36C26325Q0474.pdf

PDF 484 KB Posted

Attached to
J044--Boiler Inspection & Maintenance Federal contract opportunity
Solicitation number
36C26325Q0474
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23

About this file

This is a solicitation package (RFQ) for boiler inspection and maintenance services at the Minneapolis VA Health Care System. The solicitation number is 36C26325Q0474 and it is being conducted as a total SDVOSB set-aside under simplified acquisition procedures.

The contract requires the contractor to provide preventive maintenance, inspections, calibration, and safety device testing for five boilers and related equipment at the VA Energy Center. Services include semi-annual calibration/testing, annual inspections, vibration analysis for seven pumps, and emergency repair services. The base period of performance is April 1, 2025 through March 31, 2026 with four one-year options. The NAICS code is 238220 with a $19M size standard. Quotes are due by 12:00 PM CST on March 7, 2025 and must be emailed to cameron.rick@va.gov. A site visit is scheduled for March 3, 2025 from 10:00-11:30 AM CST. Technical questions are due by 5:00 PM CST on March 3, 2025. The contractor must provide OSHA 10 certified technicians and maintain required insurance coverage. Emergency repairs require callback within one hour and on-site response within four hours.

View the file

Other files for this federal contract opportunity

Other files attached to J044--Boiler Inspection & Maintenance, newest first.
File Type Posted
36C26325Q0474 0006.pdf PDF
36C26325Q0474 0005.pdf PDF
36C26325Q0474 0005.docx DOCX document
36C26325Q0474 0004.pdf PDF
36C26325Q0474 0003.pdf PDF
36C26325Q0474 0002.pdf PDF
36C26325Q0474 0002.docx DOCX document
36C26325Q0474 0001.pdf PDF
Site Visit Meeting Location.png PNG image
Wage Determination - Mpls.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF1. REQUISITION NO.

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE NO. UEI: EFT:

PHONE: FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

36C26325Q0474 02-21-2025

Cameron Rick 651-293-3036 03-07-2025

12:00PM CST

36C263 Department of Veterans Affairs

NETWORK 23 CONTRACTING OFFICE

316 Robert Street N. STE. 506 St. Paul MN 55101

X 100

X

238220

$19 Million

N/A

X

36C618

Department of Veterans Affairs Minneapolis VAMC

1 Veterans Dr.

Minneapolis MN 55417

36C263

Department of Veterans Affairs

NETWORK 23 CONTRACTING OFFICE

316 Robert Street N. STE. 506 St. Paul MN 55101

Department of Veterans Affairs Financial Services Center PO Box 149971

Austin TX 78714-9971

See CONTINUATION Page

This solicitation is to provide services to the Minneapolis Health Care System.

See SOW for Boiler Inspection and Maintenance.

Note block 30 - This document must be signed and returned in order to be considered. Email all required and completed documents to: cameron.rick@va.gov.

Submit questions via email by 5:00PM, March 3, 2025.

**No telephonic questions will be accepted.**

Responses to questions will be posted as an amendment to the solicitation.

Solicitation will close at 12:00PM Central on March 7, 2025.

This solicitation is a total SDVOSB set-aside.

See CONTINUATION Page

X X

X 1

Cameron Rick Contracting Officer

36C26325Q0474

Table of Contents

SECTION A

A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

Statement of Work- Boiler Maintenance

B.2 PRICE/COST SCHEDULE

ITEM INFORMATION

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES (NOV 2023)

C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

C.3 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) ...33

C.4 SUPPLEMENTAL INSURANCE REQUIREMENTS

C.5 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)

(DEVIATION)

C.6 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)

(DEVIATION)

C.7 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

C.8 VAAR 852.237-75 KEY PERSONNEL (OCT 2019)

C.9 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)

C.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

C.11 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (JAN 2025)

SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS

See attached document: Wage Determination - Mpls

SECTION E - SOLICITATION PROVISIONS

E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (SEP 2023)

ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL

ITEMS

E.2 52.212-2 EVALUATION—COMMERCIAL ITEMS (NOV 2021)

E.3 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

E.4 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT

ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023)

