This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for a boiler maintenance contract with the Minneapolis VA Health Care System. The amendment extends the response date for quotes to 04-09-2025 at 12:00pm CDT and includes updates to the Statement of Work (SOW), answers to contractor questions, and adjustments to the Price/Cost Schedule. The emergency line items (0009, 1009, 2009, 3009, and 4009) are confirmed to have a pre-priced amount of 10 calls at $3,500 per call, totaling $35,000 for each contract period.
The solicitation is for comprehensive boiler maintenance services covering five boilers located in buildings 69 and 222, including annual and semi-annual inspections, calibration, safety device testing, and emergency repairs. The contract will be awarded to a Service-Disabled Veteran-Owned Small Business (SDVOSB) under NAICS code 238220, with a base period from 04-15-2025 to 04-14-2026 and four potential option years. Key requirements include adherence to NFPA 85 standards, VHA Boiler Plant Safety Device Testing Manual, and Minnesota boiler and pressurized vessel codes, with detailed inspection and maintenance protocols for various boiler components and systems.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26325Q0474 0005.pdf | ||
| 36C26325Q0474 0005.docx | DOCX document | |
| 36C26325Q0474 0004.pdf | ||
| 36C26325Q0474 0003.pdf | ||
| 36C26325Q0474 0002.pdf | ||
| 36C26325Q0474 0002.docx | DOCX document | |
| 36C26325Q0474 0001.pdf | ||
| Site Visit Meeting Location.png | PNG image | |
| 36C26325Q0474.pdf | ||
| Wage Determination - Mpls.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 27
36C618
Department of Veterans Affairs Minneapolis VAMC
1 Veterans Dr.
Minneapolis MN 55417
36C263
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
316 Robert Street N. STE. 506 St. Paul MN 55101
To all Offerors/Bidders
36C26325Q0474
02-21-2025
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 04-09-2025 12:00pm CDT
See CONTINUATION Page
X
The purpose of this amendment is to post answers to contractor questions and to provide updated solicitation documents.
See the following pages for:
A. Questions and answers from interested contractors.
B. Updates to the SOW with highlighted changes.
C. Adjustments to the Price/Cost Schedule showing the pre-priced amount on line items 0009, 1009, 2009, 3009, and 4009
The response date for receipt of offers has been extended to 12:00pm on 04/09/2025.
No additional questions will be accepted.
CONTINUATION PAGE
1. For the annual inspection requirements of the boilers, deaerator, condensate tank, and boiler stack, is this just a visual? There isn't really any description around what is required. The references in section J don’t provide the actual inspection criteria. Can the expectations be clarified?
Inspection shall be conducted in compliance with the latest rules and regulations found in section J of the SOW. Additionally, section K has been added to the SOW to provide the inspection frequency and tasks to be performed.
2. For the Emergency line items in the price/cost schedule (0009, 1009, 2009, 3009, 4009) were already pre priced at 10 calls at $3,500. Under amendment 0004 the quantity remains at 10 but the price is blank. Was this intended?
No, this was not intended. The quantity and unit price should have remained at quantity 10 with a unit price of $3,500, total price at $35,000 for the year. This pre-priced line item is based on historical trends of emergency services performed. The pre-priced line items intent is to maintain parity between all contractors for this line item that is unknown and dependent on actual emergency repairs performed. Actual line item will be adjusted during or after the period of performance to match actual emergency parts and labor.
3. What specific maintenance materials are expected to be provided by the contractor?
There is no trending part failure nor a way to predict what will fail. The VHA Boiler Plant Safety Device Testing Manual dictates the equipment and required inspections. Contractors. The following are some recent parts that have failed that needed to be replaced: Low Fuel Oil Pressure Switch, Pilot Gas Vent Valve, High Gas Pressure Switch, and Plant Master Controls Programming.
4. What specific maintenance parts are expected to be provided by the contractor?
There is no trending part failure nor a way to predict what will fail. The VHA Boiler Plant Safety Device Testing Manual dictates the equipment and required inspections. Contractors. The following are some recent parts that have failed that needed to be replaced: Low Fuel Oil Pressure Switch, Pilot Gas Vent Valve, High Gas Pressure Switch, and Plant Master Controls Programming.
