORKMAN'S

OR TRANSIENT'S SAFETY, OR FOR THE ADEQUACY OF EQUIPMENT, BUILDING COMPONENTS,

WORK AIDS, OR ANY NECESSITY TO WORK ON ENERGIZED ELECTRICAL COMPONENTS. FURTHER,

NO SUPERINTENDENCE IS INCLUDED OR IMPLIED.

16 ALL SYSTEMS AND EQUIPMENT SHALL BE INSTALLED AND WIRED ACCORDING TO THE

MANUFACTURER'S RECOMMENDATIONS.

17 ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES, AND EQUIPMENT SHALL BE TESTED AND

LISTED BY A NATIONALLY RECOGNIZED TESTING LABORATORY.

18 THE CONTRACTOR SHALL COORDINATE CONDUIT ROUTING (PLAN AND ELEVATION) WITH THE

LIGHTING (NEW AND EXISTING), CEILING ELEVATION, STRUCTURE, DUCTWORK, PIPING, ETC.

REQUIRED FOR THE COMPLETION OF THE PROJECT, PRIOR TO INSTALLATION.

ELECTRICAL GENERAL NOTES

19 THE CONTRACTOR SHALL SECURE AND PROTECT THE BUILDING AND/OR WORK AREA WITH FIRE

RETARDANT TEMPORARY PLYWOOD PARTITIONS (WITH LOCKING DOORS), ETC. CLOSE ALL

EXISTING OPENINGS AS REQUIRED. COORDINATE THIS WORK WITH THE OWNER'S

REPRESENTATIVE PRIOR TO STARTING. IF TEMPORARY PARTITIONS IMPEDE THE FLOW OF

EGRESS TO REQUIRED EGRESS DOORS AND STAIRS, THE CONTRACTOR SHALL PROVIDE EXIT

SIGNS, AND SIGNAGE INDICATING SUCH.

20 THE CONTRACTOR SHALL CAULK ALL JOINTS BETWEEN METAL FRAMES AND EXISTING

CONDITIONS. THIS APPLIES TO BOTH INTERIOR AND EXTERIOR INSTALLATIONS.

21 THE DIMENSIONS SHOWN ON THE DRAWINGS ARE FOR THE CONVENIENCE OF THE CONTRACTOR

ONLY. VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO PERFORMING ANY WORK.

22 THE CONTRACTOR SHALL INSTALL ALL CONDUITS CONCEALED UNLESS NOTED OTHERWISE.

EXPOSED CONDUIT SHALL ONLY BE INSTALLED IN CHASES, EXPOSED CEILING AREAS, JANITOR

CLOSETS, AND MECHANICAL/ELECTRICAL ROOMS.

23 ALL ELECTRICAL EQUIPMENT SHALL BE GROUNDED AND/OR BONDED PER THE REQUIREMENTS

OF THE NATIONAL ELECTRIC CODE. PROVIDE ALL GROUNDING AND/OR BONDING COMPONENTS

NOT EXPLICITLY SHOWN ON THE DOCUMENTS.

24 THE CONTRACTOR SHALL PROVIDE UPDATED TYPED PANELBOARD DIRECTORIES, INDICATING

THE LOADS SERVED BY THE RESPECTIVE PANELS. AMEND AS REQUIRED FOR AS-BUILT

CONDITIONS. PROVIDE ELECTRONIC VERSIONS OF THE PANELBOARD SCHEDULES FOR FUTURE

USE BY THE OWNER.

25 THE CONTRACTOR SHALL REVIEW THE WORK REQUIRED WITH THE APPLICABLE UTILITY

COMPANIES SERVING THE PROJECT. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH

THE REQUIREMENTS OF THE INDIVIDUAL UTILITY COMPANIES.

26 THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE OWNER PRIOR TO STARTING ALL

PHASES OF THE PROJECT. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER WHAT

WORK, IF ANY, HAS TO BE COMPLETED DURING SECOND OR THIRD SHIFT.

27 THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY POWER CONNECTIONS TO KEEP AREAS UP

AND OPERATIONAL DURING THE CONSTRUCTION. THE CONTRACTOR SHALL COORDINATE THESE

REQUIREMENTS WITH THE OWNER.

28 THE VERBIAGE ON THE DRAWINGS INDICATING TYPES OF MATERIALS TO BE ENCOUNTERED IS INTENDED TO AID THE ELECTRICAL CONTRACTOR IN UNDERSTANDING THE VARIOUS CONDITIONS

LIKELY TO BE ENCOUNTERED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING

QUANTITIES OF MATERIALS REQUIRED TO COMPLETE THE PROJECT.

29 THE LOCATIONS OF EXISTING UTILITIES, STRUCTURE, AND OTHER CONDITIONS SHOWN ON THE PLANS ARE APPROXIMATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY

AND REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO BEGINNING ANY WORK.

30 FURNISH AND INSTALL ALL REQUIRED LINTELS AND SLEEVES. ALL CONDUITS SHALL HAVE

SLEEVES INSTALLED. ALL SLEEVES INSTALLED THROUGH EXTERIOR WALLS SHALL HAVE LINK

SEALS INSTALLED.

31 THE CONTRACTOR SHALL MAINTAIN THE BUILDING IN WEATHERTIGHT AND WATERPROOF

CONDITION THROUGHOUT THE DURATION OF THEIR WORK. DO NOT LEAVE HOLES THROUGH

WALLS AND/OR ROOFS OPEN TO THE ELEMENTS WHEN NO WORK IS OCCURRING IN THOSE

AREAS.

32 THE CONTRACTOR SHALL GENERATE A DETAILED METHOD OF PROCEDURE (MOP) DOCUMENT

INDICATING HOW HE/SHE INTENDS TO PERFORM EACH STEP IN THE PROJECT. THIS MOP SHALL

BE PRESENTED TO THE OWNER AND ENGINEER FOR SIGN OFF PRIOR TO STARTING THE

PROJECT. THE MOP MAY BE REVISED BASED ON CHANGES IN THE PROJECT CONSTRUCTION, ETC.

