36C26319B0010-010.pdf
PDF 9 MB Posted
- Attached to
- REPLACE BOILER PLANT (437-14-112)
- Solicitation number
- 36C26319B0010
About this file
36C26319B0010 437-14-112 Replace Boiler Plant Mechanical Drawings (28 pages).pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26319C0205-000.docx | DOCX document | |
| 36C26319B0010-0004000.docx | DOCX document | |
| 36C26319B0010-0003000.docx | DOCX document | |
| 36C26319B0010-0003001.pdf | ||
| 36C26319B0010-0003002.pdf | ||
| 36C26319B0010-0002000.docx | DOCX document | |
| 36C26319B0010-0002001.pdf | ||
| 36C26319B0010-0001001.pdf | ||
| 36C26319B0010-0001000.docx | DOCX document | |
| 36C26319B0010-012.pdf | ||
| 36C26319B0010-004.pdf | ||
| 36C26319B0010-011.pdf | ||
| 36C26319B0010-001.docx | DOCX document | |
| 36C26319B0010-008.pdf | ||
| 36C26319B0010-005.pdf | ||
| 36C26319B0010-002.pdf | ||
| 36C26319B0010-007.pdf | ||
| 36C26319B0010-006.pdf | ||
| 36C26319B0010-003.pdf | ||
| 36C26319B0010-009.pdf | ||
| 36C26319B0010-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AV
S
T
H
M-1
M-1 x
S-1
8x8
COMPRESSED AIR
FEEDWATER PUMP SUCTION
CONDENSATE PUMP DISCHARGE
FEEDWATER PUMP DISCHARGE
INTERRUPTIBLE NATURAL GAS
FIRM NATURAL GAS
NATURAL GAS
FUEL OIL SUPPLY
FUEL OIL RETURN
FUEL OIL VENT
PUMPED CONDENSATE
REFRIGERANT DISCHARGE
REFRIGERANT SUCTION
REFRIGERANT LIQUID
HOT GAS BYPASS
PROPANE
CONDENSATE DRAIN
LOW PRESSURE STEAM
MEDIUM PRESSURE STEAM
FG
AIR
IG
LPG
G
FOS
FOR
FOV
RD
HGB
PC
RL
RS
D
LPS
MPS
HPS
M
ROUND DUCT
DUCT UP THROUGH FLOOR ABOVE OR ROOF
DUCT WITH ACOUSTICAL LINING
DIMENSION IS SIDE SHOWN
RECTANGULAR DUCT, FIRST
DUCT SECTION, NEGATIVE PRESSURE
DUCT SECTION, POSITIVE PRESSURE
DOMESTIC COLD WATER
SANITARY VENT
DOMESTIC HOT WATER
CHILLED WATER RETURN
CHILLED WATER SUPPLY
HEATING WATER RETURN
HEATING WATER SUPPLY
STORM DRAIN BELOW GRADE
SANITARY SEWER ABOVE GRADE
RAIN LEADER
SANITARY SEWER BELOW GRADE
GLYCOL HEATING RETURN
DOMESTIC RECIRCULATING HOT WATER
GLYCOL HEATING SUPPLY
SD
CHWS
CHWR
GHWS
GHWR
HWS
HWR
RL
20x12
20x12
20ø
NEG
DN
POS
UP
MECHANICAL SYMBOLS
DNUP
SUPPLY AIR OUTLET
RETURN OR EXHAUST AIR INLET
BALL VALVE INDICATOR
HEAT PUMP WATER RETURN
HEAT PUMP WATER SUPPLYHPWS
HPWR
HIGH PRESSURE STEAM
* ALL SYMBOLS AND ABBREVIATIONS DO NOT NECESSARILY APPEAR ON DRAWINGS
CONNECT NEW TO EXISTING, VERIFY SIZE
REVISION NOTE REFERENCE
CO DETECTOR
THERMOSTAT
SHEET NOTE REFERENCE
FLOW SWITCH
RPZ BACKFLOW PREVENTOR ASSEMBLY
THERMOSTATIC STEAM TRAP
INLINE PUMP
PRESSURE GAUGE
SENSOR WELL
THERMOMETER
VARIABLE AIR VOLUME BOX REFERENCE
SYMBOL WITH GPM SHOWN (1.5) REFER
TO SCHEDULE
VOLUME DAMPER
SMOKE DAMPER
FIRE DAMPER
COMBINATION FIRE/SMOKE DAMPER
SQUARE ELBOW WITH TURNING VANES
SIDEWALL SUPPLY REGISTER
MOTORIZED DAMPER
CEILING MOUNTED GRILLE OR
WITH SIZE INDICATED
FLEXIBLE DUCT FROM MAIN
ROUND NECK CEILING DIFFUSER,
SIDEWALL EXHAUST OR RETURN GRILLE
SCHEDULE FOR MORE INFORMATION
WITH TYPE AND AIRFLOW INDICATED,
(TYPE S-1, 100 CFM), REFER TO
NEW DIFFUSER, GRILLE, OR REGISTER
ECG-CRATE GRILLE
MAIN WITH SIZE INDICATED
REGISTER. RIGID DUCT FROM
STRAINER
AUTOMATIC AIR VENT
PRESSURE REDUCING VALVE
SOLENOID VALVE
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
FLOW MEASURING DEVICE (LIQUID)
GLOBE VALVE
GLOBE ANGLE VALVE
GATE ANGLE VALVE
GATE VALVE
BUTTERFLY VALVE
BALANCING VALVES
SAFETY RELIEF VALVE
CHECK VALVE
AND LOCATION OF EXISTING
PRESSURE REGULATOR VALVE
AQUASTAT
CONDENSATE TRANSFER PUMP SUCTION
CONDENSATE TRANSFER PUMP DISCHARGE
DETAIL NOTE REFERENCE
WITH DRAWING NUMBER SHOWN (1) AND
SHEET NUMBER SHOWN (M-1)
ELEVATION/ SECTION NOTE REFERENCE
WITH DRAWING NUMBER SHOWN (1) AND
SHEET NUMBER SHOWN (M-1)
FLOW METER
COMPRESSESD AIR OUTLET
HATCHING INDICATE ITEMS TO BE
REMOVED.
