These are detailed civil engineering plan sheets for the EHRM Infrastructure Upgrades project at the Bay Pines VA Medical Center in St. Petersburg, Florida. The documents show a comprehensive site plan for proposed underground communication duct bank and manhole installations across the medical campus, with multiple proposed duct bank segments ranging from 2-4" to 3-6" conduits, totaling thousands of linear feet. The project involves strategically routing new underground communication infrastructure between various existing buildings, including the hospital, post office, police department, and multiple masonry and service buildings, with specific attention to minimizing disturbance to existing infrastructure and maintaining precise underground utility connections.

The plan sheets, dated 05/10/2024, are final bid documents prepared by AE Works, LTD. for the U.S. Department of Veterans Affairs Office of Construction and Facilities Management. The project includes detailed utility notes specifying critical requirements such as bedding, backfill compaction, underground utility protection, trench management, and coordination protocols. Each sheet includes comprehensive existing and proposed infrastructure legends, showing underground utilities like natural gas, power, sanitary sewer, storm sewer, steam, and water, with precise measurements and routing details across the Bay Pines Boulevard location.

View the file

Other files

File Type Posted
36C77625B0023 Revised - 11-5-25.pdf PDF
ISTS_31_Apx_B_Pages.pdf PDF
36C77625B0023 0009.pdf PDF
36C77625B0023 Updated - 10-27-25.pdf PDF
36C77625B0023 0008.pdf PDF
VBAY-001_ELEC_BULLETIN 1_STAMPED.pdf PDF
PACS report.xlsx XLSX spreadsheet
Technical Questions_VBAY - RFI Responses - Final Responses 10.22.25.pdf PDF
2021 VAMC Asbestos Reinspection Report.pdf PDF
36C77625B0023 0007.pdf PDF
Technical Questions Spreadsheet - Bay Pines EHRM - REV 9-8-25.pdf PDF
36C77625B0023 0006.pdf PDF
Technical Questions Spreadsheet - Bay Pines EHRM - 9-5-25.docx DOCX document
0005 - SPEC 26 05 11.pdf PDF
36C77625B0023 0005.pdf PDF
Technical Questions Spreadsheet - Bay Pines EHRM - 8-29-25.docx DOCX document
36C77625B0023 0004.pdf PDF
36C77625B0023 0003.pdf PDF
36C77625B0023 0002.pdf PDF
Site Visit Sign-in Sheet - Bay Pines EHRM 7-15-25.pdf PDF
36C77625B0023 0001.pdf PDF
ATTACHMENT 4 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 1 - Specifications.pdf PDF
36C77625B0023 - 7-2-25.pdf PDF
ATTACHMENT 2 - Drawings.pdf PDF
ATTACHMENT 5 - Construction Wage Rates - Pinellas 5-23-25.pdf PDF
ATTACHMENT 6 - Site Visit Instructions.pdf PDF
ATTACHMENT 3 - Pre-Construction Risk Assessment.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STORY

MASONRY

STORY

MASONRY

BOLLARD

EXISTING

BUILDING 100

BLDG 109

PARKING

GARAGE

BOLLARD

BOLLARDS

BOLLARD

1-5 STORY

MASONRY

BUILDING 100

HOSPITAL

STORY

MASONRY

BLDG 24

EXTEND INTO

BLDG 24

PROPOSED

PULLBOX

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 105 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 282 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 349 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 480 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 55 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 85 LF

EXISTING DB

2-4" SPARES

EXISTING DB

2-4" SPARES

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 165 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 97 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 220 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 263 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 323 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 185 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 266 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 182 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 227 LF

EXISTING DB

2-4" SPARES

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 88 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 179 LF

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

EXISTING DB

2-4" SPARES

PROPOSED

COMMUNICATION

MANHOLE

19A

419A

15A

2 STORY MASONRY

BUILDING #20

POST OFFICE

1 STORY

MASONRY

BUILDING #35

BLDG 102

1 STORY MASONRY

POD 'D'

1 STORY MASONRY

SERVICE HUB

3 STORY MASONRY

BUILDING #37

1 STORY MASONRY

BUILDING #101

MASONRY

GENERATOR

BUILDING

BOCA

CIEGA

SHOP RELOCATION

& CEP EXPANSION

BUILDING 100F

WAREHOUSE WEST

BUILDING 110

D

A

MENTAL HEALTH ADDITION

BUILDING 111

FFE = 14.00 (NGVD 29)

FFE = 13.12 (NAVD 88)

EXISTING

CEP BUILDING

EXISTING

BUILDING 100

1 STORY

MASONRY

BUILDING #71

BLDG 102

1 STORY MASONRY

POD 'A'

EXISTING FOUNDATION

PROPOSED GREC

AC

AC AC

AC AC

1 STORY METAL

FRAME BLDG.