E.5 52.233-2 SERVICE OF PROTEST (SEP 2006)

E.6 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

E.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

E.8 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—

COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2024)

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C263 Cameron Rick

Department of Veterans Affairs

NETWORK 23 CONTRACTING OFFICE

316 Robert Street N. STE. 506

St. Paul MN 55101

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or

[] 52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly []

b. Semi-Annually [X]

c. Other []

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO DATE

Statement of Work- Boiler Maintenance A. Introduction

The Minneapolis Veterans Affairs Health Care System (MVAHCS) intends to establish a contract for boiler maintenance at the VA Energy Center located in Minneapolis, Minnesota.

B. General Requirements

1. The Energy Center requires a Contractor to provide preventive maintenance including visual inspection, cleaning, lubrication, adjustments and calibration of boiler burners, controls, instrumentation and other related equipment.

2. Contractor will furnish all labor, parts and materials needed to maintain the equipment listed in this solicitation in good operational condition. The Energy Center Supervisor shall approve the use of any parts that are not OEM manufactured, and the Contracting Officer Representative (COR) shall approve payment for the purchase of parts for any given work under this contract before any upgraded parts are ordered or provided.

3. Contractor shall be responsible for providing services any time contacted. All work shall be performed during the working hours of 8:00 am to 4:30 pm. Work shall be scheduled with the Supervisor of the VA Energy Center. Each Service Technician must be trained and qualified to repair the equipment they are dispatched to diagnose, repair and/or perform maintenances services upon. In order to provide proof that their qualifications meet industry and manufacturers standards, the Contractor shall provide a certificate of training for each Technician that may be dispatched to the VAHCS. All Contracted Technicians shall be OSHA 10 certified and submit a copy of their OSHA 10 card to the COR before the start of the new contract, or whenever there is a new Contractor employee who will be performing work at the Minneapolis VAHCS facility.

4. Contractor shall also be responsible for providing semi-annual inspections as listed in Section F.

C. Emergency Service

1. If the boilers at the Energy Center are such that a required backup is not available, it will be considered an emergency. Contractor will provide emergency service including diagnosis, repair, parts and labor to correct problems related to the equipment covered under the contract.

2. The service shall be rendered at any hour of any day of the week.

Contractor is required to call the Energy Center back within one (1) hour of contact and must arrive on site at the Energy Center within four (4) hours of notification. Contractor will make necessary repairs within three calendar days. If emergency service is performed during normal hours, there shall be no additional charges.

3. Contractor will provide the Energy Center with an estimate for materials and labor prior to any emergency work beginning. The VA will not pay for any travel expenses to include flights, rental vehicles, per diem and other related expenses.

4. It is estimated that there will be approximately 10 emergency service jobs required during each period of performance. Funding for this line item is based on historical precedence. Actual number of services and pricing will be adjusted during the life of the contract based upon actual emergency services rendered.

D. Reporting

1. A written report shall be submitted to the Supervisor of the Energy Center after each service, certifying that all instruments covered by these specifications have been serviced as required. The report shall also contain any recommendations concerning instrumentation that Contractor service personnel may deem necessary.

2. During semi-annual testing, Contractor shall complete a spreadsheet provided by the Energy Center that accounts for all measurements taken and data collected and that indicates the equipment has been calibrated, adjusted and inspected.

Contractor shall tag all equipment that is calibrated.

3. When service is requested, Contractor’s technicians will report to the Energy Center on site Supervisor or Utility Services Operator (USR). Upon completion of work, a service report listing date, time, equipment and service performed shall be submitted to the Energy Center Supervisor.

E. Equipment – Boiler systems:

Contractor shall provide all labor and material to maintain all fuel and steam atomizing trains (fuel oil, natural gas and propane) from outlet of first manual cock to the gas rings and/or oil injection guns as well as ignition and burner assemblies on all five (5) boilers listed below:

#1 Cleaver Brooks- Model DL-68-RH 45,000 pounds of steam, 1275 horsepower.

#2 Cleaver Brooks- Model DL-68-RH 45,000 pounds of steam, 1275 horsepower.