ORL OVERFLOW RAIN LEADER
FD
SD
F/SD
HUMIDISTAT
MECHANICAL ABBREVIATIONS
HOT WATER
IN JOIST SPACE
IN WEB SPACE
KILOWATT
LEAVING AIR TEMPERATURE
LAVATORY
POUNDS PER HOUR
LEAVING WATER TEMPERATURE
MAKEUP AIR
MAKEUP AIR HANDLING UNIT
ONE THOUSAND BTU PER HOUR
MINIMUM CIRCUIT AMPACITY
MECHANICAL
MAXIMUM FUSE SIZE
MISCELLANEOUS
MOTOR OPERATED DAMPER
NOT APPLICABLE
NORMALLY CLOSED
NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
OUTSIDE AIR
OVERFLOW ROOF DRAIN
OVERFLOW RAIN LEADER
PHASE
PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH
POWER VENTILATOR
RETURN AIR
ROOF DRAIN
ROOF HOOD
RECIRCULATING HOT WATER
RAIN LEADER
REVOLUTIONS PER MINUTE
ROOFTOP AIR HANDLING UNIT
SUPPLY AIR
SOFTENED COLD WATER
STORM DRAIN
SEASONAL ENERGY EFFICIENCY RATIO
SPECIFICATION
TRANSFER AIR
TEMPERATURE RISE
TOTAL STATIC PRESSURE
TYPICAL
UNIT HEATER
SANITARY VENT
VOLUME DAMPER (MANUAL OPPOSED BLADE)
VERIFY SIZE AND LOCATION
VARIABLE AIR VOLUME
VENT THROUGH ROOF
SANITARY WASTE
WITH
WET BULB TEMPERATURE
WALL CLEANOUT
WATER HEATER
WITHOUT
HW
I.J.S
I.W.S.
KW
LAT
LAV
LB/HR
LWT
MA
MAU
MBH
MCA
MECH
MFS
MISC
MOD
N/A
NC
NIC
NO
NTS
OA
ORD
ORL
PH
PRV
PSI
PV
RA
RD
RH
RHW
RL
RPM
RTU
SA
SCW
SD
SEER
SPEC
TA
TR
TSP
TYP
UH
V
VD
(VER)
VAV
VTR
W
W/
WB
WCO
WH
W/O
AT
AIR COOLED CONDENSING UNIT
ABOVE FINISHED FLOOR
AIRFLOW MEASURING DEVICE
AIR HANDLING UNIT
ARCHITECT, ARCHITECTURAL
AUTOMATIC TEMPERATURE CONTROLS
BACKDRAFT DAMPER
BUILDING
BRITISH THERMAL UNITS PER HOUR
BALL VALVE INDICATOR
COMBUSTION AIR
COOLING COIL
CUBIC FEET PER MINUTE
CIRCULATING
FLOOR CLEANOUT
CONCRETE
CONDENSATE
CONNECTION
CABINET UNIT HEATER
COLD WATER
DECIBELS
DRY BULB TEMPERATURE
DEMOLISH, DEMOLITION
DIAMETER
DIVISION
DOWN
DRAWING
EXISTING
EXHAUST AIR
ENTERING AIR TEMPERATURE
ENERGY EFFICIENCY RATIO
EXHAUST FAN
ELECTRIC, ELECTRICAL
EXTERNAL STATIC PRESSURE
ENTERING WATER TEMPERATURE
EXHAUST
EXISTING
DEGREES FAHRENHEIT
COMBINATION FIRE/ SMOKE DAMPER
FIRE DAMPER
FLOOR DRAIN
FLEXIBLE
FULL LOAD AMPERAGE
FLOW MEASURING DEVICE (LIQUID)
FEET PER MINUTE
FINNED TUBE RADIATION
GALVANIZED
GRADE CLEANOUT
GALLONS PER HOUR
GALLONS PER MINUTE
HOSE BIBB
HEATING COIL
HORSE POWER
HOUR
HEATING, VENTILATION, AND AIR
CONDITIONING
ACCU
AFF
AFMD
AHU
ARCH
ATC
BDD
BLDG
BTUH
BVI
CA
CC
CFM
CIRC
CO
CONC
COND
CONN
CUH
CW
dB
DB
DEMO
DIA
DIV
DN
DWG
(E)
EA
EAT
EER
EF
ELEC
ESP
EWT
EXH
EXIST
F
F/SD
FD
FD
FLEX
FLA
FMD
FPM
FTR
GALV
GCO
GPH
GPM
HB
HC
HP
HR
HVAC
8ø x
V-x-x,
1.5 GPM
FS
S
P
D DANGEROUS GAS DETECTOR
FWPD
FWPS
CTPD
CTPS
CPD
BOILER BLOWOFFBO
CONTINUOUS BLOWDOWNCBD
CHEMICAL FEEDCF
SOFT COLD WATERSCW
BALL VALVES
PLUG VALVE
INVERTED BUCKET STEAM TRAP ASSEMBLY
CLOSED FLOAT THERMOSTATIC STEAM
TRAP ASSEMBLY
KEY PLAN
Fargo, ND 58102
2101 Elm Street
Medical Center
Dept. of Veterans Affairs
Building No.
VA Project No.
Drawing Title
Contract No.
V e te ra n s A ff a ir s
Location
Drawn ByChecked ByDesigned By
Project Title
Drawing No.