1 STORY MASONRY

BUILDING #54

POLICE DEPARTMENT

6' CHAIN LINK

FENCE GATE

1 STORY

MASONRY

BLDG 102

1 STORY MASONRYSERVICE HUB

1 STORY

MASONRY

BUILDING #56

2 STORY

MASONRY

BUILDING

FISHER HOUSE

C

B

T203

11A

13A

ELEVATED

BUILDING

VETERANS

BUSINESS

ADMINISTRATION

LOWEST FFE =

12.67

35.1'

.5

35.1'

.5

0'

1 STORY MASONRY BLDG

EDUCATION TRAINING CENTER

& MENTAL HEALTH MANAGEMENT

BLDG 102

1 STORY MASONRY

POD 'C'

BLDG 102

1 STORY MASONRY

POD 'B'

1 STORY

MASONRY

BUILDING 12

TRANSPORTATION

1 STORY

MASONRY

BUILDING 13

LAUNDRY

1 STORY

MASONRY

BUILDING 19

ELEC SYSTEMS

EQUIP STATION

1 STORY

MASONRY

BUILDING 17

1 STORY

MASONRY

1 STORY

MASONRY

BUILDING

NCA

MAITENANCE

FACILITY

BLDG 1001

NCA

1 STORY MASONRY

UNDER

CONSTRUCTION

CANCER

INFUSION FUTURE

WOMENS CLINIC

FUTURE

FIRE STATION

PROPOSED

BUILDING

FISHER HOUSE

EXISTING

DENTAL CLINIC

BUILDING

11,373 SF

FFE: 11.00

8' CHAIN LINK FENCE

W

OOD W

ALK

IN

G B

RID

GE

MH 3A

MH 3

MH 8

MH 2

MH 1

MH 29

MH 28A

MH 28MH 27

MH 26

MH

MH 4

MH 5

MH 6

MH

MH 7

MH 360

MH 362

UP

EXISTING NATURAL GAS, UNDERGROUND

EXISTING POWER, UNDERGROUND

EXISTING SANITARY SEWER, UNDERGROUND

EXISTING STORM SEWER, UNDERGROUND

EXISTING STEAM, UNDERGROUND

EXISTING WATER, UNDERGROUND

EXISTING CURB

EXISTING BUILDING OUTLINE

EXISTING LEGEND

MANHOLE

VAULT

HANDHOLE

EXISTING STORM SEWER, ROOF DRAIN

EXISTING POWER, TRANSFORMER

EXISTING STORM SEWER, INLET

EXISTING SANITARY SEWER, CLEAN-OUT

EXISTING JUNCTION BOX

VA BUILDING NUMBER100

EXISTING COMM, DUCT BANK

EXISTING COMM MANHOLE

EXISTING PAVEMENT

PROPOSED LEGEND

20' SCALE HATCH LINES

PROPOSED COMM MANHOLE

PROPOSED COMM DUCT BANK

00 60' 120'

CU101

Q1 DUCTBANK AND MANHOLE

BAY PINES BLVD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street Sewickley, PA 15143 Phone: 412-287-7333 www.ae-works.comAE WORKS®

A ut od es k D oc s:

//V B

A Y

-0

B ay

P in es V

A M

C E

H R

M In fra st ru ct ur e

U pg ra de s/ V

B A

Y -0

_B ay P in es

_M E

P .rv t 5/

/2

5:

:4

P M

EHRM INFRASTRUCTURE

UPGRADES

10000 BAY PINES BLVD, ST. PETERSBURG, FL 33714

516-21-106

N/A

05/10/2024 JS TK# Revisions Date

PENNONI ASSOCIATES INC.

5755 Rio Vista Dr

Clearwater, FL 33760 T 727.451.9561

Florida COA: 7819

FINAL BID DOCUMENTS

1. ALL PIPE LENGTHS AND DISTANCES BETWEEN STRUCTURES ARE MEASURED FROM CENTER OF

STRUCTURE TO CENTER OF STRUCTURE ALONG A HORIZONTAL PLANE.

2. BEDDING REQUIREMENTS SPECIFIED HEREIN ARE TO BE CONSIDERED AS MINIMUMS FOR

RELATIVELY DRY, STABLE EARTH CONDITIONS. ADDITIONAL BEDDING SHALL BE REQUIRED FOR

ROCK TRENCHES AND WET AREAS. CONTRACTOR SHALL HAVE THE RESPONSIBILITY TO PROVIDE

SUCH ADDITIONAL BEDDING AS MAY BE REQUIRED TO PROPERLY CONSTRUCT THE WORK.

3. COMPACTION OF THE BACKFILL OF ALL TRENCHES SHALL BE COMPACTED TO THE DENSITY OF 95% OF THEORETICAL MAXIMUM DRY DENSITY (ASTM D698). BACKFILL MATERIAL SHALL BE FREE

FROM ROOTS, STUMPS, OR OTHER FOREIGN DEBRIS AND SHALL BE PLACED IN LIFTS NOT TO

EXCEED 6 INCHES IN COMPACTED FILL THICKNESS. FACILITY ENGINEERING WILL REQUIRE THE

CONTRACTOR TO PROVIDE A REPORT FROM A GEOTECHNICAL ENGINEER. CORRECTION OF ANY

TRENCH SETTLEMENT WITHIN A YEAR FROM THE DATE OF APPROVAL WILL BE THE

RESPONSIBILITY OF THE CONTRACTOR.

4. CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY CONNECTION FEES.

5. THE LOCATION OF THE EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN HAVE BEEN

TAKEN FROM EXISTING UTILITY RECORDS AVAILABLE AT THE TIME THESE PLANS WERE

PREPARED AND FROM SURFACE OBSERVATION OF THE SITE. COMPLETENESS OR ACCURACY OF

LOCATION AND DEPTH OF UNDERGROUND UTILITIES AND STRUCTURES IS NOT GUARANTEED.

6. THE CONTRACTOR SHALL COORDINATE LOCATION AND INSTALLATION OF ALL UNDERGROUND

UTILITIES AND APPURTENANCES TO MINIMIZE DISTURBANCE TO CURBING, PAVING, AND

COMPACTED SUBGRADE.