5. What specific materials to maintain all fuel and steam atomizing trains are expected to be provided by the contractor?
There is no trending part failure nor a way to predict what will fail. The VHA Boiler Plant Safety Device Testing Manual dictates the equipment and required inspections. Contractors. The following are some recent parts that have failed that needed to be replaced: Low Fuel Oil Pressure
Switch, Pilot Gas Vent Valve, High Gas Pressure Switch, and Plant Master Controls Programming.
6. Will the Emergency CLIN be used even if repairs occur during normal business hours?
Yes, the emergency CLIN shall be used when a required backup piece of equipment is not available in or outside of normal business hours. The winning contractor will submit an estimate for materials and labor prior to any emergency work beginning. The VA will not pay for any travel expenses to include flights, rental vehicles, per diem and other related expenses.
7. Will repairs for deficiencies not considered Emergency be quoted outside of this contract?
Contractor shall conduct an initial visual inspection of boilers and supporting components upon initiation of the contract. Vendor will provide a list to the contract COR of deficiencies with notes on priority of repair (ex. critical, high, medium, low). Dependent on the scale of required repairs a separate contract may be competed to fix deficiencies.
8. Will National Board Inspections be performed under this contract?
Inspection shall be conducted in compliance with the latest rules and regulations found in section J of the SOW. Additionally, section K has been added to the SOW to provide the inspection frequency and tasks to be performed. Inspections falling outside of the parameters of this contract will be performed through another contract.
9. Who will be responsible for Minnesota Department of Labor and Industry boiler inspections?
Inspection shall be conducted in compliance with the latest rules and regulations found in section J of the SOW. Additionally, section K has been added to the SOW to provide the inspection frequency and tasks to be performed. Inspections falling outside of the parameters of this contract will be performed through another contract.
10. Can you clarify the statement below? Will Emergency services include costs for labor and parts during regular hours?
2. The service shall be rendered at any hour of any day of the week.
Contractor is required to call the Energy Center back within one (1) hour of contact and must arrive on site at the Energy Center within four (4) hours of notification. Contractor will make necessary repairs within three calendar days. If emergency service is performed during normal hours, there shall be no additional charges.
See question 6 above.
Statement of Work- Boiler Maintenance
A. Introduction
The Minneapolis Veterans Affairs Health Care System (MVAHCS) intends to establish a contract for boiler maintenance at the VA Energy Center located in Minneapolis, Minnesota.
B. General Requirements
1. The Energy Center requires a Contractor to provide preventive maintenance including visual inspection, cleaning, lubrication, adjustments and calibration of boiler burners, controls, instrumentation and other related equipment.
2. Contractor will furnish all labor, parts and materials needed to maintain the equipment listed in this solicitation in good operational condition. The Energy Center Supervisor shall approve the use of any parts that are not OEM manufactured, and the Contracting Officer Representative (COR) shall approve payment for the purchase of parts for any given work under this contract before any upgraded parts are ordered or provided.
3. Contractor shall be responsible for providing services any time contacted. All work shall be performed during the working hours of 8:00 am to 4:30 pm. Work shall be scheduled with the Supervisor of the VA Energy Center. Each Service Technician must be trained and qualified to repair the equipment they are dispatched to diagnose, repair and/or perform maintenances services upon. In order to provide proof that their qualifications meet industry and manufacturers standards, the Contractor shall provide a certificate of training for each Technician that may be dispatched to the VAHCS. All Contracted Technicians shall be OSHA 10 certified and submit a copy of their OSHA 10 card to the COR before the start of the new contract, or whenever there is a new Contractor employee who will be performing work at the Minneapolis VAHCS facility.
4. Contractor shall also be responsible for providing annual and semi-annual inspections as listed in Section F & G.
5. Contractor shall conduct an initial visual inspection of boilers and supporting components upon initiation of the contract. Vendor will provide a list to the contract COR of deficiencies with notes on priority of repair (ex. critical, high, medium, low).