Date
Scale:
D e p a rt m e n t o f
Dwg. of 6910 - BOILER PLANT
FARGO VA HEALTH CARE SYSTEM
FARGO, NORTH DAKOTA
VA263-P-1218
AH/KS AH/KS/JN DP/JK
VA263
Project Phase www.jlgarchitects.com copyright © 2015
Fargo 214 Broadway
Fargo, ND 58102 phone 7 0 1.3 6 4.0 2 3 7 facsimile 7 0 1.3 6 4.0 2 2 8
Elec. dwg name:
Submittal Date
S.D. 1 SUBMITTAL 12/30/2015
D.D. 1 SUBMITTAL (PRELIM.) 02/16/2016
D.D. 1 (35%) SUBMITTAL 09/30/2016
D.D. 2 (50%) SUBMITTAL 03/03/2017
D.D. 3 (99%) SUBMITTAL 10/20/2017
C.D. 4 (100%) SUBMITTAL 06/01/2018
/2
/2
:2 :4
P
M
1/8" = 1'-0"
P00 437-14-112
REPLACE BOILER PLANT 10.26.2018
MECHANICAL TITLE SHEET
100% CONSTRUCTION DOCUMENT
P00.dwg
MECHANICAL SHEET INDEX
P00 MECHANICAL TITLE SHEET
P1 FOUNDATION LEVEL PLUMBING PLAN -
DEMOLITION
P2 MAIN LEVEL PLUMBING DEMOLITION PLAN
P3 FOUNDATION LEVEL PLUMBING PLAN
P4 MAIN LEVEL PLUMBING PLAN
P5 UPPER LEVEL PLUMBING PLAN
F1 MAIN LEVEL FIRE PROTECTION PLAN
F2 UPPER LEVEL FIRE PROTECTION PLAN
H1 PARTIAL MECH SITE PLAN - TEMPORARY
BOILERS
H2 MAIN LEVEL TEMPORARY STEAM PIPING PLAN
H3 MAIN LEVEL STEAM & HVAC PIPING
DEMOLITION PLAN
H4 UPPER LEVEL STEAM & HVAC PIPING
DEMOLITION PLAN
H5 MECHANICAL ROOF DEMOLITION PLAN
H6 MAIN LEVEL STEAM & HVAC PIPING PLAN
H7 UPPER LEVEL STEAM & HVAC PIPING PLAN
H8 MAIN LEVEL HVAC PIPING PLAN
H9 UPPER LEVEL HVAC PIPING PLAN
H10 MAIN LEVEL VENTILATION PLAN
H11 UPPER LEVEL VENTILATION PLAN
H12 MECHANICAL ROOF PLAN
H13 MECHANICAL SECTIONS
H14 MECHANICAL SECTIONS
H15 PIPING SCHEMATICS
H16 PIPING SCHEMATICS
H17 MECHANICAL DETAILS
H18 MECHANICAL DETAILS
H19 CONTROLS DIAGRAMS
H20 MECHANICAL SCHEDULES
10-26-18
NOTE:
ALL UNDERGROUND WASTE PIPING
TO BE CLEANED AND PREPARED
FOR INSTALLATION OF INTERNAL
EPOXY BASED HIGH TEMPERATURE
LINER PER LINER MANUFACTURER'S
RECOMMENDATIONS (TYP.).
EXIST. 4" UP
TO VENT
EXIST. 4" UP
TO VENT
(E) 4" UP TO
OPEN SITE DRAIN
(E) 4" UP TO
OPEN SITE DRAIN
(E) 4" UP TO FD
(E) 2" UP TO FD
(E) 4" UP TO FD
(E) 4" UP TO CO
(E) 4" UP TO OPEN
SITE DRAIN
(E) 4" UP TO
FUNNEL DRAIN
(E) 4" UP TO
OPEN SITE
DRAIN
(E) 4" SANITARY MAIN
(E) 2" UP
TO SINK
(E) 2" UP TO
SHOWER DRAIN
4"
(E) 4" UP TO
FUNNEL DRAIN
(E) 4" UP TO
FUNNEL DRAIN
(E) 4" UP TO
FUNNEL DRAIN
(E) 4" UP TO FD
(E) 4" UP TO FD
(E) 4" UP TO FD
OUTLINE OF
EXISTING PIPE
TRENCH
OUTLINE OF
EXISTING PIPE
TRENCH
(E) 4" UP
TO FD
(E) 4" UP
TO FD
(E) 4" UP
TO FD
(E) 4" UP
TO FD
(E) 4" UP
TO FD
(E) 4" UP TO OPEN
SITE DRAIN
(E) 2" UP
TO SINK
(E) 2" UP
TO EWC
(E) 2" UP
TO VENT
(E) 4" UP
TO WC
REMOVE
EXISTING FD
(E) 4" UP TO FD
(E) 4" VENT UP
THROUGH ROOF
(E) 4" STORM SEWER MAIN
(E) 4" STORM SEWER IN
FLOOR UP TO NEW ABOVE
FLOOR PIPING. SEE MAIN
LEVEL PLUMBING PLAN FOR
CONTINUATION
DISCONNECT AND REMOVE
EXISTING WASTE PIPING IN ITS
ENTIRETY. REFER TO
REMODELED FOUNDATION
PLUMBING PLAN FOR NEW
WORK IN THIS AREA.
(E) 2" UP
TO URINAL
(E) 2" UP
TO SINK
REMOVE & REPLACE
EXISTING FD
REMOVE
EXISTING FD
REMOVE
EXISTING FD
REMOVE
EXISTING
FUNNEL
DRAIN
MODIFY EXISTING
WASTE TO
ACCOMMODATE NEW
MOP SINK ABOVE.
CUT & PATCH FLOOR
AS REQUIRED.
REMOVE EXISTING WASTE TO FLOOR
DRAIN. MODIFY REMAINING WASTE TO
PROVIDE NEW FLOOR DRAIN ON
REMAINING LINE. CUT & PATCH FLOOR
AS REQUIRED. REFER TO REMODELED
PLUMBING PLANS FOR RECONNECTION.
DISCONNECT AND REMOVE
EXISTING WASTE PIPING IN ITS
ENTIRETY. REFER TO REMODELED
FOUNDATION PLUMBING PLAN FOR
NEW WORK IN THIS AREA.
REMOVE 4" STORM SEWER
PIPING UP. CAP AND
ABANDON ASSOCIATED
PIPING BELOW FLOOR
CAP
REMOVE EXISTING WASTE PIPING
TO POINT 5'-0" OUTSIDE OF
BUILDING. REFER TO REMODELED
PLUMBING PLAN FOR NEW WASTE
PIPE BEING INSTALL IN THIS AREA.
REMOVE & REPLACE
EXISTING SUMP
PUMPS IN PIT
(E) 2" UP
TO FD
(E) 4" STORM SEWER IN FLOOR
UP TO NEW ABOVE FLOOR
PIPING. SEE MAIN LEVEL
PLUMBING PLAN FOR
CONTINUATION
NOTE:
ALL UNDERGROUND WASTE PIPING
TO BE CLEANED AND PREPARED
FOR INSTALLATION OF INTERNAL
EPOXY BASED HIGH TEMPERATURE
LINER PER LINER MANUFACTURER'S
RECOMMENDATIONS (TYP.).
