S06 Addendum Number 1 - 1 page.pdf
PDF 177 KB Posted
- Attached to
- 636A8-23-101, Update Signage & Wayfinding Federal contract opportunity
- Solicitation number
- 36C26325B0011
About this file
This document is a Supplemental Instructions Revision #1 for the Iowa City VAMC Update Signage and Wayfinding project (Project #636A8-23-101). The revision, issued by Anderson on June 4, 2025, includes specification and drawing changes to eliminate confusion and provide clarity. Specification modifications involve removing sections related to professional surveying services, temporary toilets, tests, construction signs, safety signs, and VA Tririga CPMS, while revising sections on photographic documentation, quality control, testing laboratory services, and signage.
Drawing changes focus on the Exterior Site Wayfinding & Signage Plan and Parking Ramp Structure Signage Plans for Floors 1-4, with updates including removing specific references, clarifying sign locations, and specifying mounting types for PL-12.03 signs. The revisions are intended to streamline documentation and provide more precise guidance for the signage and wayfinding update project at the Iowa City Veterans Affairs Medical Center.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
13605 1st Avenue North Suite 100, Plymouth, MN 55441 P 763.412.4000 F 763.412.4090 ae-mn.com
SUPPLEMENTAL INSTRUCTIONS
Revision #1
June 4, 2025
Update Signage and Wayfinding
Iowa City VAMC
Iowa City, IA
Project # 636A8-23-101
The Contents of this Revision alter drawings and take precedence over the related items herein:
Summary of changes:
1. Spec changes include removal of unrequired sections and updated information to eliminate confusion.
2. Drawing changes provide clarity to details and sign locations.
Specifications:
1. 01 00 00 – GENERAL REQUIREMENTS
a. Section 1.11 Professional Surveying Services was removed.
b. Section 1.17 Temporary Toilets was removed.
c. Section 1.19 Tests was removed.
d. Section 1.23 Construction Sign was removed.
e. Section 1.24 Safety Sign was removed.
f. Section 1.25 Photographic Documentation has been revised to clarify requirements.
g. Section 1.27 VA Tririga CPMS was removed.
2. 01 45 00 – QUALITY CONTROL
a. Section 3.4 Quality Control Organization, Paragraph B has been revised to clarify requirements.
3. 01 45 29 – TESTING LABORATORY SERVICES
a. Part 3 Execution has be revised to clarify requirements.
4. 10 14 00 - SIGNAGE
a. Section 2.5B – Sole Source updated.
Drawings:
1. L-2 – EXTERIOR SITE WAYFINDING & SIGNAGE PLAN
a. Reference to Detail 12 on Sheet L4 in Note 6 removed.
2. A-4 – PARKING RAMP STRUCTURE – FLOOR 1 SIGNAGE PLAN
a. Clarification on locations of PL-12.03 signs and mounting type.
3. A-6 – PARKING RAMP STRUCTURE – FLOOR 2 SIGNAGE PLAN
a. Clarification on locations of PL-12.03 signs and mounting type.
4. A-8 – PARKING RAMP STRUCTURE – FLOOR 3 SIGNAGE PLAN
a. Clarification on locations of PL-12.03 signs and mounting type.
5. A-10 – PARKING RAMP STRUCTURE – FLOOR 4 SIGNAGE PLAN
a. Clarification on locations of PL-12.03 signs and mounting type.
ATTACHMENTS: --
ISSUED BY ANDERSON: TO, JS, CZ
File details come from the government source that posted it. Updated .