7. CONTRACTOR SHALL EXCAVATE ONLY AS MUCH TRENCH WHICH PIPE CAN BE INSTALLED AND

TRENCH BACKFILLED BY THE END OF EACH WORK DAY.

8. ALL UNDERGROUND UTILITY TRENCHES SHALL BE BACKFILLED WITH SAFE CLEAN FILL.

9. ALL TRENCHES SHALL BE PROPERLY SECURED AND BRACED.

10. ALL EXISTING CASTING AND INLET TOPS OR GRATES MUST BE ADJUSTED TO THE PROPOSED

GRADE, UNLESS OTHERWISE INDICATED.

11. ALL PROPOSED UTILITIES, INCLUDING ELECTRIC SERVICE, SHALL BE PLACED UNDERGROUND.

12. ALL CONNECTIONS TO EXISTING UTILITIES AND TESTING SHALL BE PERFORMED IN THE

PRESENCE OF UTILITY OWNERS AND PENNONI. CONNECTION LOCATIONS MUST BE APPROVED IN

FIELD AFTER PIPE IS EXPOSED. CONTRACTOR SHALL PROVIDE WRITTEN REQUEST TO PENNONI

WITH PROPOSED TIME AND DATE OF CONNECTION AT LEAST 5 WORKING DAYS IN ADVANCE OF

PLANNED CONNECTION. COORDINATE WITH LOCAL JURISDICTION ON THE CAPPING AND

DISCONNECTING REQUIREMENTS FOR ANY EXISTING SERVICES.

UTILITY NOTES:

N

1 RFI RESPONSE 10/13/25

2 STORY MASONRY

BUILDING #20

POST OFFICE

1 STORY

MASONRY

BUILDING #35

BLDG 102

1 STORY MASONRY

POD 'D'

BLDG 102

1 STORY MASONRY

SERVICE HUB

3 STORY MASONRY

BUILDING #37

1 STORY MASONRY

BUILDING #101

STRM(A)

MASONRY

GENERATOR

BUILDING

SHOP RELOCATION

& CEP EXPANSION

BUILDING 100F

WAREHOUSE WEST

BUILDING 110

D

A

MENTAL HEALTH ADDITION

BUILDING 111

FFE = 14.00 (NGVD 29)

FFE = 13.12 (NAVD 88)

EXISTING

CEP BUILDING

EXISTING

BUILDING 100

1 STORY

MASONRY

BUILDING #71

BLDG 102

1 STORY MASONRY

POD 'A'

1-5 STORY

MASONRY

BUILDING 100

HOSPITAL

EXISTING FOUNDATION

PROPOSED GREC

PROPOSED

PULLBOX

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 138 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 45 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 74 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 350 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 72 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 310 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 104 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 262 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 437 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 315 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 211 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 209 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 38 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 224 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 98 LF

PROPOSED DUCT BANK

(3 - 6" CONDUIT) 225 LF

PROPOSED DUCT BANK

(3 - 6" CONDUIT) 75 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 252 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 232 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 55 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 85 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 646 LF

EXISTING DB

2-4" SPARES

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 219 LF

PROPOSED DUCT BANK

(3 - 6" CONDUIT) 215 LF

PROPOSED DUCT BANK

(3 - 6" CONDUIT) 206 LF

PROPOSED DUCT BANK

(3 - 6" CONDUIT) 58 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 119 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 214 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 323 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 274 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 167 LF

PROPOSED DUCT BANK

(1 - 6" CONDUIT) 223 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 243 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 185 LF

PROPOSED DUCT BANK

(3 - 6" CONDUIT) 103 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 79 LF

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

PROPOSED

COMMUNICATION

MANHOLE

15A

13A

10A

12A

15C

15B

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

STORY

MASONRY

STORY

MASONRY

BLDG 109

PARKING

GARAGE

1-5 STORY

MASONRY

BUILDING 100

HOSPITAL

STORY

MASONRY

BLDG 24

1 STORY METAL

FRAME BLDG.

1 STORY MASONRY

BUILDING #54

POLICE DEPARTMENT

6' CHAIN LINK

FENCE GATE

1 STORY

MASONRY

BLDG 102

1 STORY MASONRY

SERVICE HUB

1 STORY

MASONRY

BUILDING #56

2 STORY

MASONRY

BUILDING

FISHER HOUSE

C

B

T203

11A

13A

ELEVATED

BUILDING

VETERANS

BUSINESS

ADMINISTRATION

LOWEST FFE =

12.67

35.1'

.5

35.1'

.5

0'

1 STORY MASONRY BLDG

EDUCATION TRAINING CENTER

& MENTAL HEALTH MANAGEMENT

BLDG 102

1 STORY MASONRY

POD 'C'