Dependent on the scale of required repairs a separate contract may be competed to fix deficiencies.
C. Emergency Service
1. If the boilers at the Energy Center are such that a required backup is not available, it will be considered an emergency. Contractor will provide emergency service including diagnosis, repair, parts and labor to correct problems related to the equipment covered under the contract.
2. The service shall be rendered at any hour of any day of the week.
Contractor is required to call the Energy Center back within one (1) hour of contact and must arrive on site at the Energy Center within four (4) hours of notification. Contractor will make necessary repairs within three calendar days. If emergency service is performed during normal hours, there shall be no additional charges.
3. Contractor will provide the Energy Center with an estimate for materials and labor prior to any emergency work beginning. The VA will not pay for any travel expenses to include flights, rental vehicles, per diem and other related expenses.
4. It is estimated that there will be approximately 10 emergency service jobs required during each period of performance. Funding for this line item is based on historical precedence. Actual number of services and pricing will be adjusted during the life of the contract based upon actual emergency services rendered.
D. Reporting
1. A written report shall be submitted to the Supervisor of the Energy Center after each service, certifying that all instruments covered by these specifications have been serviced as required. The report shall also contain any recommendations concerning instrumentation that Contractor service personnel may deem necessary.
2. During semi-annual testing, Contractor shall complete a spreadsheet provided by the Energy Center that accounts for all measurements taken and data collected and that indicates the equipment has been calibrated, adjusted and inspected.
Contractor shall tag all equipment that is calibrated.
3. When service is requested, Contractor’s technicians will report to the Energy Center on site Supervisor or Utility Services Operator (USR). Upon completion of work, a service report listing date, time, equipment and service performed shall be submitted to the Energy Center Supervisor.
E. Equipment – Boiler systems:
Contractor shall provide all labor and material to maintain all fuel and steam atomizing trains (fuel oil, natural gas and propane) from outlet of first manual cock to the gas rings and/or oil injection guns as well as ignition and burner assemblies on all five (5) boilers listed below:
#1 Cleaver Brooks- Model DL-68-RH 45,000 pounds of steam, 1275 horsepower.
#2 Cleaver Brooks- Model DL-68-RH 45,000 pounds of steam, 1275 horsepower.
#3 Cleaver Brooks- Model DL-68-RH 45,000 pounds of steam, 1275 horsepower.
#4 Cleaver Brooks- Model DL-52-RH 30,000 pounds of steam, 875 horsepower.
#5 Small Low Pressure Boiler – Model, Pounds of Steam, and Horsepower to be determined.
Note: Boilers # 1-4 are located in building 69, also known as the Energy Center, of the Minneapolis VA Health Care Systems (VAHCS) Facility. Boiler #5 is located in building 222.
1. Plant Entrance
One (1) 6" Plant Entrance Gas Valve One
(1) 314" Plant Entrance Gas Valve Two (2)
Gas Pressure Switches
2. Main Gas Train
One ( 1) Gas Meter per boiler
One (1) Main Gas Pressure Regulator per boiler
One ( 1) Low Gas Pressure Switch per boiler
Two (2) Maxon Safety Shut Off Valves per boiler One ( 1) Normally Open Vent Valve per boiler One (1) High Gas Pressure Switch per boiler
One (1) Maxon Micro Ratio Valve per boiler
3. Pilot Gas Train
One (1) Gas Pressure Regulator - Nat. per boiler One (1) Gas Pressure Regulator - LP. per boiler One ( 1) Low Gas Pressure Switch per boiler
Two (2) Solenoid Safety Shut Off Valves per boiler
One (1) Normally Open Vent Valve per boiler
4. Burner Oil Train
One ( 1) Low Oil Pressure Switch per boiler
Two2) Maxon Safety Shut Off Valves per boiler
One (1) High Oil Pressure Switch per boiler
One (1) Maxon Synchro Control Valve per boiler
5. Atomizing Steam
One (1) Low Atomizing Steam Pressure Switch per boiler One (1) Casco Constant Differential Valve (CO) per boiler One (1) Steam Safety Shut Off Valve per boiler
6. Pilot Assembly
One (1) FPM-RD Gas-Electric Igniter per boiler
7. Panel Components
One (1) Motor Starter per boiler
Two (2) Control Circuit Transmitters per boiler One (1) Ignition Transformer per boiler
