PN: 636A8-24-003, Correct Lightning Protection and Grounding Federal contract opportunity
Solicitation number
36C26326B0008
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23

About this file

This is a Standard Form 30 Amendment of Solicitation/Modification of Contract issued by the Department of Veterans Affairs Network Contracting Office 23 in Saint Paul, Minnesota on February 11, 2026. The amendment pertains to Solicitation 36C26326B0008 for Project Number 636A8-24-003, titled "Correct Lightning Protection and Grounding" at a VA facility.

The amendment extends the bid opening deadline to February 25, 2026 at 10:00 a.m. Central Time and adds Michael Freeman (michael.freeman3@va.gov, 402-996-3538) as an alternative point of contact, alongside primary contact Angie Frost (angela.frost2@va.gov, 651-293-3070). All submission documents must be sent to both email addresses. The amendment includes Addendum Number 1 containing questions received and corresponding government responses, along with revised specifications with strikethrough markings and addendum cloud highlighting changes. Attached documents include: S06 Addendum Number 1 (10 pages), S06 Revised Attachment A.2 SOW Attachment 1 Drawings (35 pages), S06 Revised Attachment A.2 SOW Attachment 2 Specifications (141 pages), and S06 Revised Attachment A.1 SOW (4 pages) with changes highlighted in yellow. Offerors must acknowledge receipt of this amendment prior to the extended deadline by completing the required form items, acknowledging receipt on offer copies, or submitting separate written communication referencing the solicitation and amendment numbers.

View the file

Other files for this federal contract opportunity

Other files attached to PN: 636A8-24-003, Correct Lightning Protection and Grounding, newest first.
File Type Posted
36C26326B0008 0007.docx DOCX document
S06 Revised Atch A.2 SOW Atch 1 Drawings - 35 pages.pdf PDF
S06 Revised Atch A.1 SOW - 4 pages.pdf PDF
S06 Addendum Number 1 - 10 pages.pdf PDF
S06 Revised Atch A.2 SOW Atch 2 Specs - 141 pages.pdf PDF
S06 36C26326B0008 - Amendment 0005.pdf PDF
S06 36C26326B0008 - Amendment 0004.pdf PDF
S06 Atch D Revised Wage Determination IA20260068 1-2-26 - 6 pages.pdf PDF
S06 36C26326B0008 - Amendment 0003.pdf PDF
S04 Pre-Bid Site Visit Sign-In - Second Site Visit - 1 page.pdf PDF
S06 Pre-Bid Site Visit Agenda - 2 pages.pdf PDF
S06 36C26326B0008 - Amendment 0002.pdf PDF
S06 Pre-Bid Site Visit Sign-In - First Site Visit - 1 page.pdf PDF
S06 36C26326B0008 - Amendment 0001.pdf PDF
S02 Atch D Revised Wage Determination IA20250068 11-21-25 - 3 pages.pdf PDF
S02 Atch B VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance - 2 pages.pdf PDF
S02 Atch A.2 SOW Atch 3 TMS 20939 - 4 pages.pdf PDF
S02 Atch A.2 SOW Atch 2 Specs - 141 pages.pdf PDF
S02 36C26326B0008.pdf PDF
S02 Atch C Safety or Environmental Violations and EMR Information - 2 pages.pdf PDF
S02 Atch A.2 SOW Atch 1 Drawings - 43 pages.pdf PDF
S02 Atch A.1 SOW - 4 pages.pdf PDF
S02 Atch D Wage Determination IA20250068 9-5-25 - 7 pages.pdf PDF
S02 Atch A.2 SOW Atch 4 NARA Contract Language - 2 pages.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

0006 02-11-2026

636-26-2-8899-0004

636A8-24-003

36C263

DEPARTMENT OF VETERANS AFFAIRS

NETWORK CONTRACTING OFFICE 23

316 ROBERT STREET N, SUITE 506

SAINT PAUL MN 55101

36C263

DEPARTMENT OF VETERANS AFFAIRS

NETWORK CONTRACTING OFFICE 23

316 ROBERT STREET N, SUITE 506

SAINT PAUL MN 55101

To all Offerors/Bidders

36C26326B0008

11-19-2025

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 2-25-2026 10:00 AM CT

636-3660162-8899-854200-3220-23NR4WA19

Project Number: 636A8-24-003, Correct Lightning Protection and Grounding POC: Angie Frost, Angela.Frost2@va.gov; 651-293-3070 Alternate POC: Michael Freeman, michael.freeman3@va.gov, 402-996-3538

Solicitation 36C26326B0008 is hereby amended with the following changes:

1. Michael Freeman has been added as an alternative Point of Contact. In addition to sending all submission documents to angela.frost2@va.gov, these must also be sent to Michael Freeman at michael.freeman3@va.gov.

2. See page 2 for Summary of Changes.

3. Bid Opening has been extended to 2/25/2026 at 10:00 a.m. CT.

Angela Frost Contracting Officer

VA-VHA-RPOC-2024-0035

SUMMARY OF CHANGES

1. Provide Addendum Number 1, which includes the questions received and the corresponding Government responses. Additionally, this addendum summarizes all changes by presenting the revised Specifications with strikethroughs and addendum cloud, as well as the updated Drawings that emphasize changes with addendum clouds.

See attached all documents listed below:

S06 Addendum Number 1 – 10 pages S06 Revised Atch A.2 SOW Atch 1 Drawings - 35 pages S06 Revised Atch A.2 SOW Atch 2 Specs - 141 pages

2. Provide the revised Scope of Work, with the change highlighted in yellow.

See attached document listed below:

S06 Revised Atch A.1 SOW - 4 pages

See attached document: S06 Addendum Number 1 - 10 pages.

See attached document: S06 Revised Atch A.2 SOW Atch 1 Drawings - 35 pages.

See attached document: S06 Revised Atch A.2 SOW Atch 2 Specs - 141 pages.

See attached document: S06 Revised Atch A.1 SOW - 4 pages.

File details come from the government source that posted it. Updated .