BLDG 102

1 STORY MASONRYPOD 'B'

1 STORY

MASONRY

BUILDING 12

TRANSPORTATION

1 STORY

MASONRY

BUILDING 13

LAUNDRY

1 STORY

MASONRY

BUILDING 19

ELEC SYSTEMS

EQUIP STATION

1 STORY

MASONRY

BUILDING 17

1 STORY

MASONRY

1 STORY

MASONRY

BUILDING

NCA

MAITENANCE

FACILITY

BLDG 1001

NCA

1 STORY MASONRY

UNDER

CONSTRUCTION

CANCER

INFUSION FUTURE

WOMENS CLINIC

FUTURE

FIRE STATION

PROPOSED

BUILDING

FISHER HOUSE

EXISTING

DENTAL CLINIC

BUILDING

11,373 SF

FFE: 11.00

8' CHAIN LINK FENCE

WOOD W

ALK

IN

G BRID

GE

EXISTING NATURAL GAS, UNDERGROUND

EXISTING POWER, UNDERGROUND

EXISTING SANITARY SEWER, UNDERGROUND

EXISTING STORM SEWER, UNDERGROUND

EXISTING STEAM, UNDERGROUND

EXISTING WATER, UNDERGROUND

EXISTING CURB

EXISTING BUILDING OUTLINE

EXISTING LEGEND

EXISTING STORM SEWER, ROOF DRAIN

EXISTING POWER, TRANSFORMER

EXISTING STORM SEWER, INLET

EXISTING SANITARY SEWER, CLEAN-OUT

EXISTING JUNCTION BOX

VA BUILDING NUMBER100

EXISTING COMM, DUCT BANK

EXISTING COMM MANHOLE

EXISTING PAVEMENT

MANHOLE

VAULT

HANDHOLE

PROPOSED LEGEND

20' SCALE HATCH LINES

PROPOSED COMM MANHOLE

PROPOSED COMM DUCT BANK

00 60' 120'

CU102

Q2 DUCTBANK AND MANHOLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street Sewickley, PA 15143 Phone: 412-287-7333 www.ae-works.comAE WORKS®

A ut od es k D oc s:

//V B

A Y

-0

B ay

P in es V

A M

C E

H R

M In fra st ru ct ur e

U pg ra de s/ V

B A

Y -0

_B ay P in es

_M E

P .rv t 5/

/2

5:

:4

P M

EHRM INFRASTRUCTURE

UPGRADES

10000 BAY PINES BLVD, ST. PETERSBURG, FL 33714

516-21-106

N/A

05/10/2024 JS TK# Revisions Date

PENNONI ASSOCIATES INC.

5755 Rio Vista Dr

Clearwater, FL 33760 T 727.451.9561

Florida COA: 7819

FINAL BID DOCUMENTS

1. ALL PIPE LENGTHS AND DISTANCES BETWEEN STRUCTURES ARE MEASURED FROM CENTER OF

STRUCTURE TO CENTER OF STRUCTURE ALONG A HORIZONTAL PLANE.

2. BEDDING REQUIREMENTS SPECIFIED HEREIN ARE TO BE CONSIDERED AS MINIMUMS FOR

RELATIVELY DRY, STABLE EARTH CONDITIONS. ADDITIONAL BEDDING SHALL BE REQUIRED FOR

ROCK TRENCHES AND WET AREAS. CONTRACTOR SHALL HAVE THE RESPONSIBILITY TO PROVIDE

SUCH ADDITIONAL BEDDING AS MAY BE REQUIRED TO PROPERLY CONSTRUCT THE WORK.

3. COMPACTION OF THE BACKFILL OF ALL TRENCHES SHALL BE COMPACTED TO THE DENSITY OF 95% OF THEORETICAL MAXIMUM DRY DENSITY (ASTM D698). BACKFILL MATERIAL SHALL BE FREE

FROM ROOTS, STUMPS, OR OTHER FOREIGN DEBRIS AND SHALL BE PLACED IN LIFTS NOT TO

EXCEED 6 INCHES IN COMPACTED FILL THICKNESS. FACILITY ENGINEERING WILL REQUIRE THE

CONTRACTOR TO PROVIDE A REPORT FROM A GEOTECHNICAL ENGINEER. CORRECTION OF ANY

TRENCH SETTLEMENT WITHIN A YEAR FROM THE DATE OF APPROVAL WILL BE THE

RESPONSIBILITY OF THE CONTRACTOR.

4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE LOCATION OF ALL EXISTING

UNDERGROUND UTILITIES AND TO TAKE WHATEVER STEPS NECESSARY TO PROVIDE FOR THEIR

PROTECTION. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS OF UTILITIES

SHOWN OR NOT SHOWN. THE CONTRACTOR SHALL CONTACT THE UTILITY COMPANIES FOR

EXACT LOCATION OF THEIR UTILITIES PRIOR TO STARTING CONSTRUCTION. IT SHALL BE THE

SOLE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR AND REPLACE ANY AND ALL DAMAGE

MADE TO UTILITIES BY THE CONTRACTOR.

5. THE CONTRACTOR SHALL COORDINATE LOCATION AND INSTALLATION OF ALL UNDERGROUND

UTILITIES AND APPURTENANCES TO MINIMIZE DISTURBANCE TO CURBING, PAVING, AND

COMPACTED SUBGRADE.

6. CONTRACTOR SHALL EXCAVATE ONLY AS MUCH TRENCH WHICH PIPE CAN BE INSTALLED AND

TRENCH BACKFILLED BY THE END OF EACH WORK DAY.

7. ALL UNDERGROUND UTILITY TRENCHES SHALL BE BACKFILLED WITH SAFE CLEAN FILL.

8. ALL TRENCHES SHALL BE PROPERLY SECURED AND BRACED.

9. ALL EXISTING CASTING AND INLET TOPS OR GRATES MUST BE ADJUSTED TO THE PROPOSED

GRADE, UNLESS OTHERWISE INDICATED.