(E) 4" UP TO
FLOOR DRAIN
REMOVE EXISTING WATER
SERVICE PIPING TO POINT
5'-0" OUTSIDE OF BUILDING.
REFER TO REMODELED
PLUMBING PLAN FOR NEW
WATER SERVICE PIPE BEING
INSTALL IN THIS AREA.
KEY PLAN
Fargo, ND 58102
2101 Elm Street
Medical Center
Dept. of Veterans Affairs
Building No.
VA Project No.
Drawing Title
Contract No.
V e te ra n s A ff a ir s
Location
Drawn ByChecked ByDesigned By
Project Title
Drawing No.
Date
Scale:
D e p a rt m e n t o f
Dwg. of 6910 - BOILER PLANT
FARGO VA HEALTH CARE SYSTEM
FARGO, NORTH DAKOTA
VA263-P-1218
AH/KS AH/KS/JN DP/JK
VA263
Project Phase www.jlgarchitects.com copyright © 2015
Fargo 214 Broadway
Fargo, ND 58102 phone 7 0 1.3 6 4.0 2 3 7 facsimile 7 0 1.3 6 4.0 2 2 8
Elec. dwg name:
Submittal Date
S.D. 1 SUBMITTAL 12/30/2015
D.D. 1 SUBMITTAL (PRELIM.) 02/16/2016
D.D. 1 (35%) SUBMITTAL 09/30/2016
D.D. 2 (50%) SUBMITTAL 03/03/2017
D.D. 3 (99%) SUBMITTAL 10/20/2017
C.D. 4 (100%) SUBMITTAL 06/01/2018
/2
/2
:2 :4
P
M
1/4" = 1'-0"
P1 437-14-112
REPLACE BOILER PLANT 10.26.2018
FOUNDATION LEVEL PLUMBING
PLAN - DEMOLITION
100% CONSTRUCTION DOCUMENT
P1.dwg
NORTH
1/4" = 1'-0"P1
1 FOUNDATION LEVEL PLUMBING PLAN - DEMOLITION
MECHANICAL SHEET INDEX
P00 MECHANICAL TITLE SHEET
P1 FOUNDATION LEVEL PLUMBING PLAN -
DEMOLITION
P2 MAIN LEVEL PLUMBING DEMOLITION PLAN
P3 FOUNDATION LEVEL PLUMBING PLAN
P4 MAIN LEVEL PLUMBING PLAN
P5 UPPER LEVEL PLUMBING PLAN
F1 MAIN LEVEL FIRE PROTECTION PLAN
F2 UPPER LEVEL FIRE PROTECTION PLAN
H1 PARTIAL MECH SITE PLAN - TEMPORARY
BOILERS
H2 MAIN LEVEL TEMPORARY STEAM PIPING PLAN
H3 MAIN LEVEL STEAM & HVAC PIPING
DEMOLITION PLAN
H4 UPPER LEVEL STEAM & HVAC PIPING
DEMOLITION PLAN
H5 MECHANICAL ROOF DEMOLITION PLAN
H6 MAIN LEVEL STEAM & HVAC PIPING PLAN
H7 UPPER LEVEL STEAM & HVAC PIPING PLAN
H8 MAIN LEVEL HVAC PIPING PLAN
H9 UPPER LEVEL HVAC PIPING PLAN
H10 MAIN LEVEL VENTILATION PLAN
H11 UPPER LEVEL VENTILATION PLAN
H12 MECHANICAL ROOF PLAN
H13 MECHANICAL SECTIONS
H14 MECHANICAL SECTIONS
H15 PIPING SCHEMATICS
H16 PIPING SCHEMATICS
H17 MECHANICAL DETAILS
H18 MECHANICAL DETAILS
H19 CONTROLS DIAGRAMS
H20 MECHANICAL SCHEDULES
REMOVE EXISTING EMERGENCY
SHOWER AND ASSOCIATED CW
PIPING BACK TO MAIN.
EXIST. FD
TO REMAIN
EXIST. FD
TO REMAIN
EXIST. PIPE TRENCH
TO REMAINEXIST. FD
TO REMAIN
EXIST. FUNNEL
DRAIN TO REMAIN
EXIST. FUNNEL
DRAIN TO REMAIN
EXIST. FD
TO REMAIN
EXIST. FD
TO REMAIN
EXIST. FD
TO REMAIN
EXIST. FD
TO REMAIN
EXIST. C.O.
TO REMAIN
EXIST. FD
TO REMAIN
4EXIST. FD
TO REMAIN
EXIST. FD
TO REMAIN
EXIST. FD
TO REMAIN
EXIST. FD
TO REMAIN
EXIST. OPEN
SITE DRAIN TO
REMAIN
EXIST. FD
TO REMAIN
EXIST. FD
TO REMAIN
EXIST. FD
TO REMAIN
EXIST. OPEN SITE
DRAIN TO REMAIN
REMOVE EXIST.
CONCRETE BLOW
DOWN SUMP PIT
EXIST. EMERGENCY
DOMESTIC WATER
STORAGE TANK FOR
HOSPITAL SHALL
REMAIN
REMOVE EXISTING DOMESTIC
WATER BOOSTER PUMP SKID
FOR FLOOR REPLACEMENT.
INSTALL TEMPORARY 4"
BYPASS PIPING IN WATER LINE.
RE-INSTALL PUMP SKID AFTER
NEW FLOOR IS INSTALLED.
EXIST. HOSPITAL WATER
SOFTENER TO REMAIN.
SEE NOTE #7.
EXIST. HOSPITAL WATER
SOFTENER SALT TANK TO
REMAIN. SEE NOTE #7.
EXIST. WATER
SOFTENER SHALL
REMAIN. SEE NOTE #7.
EXIST. TRANSFER
PUMPS AND PIPING FOR
EMERGENCY DOMESTIC
WATER SHALL REMAIN.
SEE NOTE #7.