AT ALL POINTS IN THE PROJECT THE OWNER SHALL BE MADE AWARE OF CHANGES TO THE MOP, AND A REVISED MOP SHALL BE PRESENTED TO THE OWNER AND ENGINEER FOR SIGN OFF.

33 PROVIDE ALL JUNCTION BOXES, PULL BOXES AND OTHER PULL POINTS AS REQUIRED FOR EASE

OF PULLING AND TO MEET THE MAXIMUM NUMBER OF BENDS PER NEC REQUIREMENTS FOR A

CODE COMPLIANT INSTALLATION. NOT ALL CONDUITS, PULL BOXES AND OTHER RACEWAY ITEMS

ARE INDICATED ON THE DOCUMENTS. THE CONTRACTOR SHALL PROVIDE A COMPLETE RACEWAY

SYSTEM MEETING THE REQUIREMENTS OUTLINED IN THE DRAWINGS AND SPECIFICATIONS. ALL

JUNCTION BOXES AND OTHER PULL POINTS SHALL BE ACCESSIBLE.

34 DISTRIBUTION EQUIPMENT SHALL BE AIC RATED, AND ANY CIRCUIT BREAKERS SELECTED AND

SET BASED ON THE OUTCOME OF THE CONTRACTORS OVERCURRENT PROTECTIVE DEVICE

COORDINATION STUDY. STUDY SHALL INCLUDE ALL ELEMENTS OF THE EXISTING AND NEW

DISTRIBUTION SYSTEM REQUIRED TO ACCURATELY SIZE AND RATE THE NEW EQUIPMENT ADDED

AS PART OF THIS PROJECT.

35 ARC FLASH LABELS SHALL BE PROVIDED TO ALL NEW EQUIPMENT BASED ON THE OUTCOME OF

THE CONTRACTOR'S ARC FLASH STUDY. ANY EQUIPMENT MODIFIED AS PART OF THIS PROJECT

SHALL ALSO BE INCLUDED IN THE ARC FLASH STUDY AND SHALL BE RELABELED AS REQUIRED.

36 THESE DRAWINGS DO NOT INDICATE ALL CONDUITS INTERCONNECTING EQUIPMENT, AND WHERE CONDUITS ARE INDICATED, THE ROUTING IS APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR THE ROUTING AND INSTALLATION OF ALL CONDUIT IN COORDINATION WITH OTHER TRADES

AND EXISTING CONDITIONS.

37 MULTIWIRE BRANCH CIRCUITS ARE NOT PERMITTED. ALL SINGLE POLE BRANCH CIRCUITS SHALL

HAVE A DEDICATED NEUTRAL. SHARING OF NEUTRALS IS PROHIBITED. ALL CIRCUITS SHALL

CONTAIN AN INDIVIDUAL GROUND WIRE. USE OF THE CONDUIT SYSTEM FOR THE GROUND PATH

IS PROHIBITED.

38 MULTIPLE SMALL 20A/1P BRANCH CIRCUITS MAY SHARE A SINGLE CONDUIT PROVIDED THE

CONTRATOR UPSIZES THE WIRES (INCLUDING THE GROUND) AND CONDUIT AS REQUIRED PER

NEC.

39 THE COMPLETE BRANCH WIRING SYSTEM IS NOT SHOWN ON THE DRAWINGS. AN ABBREVIATED

FORMAT IS USED TO INDICATE WHICH FIXTURES/DEVICES ARE CONNECTED TO A COMMON

CIRCUIT OR SWITCH. THIS IS PROVIDED AS A GUIDE TO THE CONTRACTOR TO ILLUSTRATE

CIRCUITS AND CONTROL INTENT. ACTUAL WIRING MAY DIFFER DUE TO FIELD CONDITIONS.

COLOR CODING OF WIRES SHALL BE AS PER NEC.

40 PROVIDE 120V 20A 5-20R RECEPTACLE AT ALL FAN COIL UNITS FOR CONDENSATE PUMP POWER

AND HOT WATER RECIRCULATING PUMPS, WHETHER SHOWN ON PLANS OR NOT. RECEPTACLE IS

TO BE CONNECTED TO NEAREST 120V RECEPTACLE CIRCUIT.

41 PROVIDE 120V CONNECTION TO ALL MOTORIZED DAMPERS INDICATED ON MECHANICAL PLANS, WHETHER SHOWN ON DIVISION 26 DRAWINGS OR NOT. FIRE/SMOKE DAMPER CIRCUITS ARE TO BE

PROVIDED FROM EMERGENCY (LIFE SAFETY) BRANCH PANEL. MOTORIZED DAMPERS WITHIN THE

SAME AREA CAN BE CIRCUITED TO THE SAME CIRCUIT (I.E. DEDICATED CIRCUIT IS NOT

REQUIRED).

42 DURING THE BIDDING PROCESS, THE ELECTRICAL CONTRACTOR SHALL REVIEW DRAWINGS AND SPECIFICATIONS OF ALL OTHER TRADES (ARCHITECTURAL, SITE/LANDSCAPING, HVAC, PLUMBING, AND SPECIALTY TRADES). ALL ITEMS REQUIRING POWER INDICATED ON THESE DRAWINGS BUT

NOT INDICATED ON THE ELECTRICAL DRAWINGS SHALL BE CONSIDERED A PART OF THE

ELECTRICAL CONTRACTOR’S WORK. THIS WORK SHALL BE INSTALLED AS PER NEC

REQUIREMENTS AT NO ADDITIONAL COST TO THE OWNER.

43 REFER TO G-SERIES DRAWINGS AND DIVISION 1 SPECIFICATIONS FOR PROJECT PHASING

REQUIREMENTS.

SECURITY GENERAL NOTES

1 THE DIVISION 28 ELECTRONIC SAFETY AND SECURITY SPECIFICATIONS OUTLINE THE PROJECT PERFORMANCE

REQUIREMENTS AND SHALL BE USED IN COMBINATION WITH THE CONSTRUCTION DRAWINGS TO PROVIDE A COMPLETE AND

FULLY FUNCTIONAL ELECTRONIC SAFETY AND SECURITY SYSTEM.