One (1) Agastat per boiler
8. Flame safe guard
9. Scanner and relays in burner control panel
10. Four (4) Jackshaft fuel valve and air damper Actuators Herculin
11. Four (4) Oxygen trim drivers ABB.
12. Four (4) Oxygen analyzers
13. Four (4) Oxygen analog meters
14. Four (4) Oxygen trim dump timers
15. Four (4) Boiler steam flow transmitters
16. Four (4) Vertical scale draft indicators
17. Four (4) Drum level transmitters
18. Four (4) Preferred Utilities instruments and controls
19. Four (4) Boiler flame safeguard panels
20. Twenty-Eight (28) Burner flame safeguard pressure switches.
Boiler Controls
Five (5) sub-master Controllers IRecorders in Graphic and in Texts (Preferred Utilities).
Inputs:
1. Control Signal from Plant Master
2. Percent 02
3. Fuel oil flow
4. Natural gas flow
5. Boiler steam flow
6. Economizer flue gas inlet temperature
7. Economizer flue gas outlet temperature
8. Feed water temperature into economizer
9. Feed water temperature out of economizer
10. Repeat signal from boiler water level controller
Control Outputs:
1. Boiler fire control signal
2. 02 trim control signal
3. Selected alarms to operator work station
Color LCD:
1. Control Signal from Plant Master
2. Percent 02
3. Fuel oil flow
4. Natural gas flow
5. Steam flow
6. Economizer flue gas temperature in
7. Economizer flue gas temperature out
8. Feed water temperature into economizer
9. Feed water temperature out of economizer
10. Boiler fire control signal
11. 02 trim control signal
12. Boiler water level
Manual Controls:
1. Fire control signal
2. 02 trim control signal
3. Manual I Auto
4. Increase I Decrease
5. Display Select
6. Operator adjustable software parameters
Ranges:
1. Steam flow: Boilers 1-2-3 = 45,000 Lb/Hr Boiler 4 =30,000 Lb/Hr (500 Lb/hr per Division)
2. Flue gas In/Out: 0 - 600 Degree F (5 Deg. I Division)
3. Feed water In/Out: 0 - 500 Degree F (5 Deg. I Division)
4. Percent Oxygen: 0 - 10%
5. Fuel Oil Flow: 0 - 10 Gal. I Min
1. Analog output and external control unit model 46
2. Narrow span DC current input digital panel meter 46DV
Steam Plant Master Controller (Preferred Utilities)
Inputs:
1. Main steam header pressure
2. Building 70 steam flow
3. Building 69 steam flow
4. Outside air temperature
5. Feed water temperature
6. Make-up tank temperature
Control Outputs:
1. Control Signal to Four sub-master Boiler controllers
2. Selected alarms to operator station.
Color LCD:
1. Main Steam Header Pressure
2. Building 70 steam flow
3. Building 69 steam flow
4. Outside air temperature
5. Feed water temperature
6. Make-up tank temperature
Manual Controls:
1. Set point for steam header pressure
2. Manual I Auto
3. Increase I Decrease
4. Display select
5. Operator adjustable software parameters
Ranges:
1. Steam Pressure: 0 - 300 PSIG (5 Lb I Division)
2. Feed I Made-up water temperature: 0 -300 Degrees F ( b Lb I Division)
3. Outside air temperature: (-30) - 140 Degree F (2 Lb I Division)
4. Building 70 steam flow: 0 - 100,000 Lbs/Hr (1000 Lb/Hr Per Division)
5. Building 69 steam flow: 0 - 10,000 Lbs/Hr (100 Lb/Hr Per Division)
Additional Equipment:
1. One ( 1) Steam header pressure transmitter
2. One ( 1) High steam header pressure switch
3. One (1) Steam transmitter (Bldg.70)
4. One (1) Steam transmitter (Bldg.69)
5. One (1) Annunciator
a. 29 alarms
b. 1 flasher module
c. 1 filter module
d. 1 power supply
e. 29 lamp modules
6. One (1) Fuel oil supply pressure regulator
7. Computer Work Station:
a. 500 GB
b. Window XP
c. Service pack 2
d. 2 GB of ram
e. 3.4 GHZ
f. Sony CD-RW
g. CR X 230EE
h. Zip Drive
i. Flip Drive
j. Keyboard
k. Mouse
I. 19" LCD Monitor
m. HP Deskjet 5440 Printer for (Recorders and Graphic)
n. Epson FX 2190 Printer for (alarms)
o. Programming as specified in specification Section 15E101
8. UPS Plant Master Controller, Boiler Monitoring Computer, and Boilers
1, 2, 3, 4, and 5: (Liebert Power Sure)
F. Annual Testing / Inspection Requirements See section H and K for additional information.
1. Perform annual inspections of Boilers
2. Perform annual inspections on Boiler stack.
3. Perform annual inspections on Deaerator tank.
4. Performa annual inspections on Condensate tank.
5. Perform annual Pump Vibration Analysis
G.Semi-Annual Testing/Inspection Requirements
Contractor shall perform the following inspections semi-annually:
1. Adjust burner combustion settings and calibrate oxygen trim.
2. Check vibration of burner fans.
3. Calibrate instrumentation, monitoring, and control systems.
4. Operational Testing of Boiler Safety Devices:
A. High-steam pressure cutout (recycle).
B. High steam pressure cutout (non-cycle).
C. Steam safety valves (raise boiler pressure until valve pops).
D. Check gas vent for leaks.
E. High-gas fuel pressure cutoff.
F. Low gas fuel pressure cutoff.
G. Gas fuel safety shut off valves proof of closure.
H. Leak test gas fuel safety shut off valves.
I. High-fuel oil temperature cutoff (heated fuel).
J. Low-fuel temperature cutoff (heated fuel)
K. Low-atomizing pressure for fuel oil
L. High-fuel oil pressure cutoff
M. Low-fuel oil pressure cutoff.
N. Fuel oil safety shut off valves proof of closure.
0. Leak test fuel oil safety shut off valves.
P. Check operation of Liquid Petroleum Gas pilot.
Q. Low-pilot gas pressure cutout.
R. Forced draft fan motor interlock.
S. Forced draft fan damper wide open for purge.
T. Boiler outlet damper wide open for purge.
U. Purge air flow interlock.
V. Timing for pre purge
W. Timing for post purge.
X. Igniter timing.
Y. Low fire position interlock.
Z. Combustion air interlock.
AA. Main flame out; i.e., time to close valves.
BB. Ignition flame out;, i.e., it is time to close valves.
CC. Minimum igniter flame test.
DD. Scanner not sensing ignition spark.
EE. Low-oxygen alarm and/or cutout.
FF. Pre-purge setting of flue gas recirculation damper.
GG. Interlock of building outside air damper with burner control or combustion air transmitter system, which ever system is currently in place.
HH. Instrument air pressure low cutout.
5. Boiler Plan Safety and Operational Duties:
A. Check furnace pressure.
B. Check combustion gas leaks into boiler room.
H. Vibration Analysis
1. Perform Vibration Analysis on eight Pumps Annually. Seven pumps located in building 69 and one pump in building 222.
2. Analysis shall be performed on the pump assembly (motor and pump).
3. Submit reports that provides detailed information about the pumps condition.
I. Security/ Badging
1. Contractor’s personnel will utilize a temporary vendor’s security badge until a permanent security PIV badge can be issued. Temporary badge use will not exceed 30 calendar days.
2. The Contractor shall comply with Minneapolis VA security, access and badging requirements. Employees must provide fingerprints and be able to pass a background check so they can obtain Security access badge. Employees must complete web-based Rules of Behavior training.
