This technical specification covers the installation of a sliding gate operator at the Tucson Clinical Resource and Management Center Parking Lot. The specification requires a LiftMaster HDSL24UL slide gate operator or approved equivalent. Key components include a gear-driven motor rated for continuous duty, 24VDC battery backup, monitored photo eyes for safety, and a wireless commercial keypad for after-hours access control. The operator must meet relevant UL standards and be installed according to the manufacturer's instructions, including the recommended concrete pad and reinforcing. The contractor must test and adjust the installed operator and demonstrate its programming and operation to the Department of Veterans Affairs project representative upon completion.

View the file

Other files

File Type Posted
36C77623B0039 0004.docx DOCX document
ADDENDUM 03_Dwgs.pdf PDF
Technical Questions - FINAL 2 - TUCSON - 06.20.2023.pdf PDF
standard drop arm gate.pdf PDF
ADDENDUM 03 - Front End Doc.pdf PDF
00 01 10 Spec TOC.pdf PDF
36C77623B0039 0003.docx DOCX document
36C77623B0039_Civil Doc 1.pdf PDF
36C77623B0039_Addendum 02.pdf PDF
36C77623B0039_Addendum 02 - Drawings.pdf PDF
Technical Questions - FINAL - Tucson 06-07-2023.pdf PDF
36C77623B0039 0002.docx DOCX document
36C77623B0039_Mech Doc 2.pdf PDF
36C77623B0039_Mech Doc 1.pdf PDF
36C77623B0039_25 10 10 Advanced Utility Metering System.pdf PDF
36C77623B0039_Geo Report.pdf PDF
Site Visit Sign-in Sheet - Tucson 5-11-23.pdf PDF
36C77623B0039 0001.docx DOCX document
ATTACHMENT 2 - Drawings 1of1.pdf PDF
ATTACHMENT 3 - Drawings 2of2.pdf PDF
ATTACHMENT 4 - Geotechnical Report.pdf PDF
ATTACHMENT 8 - SIte Visit Instructions.pdf PDF
ATTACHMENT 7 - Contractor Safety - Environmental Form.docx DOCX document
ATTACHMENT 6 - Construction Wage Rates - Pima 2-3-23.pdf PDF
ATTACHMENT 1 - Specifications.pdf PDF
36C77623B0039_1.docx DOCX document
ATTACHMENT 5 - Limitations on Subcontracting - Construction.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA 762-301 Tucson CMOP Building Acquisition Minor

CMOP - Tucson, AZ

Addendum 03

32 31 11-1

GATE OPERATORS

SECTION 32 31 11

GATE OPERATORS

PART 1 GENERAL

1.1 SUBMITTALS

A. Action Submittals:

1. Shop Drawings: Illustrate products, installation, and relationship to adjacent construction.

2. Product Data: Manufacturer’s descriptive data and product attributes.

B. Closeout Submittals:

1. Operation and Maintenance Data.

1.2 QUALITY ASSURANCE

A. Installer Qualifications: Firm specializing in work of this Section, with minimum 2 years’ experience.

1.3 WARRANTY

A. Manufacturer’s 5 year warranty against material and manufacturing defects.

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Contract Documents are based on products by LiftMaster. www.LiftMaster.com

B. Substitutions: Refer to Division 01.

2.2 OPERATION

A. Sliding gate to remain open during business hours, locked after hours with code keypad access.

2.3 MANUFACTURED UNITS

A. Slide Gate Operators:

1. Model: HDSL24UL.

2. Operation: Gear driven.

3. Rated duty cycle: Continuous duty.

4. Meet UL 325, UL 991, ASTM F2200, and CAS C22.2 No. 247.

5. Power: 120/240 VAC, single phase.

6. Motor: 24 VDC, continuous duty type, sized to gate conditions.

7. Battery backup: 33Ah.

8. Monitoring and controls:

a. Monitored retro-reflective photo eyes.

9. Accessories:

a. Monitored safety devices: Thru-beam photo eyes.

b. Wireless commercial keypad.

c. Control station: code keypad type in NEMA 4X enclosure for after hours access.

http://www.liftmaster.com/

VA 762-301 Tucson CMOP Building Acquisition Minor

CMOP - Tucson, AZ

Addendum 03

32 31 11-2

GATE OPERATORS

PART 3 EXECUTION

3.1 INSTALLATION

A. Install in accordance with manufacturer’s instructions, including concrete pad size and reinforcing as indicated in manufacturer’s literature.

3.2 CLOSEOUT ACTIVITIES

A. Test and adjust operators for proper operation.

B. Demonstration: Demonstrate operation and programming of operators to

Owner.

END OF SECTION