2 THE CONTRACTOR SHALL EVALUATE EXISTING SYSTEMS AND COORDINATE WITH MANUFACTURERS AND SERVICE PROVIDERS TO FINALIZE REQUIREMENTS AND DEVELOP SHOP DRAWINGS TO EXECUTE THE WORK. INTEGRATE NEW ELECTRONIC SECURITY DEVICES WITH EXISTING SECURITY SYSTEMS, BUILDING FIRE ALARM, INTRUSION ALARM, AND

BUILDING AUTOMATION SYSTEMS IN ACCORDANCE WITH APPLICABLE LIFE SAFETY CODES.

3 UTILIZE EXISTING CODE COMPLIANT BUILDING PATHWAYS TO THE EXTENT POSSIBLE AND PROVIDE NEW AS NOTED ON DRAWINGS, AND AS NECESSARY TO COMPLETE THE WORK PER INDUSTRY BEST PRACTICES. OPEN-TOP STRUCTURALLY SUPPORTED J-HOOKS APPROVED AS SUPPLEMENTAL MEANS IN WORK AREAS. CONTINUOUS HARDENED CONDUIT REQUIRED

IN EXPOSED OR HAZARDOUS AREAS, CRAWL SPACES, AND INTERSTITIAL SPACES.

# Revisions Date

1 BULLETIN #1 09/30/2025

10/22/2025

19A

419A

C

EXTEND

INTO

BLDG 24

C

OV

ER

ED

P C C E

NT

RY

OV

ER

H

AN

G

EMH 359

PROGRESS ENERGY

INCOMING FEEDERS

METAL SIGN ON

PCC BASE

18"

7"

L

MH

E

D

O

U

A A

B B

B B

A

A

A

A

A

A

A

A

A

A

A

A

A A

A

A

A

B

B

B B

B

B

A A

A A

A

B

B

B

B B

B

A A

A

A

A

A A

A

A

A A A A AB B B B B

B

B

A A

A A

A

B

B

B

B

A A

A A

A AA

B BB

(1) 12-TUBE

MICRODUCT

(1) 12-TUBE

MICRODUCT

(1) 4-TUBE

MICRODUCT

(1) 4-TUBE

MICRODUCT

(1) 7-TUBE

MICRODUCT

(1) 19-TUBE

MICRODUCT

(1) 12-TUBE

MICRODUCT

(1) 12-TUBE

MICRODUCT

A2-E

A2-E

23/23A

(2) 19-TUBE +

(1) 4-TUBE

MICRODUCT

(2) 19-TUBE +

(1) 4-TUBE

MICRODUCT

(1) 19-TUBE

MICRODUCT

(1) 4-TUBE

MICRODUCT

(1) 4-TUBE

MICRODUCT

(1) 4-TUBE

MICRODUCT

(1) 4-TUBE

MICRODUCT

(1) 19-TUBE

MICRODUCT

BUILDING NUMBER

MANHOLE AND MANHOLE NUMBER

DIVERSE FIBER CABLING ROUTE A

DIVERSE FIBER CABLING ROUTE B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.aeworks.comAE WORKS ®

A u to d e s k D o c s

/V B

A Y

-0

B a y P in e s V

A M

C E

H R

M I n fr a s tr u c tu re U p g ra d e s /V

B A

Y -0

B a y P in e s

M E

P .r v t

/2 /2

:0

:4

A

M

ET002

PARTIAL SYSTEMS SITE PLAN EHRM Infrastructure Upgrades - Bay Pines VA Healthcare System - CWBY

10000 Bay Pines, Blvd. St. Petersburg FL 33714

516-21-106

SEE DRAWING TITLE

04.11.2025 SL, DS MH, CM, JC

FINAL BID DOCUMENTS

3/16" = 1'-0"

PARTIAL SYSTEMS SITE PLAN 1

SYSTEM SITE PLAN SHEET NOTES

1 PROVIDE A PHYSICALLY DIVERSE AND REDUNDANT "A" AND "B" AIR-BLOWN FIBER OPTIC

MICRO-DUCT CABLING PATHWAY SYSTEM FROM THE BUILDING 2 DATA CENTER DIRECTLY TO EACH

NEW/MODIFIED TELECOMMUNICATIONS ROOM. BASIS OF DESIGN IS SUMITOMO FUTURE-FLEX

SOLUTION.

2 UTILIZE DEDICATED OUTSIDE PLANT CONDUITS BETWEEN BUILDINGS TO SEPARATE EACH "A" AND

"B" SEGMENT. MICRO-DUCT SIZES ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY.

CONTRACTOR SHALL VALIDATE EXISTING CONDITIONS AND PROVIDE AN ADEQUATELY SIZED

MICRO-DUCT PATHWAY SYSTEM BETWEEN THE DATA CENTER AND EACH TELECOMMUNICATIONS

ROOM TO ACCOMMODATE FIBER OPTIC BACKBONE CABLING REQUIREMENTS.

3 PROVIDE SEPERATE "A" AND "B" PATHWAYS WITHIN BUILDINGS UTILIZING OPPOSITE FACILITY RISERS AND CORRIDORS FOR EACH SEGMENT. WHERE NOT FEASIBLE, ROUTE "A" AND "B" FIBER

OPTIC BACKBONE CABLING ON OPPOSITE SIDES OF SHARED CORRIDORS AND SEPERATE

CONDUITS IN SHARED RISER SPACES.