3. All employees will need a valid personal email account. Fingerprint scheduling/appointments, background investigation tasks and Training Management System (TMS) required classes notifications will be sent to their email address throughout the process.
4. Contractor will submit all required security badging documents for each employee within 5 business days from the award date of contract. All documents must be legible. The following documents will be sent to contractor via email after contract is awarded.
OF 306- Must be Typed. Handwritten will not be acceptable.
Self Certification
VA 10-2417
Employee Fingerprint Resource Form
J. Contractor Responsibilities
1. Contractor shall adhere to the latest standards set forth by the following references:
A. NFPA 85- Boiler and Combustion Systems Hazards Code.
B. VHA Boiler Plant Safety Device Testing Manual, 8th Edition (or most current version).
C. All boiler and pressurized vessel codes adopted by the State of Minnesota.
2. Contractor shall provide information to the Energy Center Supervisor with product modifications, when applicable.
3. Contractor shall have immediate access to factory authorized renewal parts and shall stock commonly used parts at the Contractor's place of business, in order to provide the fastest timelines for repairs.
4. The Contractor shall use testing equipment that is calibrated and adheres to the standards and criteria set forth by the National Institute of Standards and Technology
(NIST), as recommended by the ISO-9001 requirements. As proof of current calibration, the Contractor shall provide a Traceable Calibration Certificate to the VAHCS, presented upon initial contract issuance and each time certificates are updated.
5. Contractor shall take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract.
6. Contractor shall maintain personal liability and property damage insurance. The Offeror shall furnish evidence of insurance coverage with the proposal certification from his/her insurance company indicating that coverage outlined has been obtained and that it may not be changed or canceled without written notice to the Contracting Officer.
7. If Contractor fails to promptly perform the services or to take the necessary action to ensure future performance in conformity with the contract requirements, the Government may Terminate the contract, for cause.
8. At least one week prior to the commencement of a new quarter, Contractor shall provide the Energy Center Supervisor with a quarterly work schedule, to include the dates on which the work will be completed. This schedule shall be coordinated with and approved by the Energy Center Supervisor.
K. Inspection Frequency Table 1: Abbreviation Key and Legend
Table 2: Boiler Plant Equipment Inspection and Testing Frequency
Term Abbreviation
High Pressure Steam Boiler HP
Low Pressure Steam Boiler LPSB
Hot Water Boiler HWB
Electric Hot Water Boiler EHWB
Electric Steam Boiler ESB
Once every 6 months. 6M
Once per year Y
Once every 6 years 6Y depends on capacity +
1. Inspect furnace and other
Y Y Y Y Y internal surfaces, closures and accessories
2. Inspect exterior of Unit, casing, supports, closures, accessories, valves, controls.
Y Y Y Y Y
3. Check all Boilers for fouling and combustion gas flow.
Y Y Y N/A N/A
4. Tube leak check on all boiler types.
Y Y Y Y Y
5. Deaerator:
interior cleaning and visual inspection.
Y Y
If equipped
N/A N/A Y
If equipped
6.
Condensate Tank: interior cleaning and visual inspection.
Y Y N/A N/A Y
If equipped
7. Adjust burner combustion settings and calibrate oxygen trim.
6M 6M 6M+ N/A N/A
8. Check vibration of burner fans.
6M 6M 6M N/A N/A
9. Calibrate instrumenta-tion, monitoring, and control
6M 6M 6M+ 6M+ 6M+
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1.00 YR _______________ _______________
Annual Inspection of Boilers Contract Period: Base POP Begin: 04-15-2025 POP End: 04-14-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
0002 1.00 YR ________________ ________________
Annual Inspection of Condensate Tank Contract Period: Base POP Begin: 04-15-2025 POP End: 04-14-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-systems.