10. ALL PROPOSED UTILITIES, INCLUDING ELECTRIC SERVICE, SHALL BE PLACED UNDERGROUND.

11. ALL CONNECTIONS TO EXISTING UTILITIES AND TESTING SHALL BE PERFORMED IN THE

PRESENCE OF UTILITY OWNERS AND PENNONI. CONNECTION LOCATIONS MUST BE APPROVED IN

FIELD AFTER PIPE IS EXPOSED. CONTRACTOR SHALL PROVIDE WRITTEN REQUEST TO PENNONI

WITH PROPOSED TIME AND DATE OF CONNECTION AT LEAST 5 WORKING DAYS IN ADVANCE OF

PLANNED CONNECTION. COORDINATE WITH LOCAL JURISDICTION ON THE CAPPING AND

DISCONNECTING REQUIREMENTS FOR ANY EXISTING SERVICES.

UTILITY NOTES:

AC

1 STORY MASONRY

BUILDING #54

POLICE DEPARTMENT

1 STORY

MASONRY

BLDG 102

1 STORY MASONRY

POD 'D'

BLDG 102

1 STORY MASONRY

SERVICE HUB

1 STORY

MASONRY

BUILDING #56

D

C

B

T203

11A

CEMETERY ROAD

35.1'

.5

35.1'

.5

0'

1 STORY MASONRY BLDG

EDUCATION TRAINING CENTER

& MENTAL HEALTH MANAGEMENT

BLDG 102

1 STORY MASONRY

POD 'C'

BLDG 102

1 STORY MASONRY

POD 'B'

MASONRY

1 STORY

MASONRY

BUILDING

H O O V E R

BLDG 1001

NCA

1 STORY MASONRY

EXISTING

DENTAL CLINIC

BUILDING

11,373 SF

FFE: 11.00

WOOD W

ALK

IN

G BRID

GE

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 262 LF

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 283 LF

(2 - 4" CONDUIT) 87 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 287 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 251 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 257 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 256 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 233 LF

PROPOSED DUCT BANK

(2 - 6" CONDUIT) 219 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 45 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 15 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 527 LF

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 235 LF

3A

2 STORY MASONRY

BUILDING #20

POST OFFICE

1 STORY

MASONRY

BUILDING #35

BLDG 102

1 STORY MASONRY

POD 'D'

1 STORY MASONRY

SERVICE HUB

3 STORY MASONRY

BUILDING #37

1 STORY MASONRY

BUILDING #101

STORY

MASONRY

STORY

MASONRY

MASONRY

GENERATOR

BUILDING

SHOP RELOCATION

& CEP EXPANSION

BUILDING 100F

WAREHOUSE WEST

BUILDING 110

D

A

MENTAL HEALTH ADDITION

BUILDING 111

FFE = 14.00 (NGVD 29)

FFE = 13.12 (NAVD 88)

EXISTING

CEP BUILDING

EXISTING

BUILDING 100

BLDG 109

PARKING

GARAGE

1 STORY

MASONRY

BUILDING #71

BLDG 102

1 STORY MASONRY

POD 'A'

1-5 STORY

MASONRY

BUILDING 100

HOSPITAL

STORY

MASONRY

BLDG 24

EXISTING FOUNDATION

PROPOSED GREC

F

AC AC

AC AC

1 STORY METAL

FRAME BLDG.

BOLLARDS (TYP)

BOLLARDS

1 STORY MASONRY

BUILDING #54

POLICE DEPARTMENT

6' CHAIN LINK

FENCE GATE

1 STORY

MASONRY

BOLLARDS

BOLLARDS

1 STORY

MASONRY

BUILDING #56

2 STORY

MASONRY

BUILDING

FISHER HOUSE

11A

13A

ELEVATED

BUILDING

VETERANS

BUSINESS

ADMINISTRATION

LOWEST FFE =

12.67

35.1'

.5

35.1'

.5

0'

1 STORY

MASONRY

BUILDING 12

TRANSPORTATION

1 STORY

MASONRY

BUILDING 13

LAUNDRY

1 STORY

MASONRY

BUILDING 19

ELEC SYSTEMS

EQUIP STATION

1 STORY

MASONRY

BUILDING 17

1 STORY

MASONRY

1 STORY

MASONRY

BUILDING

UNDER

CONSTRUCTION

CANCER

INFUSION FUTURE

WOMENS CLINIC

FUTURE

FIRE STATION

PROPOSED

BUILDING

FISHER HOUSE

CANOPY C

OVERED A

REA

24.10'7.4

16.40'

11.30'

115.20'

65.00'

120.20'

60.00'

50.50'

180.00'

30.00'

20.00'

10.00'

.20

6.6 0'

.00

87.70'

.2'

12.34'

7.3 0''

.00

3.