EXIST. PIPING
TO EMERGENCY
DOMESTIC
WATER TANK
SHALL REMAIN
EXIST. WATER SOFTENER
SALT TANK TO REMAIN.
SEE NOTE #7.
(E) 4" WATER SERVICE AND
METER LOCATION.
REPLACE EXIST.
DOMESTIC WATER
HEATER LOCATED
UNDER COUNTER
WITH NEW.
LOWER LEVEL SLAB WILL BE REMOVED
AND REPLACED. COORDINATE
REMOVAL AND INSTALLATION OF PIPING
AND DRAINS WITH THIS WORK. REFER
TO ARCHITECTURAL PLANS FOR
EXTENT OF FLOOR REPLACEMENT. SEE
NOTE #7.
EXISTING STEAM TUNNEL
REMOVE EXISTING
FUNNEL DRAIN
REMOVE AND REPLACE
EXISTING FLOOR
DRAIN IN TRENCH
REMOVE EXISTING WALL
HYDRANT & ASSOCIATED
PIPING BACK TO MAIN. PATCH
WALL PER ARCHITECT'S
SPECIFICATIONS.
REMOVE EXISTING
EMERGENCY EYE WASH AND
ASSOCIATED H.W. & C.W.
PIPING BACK TO MAINS.
REMOVE EXISTING HOSE
BIBB AND REPLACE WITH
NEW AT THIS LOCATION
EXIST.FUNNEL
DRAIN TO REMAIN
EXIST. FUNNEL
DRAIN TO REMAIN
EXIST. PIPE TRENCH
TO REMAIN
REMOVE EXISTING FLOOR
DRAIN AND MODIFY WASTE
PIPING TO PROVIDE NEW FD IN
THIS AREA. REFER TO
REMODELED PLUMBING PLANS
FOR MORE INFORMATION.
(E) WALL HYDRANT
TO REMAIN
REMOVE
EXISTING
CW PIPING
2(E) 2" V.
(E) 3/4" H.W.
(E) 3/4" H.W.
(E) 1" C.W.
(E) 3/4" H.W.
(E) 3/4" C.W.
(E) 1-1/2" V.
REMOVE EXISTING
FD DRAIN IN
TRENCH
REMOVE EXISTING
FLOOR DRAIN
EXIST. 4" VENT UP
THROUGH ROOF
TO REMAIN
EXIST. FD
TO REMAIN
REMOVE EXISTING
CW PIPING
REMOVE EXISTING
CW PIPING
REMOVE
EXISTING
CW PIPING
REMOVE EXISTING CW
PIPING TO THIS POINT.
PREPARE REMAINING FOR
CONNECTION TO NEW
REMOVE EXISTING
CW PIPING
REMOVE EXISTING
CW PIPING
REMOVE
EXISTING
CW PIPING
REMOVE
EXISTING
CW PIPING
EXISTING CW PIPING
TO REMAIN
REMOVE EXISTING FD
DRAIN IN TRENCH
(E) 1-1/2" V.
(E) 1/2" CW
(E) 1-1/2" V.
REMOVE AND REPLACE
EXISTING RAIN LEADER
PIPING FROM ROOF
DRAIN TO FLOOR.
REMOVE AND REPLACE
EXISTING RAIN LEADER
PIPING FROM ROOF
DRAIN TO FLOOR.(E) VENT STACK
UP & DN. TO
REMAIN
(E) 1/2" CW &
1/2" H.W. TO
SINK
EXIST. SHOWER
DRAIN TO REMAIN
DEMOLITION NOTES:
DISCONNECT AND REMOVE EXISTING SHOWER VALVE
AND SHOWER HEAD AND REPLACE WITH NEW. REFER
TO REMODELED PLUMBING PLANS FOR ADDITIONAL
INFORMATION.
DISCONNECT AND REMOVE EXISTING SINK FIXTURE.
PREPARE EXISTING REMAINING WASTE, VENT, AND
WATER PIPING FOR CONNECTION TO NEW FIXTURE IN
THIS LOCATION. REFER TO REMODELED PLUMBING PLAN
FOR NEW WORK.
DISCONNECT AND REMOVE EXISTING SERVICE SINK.
REVISE WASTE, VENT, AND WATER PIPING AS REQUIRED
FOR CONNECTION TO NEW MOP BASIN AT THIS
LOCATION. REFER TO REMODELED PLUMBING PLANS
FOR ADDITIONAL INFORMATION.
DISCONNECT AND REMOVE EXISTING WATER COOLER
AND REPLACE WITH NEW. REFER TO REMODELED
PLUMBING PLANS FOR ADDITIONAL INFORMATION.
DISCONNECT AND REMOVE EXISTING URINAL FIXTURE.
PREPARE EXISTING REMAINING WASTE, VENT, AND
WATER PIPING FOR CONNECTION TO NEW FIXTURE IN
THIS LOCATION. REFER TO REMODELED PLUMBING PLAN
FOR NEW WORK.
DISCONNECT AND REMOVE EXISTING WATER CLOSET
FIXTURE. PREPARE EXISTING REMAINING WASTE, VENT,
AND WATER PIPING FOR CONNECTION TO NEW FIXTURE
IN THIS LOCATION. REFER TO REMODELED PLUMBING
PLAN FOR NEW WORK.
UNDER BASE BID: ALL EQUIPMENT THAT IS FLOOR SET IN
THE LOWER LEVEL OF THE BOILER PLANT SHALL BE
TEMPORARILY REMOVED FOR SLAB REMOVAL AND RE-
INSTALLATION. RE-INSTALL ALL REMOVED EQUIPMENT
ONCE NEW FLOOR SLAB AND EQUIPMENT PADS ARE
INSTALLED.
THE HOSPITAL WATER SOFTENER MUST REMAIN IN
OPERATION DURING FLOOR SLAB REPLACEMENT.
CONTRACTOR TO PROVIDE PROVISIONS FOR
TEMPORARILY RELOCATING THE HOSPITAL SOFTENING
EQUIPMENT WHILE MAINTAINING ITS OPERATION DURING
THE FLOOR SLAB REPLACEMENT.