#3 Cleaver Brooks- Model DL-68-RH 45,000 pounds of steam, 1275 horsepower.

#4 Cleaver Brooks- Model DL-52-RH 30,000 pounds of steam, 875 horsepower.

#5 Small Low Pressure Boiler – Model, Pounds of Steam, and Horsepower to be determined.

Note: Boilers # 1-4 are located in building 69, also known as the Energy Center, of the Minneapolis VA Health Care Systems (VAHCS) Facility. Boiler #5 is located in building 222.

1. Plant Entrance

One (1) 6" Plant Entrance Gas Valve One

(1) 314" Plant Entrance Gas Valve Two (2)

Gas Pressure Switches

2. Main Gas Train

One ( 1) Gas Meter per boiler

One (1) Main Gas Pressure Regulator per boiler

One ( 1) Low Gas Pressure Switch per boiler

Two (2) Maxon Safety Shut Off Valves per boiler One ( 1) Normally Open Vent Valve per boiler One (1) High Gas Pressure Switch per boiler

One (1) Maxon Micro Ratio Valve per boiler

3. Pilot Gas Train

One (1) Gas Pressure Regulator - Nat. per boiler One (1) Gas Pressure Regulator - LP. per boiler One ( 1) Low Gas Pressure Switch per boiler

Two (2) Solenoid Safety Shut Off Valves per boiler

One (1) Normally Open Vent Valve per boiler

4. Burner Oil Train

One ( 1) Low Oil Pressure Switch per boiler

Two2) Maxon Safety Shut Off Valves per boiler

One (1) High Oil Pressure Switch per boiler

One (1) Maxon Synchro Control Valve per boiler

5. Atomizing Steam

One (1) Low Atomizing Steam Pressure Switch per boiler One (1) Casco Constant Differential Valve (CO) per boiler One (1) Steam Safety Shut Off Valve per boiler

6. Pilot Assembly

One (1) FPM-RD Gas-Electric Igniter per boiler

7. Panel Components

One (1) Motor Starter per boiler

Two (2) Control Circuit Transmitters per boiler One (1) Ignition Transformer per boiler

One (1) Agastat per boiler

8. Flame safe guard

9. Scanner and relays in burner control panel

10. Four (4) Jackshaft fuel valve and air damper Actuators Herculin

11. Four (4) Oxygen trim drivers ABB.

12. Four (4) Oxygen analyzers

13. Four (4) Oxygen analog meters

14. Four (4) Oxygen trim dump timers

15. Four (4) Boiler steam flow transmitters

16. Four (4) Vertical scale draft indicators

17. Four (4) Drum level transmitters

18. Two (2) Honeywell UDC 3300 Boilers 1 & 2, and (2) Two Honeywell UDC 6300

Boilers 3 &4.

19. Four (4) Boiler flame safeguard panels

20. Twenty-Eight (28) Burner flame safeguard pressure switches.

Boiler Controls

Five (5) sub-master Controllers IRecorders in Graphic and in Texts (Honeywell 1052).

Inputs:

1. Control Signal from Plant Master

2. Percent 02

3. Fuel oil flow

4. Natural gas flow

5. Boiler steam flow

6. Economizer flue gas inlet temperature

7. Economizer flue gas outlet temperature

8. Feed water temperature into economizer

9. Feed water temperature out of economizer

10. Repeat signal from boiler water level controller

Control Outputs:

1. Boiler fire control signal

2. 02 trim control signal

3. Selected alarms to operator work station

Color LCD:

1. Control Signal from Plant Master

2. Percent 02

3. Fuel oil flow

4. Natural gas flow

5. Steam flow

6. Economizer flue gas temperature in

7. Economizer flue gas temperature out

8. Feed water temperature into economizer

9. Feed water temperature out of economizer

10. Boiler fire control signal

11. 02 trim control signal

12. Boiler water level

Manual Controls:

1. Fire control signal

2. 02 trim control signal

3. Manual I Auto

4. Increase I Decrease

5. Display Select

6. Operator adjustable software parameters

Ranges:

1. Steam flow: Boilers 1-2-3 = 45,000 Lb/Hr Boiler 4 =30,000 Lb/Hr (500 Lb/hr per Division)

2. Flue gas In/Out: 0 - 600 Degree F (5 Deg. I Division)

3. Feed water In/Out: 0 - 500 Degree F (5 Deg. I Division)

4. Percent Oxygen: 0 - 10%

5. Fuel Oil Flow: 0 - 10 Gal. I Min

1. Analog output and external control unit model 46

2. Narrow span DC current input digital panel meter 46DV

3. Honeywell HC900 controller power supply, Boilers 1,2,:l, 4, and Plant the

Master.

4. Honeywell HC900 controller input I output module, Boilers

1,2,3,4, and the Plant Master.

5. Honeywell HC900 controller CPU and scanner module, Boilers 1,2,3,4 and the Plant Master.

6. Honeywell power supply kit, Boiler 1,2,3,4, and Plant Master.

*'Honeywell1042 series operator interface for use with HC900 hybrid controller, Boilers 1,2,3,4, and the Plant Master

Steam Plant Master Controller (Honeywell 1052)

Inputs:

1. Main steam header pressure

2. Building 70 steam flow

3. Building 69 steam flow

4. Outside air temperature

5. Feed water temperature

6. Make-up tank temperature

Control Outputs:

1. Control Signal to Four sub-master Boiler controllers

2. Selected alarms to operator station.

Color LCD:

1. Main Steam Header Pressure

2. Building 70 steam flow

3. Building 69 steam flow

4. Outside air temperature

5. Feed water temperature

6. Make-up tank temperature

Manual Controls:

1. Set point for steam header pressure

2. Manual I Auto

3. Increase I Decrease

4. Display select

5. Operator adjustable software parameters

Ranges:

1. Steam Pressure: 0 - 300 PSIG (5 Lb I Division)

2. Feed I Made-up water temperature: 0 -300 Degrees F ( b Lb I Division)

3. Outside air temperature: (-30) - 140 Degree F (2 Lb I Division)

4. Building 70 steam flow: 0 - 100,000 Lbs/Hr (1000 Lb/Hr Per Division)

5. Building 69 steam flow: 0 - 10,000 Lbs/Hr (100 Lb/Hr Per Division)

Additional Equipment:

1. One ( 1) Steam header pressure transmitter

2. One ( 1) High steam header pressure switch

3. One (1) Steam transmitter (Bldg.70)

4. One (1) Steam transmitter (Bldg.69)

5. One (1) Annunciator

a. 29 alarms

b. 1 flasher module

c. 1 filter module

d. 1 power supply

e. 29 lamp modules

6. One (1) Fuel oil supply pressure regulator

7. Computer Work Station:

a. 500 GB

b. Window XP

c. Service pack 2

d. 2 GB of ram

e. 3.4 GHZ

f. Sony CD-RW

g. CR X 230EE

h. Zip Drive

i. Flip Drive

j. Keyboard

k. Mouse

I. 19" LCD Monitor

m. HP Deskjet 5440 Printer for (Recorders and Graphic)

n. Epson FX 2190 Printer for (alarms)

o. SpecView with Honeywell Instruments (program)

p. Programming as specified in specification Section 15E101

8. UPS Plant Master Controller, Boiler Monitoring Computer, and Boilers

1, 2, 3, 4, and 5: (Liebert Power Sure)