4'

.10

'6.50'

4.00'

.00

21.90' 12.80'

8.00'

20.30'

32.20'

.20

.20

.00

31.60'

.00

28.00'

.10

25.88'

58.70'

.10

58.70'

.10

8"

MASONRY W

ALL

.0'

24.10'

.90

.20

10.50'

.20

74.60'

.00

87.50'

184.70'

131.00'

.70

100.20'

40.20'

8.00'

8.00'4.00' 14.60' 20.20'

14.40'

34.30'

17.00'

17.00'

4.00' 7.70'

4.00' 4.00'

4.00'

3.20'

18.70' 18.50' 17.10'

34.20'

17.10'

CANOPY C

OVERED A

REA

EQUIP RM

8' CHAIN LINK FENCE

W

OOD W

ALK

IN

G B

RID

GE

UP

EXISTING NATURAL GAS, UNDERGROUND

EXISTING POWER, UNDERGROUND

EXISTING SANITARY SEWER, UNDERGROUND

EXISTING STORM SEWER, UNDERGROUND

EXISTING STEAM, UNDERGROUND

EXISTING WATER, UNDERGROUND

EXISTING CURB

EXISTING BUILDING OUTLINE

EXISTING LEGEND

EXISTING STORM SEWER, ROOF DRAIN

EXISTING POWER, TRANSFORMER

EXISTING STORM SEWER, INLET

EXISTING SANITARY SEWER, CLEAN-OUT

EXISTING JUNCTION BOX

VA BUILDING NUMBER100

EXISTING COMM, DUCT BANK

EXISTING COMM MANHOLE

EXISTING PAVEMENT

MANHOLE

VAULT

HANDHOLE

PROPOSED LEGEND

20' SCALE HATCH LINES

PROPOSED COMM MANHOLE

PROPOSED COMM DUCT BANK

00 60' 120'

CU103

Q3 DUCTBANK AND MANHOLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street Sewickley, PA 15143 Phone: 412-287-7333 www.ae-works.comAE WORKS®

A ut od es k D oc s:

//V B

A Y

-0

B ay

P in es V

A M

C E

H R

M In fra st ru ct ur e

U pg ra de s/ V

B A

Y -0

_B ay P in es

_M E

P .rv t 5/

/2

5:

:4

P M

EHRM INFRASTRUCTURE

UPGRADES

10000 BAY PINES BLVD, ST. PETERSBURG, FL 33714

516-21-106

N/A

05/10/2024 JS TK# Revisions Date

PENNONI ASSOCIATES INC.

5755 Rio Vista Dr

Clearwater, FL 33760 T 727.451.9561

Florida COA: 7819

FINAL BID DOCUMENTS

1. ALL PIPE LENGTHS AND DISTANCES BETWEEN STRUCTURES ARE MEASURED FROM CENTER OF

STRUCTURE TO CENTER OF STRUCTURE ALONG A HORIZONTAL PLANE.

2. BEDDING REQUIREMENTS SPECIFIED HEREIN ARE TO BE CONSIDERED AS MINIMUMS FOR

RELATIVELY DRY, STABLE EARTH CONDITIONS. ADDITIONAL BEDDING SHALL BE REQUIRED FOR

ROCK TRENCHES AND WET AREAS. CONTRACTOR SHALL HAVE THE RESPONSIBILITY TO PROVIDE

SUCH ADDITIONAL BEDDING AS MAY BE REQUIRED TO PROPERLY CONSTRUCT THE WORK.

3. COMPACTION OF THE BACKFILL OF ALL TRENCHES SHALL BE COMPACTED TO THE DENSITY OF 95% OF THEORETICAL MAXIMUM DRY DENSITY (ASTM D698). BACKFILL MATERIAL SHALL BE FREE

FROM ROOTS, STUMPS, OR OTHER FOREIGN DEBRIS AND SHALL BE PLACED IN LIFTS NOT TO

EXCEED 6 INCHES IN COMPACTED FILL THICKNESS. FACILITY ENGINEERING WILL REQUIRE THE

CONTRACTOR TO PROVIDE A REPORT FROM A GEOTECHNICAL ENGINEER. CORRECTION OF ANY

TRENCH SETTLEMENT WITHIN A YEAR FROM THE DATE OF APPROVAL WILL BE THE

RESPONSIBILITY OF THE CONTRACTOR.

4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE LOCATION OF ALL EXISTING

UNDERGROUND UTILITIES AND TO TAKE WHATEVER STEPS NECESSARY TO PROVIDE FOR THEIR

PROTECTION. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS OF UTILITIES

SHOWN OR NOT SHOWN. THE CONTRACTOR SHALL CONTACT THE UTILITY COMPANIES FOR

EXACT LOCATION OF THEIR UTILITIES PRIOR TO STARTING CONSTRUCTION. IT SHALL BE THE

SOLE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR AND REPLACE ANY AND ALL DAMAGE

MADE TO UTILITIES BY THE CONTRACTOR.

5. THE CONTRACTOR SHALL COORDINATE LOCATION AND INSTALLATION OF ALL UNDERGROUND

UTILITIES AND APPURTENANCES TO MINIMIZE DISTURBANCE TO CURBING, PAVING, AND

COMPACTED SUBGRADE.

6. CONTRACTOR SHALL EXCAVATE ONLY AS MUCH TRENCH WHICH PIPE CAN BE INSTALLED AND

TRENCH BACKFILLED BY THE END OF EACH WORK DAY.

7. ALL UNDERGROUND UTILITY TRENCHES SHALL BE BACKFILLED WITH SAFE CLEAN FILL.

8. ALL TRENCHES SHALL BE PROPERLY SECURED AND BRACED.

9. ALL EXISTING CASTING AND INLET TOPS OR GRATES MUST BE ADJUSTED TO THE PROPOSED

GRADE, UNLESS OTHERWISE INDICATED.