THE EMERGENCY DOMESTIC WATER TRANSFER PUMPS
AND EMERGENCY BOOSTER PUMP SKID MUST REMAIN IN
OPERATION DURING FLOOR SLAB REPLACEMENT.
CONTRACTOR TO PROVIDE PROVISIONS FOR
TEMPORARILY RELOCATING THE PUMPS WHILE
MAINTAINING THEIR OPERATION DURING THE FLOOR
SLAB REPLACEMENT.
UNDER ALTERNATE BID 03: THE EXISTING FLOOR SLAB
WOULD NOT BE REMOVED IN ITS ENTIRETY AND THIS
CONTRACTOR SHALL CUT AND PATCH THE EXISTING
FLOOR AS REQUIRED FOR REMOVAL OF EXISTING
BELOW FLOOR PIPING AND INSTALLATION OF NEW
UNDERFLOOR PIPING.
GENERAL NOTES:
1. CONTRACTOR SHALL PATCH ANY WALL OR FLOOR
PENETRATIONS THAT ARE LEFT AFTER DEMOLITION AND
INSTALLATION OF NEW. SEE ARCHITECTURAL FOR WALL
AND FLOOR SYSTEM TYPES AND PATCHING
REQUIREMENTS.
DISCONNECT AND REMOVE
EXISTING PLUMBING FIXTURE
AND REPLACE WITH NEW.
REFER TO REMODELED
PLUMBING PLANS FOR MORE
INFORMATION
REMOVE EXISTING HW
PIPING DN. REFER TO
REMODELED PLUMBING
PLAN FOR RECONNECTION
TO NEW.
HW
C W
H W
3/4"
(E) 3/4" CW DN.
KEY PLAN
Fargo, ND 58102
2101 Elm Street
Medical Center
Dept. of Veterans Affairs
Building No.
VA Project No.
Drawing Title
Contract No.
V e te ra n s A ff a ir s
Location
Drawn ByChecked ByDesigned By
Project Title
Drawing No.
Date
Scale:
D e p a rt m e n t o f
Dwg. of 6910 - BOILER PLANT
FARGO VA HEALTH CARE SYSTEM
FARGO, NORTH DAKOTA
VA263-P-1218
AH/KS AH/KS/JN DP/JK
VA263
Project Phase www.jlgarchitects.com copyright © 2015
Fargo 214 Broadway
Fargo, ND 58102 phone 7 0 1.3 6 4.0 2 3 7 facsimile 7 0 1.3 6 4.0 2 2 8
Elec. dwg name:
Submittal Date
S.D. 1 SUBMITTAL 12/30/2015
D.D. 1 SUBMITTAL (PRELIM.) 02/16/2016
D.D. 1 (35%) SUBMITTAL 09/30/2016
D.D. 2 (50%) SUBMITTAL 03/03/2017
D.D. 3 (99%) SUBMITTAL 10/20/2017
C.D. 4 (100%) SUBMITTAL 06/01/2018
/2
/2
:2 :5
P
M
As indicated
P2 437-14-112
REPLACE BOILER PLANT 10.26.2018
MAIN LEVEL PLUMBING
DEMOLITION PLAN
100% CONSTRUCTION DOCUMENT
P2.dwg
NORTH
1/4" = 1'-0"P2
1 PLUMBING DEMOLITION PLAN
MECHANICAL SHEET INDEX
P00 MECHANICAL TITLE SHEET
P1 FOUNDATION LEVEL PLUMBING PLAN -
DEMOLITION
P2 MAIN LEVEL PLUMBING DEMOLITION PLAN
P3 FOUNDATION LEVEL PLUMBING PLAN
P4 MAIN LEVEL PLUMBING PLAN
P5 UPPER LEVEL PLUMBING PLAN
F1 MAIN LEVEL FIRE PROTECTION PLAN
F2 UPPER LEVEL FIRE PROTECTION PLAN
H1 PARTIAL MECH SITE PLAN - TEMPORARY
BOILERS
H2 MAIN LEVEL TEMPORARY STEAM PIPING PLAN
H3 MAIN LEVEL STEAM & HVAC PIPING
DEMOLITION PLAN
H4 UPPER LEVEL STEAM & HVAC PIPING
DEMOLITION PLAN
H5 MECHANICAL ROOF DEMOLITION PLAN
H6 MAIN LEVEL STEAM & HVAC PIPING PLAN
H7 UPPER LEVEL STEAM & HVAC PIPING PLAN
H8 MAIN LEVEL HVAC PIPING PLAN
H9 UPPER LEVEL HVAC PIPING PLAN
H10 MAIN LEVEL VENTILATION PLAN
H11 UPPER LEVEL VENTILATION PLAN
H12 MECHANICAL ROOF PLAN
H13 MECHANICAL SECTIONS
H14 MECHANICAL SECTIONS
H15 PIPING SCHEMATICS
H16 PIPING SCHEMATICS
H17 MECHANICAL DETAILS
H18 MECHANICAL DETAILS
H19 CONTROLS DIAGRAMS
H20 MECHANICAL SCHEDULES
NORTH
1/4" = 1'-0"P2
2 PARTIAL UPPER LEVEL PLUMBING DEMOLITION PLAN
NOTE:
CONTRACTOR SHALL PROVIDE DRAIN PIPE CLEANING AND
TRENCHLESS, CAST IN PLACE RE-LINING OF ALL EXISTING
DRAIN PIPING TO REMAIN. RE-LINING SHALL BE
COMPLETED WITH A HIGH TEMPERATURE EPOXY LINER
CAPABLE OF WITHSTANDING TEMPERATURES UP TO 200
DEGREES F. PROVIDE 'NU FLOW' PIPING SYSTEM OR
APPROVED EQUAL. CONTRACTOR SHALL INSTALL AS PER
MANUFACTURER'S INSTRUCTIONS.
