This addendum modifies construction documents for the Tucson CMOP Building Acquisition Minor project. The modifications include updating the table of contents to include a new gate operator specification section. The architectural site plans are revised to show the location of the gate operator and distinguish between existing and new fencing. The solicitation is for the Department of Veterans Affairs Technology Acquisition Center Austin and relates to minor construction work at the Tucson Clinical Medical Outpatient Clinic to construct a new parking lot. The opportunity closing date is not specified.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM 03
PROJECT NUMBER 762-301 (2091.02)
PROJECT NAME Tucson CMOP Building
Acquisition Minor
ADDENDUM NUMBER 03
DATE June 19, 2023 SUBJECT Pre-Bid RFIs
A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com
THE FOLLOWING MODIFICATIONS, ADDITIONS, AND DELETIONS ARE HEREBY MADE A PART OF THE CONTRACT DOCUMENTS.
SEAL:
PROJECT MANUAL:
DIVISION 00
1. 00 01 10 – Table of Contents
Item 1: TOC updated for added specs.
DIVISION 32
1. 32 31 11 – Gate Operator
Item 1: Spec section added per contractor’s request.
CONSTRUCTION DRAWINGS:
ARCHITECTURAL
1. AS001 – DEMO ARCHITECTURAL SITE PLAN – 30 x 42
Item 1: Keynote added to demo double swing gate.
Item 2: Legend update to distinguish existing fence to remain and existing fence to be demoed line type.
2. AS002 – ARCHITECTURAL SITE PLAN – 30 x 42
Item 1: Showing gate operator and keynote on plan.
Item 2: Legend updated to distinguish existing fencing and new fencing line type.
Item 3: Keynote added to show where new and existing fencing will meet.
A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com
3. AS003 – FUTURE ARCHITECTURAL SITE PLAN – 30 x 42
Item 1: Showing gate operator and keynote on plan.
Item 2: Legend updated to distinguish existing fencing and new fencing line type.
Item 3: Keynote added to show where new and existing fencing will meet.
TOTAL: 3 Pages [30 x 42]
5 Pages [8 ½ x 11]
END OF ADDENDUM NO. 03