F. Semi-Annual Testing/Inspection Requirements Contractor shall perform the following inspections semi-annually:

1. Adjust burner combustion settings and calibrate oxygen trim.

2. Check vibration of burner fans.

3. Calibrate instrumentation, monitoring, and control systems.

4. Operational Testing of Boiler Safety Devices:

A. High-steam pressure cutout (recycle).

B. High steam pressure cutout (non-cycle).

C. Steam safety valves (raise boiler pressure until valve pops).

D. Check gas vent for leaks.

E. High-gas fuel pressure cutoff.

F. Low gas fuel pressure cutoff.

G. Gas fuel safety shut off valves proof of closure.

H. Leak test gas fuel safety shut off valves.

I. High-fuel oil temperature cutoff (heated fuel).

J. Low-fuel temperature cutoff (heated fuel)

K. Low-atomizing pressure for fuel oil

L. High-fuel oil pressure cutoff

M. Low-fuel oil pressure cutoff.

N. Fuel oil safety shut off valves proof of closure.

0. Leak test fuel oil safety shut off valves.

P. Check operation of Liquid Petroleum Gas pilot.

Q. Low-pilot gas pressure cutout.

R. Forced draft fan motor interlock.

S. Forced draft fan damper wide open for purge.

T. Boiler outlet damper wide open for purge.

U. Purge air flow interlock.

V. Timing for pre purge

W. Timing for post purge.

X. Igniter timing.

Y. Low fire position interlock.

Z. Combustion air interlock.

AA. Main flame out; i.e., time to close valves.

BB. Ignition flame out;, i.e., it is time to close valves.

CC. Minimum igniter flame test.

DD. Scanner not sensing ignition spark.

EE. Low-oxygen alarm and/or cutout.

FF. Pre-purge setting of flue gas recirculation damper.

GG. Interlock of building outside air damper with burner control or combustion air transmitter system, which ever system is currently in place.

HH. Instrument air pressure low cutout.

5. Boiler Plan Safety and Operational Duties:

A. Check furnace pressure.

B. Check combustion gas leaks into boiler room.

G.Vibration Analysis

1. Perform Vibration Analysis on seven Pumps Annually

2. Submit reports that provides detailed information about the pumps condition.

H. Security/ Badging

1. Contractor’s personnel will utilize a temporary vendor’s security badge until a permanent security PIV badge can be issued. Temporary badge use will not exceed 30 calendar days.

2. The Contractor shall comply with Minneapolis VA security, access and badging requirements. Employees must provide fingerprints and be able to pass a background check so they can obtain Security access badge. Employees must complete web-based Rules of Behavior training.

3. All employees will need a valid personal email account. Fingerprint scheduling/appointments, background investigation tasks and Training Management System (TMS) required classes notifications will be sent to their email address throughout the process.

4. Contractor will submit all required security badging documents for each employee within 5 business days from the award date of contract. All documents must be legible. The following documents will be sent to contractor via email after contract is awarded.

OF 306- Must be Typed. Handwritten will not be acceptable.

Self Certification

VA 10-2417

Employee Fingerprint Resource Form

I. Contractor Responsibilities

1. Contractor shall adhere to the latest standards set forth by the following references:

A. NFPA 85- Boiler and Combustion Systems Hazards Code.

B. VHA Boiler Plant Safety Device Testing Manual, 3rd Edition.

C. All boiler and pressurized vessel codes adopted by the State of Minnesota.

2. Contractor shall provide information to the Energy Center Supervisor with product modifications, when applicable.

3. Contractor shall have immediate access to factory authorized renewal parts and shall stock commonly used parts at the Contractor's place of business, in order to provide the fastest timelines for repairs.

4. The Contractor shall use testing equipment that is calibrated and adheres to the standards and criteria set forth by the National Institute of Standards and Technology (NIST), as recommended by the ISO-9001 requirements. As proof of current calibration, the Contractor shall provide a Traceable Calibration Certificate to the VAHCS, presented upon initial contract issuance and each time certificates are updated.

5. Contractor shall take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract.

6. Contractor shall maintain personal liability and property damage insurance. The Offeror shall furnish evidence of insurance coverage with the proposal certification from his/her insurance company indicating that coverage outlined has been obtained and that it may not be changed or canceled without written notice to the Contracting Officer.

7. If Contractor fails to promptly perform the services or to take the necessary action to ensure future performance in conformity with the contract requirements, the Government may Terminate the contract, for cause.

8. At least one week prior to the commencement of a new quarter, Contractor shall provide the Energy Center Supervisor with a quarterly work schedule, to include the dates on which the work will be completed. This schedule shall be coordinated with and approved by the Energy Center Supervisor.