EXIST. 4" UP
TO VENT
NEW 4" DOMESTIC
WATER SERVICE
EXIST. 4" UP
TO VENT
(E) 4" UP TO
OPEN SITE
DRAIN
(E) 4" UP TO
OPEN SITE DRAIN
(E) 4" UP TO FD
(E) 2" UP TO FD
4" UP TO FD
(E) 4" UP TO FD
(E) 4" UP TO CO
(E) 4" UP TO OPEN
SITE DRAIN
(E) 4" UP TO
FUNNEL DRAIN
(E) 4" UP TO
OPEN SITE
DRAIN
(E) 4" SANITARY MAIN
(E) 2" UP
TO SINK
(E) 2" UP TO
SHOWER DRAIN
4"
(E) 4" UP TO
FUNNEL DRAIN
(E) 4" UP TO
FUNNEL DRAIN
(E) 4" UP TO
FUNNEL DRAIN
(E) 4" UP TO FD
(E) 4" UP TO FD (E) 4" UP TO FD
OUTLINE OF
EXISTING TRENCH
OUTLINE OF
EXISTING
TRENCH
(E) 4" UP
TO FD
(E) 4" UP
TO FD
(E) 4" UP
TO FD
(E) 4" UP
TO FD
(E) 4" UP
TO FD
(E) 4" UP TO OPEN
SITE DRAIN
(E) 2" UP
TO SINK
(E) 2" UP
TO EWC
(E) 2" UP
TO VENT
(E) 4" UP
TO WC
3" UP TO FD IN
EXISTING TRENCH
4" C.W. UP
(E) 4" UP TO FD
(E) 4" VENT UP
THROUGH ROOF
NEW 6" FIRE
PROTECTION WATER
SERVICE TO 5'-0"
OUTSIDE OF BUILDING
6" STORM SEWER (E) 4" STORM SEWER
4" CAST IRON WASTE
STUBBED TO 5'-0" OUTSIDE OF
BUILDING. FINAL CONNECTION
BY THIS CONTRACTOR.
6 C.W. UP TO
FIRE RISER
(E) 4" STORM SEWER IN
FLOOR UP TO NEW ABOVE
FLOOR PIPING. SEE MAIN
LEVEL PLUMBING PLAN FOR
CONTINUATION
6" STORM UP
(E) 2" UP
TO URINAL
(E) 2" UP
TO SINK
NOTE:
CONTRACTOR SHALL PROVIDE DRAIN PIPE
CLEANING AND TRENCHLESS, CAST IN PLACE
RE-LINING OF ALL EXISTING DRAIN PIPING TO
REMAIN. RE-LINING SHALL BE COMPLETED
WITH A HIGH TEMPERATURE EPOXY LINER
CAPABLE OF WITHSTANDING TEMPERATURES
UP TO 200 DEGREES F. PROVIDE 'NU FLOW'
PIPING SYSTEM OR APPROVED EQUAL.
CONTRACTOR SHALL INSTALL AS PER
MANUFACTURER'S INSTRUCTIONS.
MODIFY EXISTING WASTE
PIPING TO PROVIDE NEW
FLOOR DRAIN
4" UP
TO VENT
4"
4" 4"
4" W. UP TO
TRENCH DRAIN
4" W. UP TO
FLOOR SINK
2" UP TO VENT
ALL NEW WASTE
PIPING SHALL BE
CAST IRON PIPE
2" W. UP TO
TRENCH DRAIN
2" W. UP TO
TRENCH DRAIN
2"
2"
4"
3"3" VENT UP
3"
4"
SP-1
EXTEND TRENCH
TO BACK OF
BOILER (BY G.C.)
EXTEND TRENCH TO
BACK OF BOILER
(BY G.C.)
EXTEND TRENCH
TO BACK OF
BOILER (BY G.C.)
3" UP TO
MB
2" UP TO V.
CUT & PATCH
EXISTING FLOOR AS
REQ'D. FOR NEW
PIPING
(E) 4" STORM SEWER IN
FLOOR UP TO NEW ABOVE
FLOOR PIPING. SEE MAIN
LEVEL PLUMBING PLAN FOR
CONTINUATION
INSTALL SUMP PUMP IN PIT
AND ROUTE DISCHARGE
PIPE TO TRENCH DRAIN
CUT AND PATCH FLOOR AS
REQUIRED FOR INSTALLATION
OF NEW FLOOR DRAIN.
(E) 4" UP TO FD
CUT AND PATCH FLOOR AS
REQUIRED FOR INSTALLATION
OF NEW STORM PIPING
CUT AND PATCH FLOOR AS
REQUIRED FOR INSTALLATION
OF NEW STORM PIPING
CUT AND PATCH FLOOR AS
REQUIRED FOR INSTALLATION
OF NEW STORM PIPING
(E) 2" UP TO FD
1. MECHANICAL CONTRACTOR SHALL INSPECT ALL EXISTING
PLUMBING DRAINS AND UNDERFLOOR PIPING. SCOPE AND
CLEAN ALL EXISTING WASTE PIPING TO MAIN EXITING
BUILDING.
PLUMBING
SHEET NOTES:
1 THE DOMESTIC WATER SERVICE MAIN WAS REPLACED
IN PREVIOUS PROJECT TO A POINT APPROXIMATELY
5'-0" OUTSIDE OF BUILDING. UNDER THE SCOPE OF
WORK FOR THIS PROJECT, THE CONTRACTOR SHALL
CONNECT TO NEW SERVICE PIPING OUTSIDE OF
BUILDING AND EXTEND INTO BASEMENT AS INDICATED
ON PLAN. PROVIDE TEMPORARY WATER CONNECTIONS
AS REQUIRED DURING TIE-IN.
UNDER THE SCOPE OF A PREVIOUS PROJECT, A NEW
6" FIRE PROTECTION WATER SERVICE LINE WAS
INSTALLED TO A POINT APPROXIMATELY 5'-0" OUTSIDE
OF THE BUILDING. UNDER THE SCOPE OF WORK FOR
THIS PROJECT, THE CONTRACTOR SHALL CONNECT TO
NEW SERVICE PIPING OUTSIDE OF BUILDING AND
EXTEND INTO BASEMENT AS INDICATED ON PLAN.
UNDER THE SCOPE OF A PREVIOUS PROJECT, A NEW
6" STORM SEWER LINE WAS INSTALLED TO A POINT
APPROXIMATELY 5'-0" OUTSIDE OF THE BUILDING.
UNDER THE SCOPE OF WORK FOR THIS PROJECT, THE
CONTRACTOR SHALL CONNECT TO NEW SERVICE
PIPING OUTSIDE OF BUILDING AND EXTEND INTO
BUILDING AS INDICATED ON PLAN.