4 SEE CIVIL DRAWINGS FOR CAMPUS PATHWAY DETAILS.

CONTINUE ONTO SHEET 000-ET003

C O

N T

IN

U

E O

N T

O S

H E

E T

-E T

SYSTEMS SITE PLAN LEGEND

# Revisions Date

1 BULLETIN #1 09/30/2025

15A

13A

10A

12A

15C

15B

C

M

PROPOSED

PULLBOX

A m a s o v e rh a n g sign

D

B B

A A

A B

B

B

B

A A

A

A

A A

A A

A

A

A A

B

B

A A

A A

B B

B B

B B

A

A

A A

A

A A

A

A

A

A A

B B

A A

B B

B B

A A

A

B

B

B B

B B

A AA A A

A A

A A

A A

A

B

B

B

B

A AA

B

B

B

B

A

A

A A

B

B

B B

B B B

B B

B

B

B A

A

A

AA

A

A A

A A

B B

BA

A

A A

A

A

A

A

A

A

A

A

A

B

B

B B

B B

A A

A

A

A

B B

B

B

B

B

B

B

B B

A

A

A

A

B

B

B

B

B

A AA

B BB

A AAB BA

A A

B

B

B

B

B

A

A

A

A

B B

B B

A A

A A

(1) 4-TUBE

MICRODUCT

(1) 12-TUBE

MICRODUCT

(1) 7-TUBE

MICRODUCT

(1) 12-TUBE

MICRODUCT

(1) 19-TUBE

MICRODUCT

(1) 7-TUBE

MICRODUCT +

(1) 4-TUBE

MICRODUCT

(1) 7-TUBE

MICRODUCT

(1) 19-TUBE

MICRODUCT

(1) 4-TUBE

MICRODUCT

(1) 19-TUBE

MICRODUCT + (1) 4-

TUBE MICRODUCT

(1) 19-TUBE

MICRODUCT

(1) 19-TUBE + (1)

12-TUBE

MICRODUCT

(1) 2-TUBE

MICRODUCT

(1) 2-TUBE

MICRODUCT

(5) 19-TUBE + (1) 4-

TUBE MICRODUCT(5) 19-TUBE + (1) 4-

TUBE MICRODUCT

(1) 2-TUBE

MICRODUCT

(1) 2-TUBE

MICRODUCT

(1) 4-TUBE

MICRODUCT

(1) 4-TUBE

MICRODUCT

(1) 4-TUBE

MICRODUCT

(5) 19-TUBE + (1) 4-

TUBE MICRODUCT

(4) 19-TUBE

MICRODUCT

(5) 19-TUBE + (1) 4-

TUBE MICRODUCT

(1) 7-TUBE

MICRODUCT

(1) 4-TUBE

MICRODUCT

(1) 2-TUBE

MICRODUCT (1) 7-TUBE

MICRODUCT

(1) 19-TUBE

MICRODUCT

(4) 19-TUBE

MICRODUCT

(2) 19-TUBE +

(1) 4-TUBE

MICRODUCT

(1) 19-TUBE +

(1) 4-TUBE

MICRODUCT

A2-C

A3-C

A4-C

13A

A2-F

A2-A

102A

(2) 19-TUBE

MICRODUCT

FUTURE ACCESS FOR

GERIATRIC PRIMARY

CARE FACILITY -

BUILDING NOT IN SCOPE

(1) 12-TUBE

MICRODUCT

(1) 4-TUBE

MICRODUCT

(1) 19-TUBE

MICRODUCT + (1)

12-TUBE

MICRODUCT

(1) 4-TUBE

MICRODUCT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.aeworks.comAE WORKS ®

A u to d e s k D o c s

/V B

A Y

-0

B a y P in e s V

A M

C E

H R

M I n fr a s tr u c tu re U p g ra d e s /V

B A

Y -0

B a y P in e s

M E

P .r v t

/2 /2

:0

:5

A

M

ET003

PARTIAL SYSTEMS SITE PLAN EHRM Infrastructure Upgrades - Bay Pines VA Healthcare System - CWBY

10000 Bay Pines, Blvd. St. Petersburg FL 33714

516-21-106

SEE DRAWING TITLE

04.11.2025 SL, DS MH, CM, JC

FINAL BID DOCUMENTS

3/16" = 1'-0"

PARTIAL SYSTEMS SITE PLAN 2

CONTINUE ONTO SHEET 000-ET002

C O

N T

IN

U

E O

N T

O S

H E

E T

-E T

SYSTEM SITE PLAN SHEET NOTES

1 PROVIDE A PHYSICALLY DIVERSE AND REDUNDANT "A" AND "B" AIR-BLOWN FIBER OPTIC

MICRO-DUCT CABLING PATHWAY SYSTEM FROM THE BUILDING 2 DATA CENTER DIRECTLY TO EACH

NEW/MODIFIED TELECOMMUNICATIONS ROOM. BASIS OF DESIGN IS SUMITOMO FUTURE-FLEX

SOLUTION.

2 UTILIZE DEDICATED OUTSIDE PLANT CONDUITS BETWEEN BUILDINGS TO SEPARATE EACH "A" AND

"B" SEGMENT. MICRO-DUCT SIZES ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY.

CONTRACTOR SHALL VALIDATE EXISTING CONDITIONS AND PROVIDE AN ADEQUATELY SIZED

MICRO-DUCT PATHWAY SYSTEM BETWEEN THE DATA CENTER AND EACH TELECOMMUNICATIONS

ROOM TO ACCOMMODATE FIBER OPTIC BACKBONE CABLING REQUIREMENTS.

3 PROVIDE SEPERATE "A" AND "B" PATHWAYS WITHIN BUILDINGS UTILIZING OPPOSITE FACILITY RISERS AND CORRIDORS FOR EACH SEGMENT. WHERE NOT FEASIBLE, ROUTE "A" AND "B" FIBER

OPTIC BACKBONE CABLING ON OPPOSITE SIDES OF SHARED CORRIDORS AND SEPERATE

CONDUITS IN SHARED RISER SPACES.