B.2 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBE

R

DESCRIPTION OF

SUPPLIES/SERVIC

ES

QUANTIT

Y

UNI

T UNIT PRICE AMOUNT

0001 1.00 YR ________________

Annual Inspection of Boilers Contract Period: Base POP Begin: 04-01-2025 POP End: 03-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

0002 1.00 YR ________________

Annual Inspection of Condensate Tank Contract Period: Base POP Begin: 04-01-2025 POP End: 03-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and

Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

0003 1.00 YR ________________

Annual Inspection of Deaerator Tank Contract Period: Base POP Begin: 04-01-2025 POP End: 03-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

0004 1.00 YR ________________

Semi-Annual Calibration and Safety Device Testing of Boilers Contract Period: Base POP Begin: 04-01-2025 POP End: 03-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

0005 1.00 YR ________________

Semi-Annual Calibration and Safety Device Testing of Condensate Tank Contract Period: Base POP Begin: 04-01-2025 POP End: 03-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

0006 1.00 YR ________________

Semi-Annual Calibration and Safety Device Testing of Deaerator Contract Period: Base POP Begin: 04-01-2025 POP End: 03-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and

Drying Equipment; Nuclear Reactors

0007 1.00 YR ________________

Annual Pump Vibration Analysis Testing (7 Pumps) Contract Period: Base POP Begin: 04-01-2025 POP End: 03-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

0008 1.00 YR ________________

Annual Boiler Stack Inspection Contract Period: Base POP Begin: 04-01-2025 POP End: 03-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

0009 10.00 JB _____$3,500.00___ ___$35,000.00____

Emergency Repairs: Parts and Labor Contract Period: Base POP Begin: 04-01-2025 POP End: 03-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

1001 1.00 YR ________________

Annual Inspection of Boilers Contract Period: Option 1 POP Begin: 04-01-2026 POP End: 03-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

1002 1.00 YR ________________

Annual Inspection of Condensate Tank

Contract Period: Option 1 POP Begin: 04-01-2026 POP End: 03-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

1003 1.00 YR ________________

Annual Inspection of Deaerator Tank Contract Period: Option 1 POP Begin: 04-01-2026 POP End: 03-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

1004 1.00 YR ________________

Semi-Annual Calibration and Safety Device Testing of Boilers Contract Period: Option 1 POP Begin: 04-01-2026 POP End: 03-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

1005 1.00 YR ________________

Semi-Annual Calibration and Safety Device Testing of Condensate Tank Contract Period: Option 1 POP Begin: 04-01-2026 POP End: 03-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

1006 1.00 YR ________________

Semi-Annual Calibration and Safety Device Testing of Deaerator Contract Period: Option 1 POP Begin: 04-01-2026 POP End: 03-31-2027

PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

1007 1.00 YR ________________

Annual Pump Vibration Analysis Testing (7 Pumps) Contract Period: Option 1 POP Begin: 04-01-2026 POP End: 03-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

1008 1.00 YR ________________

Annual Boiler Stack Inspection Contract Period: Option 1 POP Begin: 04-01-2026 POP End: 03-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

1009 10.00 JB _____$3,500.00___ ___$35,000.00____

Emergency Repairs: Parts and Labor Contract Period: Option 1 POP Begin: 04-01-2026 POP End: 03-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

2001 1.00 YR ________________

Annual Inspection of Boilers Contract Period: Option 2 POP Begin: 04-01-2027 POP End: 03-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, Drying Equipment; Nuclear Reactors

2002 1.00 YR ________________

Annual Inspection of Condensate Tank Contract Period: Option 2 POP Begin: 04-01-2027 POP End: 03-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

2003 1.00 YR ________________

Annual Inspection of Deaerator Tank Contract Period: Option 2 POP Begin: 04-01-2027 POP End: 03-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

2004 1.00 YR ________________

Semi-Annual Calibration and Safety Device Testing of Boilers Contract Period: Option 2 POP Begin: 04-01-2027 POP End: 03-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

2005 1.00 YR ________________

Semi-Annual Calibration and Safety Device Testing of Condensate Tank Contract Period: Option 2 POP Begin: 04-01-2027 POP End: 03-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

