Mechanical - Sheet - MP1-10 - Upper Level Hydronic New Plan - Rev -1.pdf

PDF 378 KB Posted

Attached to
Y1AZ--EHRM Training and Administrative Support Space - Oklahoma City
Solicitation number
36C77623B0008
Issued by

About this file

This document includes mechanical plans and details for a federal construction project to renovate existing space at the Oklahoma City VA Health Care System for use as administration and training areas. Key details include the following:

The project will renovate approximately 7,700 square feet of existing space in the northwest area of the Oklahoma City VA facility to support deployment of new Cerner EHRM software. Work includes installing all new steam, condensate, chilled water and hydronic hot water piping as high as possible in the structure. Tags and labels shown are specific to the plans, and the contractor must coordinate final tagging requirements with the VA. Double isolation valves are required on all steam-served equipment and end equipment. New duct and pipe penetrations through walls must be firecaulked. Refer to sheet M0.03 for hydronic piping details in mechanical rooms. Equipment in gray on the plans is existing and to remain.

The related federal contract opportunity is solicitation number 36C77623B0008 to furnish all labor, materials and equipment for the renovation as the general contractor. The agency is the Department of Veterans Affairs Technology Acquisition Center in Austin.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B

D

E F G

H

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

VAV

EXISTING

2-1/2"⌀ STM-LP

EXISTING 3/4"⌀

CDR-L

3/4"⌀ HWS/HWR

TYP OF VAV

1 1/2"ø PHWR 1 1/2"ø PHWS

1 1/4"ø RHWR

1 1/4"ø RHWS

3/4"ø

3/4"ø

1 1/2"ø PHWR

3/4"ø

3/4"ø

1 1/2"ø PHWS

1 1/2"ø PHWR

1/

2" ø

P H

W R

1/

2" ø

P H

W S

1 1/2"ø PHWS1 1/2"ø PHWS 1 1/2"ø PHWR

3/4"ø

3/4"ø3/4"ø

1 1/2"ø PHWR

3/4"ø

3/4"ø

3/4"ø

3/4"ø

1/

2" ø

P H

W S

3/ 4" ø

3/ 4" ø

3/4"ø

3/ 4" ø

1 1/4"ø RHWS 1 1/4"ø RHWR

3/4"ø

1 1/4"ø RHWR

1 1/4"ø RHWS

3/ 4" ø

3/ 4" ø

1 1/4"ø RHWR

1 1/4"ø RHWS

1/

4" ø

R H

W R

1/

4" ø

R H

W S

1 1/2"ø PHWS

3/ 4" ø

1 1/2"ø PHWR

1 1/2"ø PHWS

T

T T

TT

T T

RAD

RAD

RAD

1 1/2"ø PHWS

1 1/2"ø PHWR

1 1/2"ø PHWS

1 1/2"ø PHWR

3/4"ø

T

MH3.00

MH3.00

MH3.00

MH3.00

MEETING ROOM

MEETING ROOM

MEETING ROOM

MEETING ROOM

CORRIDOR

CO2

STAIRS

MECHANICAL

STORAGE

VAV

VAV

MH3.01 2

MH3.01

MH3.01

RAD

3/4"ø 3/4"ø

RAD

1-1/2"⌀ PHWS TO LOWER LEVEL

2-1/2"⌀ PHWS FROM PUMPS

1-1/2"⌀ PHWR FROM LOWER LEVEL

2-1/2" PHWR TO PUMPS

1-1/2"⌀ RHWR FROM LOWER

LEVEL AND PUMPS

1-1/2"⌀ RHWS TO LOWER

LEVEL AND PUMPS

1 1/2"ø

VAV

VAV

VAV

VAV

3/4"ø 1 1/4"ø RHWR

1 1/4"ø RHWS

3/ 4" ø

3/4"ø

3/ 4" ø

3/4"ø

VAV

3/ 4" ø

3/4"ø

1" ø

R H

W R

1" ø

R H

W S

3/4"ø3/4"ø

1" ø

R H

W S

1" ø

R H

W R 1

1/ 2" ø

1 1/4"ø1 1/4"ø

P

P

P

HEX

P

P

AHU

3/ 4" ø

3/4"ø

MH3.00

2 1/2"ø STM-LP

3/4"ø CDR-L

(E )2

/2

"ø C

H R

(E )2

/2

"ø C

H S

(E )3

/4 "ø

C D

R -L

(E )2

/2

"ø S

T M

-L P

COORDINATE

INSTALLATION WITH

DIV 27 CONTRACTOR

ELECTRICAL ROOM

1 1/2"ø STM-LP

1 1/4"ø CDR-L

EXISTING WALL RATING:

SMOKE RESISTIVE HAZARDOUS

ROOM ENCLOSURE

2 HOUR FIRE BARRIER

PROJECT LOCATION

TRUE

NORTH

N

SECURE STRUT RACK BASE

TO FLOOR AND 1" DRYPACK

TO ELEVATE ABOVE FLOOR

CHEMICAL POT FEEDER.

SECURE WITH STRAPS TO

UNISTRUT RACK

SOV (TYP)

3/4" POT FEEDER

PIPING TO EITHER SIDE

OF SYSTEM PUMP(S) (TYP)

UNISTRUT POST BASE.

SECURE RACK TO

BASE WITH 3/8" BOLTS

SECURE CHEMICAL

FEEDER TO STRUT

WITH SHEETMETAL

STRAPS (16 GA MIN)

AND BOLTS

VERTICAL UNISTRUT

1/2" DRAIN TO

NEAREST FLOOR

DRAIN/SINK

STEAM HEATING

COIL

FLOAT AND

THERMOSTATIC TRAP

UNION, TYP.

CHECK VALVE

STRAINER WITH

BLOWDOWN VALVE

AND HOSE CONNECTION

ISOLATION VALVE (TYP)

1-1/4"

COND

1-1/2"

LPS

MODULATING STEAM

CONTROL VALVE

BYPASS STEAM

SHUTOFF VALVE

REDUNDANT STEAM

SHUTOFF VALVE

COIL DRAIN (MANUAL)

1/4 TURN BOILER DRAIN

VALVE WITH BRASS

CAP, TYP.

E E

N

No. 20031

AOM

TN AN

SC

L I EN

DE

S S

R O

F E

P

LI O AN

NG

E

I

R

ALEX R.

ZIMMERMAN

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

01/09/2023REV-1

/0

/2

:2

:2

CONSTRUCTION DOCUMENTS

05/12/2022

UPPER LEVEL HYDRONIC NEW PLAN

MP1.10

EHRM TRAINING AND ADMIN

SPACE

AZRD

921 NE 13TH ST

OKLAHOMA CITY, OK 73104Owner

VA259-16-D-0217

37 59

1/4" = 1'-0"

UPPER LEVEL HYDRONIC PLAN - NEW

• INSTALL ALL NEW STEAM, CONDENSATE, CHILLED

WATER, AND HYDRONIC HOT WATER PIPING AS HIGH

AS POSSIBLE TO STRUCTURE ABOVE. INSTALL BELOW

DUCT WHERE NEEDED FOR ACCESS TO THE PIPE.

COORDINATE WITH ALL OTHER TRADES PRIOR TO

INSTALLATION.

• TAGS AND LABELS SHOWN ARE SPECIFIC TO THESE

PLANS. CONTRACTOR TO COORDINATE FINAL TAGS

AND LABELING REQUIREMENTS WITH THE OKLAHOMA

CITY VA COR.

• PROVIDE DOUBLE ISOLATION VALVES ON ALL STEAM

SERVED EQUIPMENT.

• DOUBLE ISOLATION VALVES ON ALL END EQUIPMENT

REQUIRED.

• FIRECAULK ALL NEW DUCT AND PIPE PENETRATIONS

THROUGH NEW AND EXISTING WALLS.

• REFER TO 5/M0.03 FOR MECHANICAL ROOM HYDRONIC

PIPING DETAILS.

GENERAL PIPING NOTES

• EQUIPMENT, DUCT, PIPING, AND GRILLES, REGISTERS,

AND DIFFUSERS SHOWN IN GRAY ARE EXISTING AND

TO REMAIN.

GENERAL NOTES

KEY PLAN

NOT TO SCALE

POT FEEDER (UPDATED) DETAIL

NOT TO SCALE

AHU STEAM PREHEAT COIL DETAIL

Sheets
MP1.10 - UPPER LEVEL HYDRONIC NEW PLAN

File details come from the government source that posted it. Updated .