4 SEE CIVIL DRAWINGS FOR CAMPUS PATHWAY DETAILS.

# Revisions Date

1 BULLETIN #1 09/30/2025

c o n cr e te w a lk

A P P R O X

IM

A T E

T O P

O F

B A N K

D

C

B

T203

.5

35.1'

.5

EMH

RIM = 10.1

EMH

RIM = 11.4

FLAGPOLEsign

R E T E N T I O N L A K E

AC

A

A A

A A

A A

A A

A

A

A A

B

B

B

B

B

B

B B B

B

B

B

B B

A

A

A

A

B B

B

B

B

B

B B

B

B

B

B B

B

B

B

A

A

A

AA

A A

A

A

A

A

A

A

A A

A

A

A

A

A

A

A

A

A A

(1) 12-TUBE

MICRODUCT

(2) 19-TUBE

MICRODUCT

(1) 19-TUBE

MICRODUCT

(1) 2-TUBE

MICRODUCT

(1) 12-TUBE +

(1) 19-TUBE

MICRODUCT

102D

102C

102B

A3-F

T203

(1) 2-TUBE

MICRODUCT

(1) 12-TUBE +

(1) 19-TUBE

MICRODUCT

(1) 12-TUBE +

(1) 19-TUBE

MICRODUCT

(2) 19-TUBE

MICRODUCT

FUTURE ACCESS FOR

DENTAL CLINIC FACILITY -

BUILDING NOT IN SCOPE

(1) 2-TUBE

MICRODUCT

(1) 2-TUBE

MICRODUCT

(1) 19-TUBE

MICRODUCT

(1) 19-TUBE

MICRODUCT

(1) 19-TUBE

MICRODUCT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.aeworks.comAE WORKS ®

A u to d e s k D o c s

/V B

A Y

-0

B a y P in e s V

A M

C E

H R

M I n fr a s tr u c tu re U p g ra d e s /V

B A

Y -0

B a y P in e s

M E

P .r v t

/2 /2

:0

:5

A

M

ET004

PARTIAL SYSTEMS SITE PLAN EHRM Infrastructure Upgrades - Bay Pines VA Healthcare System - CWBY

10000 Bay Pines, Blvd. St. Petersburg FL 33714

516-21-106

SEE DRAWING TITLE

04.11.2025 SL, DS MH, CM, JC

FINAL BID DOCUMENTS

3/16" = 1'-0"

PARTIAL SYSTEMS SITE PLAN 3

CONTINUE ONTO SHEET 000-ET005

C O

N T

IN

U

E O

N T

O S

H E

E T

-E T

SYSTEM SITE PLAN SHEET NOTES

1 PROVIDE A PHYSICALLY DIVERSE AND REDUNDANT "A" AND "B" AIR-BLOWN FIBER OPTIC

MICRO-DUCT CABLING PATHWAY SYSTEM FROM THE BUILDING 2 DATA CENTER DIRECTLY TO EACH

NEW/MODIFIED TELECOMMUNICATIONS ROOM. BASIS OF DESIGN IS SUMITOMO FUTURE-FLEX

SOLUTION.

2 UTILIZE DEDICATED OUTSIDE PLANT CONDUITS BETWEEN BUILDINGS TO SEPARATE EACH "A" AND

"B" SEGMENT. MICRO-DUCT SIZES ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY.

CONTRACTOR SHALL VALIDATE EXISTING CONDITIONS AND PROVIDE AN ADEQUATELY SIZED

MICRO-DUCT PATHWAY SYSTEM BETWEEN THE DATA CENTER AND EACH TELECOMMUNICATIONS

ROOM TO ACCOMMODATE FIBER OPTIC BACKBONE CABLING REQUIREMENTS.

3 PROVIDE SEPERATE "A" AND "B" PATHWAYS WITHIN BUILDINGS UTILIZING OPPOSITE FACILITY RISERS AND CORRIDORS FOR EACH SEGMENT. WHERE NOT FEASIBLE, ROUTE "A" AND "B" FIBER

OPTIC BACKBONE CABLING ON OPPOSITE SIDES OF SHARED CORRIDORS AND SEPERATE

CONDUITS IN SHARED RISER SPACES.

4 SEE CIVIL DRAWINGS FOR CAMPUS PATHWAY DETAILS.

# Revisions Date

1 BULLETIN #1 09/30/2025

3A

20A

PROPOSED

COMMUNICATION

MANHOLE

EXISTING

COMMUNICATION

VAULT

TBM

SET HUB & TACK

ELEV = 8.74

7.39

1-1 /2"

ELE

C C

OND

UIT

6.90

R E T E N T I O N L A K E

11A

13A

35.1'

BOLLARDS

sign sign

1 2'

R E T E N T I O N L A K E

RETENTION POND

HH

E

E

AC AC AC AC

A

A

A

A A

A

A A

A AA

B BB

A

A AA A A A A

B BB B B B

B

B

B BB B B B

B B

B B

B

B

B B

B B

B

B

B

B

B

B

B

B

B

B B

B B

B B

B B

B B

B B

B B

A A

A

A

A

A

A A

A

A

A

A

B

B

B

B

A

A

A A A A A

B B

B

B B

B B

B

BA

A

A A

BB

A

A

A

A

A

A

A

A

A AA

A AA A

A A

(1) 4-TUBE

MICRODUCT

(1) 12-TUBE

MICRODUCT

(1) 4-TUBE

MICRODUCT

(1) 12-TUBE +

(1) 19-TUBE

MICRODUCT

(1) 2-TUBE

MICRODUCT

(1) 2-TUBE

MICRODUCT

(1) 2-TUBE

MICRODUCT

(1) 12-TUBE

MICRODUCT

(1) 12-TUBE

MICRODUCT

(1) 12-TUBE

MICRODUCT

(1) 2-TUBE

MICRODUCT

(1) 2-TUBE

MICRODUCT

(1) 4-TUBE

MICRODUCT

(1) 12-TUBE

MICRODUCT

(1) 2-TUBE

MICRODUCT

(1) 2-TUBE

MICRODUCT

(1) 2-TUBE

MICRODUCT

(1) 12-TUBE

MICRODUCT

(1) 12-TUBE

MICRODUCT

(1) 12-TUBE

MICRODUCT

A2-D

27 28

28A

361360

11/54

(1) 12-TUBE

MICRODUCT

WOMENS

HEALTH

FACILITY

FUTURE ACCESS FOR

WOMENS HEALTH

FACILITY - BUILDING

NOT IN SCOPE

(1) 2-TUBE

MICRODUCT

(1) 2-TUBE

MICRODUCT

FISHER

HOUSE 2FISHER

HOUSE 1

(1) 19-TUBE

MICRODUCT

(1) 12-TUBE

MICRODUCT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.aeworks.comAE WORKS ®