10. Calibrate pressure gages and thermometers.
Y Y Y Y Y
11. Test functionality of UPS systems.
Y Y Y Y Y
12. Boiler chimneys and stacks visual inspection
Y Y Y Y Y
13. Emission control system inspection and testing (SCRs etc.).
Y Y Y N/A N/A
Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
0003 1.00 YR ________________ ________________
Annual Inspection of Deaerator Tank Contract Period: Base POP Begin: 04-15-2025 POP End: 04-14-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
0004 1.00 YR ________________ ________________
Semi-Annual Calibration and Safety Device Testing of Boilers Contract Period: Base POP Begin: 04-15-2025 POP End: 04-14-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
0005 1.00 YR ________________ ________________
Semi-Annual Calibration and Safety Device Testing of Condensate Tank Contract Period: Base POP Begin: 04-15-2025 POP End: 04-14-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
0006 1.00 YR ________________ ________________
Semi-Annual Calibration and Safety Device Testing of Deaerator Contract Period: Base POP Begin: 04-15-2025 POP End: 04-14-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
0007 1.00 YR ________________ ________________
Annual Pump Vibration Analysis Testing (8 Pumps)
Contract Period: Base POP Begin: 04-15-2025 POP End: 04-14-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
0008 1.00 YR ________________ ________________
Annual Boiler Stack Inspection Contract Period: Base POP Begin: 04-15-2025 POP End: 04-14-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
0009 10.00 JB ____$3,500.00__ ___$35,0000.00___
Emergency Repairs: Parts and Labor Contract Period: Base POP Begin: 04-15-2025 POP End: 04-14-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
1001 1.00 YR ________________ ________________
Annual Inspection of Boilers Contract Period: Option 1 POP Begin: 04-15-2026 POP End: 04-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
1002 1.00 YR ________________ ________________
Annual Inspection of Condensate Tank Contract Period: Option 1 POP Begin: 04-15-2026 POP End: 04-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
1003 1.00 YR ________________ ________________
Annual Inspection of Deaerator Tank Contract Period: Option 1 POP Begin: 04-15-2026 POP End: 04-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
1004 1.00 YR ________________ ________________
Semi-Annual Calibration and Safety Device Testing of Boilers Contract Period: Option 1 POP Begin: 04-15-2026 POP End: 04-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
1005 1.00 YR ________________ ________________
Semi-Annual Calibration and Safety Device Testing of Condensate Tank Contract Period: Option 1 POP Begin: 04-15-2026 POP End: 04-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
1006 1.00 YR ________________ ________________
Semi-Annual Calibration and Safety Device Testing of Deaerator Contract Period: Option 1 POP Begin: 04-15-2026 POP End: 04-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
1007 1.00 YR ________________ ________________
Annual Pump Vibration Analysis Testing (8 Pumps) Contract Period: Option 1 POP Begin: 04-15-2026 POP End: 04-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-
PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
1008 1.00 YR ________________ ________________
Annual Boiler Stack Inspection Contract Period: Option 1 POP Begin: 04-15-2026 POP End: 04-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
1009 10.00 JB ____$3,500.00__ ___$35,0000.00___
Emergency Repairs: Parts and Labor Contract Period: Option 1 POP Begin: 04-15-2026 POP End: 04-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
2001 1.00 YR ________________ ________________
Annual Inspection of Boilers Contract Period: Option 2 POP Begin: 04-15-2027 POP End: 04-14-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
2002 1.00 YR ________________ ________________
Annual Inspection of Condensate Tank Contract Period: Option 2 POP Begin: 04-15-2027 POP End: 04-14-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
2003 1.00 YR ________________ ________________
Annual Inspection of Deaerator Tank Contract Period: Option 2 POP Begin: 04-15-2027 POP End: 04-14-2028
Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
2004 1.00 YR ________________ ________________
Semi-Annual Calibration and Safety Device Testing of Boilers Contract Period: Option 2 POP Begin: 04-15-2027 POP End: 04-14-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
2005 1.00 YR ________________ ________________
Semi-Annual Calibration and Safety Device Testing of Condensate Tank Contract Period: Option 2 POP Begin: 04-15-2027 POP End: 04-14-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
