This document is an Amendment of Solicitation (Standard Form 30) for Solicitation Number 36C26325Q0474, issued by the Department of Veterans Affairs. The amendment addresses vendor questions related to a boiler inspection and maintenance services contract for the Minneapolis VA Medical Center. Key details include clarifications on boiler serial numbers (4 Cleaver Brooks boilers and 1 small low-pressure boiler), inspection requirements to the 8th edition standards, and emergency service expectations. The document specifies that the contractor will conduct an initial visual inspection, provide a deficiency list with repair priorities, and potentially pursue a separate contract for extensive repairs. The bid due date remains unchanged at 5:00 PM on 04/04/2025, with the contract period of performance from 04/01/2025 to 03/31/2026 and four potential option years. The solicitation is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS code 238220.

View the file

Other files for this federal contract opportunity

Other files attached to J044--Boiler Inspection & Maintenance, newest first.
File Type Posted
36C26325Q0474 0006.pdf PDF
36C26325Q0474 0005.docx DOCX document
36C26325Q0474 0004.pdf PDF
36C26325Q0474 0003.pdf PDF
36C26325Q0474 0002.pdf PDF
36C26325Q0474 0002.docx DOCX document
36C26325Q0474 0001.pdf PDF
Site Visit Meeting Location.png PNG image
36C26325Q0474.pdf PDF
Wage Determination - Mpls.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0005 04-03-2025

36C618

Department of Veterans Affairs Minneapolis VAMC

1 Veterans Dr.

Minneapolis MN 55417

36C263

Department of Veterans Affairs

NETWORK 23 CONTRACTING OFFICE

316 Robert Street N. STE. 506 St. Paul MN 55101

To all Offerors/Bidders

36C26325Q0474

02-21-2025

X

X X

X

The purpose of this amendment is to answer vendor questions, see below.

Bid due date remains the same at 5:00pm on 04/04/2025.

Cameron Rick Contracting Officer

1. Are the serial numbers on the boilers available? The serial numbers are all made unique and specific to each building design, they actually look it up in a system before giving proper quotes.

Cleaver Brooks representative states that the serial number and unit number are the same thing, they are as follows:

#1 Cleaver Brooks- Model DL-68-RH 45,000 pounds of steam, 1275 horsepower. WG- #2 Cleaver Brooks- Model DL-68-RH 45,000 pounds of steam, 1275 horsepower. WG- #3 Cleaver Brooks- Model DL-68-RH 45,000 pounds of steam, 1275 horsepower. WG- #4 Cleaver Brooks- Model DL-52-RH 30,000 pounds of steam, 875 horsepower. WG- #5 Small Low Pressure Boiler – Model, Pounds of Steam, and Horsepower to be determined. SN# 64275041

2. Is Item # 1 supposed to say that the testing requirements are to the 8th edition or is the Contractor really expected to correct the entire boiler plant with materials and labor to bring this up to the 8th edition standards?

Inspection / Testing requirements are to the 8th edition (or most current edition at the time of inspection / testing. Contractor will conduct an initial visual inspection of boilers and supporting components upon initiation of the contract. Vendor will provide a list to the contract COR of deficiencies with notes on priority of repair (ex. critical, high, medium, low). Dependent on the scale of required repairs a separate contract may be competed to fix deficiencies dependent on how extensive the repairs are. If any failure to the boiler system occurs during the period of performance in which a backup is not available or a deficiency is noted during the initial visual inspection to be of such an extreme nature it will be considered an emergency and all parts and labor will be billed under that line item, 0009, 1009, 2009, 3009, or 4009 (dependent on option year period of performance if executed). Prior authorization for any emergency repair from the COR must be received prior to any work being performed or repair part ordered.

3. For the annual inspection requirements of the boilers, deaerator, condensate tank, and boiler stack, is this just a visual? There isn't really any description around what is required. Can the expectations be clarified?

Inspection shall be conducted in compliance with the latest rules and regulations found in section J of the SOW.

4. In Section C: Emergency Service, Item 1 says it covers labor and parts and item 3 says that the contractor will provide an estimate for materials. Which is correct?

Contractor shall provide an estimate for materials prior to any work beginning or parts ordered. It is estimated that there will be approximately 10 emergency service jobs required during each period of performance. Funding for this line item is based on historical precedence and has been pre-priced on line items 0009, 1009, 2009, 3009, or 4009. Actual number of services and pricing will be adjusted during the life of the contract based upon actual emergency services rendered.

File details come from the government source that posted it. Updated .