A u to d e s k D o c s

/V B

A Y

-0

B a y P in e s V

A M

C E

H R

M I n fr a s tr u c tu re U p g ra d e s /V

B A

Y -0

B a y P in e s

M E

P .r v t

/2 /2

:0

:0

A

M

ET005

PARTIAL SYSTEMS SITE PLAN EHRM Infrastructure Upgrades - Bay Pines VA Healthcare System - CWBY

10000 Bay Pines, Blvd. St. Petersburg FL 33714

516-21-106

SEE DRAWING TITLE

04.11.2025 SL, DS MH, CM, JC

FINAL BID DOCUMENTS

3/16" = 1'-0"

PARTIAL SYSTEMS SITE PLAN 4

CONTINUE ONTO SHEET 000-ET004

C O

N T

IN

U

E O

N T

O S

H E

E T

-E T

SYSTEM SITE PLAN SHEET NOTES

1 PROVIDE A PHYSICALLY DIVERSE AND REDUNDANT "A" AND "B" AIR-BLOWN FIBER OPTIC

MICRO-DUCT CABLING PATHWAY SYSTEM FROM THE BUILDING 2 DATA CENTER DIRECTLY TO EACH

NEW/MODIFIED TELECOMMUNICATIONS ROOM. BASIS OF DESIGN IS SUMITOMO FUTURE-FLEX

SOLUTION.

2 UTILIZE DEDICATED OUTSIDE PLANT CONDUITS BETWEEN BUILDINGS TO SEPARATE EACH "A" AND

"B" SEGMENT. MICRO-DUCT SIZES ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY.

CONTRACTOR SHALL VALIDATE EXISTING CONDITIONS AND PROVIDE AN ADEQUATELY SIZED

MICRO-DUCT PATHWAY SYSTEM BETWEEN THE DATA CENTER AND EACH TELECOMMUNICATIONS

ROOM TO ACCOMMODATE FIBER OPTIC BACKBONE CABLING REQUIREMENTS.

3 PROVIDE SEPERATE "A" AND "B" PATHWAYS WITHIN BUILDINGS UTILIZING OPPOSITE FACILITY RISERS AND CORRIDORS FOR EACH SEGMENT. WHERE NOT FEASIBLE, ROUTE "A" AND "B" FIBER

OPTIC BACKBONE CABLING ON OPPOSITE SIDES OF SHARED CORRIDORS AND SEPERATE

CONDUITS IN SHARED RISER SPACES.

4 SEE CIVIL DRAWINGS FOR CAMPUS PATHWAY DETAILS.

# Revisions Date

1 BULLETIN #1 09/30/2025

UP

UP

UP

UP

UP

UP

UPUP

UP

DNDN

UP

UP

UPUP

UP

UP

J J

V

F

CR

DC ES

MD

RX

A2 A1

A2

A2

D

A2

A2

A1

A2

A2

A2

A2

A2

A2

A2D

D

01-ET101

01-ET101

01-ET101

TELECOM ROOM

01-101

A7 A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7 A7

A7 A7

A7

A7

A7

A7

A7

A7

A7

A7A7

A7

A7

A7

A7

A7

A7

A7

A7A7

A7

NEW TELECOM

ROOM

EXISTING

TELECOM ROOM

A4

(ETR)

NL1S4

J1 J1

NL1S4-36

NL1S4-30,32,34 NL1S4-31,33,35

B B

BB

NL1S4-37

ET201

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.aeworks.comAE WORKS ®

A u to d e s k D o c s

/V B

A Y

-0

B a y P in e s V

A M

C E

H R

M I n fr a s tr u c tu re U p g ra d e s /V

B A

Y -0

B a y P in e s

M E

P .r v t

/2 /2

:0

:1

A

M

01-ET101

BUILDING 01 - FIRST FLOOR SYSTEMS PLAN EHRM Infrastructure Upgrades - Bay Pines VA Healthcare System - CWBY

10000 Bay Pines, Blvd. St. Petersburg FL 33714

516-21-106

SEE DRAWING TITLE

04.11.2025 SL, DS MH, CM, JC

FINAL BID DOCUMENTS

1/16" = 1'-0"

BUILDING 01 - FIRST FLOOR SYSTEMS PLAN

1/4" = 1'-0"

BUILDING 01 - TR 01-101 POWER PLAN

SYSTEMS PLAN GENERAL NOTES

1 REMOVE EXISTING COMMUNICATIONS WAO CABLING AND COMPONENTS IN THEIR ENTIRETY FROM EXISTING

TELECOMMUNICATIONS ROOM AND REPLACE WITH NEW CABLING AND COMPONENTS FROM NEW OR MODIFIED TELECOMMUNICATIONS ROOM, OR PROVIDE A BLANK OUTLET FACEPLATE, AS NOTED ON DRAWINGS. ENSURE

TERMINATED WAO CABLING DOES NOT EXCEED 90 METERS.

2 FEED NEMA OUTLETS AND JUNCTION BOXES SERVING TELECOMMUNICATIONS ROOM FROM THE EXISTING PANEL AND CIRCUIT INDICATED IN TAG. FEED NEW DUPLEX OUTLETS FROM NEAREST EXISTING RECEPTACLE CIRCUIT.

3 IN TELECOMMUNICATIONS ROOMS, PROVIDE OUTLET AND BREAKER TYPE INDICATED IN THE TELECOMMUNICATIONS

ROOM POWER PLAN AND OUTLET AND PDU TYPE LEGEND.

1/4" = 1'-0"

BUILDING 01 - TR 01-101 LIGHTING PLAN

1/4" = 1'-0"

BUILDING 01 - TR 01-101 SYSTEMS PLAN

NEW/MODIFIED TELECOM ROOM NOTES

1 DIMENSIONS TO BE FIELD VERIFIED. PROVIDE A MINIMUM WORKING CLEARANCE OF 36" (AS SHOWN WITH DASHED

LINES) OF UNOBSTRUCTED SPACE IN THE FRONT, REAR, AND ACCESSIBLE SIDES OF EQUIPMENT CABINETS, LOADED

RACKS, AND WALL MOUNTED EQUIPMENT.