2006 1.00 YR ________________ ________________
Semi-Annual Calibration and Safety Device Testing of Deaerator Contract Period: Option 2 POP Begin: 04-15-2027 POP End: 04-14-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
2007 1.00 YR ________________ ________________
Annual Pump Vibration Analysis Testing (8 Pumps) Contract Period: Option 2 POP Begin: 04-15-2027 POP End: 04-14-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying
2008 1.00 YR ________________ ________________
Annual Boiler Stack Inspection Contract Period: Option 2 POP Begin: 04-15-2027 POP End: 04-14-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
2009 10.00 JB ____$3,500.00__ ___$35,0000.00___
Emergency Repairs: Parts and Labor Contract Period: Option 2 POP Begin: 04-15-2027 POP End: 04-14-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
3001 1.00 YR ________________ ________________
Annual Inspection of Boilers Contract Period: Option 3 POP Begin: 04-15-2028 POP End: 04-14-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
3002 1.00 YR ________________ ________________
Annual Inspection of Condensate Tank Contract Period: Option 3 POP Begin: 04-15-2028 POP End: 04-14-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
3003 1.00 YR ________________ ________________
Annual Inspection of Deaerator Tank Contract Period: Option 3 POP Begin: 04-15-2028 POP End: 04-14-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and
3004 1.00 YR ________________ ________________
Semi-Annual Calibration and Safety Device Testing of Boilers Contract Period: Option 3 POP Begin: 04-15-2028 POP End: 04-14-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
3005 1.00 YR ________________ ________________
Semi-Annual Calibration and Safety Device Testing of Condensate Tank Contract Period: Option 3 POP Begin: 04-15-2028 POP End: 04-14-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
3006 1.00 YR ________________ ________________
Semi-Annual Calibration and Safety Device Testing of Deaerator Contract Period: Option 3 POP Begin: 04-15-2028 POP End: 04-14-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
3007 1.00 YR ________________ ________________
Annual Pump Vibration Analysis Testing (8 Pumps) Contract Period: Option 3 POP Begin: 04-15-2028 POP End: 04-14-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
3008 1.00 YR ________________ ________________
Annual Boiler Stack Inspection Contract Period: Option 3 POP Begin: 04-15-2028 POP End: 04-14-2029
PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
3009 10.00 JB ____$3,500.00__ ___$35,0000.00___
Emergency Repairs: Parts and Labor Contract Period: Option 3 POP Begin: 04-15-2028 POP End: 04-14-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
4001 1.00 YR ________________ ________________
Annual Inspection of Boilers Contract Period: Option 4 POP Begin: 04-15-2029 POP End: 04-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
4002 1.00 YR ________________ ________________
Annual Inspection of Condensate Tank Contract Period: Option 4 POP Begin: 04-15-2029 POP End: 04-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
4003 1.00 YR ________________ ________________
Annual Inspection of Deaerator Tank Contract Period: Option 4 POP Begin: 04-15-2029 POP End: 04-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
4004 1.00 YR ________________ ________________
Semi-Annual Calibration and Safety Device Testing of Boilers Contract Period: Option 4 POP Begin: 04-15-2029
POP End: 04-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
4005 1.00 YR ________________ ________________
Semi-Annual Calibration and Safety Device Testing of Condensate Tank Contract Period: Option 4 POP Begin: 04-15-2029 POP End: 04-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
4006 1.00 YR ________________ ________________
Semi-Annual Calibration and Safety Device Testing of Deaerator Contract Period: Option 4 POP Begin: 04-15-2029 POP End: 04-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
4007 1.00 YR ________________ ________________
Annual Pump Vibration Analysis Testing (8 Pumps) Contract Period: Option 4 POP Begin: 04-15-2029 POP End: 04-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors
4008 1.00 YR ________________ ________________
Annual Boiler Stack Inspection Contract Period: Option 4 POP Begin: 04-15-2029 POP End: 04-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and
4009 10.00 JB ____$3,500.00__ ___$35,0000.00___
Emergency Repairs: Parts and Labor Contract Period: Option 4 POP Begin: 04-15-2029 POP End: 04-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying
GRAND TOTAL ________________