2006 1.00 YR ________________

Semi-Annual Calibration and Safety Device Testing of

Deaerator Contract Period: Option 2 POP Begin: 04-01-2027 POP End: 03-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

2007 1.00 YR ________________

Annual Pump Vibration Analysis Testing (7 Pumps) Contract Period: Option 2 POP Begin: 04-01-2027 POP End: 03-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

2008 1.00 YR ________________

Annual Boiler Stack Inspection Contract Period: Option 2 POP Begin: 04-01-2027 POP End: 03-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

2009 10.00 JB _____$3,500.00___ ___$35,000.00____

Emergency Repairs: Parts and Labor Contract Period: Option 2 POP Begin: 04-01-2027 POP End: 03-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

3001 1.00 YR ________________

Annual Inspection of Boilers Contract Period: Option 3 POP Begin: 04-01-2028 POP End: 03-31-2029

Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

3002 1.00 YR ________________

Annual Inspection of Condensate Tank Contract Period: Option 3 POP Begin: 04-01-2028 POP End: 03-31-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

3003 1.00 YR ________________

Annual Inspection of Deaerator Tank Contract Period: Option 3 POP Begin: 04-01-2028 POP End: 03-31-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

3004 1.00 YR ________________

Semi-Annual Calibration and Safety Device Testing of Boilers Contract Period: Option 3 POP Begin: 04-01-2028 POP End: 03-31-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

3005 1.00 YR ________________

Semi-Annual Calibration and Safety Device Testing of Condensate Tank Contract Period: Option 3 POP Begin: 04-01-2028 POP End: 03-31-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, 3006 1.00 YR ________________

Semi-Annual Calibration and Safety Device Testing of Deaerator Contract Period: Option 3 POP Begin: 04-01-2028 POP End: 03-31-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

3007 1.00 YR ________________

Annual Pump Vibration Analysis Testing (7 Pumps) Contract Period: Option 3 POP Begin: 04-01-2028 POP End: 03-31-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

3008 1.00 YR ________________

Annual Boiler Stack Inspection Contract Period: Option 3 POP Begin: 04-01-2028 POP End: 03-31-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

3009 10.00 JB _____$3,500.00___ ___$35,000.00____

Emergency Repairs: Parts and Labor Contract Period: Option 3 POP Begin: 04-01-2028 POP End: 03-31-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

4001 1.00 YR ________________

Annual Inspection of Boilers

Contract Period: Option 4 POP Begin: 04-01-2029 POP End: 03-31-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

4002 1.00 YR ________________

Annual Inspection of Condensate Tank Contract Period: Option 4 POP Begin: 04-01-2029 POP End: 03-31-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

4003 1.00 YR ________________

Annual Inspection of Deaerator Tank Contract Period: Option 4 POP Begin: 04-01-2029 POP End: 03-31-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

4004 1.00 YR ________________

Semi-Annual Calibration and Safety Device Testing of Boilers Contract Period: Option 4 POP Begin: 04-01-2029 POP End: 03-31-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

4005 1.00 YR ________________

Semi-Annual Calibration and Safety Device Testing of Condensate Tank Contract Period: Option 4 POP Begin: 04-01-2029 POP End: 03-31-2030

Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

4006 1.00 YR ________________

Semi-Annual Calibration and Safety Device Testing of Deaerator Contract Period: Option 4 POP Begin: 04-01-2029 POP End: 03-31-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

4007 1.00 YR ________________

Annual Pump Vibration Analysis Testing (7 Pumps) Contract Period: Option 4 POP Begin: 04-01-2029 POP End: 03-31-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

4008 1.00 YR ________________

Annual Boiler Stack Inspection Contract Period: Option 4 POP Begin: 04-01-2029 POP End: 03-31-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

4009 10.00 JB _____$3,500.00___ ___$35,000.00____

Emergency Repairs: Parts and Labor Contract Period: Option 4 POP Begin: 04-01-2029 POP End: 03-31-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, GRAND TOTAL ________________

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL

PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered;

and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212- 5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law.

This is the start of the file's text. The full file is on GovTribe.