2 SEPARATE AND ORGANIZE CABLES BY MEDIA, SIGNAL TYPE, AND COLOR PRIOR TO ENTERING WIRING CLOSETS.

3 PROVIDE FOUR 4-INCH CONDUITS TO INTERSTITIAL SPACES TO ACCOMMODATE NEW HORIZONTAL AND BACKBONE

CABLING.

NEW/MODIFIED TELECOM ROOM KEYNOTES

1 4' x 8' x 3/4" FIRE RATED PLYWOOD MOUNTED VERTICALLY 12" - 18" AFF AROUND TELECOMMUNICATIONS ROOM

INTERIOR WALLS.

2 12" BASKET CABLE TRAY. LOCATE CABLE TRAY A MINIMUM 2" ABOVE ENCLOSED EQUIPMENT CABINETS, OPEN RACKS, EQUIPMENT WALLFIELDS, AND CLOSET DOOR TRIMS. ATTACH OPEN RACKS TO THE TRAY SYSTEM WITH

MANUFACTURER RECOMMENDED HARDWARE AND PROVIDE CABLE BEND RADIUS COMPONENTS.

3 EQUIPMENT RACK WITH 6" FRONT VERTICAL CABLING ORGANIZER. (TYPICAL)

4 PROVIDE THREE (3) 4" PENETRATIONS. PROVIDE SELF-CONTAINED UL LISTED MECHANICAL ASSEMBLIES FOR PENETRATIONS THROUGH FIRE-RATED BARRIERS THAT ALLOW RE-ENTRY WITHOUT THE NEED FOR PILLOWS, CAULK, PUTTY, ETC., AND RATED FOR THE BARRIER PENETRATED.

# Revisions Date

1 BULLETIN #1 09/30/2025

FLOORPLAN KEYNOTES

1 WAO WITH A 20' TERMINATED WHIP WITHOUT A WORK BOX OR FACEPLATE TAGGED "FOR USE BY SYSTEMS

VENDORS TO SUPPORT LEGACY SYSTEMS REQUIRING ENTERPRISE ETHERNET CONNECTIVITY."

ENLARGED POWER PLAN KEYNOTES

1 TELECOM ROOM WILL BE PROVIDED WITH A SPLIT SYSTEM IN THE ROOM THAT IS SERVED BY A

CONDENSING UNIT. SEE SHEET ET401 FOR CONDENSING UNIT POWER AND CIRCUITING

REQUIREMENTS AND M SERIES DRAWINGS FOR CONDENSING UNIT LOCATIONS. ELECTRICAL

CONTRACTOR SHALL COORDINATE WITH MECHANICAL CONTRACTOR FOR FINAL EQUIPMENT

LOCATIONS.

V

ES

MD

CR

F

DCRX

A2

A2

A2

A2

A2

A2

A2A2

A2

A2

A2

A2

A2

A2

A2 A2 A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

D

A2

D

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

D

A2

A2

D

A2

A2

A2

D

A2

A2

D

A2

A2

A2DA2

A2A2

A2

D

A2

D

A2

A2

D

A2

D

A2

A2A2

A2DA2

A2

A2

A2

A2

A2

02-ET101

202-ET101

02-ET101

TELECOM ROOM

02-101

18"x4" CABLE TRAY

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

MODIFIED

TELECOM ROOM

2E-6 2N-6

(ETR) (ETR)

P2P2

2N-6-39

2N-6-33,35,37 2E-6-34,36,38

A

A

2N-6-41

ET201

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.aeworks.comAE WORKS ®

A u to d e s k D o c s

/V B

A Y

-0

B a y P in e s V

A M

C E

H R

M I n fr a s tr u c tu re U p g ra d e s /V

B A

Y -0

B a y P in e s

M E

P .r v t

/2 /2

:0

:2

A

M

02-ET101

BUILDING 02 - FIRST FLOOR SYSTEMS PLAN EHRM Infrastructure Upgrades - Bay Pines VA Healthcare System - CWBY

10000 Bay Pines, Blvd. St. Petersburg FL 33714

516-21-106

SEE DRAWING TITLE

04.11.2025 SL, DS MH, CM, JC

FINAL BID DOCUMENTS

1/8" = 1'-0"

BUILDING 02 - FIRST FLOOR SYSTEMS PLAN

1/4" = 1'-0"

BUILDING 02 - TR 02-101 POWER PLAN

SYSTEMS PLAN GENERAL NOTES

1 REMOVE EXISTING COMMUNICATIONS WAO CABLING AND COMPONENTS IN THEIR ENTIRETY FROM EXISTING

TELECOMMUNICATIONS ROOM AND REPLACE WITH NEW CABLING AND COMPONENTS FROM NEW OR MODIFIED TELECOMMUNICATIONS ROOM, OR PROVIDE A BLANK OUTLET FACEPLATE, AS NOTED ON DRAWINGS. ENSURE

TERMINATED WAO CABLING DOES NOT EXCEED 90 METERS.

2 FEED NEMA OUTLETS AND JUNCTION BOXES SERVING TELECOMMUNICATIONS ROOM FROM THE EXISTING PANEL AND CIRCUIT INDICATED IN TAG. FEED NEW DUPLEX OUTLETS FROM NEAREST EXISTING RECEPTACLE CIRCUIT.

3 IN TELECOMMUNICATIONS ROOMS, PROVIDE OUTLET AND BREAKER TYPE INDICATED IN THE TELECOMMUNICATIONS

ROOM POWER PLAN AND OUTLET AND PDU TYPE LEGEND.