10. ALL PROPOSED UTILITIES, INCLUDING ELECTRIC SERVICE, SHALL BE PLACED UNDERGROUND.

11. ALL CONNECTIONS TO EXISTING UTILITIES AND TESTING SHALL BE PERFORMED IN THE

PRESENCE OF UTILITY OWNERS AND PENNONI. CONNECTION LOCATIONS MUST BE APPROVED IN

FIELD AFTER PIPE IS EXPOSED. CONTRACTOR SHALL PROVIDE WRITTEN REQUEST TO PENNONI

WITH PROPOSED TIME AND DATE OF CONNECTION AT LEAST 5 WORKING DAYS IN ADVANCE OF

PLANNED CONNECTION. COORDINATE WITH LOCAL JURISDICTION ON THE CAPPING AND

DISCONNECTING REQUIREMENTS FOR ANY EXISTING SERVICES.

UTILITY NOTES:

10 10

L

E E

TR

TR

TR

TR

AC

AC AC AC AC

1 STORY METAL

FRAME BLDG.

1 STORY MASONRY

BUILDING #54

POLICE DEPARTMENT

6' CHAIN LINK

FENCE GATE

1 STORY

MASONRY

1 STORY

MASONRY

BUILDING #56

2 STORY

MASONRY

BUILDING

FISHER HOUSE

BAY PINES BLVD. (STATE RD 595) (US ALT 19)

11A

13A

BLDG 109

PARKING

GARAGE

ELEVATED

BUILDING

VETERANS

BUSINESS

ADMINISTRATION

LOWEST FFE =

12.67

35.1'

.5

35.1'30 .5

0'

1 STORY

MASONRY

BUILDING 12

TRANSPORTATION

1 STORY

MASONRY

BUILDING 13

LAUNDRY

1 STORY

MASONRY

BUILDING 19

ELEC SYSTEMS

EQUIP STATION

1 STORY

MASONRY

BUILDING 17

1 STORY

MASONRY

1 STORY

MASONRY

BUILDING

H O O V E R

UNDER

CONSTRUCTION

CANCER

INFUSION FUTURE

WOMENS CLINIC

FUTURE

FIRE STATION

PROPOSED

BUILDING

FISHER HOUSE

8' CHAIN LINK FENCE

WOOD W

ALK

IN

G BRID

GE

EXISTING

COMMUNICATION

VAULT

EXISTING DB

2-4" SPARES

EXISTING DB

2-4" SPARES

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 283 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 87 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 287 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 97 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 220 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 56 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 768 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 388 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 536 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 312 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 263 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 234 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 200 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 158 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 69 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 242 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 111 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 114 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 15 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 28 LF

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 88 LF

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 235 LF

PROPOSED

COMMUNICATION

MANHOLE

PROPOSED

COMMUNICATION

MANHOLE

3A

28A

CORE INTO EXISTING MANHOLE

(2.5' MINIMUM COVER TYP.)

PROPOSED DUCT BANK

(2 - 4" CONDUIT) 194 LF

P 9"

C 12"

C 12"

P 15"

O 18"

P16"

P20"

P26"

C 12"

13"

15"

2@12"

P19"

P 24"

P22"

P 16"

P26"

P 7"

U 7"

P 9"

P13"

P 17"

P 8"

P8"

P8" P

2 STORY MASONRY

BUILDING #20

POST OFFICE

1 STORY

MASONRY

BUILDING #35

3 STORY MASONRY

BUILDING #37

1 STORY MASONRY

BUILDING #101

STORYMASONRY

STORY

MASONRY

MASONRY

GENERATOR

BUILDING

MAIN GATE

BOCA

CIEGA

SHOP RELOCATION

& CEP EXPANSION

BUILDING 100F

WAREHOUSE WEST

BUILDING 110

A

MENTAL HEALTH ADDITION

BUILDING 111

FFE = 14.00 (NGVD 29)

FFE = 13.12 (NAVD 88)

EXISTING

CEP BUILDING

EXISTING

BUILDING 100

BRYSON CIRCLE E

HALF

C

IR

C

LE

E

1 STORY

MASONRY

BUILDING #71

BLDG 102

1 STORY MASONRY

POD 'A'

1-5 STORY

MASONRY

BUILDING 100

HOSPITAL

STORY

MASONRY

BLDG 24

EXISTING FOUNDATION

PROPOSED GREC

TR

AC

TR

BLDG 102

1 STORY MASONRY

POD 'D'

BLDG 102

1 STORY MASONRY

SERVICE HUB

19" PINE

D

C

A

B

T203

CEMETERY ROAD

1 STORY MASONRY BLDG

EDUCATION TRAINING CENTER

& MENTAL HEALTH MANAGEMENT

BLDG 102

1 STORY MASONRY

POD 'C'

BLDG 102

1 STORY MASONRY

POD 'A'

BLDG 102

1 STORY MASONRY

POD 'B'

NCA

MAITENANCE

FACILITY

BLDG 1001

NCA

1 STORY MASONRY

EXISTING

DENTAL CLINIC

BUILDING

11,373 SF

FFE: 11.00

EXISTING NATURAL GAS, UNDERGROUND

EXISTING POWER, UNDERGROUND

EXISTING SANITARY SEWER, UNDERGROUND

EXISTING STORM SEWER, UNDERGROUND

EXISTING STEAM, UNDERGROUND

EXISTING WATER, UNDERGROUND

EXISTING CURB

EXISTING BUILDING OUTLINE

EXISTING LEGEND

EXISTING STORM SEWER, ROOF DRAIN

EXISTING POWER, TRANSFORMER

EXISTING STORM SEWER, INLET

EXISTING SANITARY SEWER, CLEAN-OUT

EXISTING JUNCTION BOX

VA BUILDING NUMBER100

EXISTING COMM, DUCT BANK

EXISTING COMM MANHOLE

EXISTING PAVEMENT

MANHOLE

VAULT

HANDHOLE

PROPOSED LEGEND

20' SCALE HATCH LINES

PROPOSED COMM MANHOLE

PROPOSED COMM DUCT BANK

00 60' 120'