1/4" = 1'-0"

BUILDING 02 - TR 02-101 LIGHTING PLAN

1/4" = 1'-0"

BUILDING 02 - TR 02-101 SYSTEMS PLAN

NEW/MODIFIED TELECOM ROOM NOTES

1 DIMENSIONS TO BE FIELD VERIFIED. PROVIDE A MINIMUM WORKING CLEARANCE OF 36" (AS SHOWN WITH DASHED

LINES) OF UNOBSTRUCTED SPACE IN THE FRONT, REAR, AND ACCESSIBLE SIDES OF EQUIPMENT CABINETS, LOADED

RACKS, AND WALL MOUNTED EQUIPMENT.

2 SEPARATE AND ORGANIZE CABLES BY MEDIA, SIGNAL TYPE, AND COLOR PRIOR TO ENTERING WIRING CLOSETS.

3 PROVIDE FOUR 4-INCH CONDUITS TO INTERSTITIAL SPACES TO ACCOMMODATE NEW HORIZONTAL AND BACKBONE

CABLING.

NEW/MODIFIED TELECOM ROOM KEYNOTES

1 4' x 8' x 3/4" FIRE RATED PLYWOOD MOUNTED VERTICALLY 12" - 18" AFF AROUND TELECOMMUNICATIONS ROOM

INTERIOR WALLS.

2 12" BASKET CABLE TRAY. LOCATE CABLE TRAY A MINIMUM 2" ABOVE ENCLOSED EQUIPMENT CABINETS, OPEN RACKS, EQUIPMENT WALLFIELDS, AND CLOSET DOOR TRIMS. ATTACH OPEN RACKS TO THE TRAY SYSTEM WITH

MANUFACTURER RECOMMENDED HARDWARE AND PROVIDE CABLE BEND RADIUS COMPONENTS.

3 EQUIPMENT RACK WITH 6" FRONT VERTICAL CABLING ORGANIZER. (TYPICAL)

4 PROVIDE THREE (3) 4" PENETRATIONS. PROVIDE SELF-CONTAINED UL LISTED MECHANICAL ASSEMBLIES FOR PENETRATIONS THROUGH FIRE-RATED BARRIERS THAT ALLOW RE-ENTRY WITHOUT THE NEED FOR PILLOWS, CAULK, PUTTY, ETC., AND RATED FOR THE BARRIER PENETRATED.

5 (4) EXISTING 4" CONDUITS TO BASEMENT CRAWLSPACE.

6 PROVIDE (4) NEW 4" CONDUITS TO BASEMENT CRAWLSPACE WITH PULL BOX AND EXTEND TO INTERCEPT

OUTSIDE FIBER OPTIC CABLE PLANT PATHWAYS.

# Revisions Date

1 BULLETIN #1 09/30/2025

ENLARGED POWER PLAN KEYNOTES

1 TELECOM ROOM WILL BE PROVIDED WITH A SPLIT SYSTEM IN THE ROOM THAT IS SERVED BY A

CONDENSING UNIT. SEE SHEET ET401 FOR CONDENSING UNIT POWER AND CIRCUITING

REQUIREMENTS AND M SERIES DRAWINGS FOR CONDENSING UNIT LOCATIONS. ELECTRICAL

CONTRACTOR SHALL COORDINATE WITH MECHANICAL CONTRACTOR FOR FINAL EQUIPMENT

LOCATIONS.

F

DC

ES

MD

CR

RX

A2

A2

A2

A2

A2

A2

A2

A2

A2D A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

D

A2

A2

A2

A2 A2 A2 A2

A2A2

A2

A2 A2

A2 A2 A2

A2

A2

A2

A2

A2

D

A2

A2

D

A2

D

A2

A2

A2

A2 A2

A2

A2

A2

A2

A2

A2

A2 A2 D A2 A2 D

A2

A2

A2

A2

A2

A2

D

A2

A2

A2

D A2

A2 A2 A2

A2

A2A2

A2

A2

A2

A2

A2

A2

A2 A2 A2

A2

A2

A2

A2

D

A2

A2

A2

A2

D

A2

A2

A2

A2

A2 D A2

A2

A2

A2

A2

A2

A2

A2

A2 A2

A2

A2

A4

A2

A2

A2

A2

A2A2

A2

A2

A2

A2 A2

02-ET102

02-ET104

02-ET102

02-ET102

02-ET104

TELECOM ROOM

02-201

DATA CENTER

UPS ROOM

201A

BATTERY ROOM

18"x4" CABLE TRAY 18"x4" CABLE TRAY

"x

4" C

A B

LE

T

R A

Y

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7

A7A7

A7

A7

A7

NEW TELECOM

ROOM

2E-5

(ETR)2N-9

(ETR)

P2

P2

2N-9-30

2N-9-31,33,35

2E-5-32,34,36

A A

2N-9-32

ET2012

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.aeworks.comAE WORKS ®

A u to d e s k D o c s

/V B

A Y

-0

B a y P in e s V

A M

C E

H R

M I n fr a s tr u c tu re U p g ra d e s /V

B A

Y -0

B a y P in e s

M E

P .r v t

/2 /2

:0

:3

A

M

02-ET102

BUILDING 02 - SECOND FLOOR SYSTEMS

PLAN

EHRM Infrastructure Upgrades - Bay Pines VA Healthcare System - CWBY

10000 Bay Pines, Blvd. St. Petersburg FL 33714

516-21-106

SEE DRAWING TITLE

04.11.2025 SL, DS MH, CM, JC

FINAL BID DOCUMENTS

1/8" = 1'-0"

BUILDING 02 - SECOND FLOOR SYSTEMS PLAN

1/4" = 1'-0"

BUILDING 02 - TR 02-201 POWER PLAN

SYSTEMS PLAN GENERAL NOTES

1 REMOVE EXISTING COMMUNICATIONS WAO CABLING AND COMPONENTS IN THEIR ENTIRETY FROM EXISTING

TELECOMMUNICATIONS ROOM AND REPLACE WITH NEW CABLING AND COMPONENTS FROM NEW OR MODIFIED TELECOMMUNICATIONS ROOM, OR PROVIDE A BLANK OUTLET FACEPLATE, AS NOTED ON DRAWINGS. ENSURE

TERMINATED WAO CABLING DOES NOT EXCEED 90 METERS.

2 FEED NEMA…