CU104

Q4 DUCTBANK AND MANHOLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street Sewickley, PA 15143 Phone: 412-287-7333 www.ae-works.comAE WORKS®

A ut od es k D oc s:

//V B

A Y

-0

B ay

P in es V

A M

C E

H R

M In fra st ru ct ur e

U pg ra de s/ V

B A

Y -0

_B ay P in es

_M E

P .rv t 5/

/2

5:

:4

P M

EHRM INFRASTRUCTURE

UPGRADES

10000 BAY PINES BLVD, ST. PETERSBURG, FL 33714

516-21-106

N/A

05/10/2024 JS TK# Revisions Date

PENNONI ASSOCIATES INC.

5755 Rio Vista Dr

Clearwater, FL 33760 T 727.451.9561

Florida COA: 7819

FINAL BID DOCUMENTS

1. ALL PIPE LENGTHS AND DISTANCES BETWEEN STRUCTURES ARE MEASURED FROM CENTER OF

STRUCTURE TO CENTER OF STRUCTURE ALONG A HORIZONTAL PLANE.

2. BEDDING REQUIREMENTS SPECIFIED HEREIN ARE TO BE CONSIDERED AS MINIMUMS FOR

RELATIVELY DRY, STABLE EARTH CONDITIONS. ADDITIONAL BEDDING SHALL BE REQUIRED FOR

ROCK TRENCHES AND WET AREAS. CONTRACTOR SHALL HAVE THE RESPONSIBILITY TO PROVIDE

SUCH ADDITIONAL BEDDING AS MAY BE REQUIRED TO PROPERLY CONSTRUCT THE WORK.

3. COMPACTION OF THE BACKFILL OF ALL TRENCHES SHALL BE COMPACTED TO THE DENSITY OF 95% OF THEORETICAL MAXIMUM DRY DENSITY (ASTM D698). BACKFILL MATERIAL SHALL BE FREE

FROM ROOTS, STUMPS, OR OTHER FOREIGN DEBRIS AND SHALL BE PLACED IN LIFTS NOT TO

EXCEED 6 INCHES IN COMPACTED FILL THICKNESS. FACILITY ENGINEERING WILL REQUIRE THE

CONTRACTOR TO PROVIDE A REPORT FROM A GEOTECHNICAL ENGINEER. CORRECTION OF ANY

TRENCH SETTLEMENT WITHIN A YEAR FROM THE DATE OF APPROVAL WILL BE THE

RESPONSIBILITY OF THE CONTRACTOR.

4. CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY CONNECTION FEES.

5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE LOCATION OF ALL EXISTING

UNDERGROUND UTILITIES AND TO TAKE WHATEVER STEPS NECESSARY TO PROVIDE FOR THEIR

PROTECTION. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS OF UTILITIES

SHOWN OR NOT SHOWN. THE CONTRACTOR SHALL CONTACT THE UTILITY COMPANIES FOR

EXACT LOCATION OF THEIR UTILITIES PRIOR TO STARTING CONSTRUCTION. IT SHALL BE THE

SOLE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR AND REPLACE ANY AND ALL DAMAGE

MADE TO UTILITIES BY THE CONTRACTOR.

6. THE CONTRACTOR SHALL COORDINATE LOCATION AND INSTALLATION OF ALL UNDERGROUND

UTILITIES AND APPURTENANCES TO MINIMIZE DISTURBANCE TO CURBING, PAVING, AND

COMPACTED SUBGRADE.

7. CONTRACTOR SHALL EXCAVATE ONLY AS MUCH TRENCH WHICH PIPE CAN BE INSTALLED AND

TRENCH BACKFILLED BY THE END OF EACH WORK DAY.

8. ALL UNDERGROUND UTILITY TRENCHES SHALL BE BACKFILLED WITH SAFE CLEAN FILL.

9. ALL TRENCHES SHALL BE PROPERLY SECURED AND BRACED.

10. ALL EXISTING CASTING AND INLET TOPS OR GRATES MUST BE ADJUSTED TO THE PROPOSED

GRADE, UNLESS OTHERWISE INDICATED.

11. ALL PROPOSED UTILITIES, INCLUDING ELECTRIC SERVICE, SHALL BE PLACED UNDERGROUND.

12. ALL CONNECTIONS TO EXISTING UTILITIES AND TESTING SHALL BE PERFORMED IN THE

PRESENCE OF UTILITY OWNERS AND PENNONI. CONNECTION LOCATIONS MUST BE APPROVED IN

FIELD AFTER PIPE IS EXPOSED. CONTRACTOR SHALL PROVIDE WRITTEN REQUEST TO PENNONI

WITH PROPOSED TIME AND DATE OF CONNECTION AT LEAST 5 WORKING DAYS IN ADVANCE OF

PLANNED CONNECTION. COORDINATE WITH LOCAL JURISDICTION ON THE CAPPING AND

DISCONNECTING REQUIREMENTS FOR ANY EXISTING SERVICES.

UTILITY NOTES:

Sheets and Views
CU101 - Q1 DUCTBANK AND MANHOLE LAYOUT

File details come from the government source that posted it. Updated .