KEY PLAN
Fargo, ND 58102
2101 Elm Street
Medical Center
Dept. of Veterans Affairs
Building No.
VA Project No.
Drawing Title
Contract No.
V e te ra n s A ff a ir s
Location
Drawn ByChecked ByDesigned By
Project Title
Drawing No.
Date
Scale:
D e p a rt m e n t o f
Dwg. of 6910 - BOILER PLANT
FARGO VA HEALTH CARE SYSTEM
FARGO, NORTH DAKOTA
VA263-P-1218
AH/KS AH/KS/JN DP/JK
VA263
Project Phase www.jlgarchitects.com copyright © 2015
Fargo 214 Broadway
Fargo, ND 58102 phone 7 0 1.3 6 4.0 2 3 7 facsimile 7 0 1.3 6 4.0 2 2 8
Elec. dwg name:
Submittal Date
S.D. 1 SUBMITTAL 12/30/2015
D.D. 1 SUBMITTAL (PRELIM.) 02/16/2016
D.D. 1 (35%) SUBMITTAL 09/30/2016
D.D. 2 (50%) SUBMITTAL 03/03/2017
D.D. 3 (99%) SUBMITTAL 10/20/2017
C.D. 4 (100%) SUBMITTAL 06/01/2018
/2
/2
:2 :5
P
M
As indicated
P3 437-14-112
REPLACE BOILER PLANT 10.26.2018
FOUNDATION LEVEL PLUMBING
PLAN
100% CONSTRUCTION DOCUMENT
P3.dwg
NORTH
1/4" = 1'-0"P3
1 FOUNDATION LEVEL PLUMBING PLAN
MECHANICAL SHEET INDEX
P00 MECHANICAL TITLE SHEET
P1 FOUNDATION LEVEL PLUMBING PLAN -
DEMOLITION
P2 MAIN LEVEL PLUMBING DEMOLITION PLAN
P3 FOUNDATION LEVEL PLUMBING PLAN
P4 MAIN LEVEL PLUMBING PLAN
P5 UPPER LEVEL PLUMBING PLAN
F1 MAIN LEVEL FIRE PROTECTION PLAN
F2 UPPER LEVEL FIRE PROTECTION PLAN
H1 PARTIAL MECH SITE PLAN - TEMPORARY
BOILERS
H2 MAIN LEVEL TEMPORARY STEAM PIPING PLAN
H3 MAIN LEVEL STEAM & HVAC PIPING
DEMOLITION PLAN
H4 UPPER LEVEL STEAM & HVAC PIPING
DEMOLITION PLAN
H5 MECHANICAL ROOF DEMOLITION PLAN
H6 MAIN LEVEL STEAM & HVAC PIPING PLAN
H7 UPPER LEVEL STEAM & HVAC PIPING PLAN
H8 MAIN LEVEL HVAC PIPING PLAN
H9 UPPER LEVEL HVAC PIPING PLAN
H10 MAIN LEVEL VENTILATION PLAN
H11 UPPER LEVEL VENTILATION PLAN
H12 MECHANICAL ROOF PLAN
H13 MECHANICAL SECTIONS
H14 MECHANICAL SECTIONS
H15 PIPING SCHEMATICS
H16 PIPING SCHEMATICS
H17 MECHANICAL DETAILS
H18 MECHANICAL DETAILS
H19 CONTROLS DIAGRAMS
H20 MECHANICAL SCHEDULES
(E) FD(E) FD
(E) OPEN SITE
DRAIN
(E) OPEN SITE
DRAIN
(E) FD
(E) FD
(E) FD
(E) FD
(E) FD
FD
(E) FD
(E) FD
(E) FD
(E) FUNNEL
DRAIN
(E) OPEN
SITE DRAIN
(E) FUNNEL
DRAIN
(E) OPEN SITE
DRAIN
(E) FUNNEL
DRAIN
(E) FD
(E) FD)
CONNECT 3" V.
TO EXISTING 4"
VENT STACK
(E) 4" WASTE DN. TO BELOW
FLOOR AND 4" VENT STACK
UP THROUGH ROOF.
(E) PIPE TRENCH
PROVIDE AND INSTALL
NEW SHOWER VALVE
AND SHOWER HEAD
WHERE EXISTING WAS
REMOVED. P-307
PROVIDE & INSTALL
NEW EMERGENCY
SHOWER/ EYEWASH
STATION P-707
PROVIDE AND INSTALL NEW
WATER COOLER WHERE
EXISTING WATER COOLER WAS
REMOVED. P-604
PROVIDE AND INSTALL NEW
SINK WHERE EXISTING SINK
WAS REMOVED. P-501
PROVIDE AND INSTALL
NEW SINK WHERE
EXISTING SINK WAS
REMOVED. P-528
(E) OPEN SITE
DRAIN (E) OPEN SITE
DRAIN
PROVIDE AND INSTALL NEW MOP
BASIN WHERE EXISTING SERVICE
SINK WAS REMOVED. P-1001
(E) 4" V. DN. FOR EXISTING
FLOOR DRAINS & 4" V. UP
TO 4" VENT THROUGH
ROOF
4" RL UP TO
ROOF DRAIN
4" RL DN. CONNECT
TO EXISTING PIPING
BELOW FLOOR
4" RL UP TO
ROOF DRAIN
4" RL DN. CONNECT
TO EXISTING PIPING
BELOW FLOOR
6" RL UP & DN. PROVIDE
CLEANOUT AT BASE OF
STACK
2" C.W. UP TO NEAR ROOF.
SEE UPPER LEVEL PLUMBING
PLAN FOR CONTINUATION
(E) 2" V. UP
TO (E) 4" VTR
EXIST. HOSPITAL WATER
SOFTENER. SHALL
REMAIN. SEE NOTE #5.
(E) HOSPITAL WATER
SOFTENER SALT TANK
TO REMAIN. SEE
NOTE #5.
(E) WATER SOFTENER TO
REMAIN. SEE NOTE #5.
(E) TRANSFER PUMPS &
PIPING FOR EMERGENCY
DOMESTIC WATER SHALL
REMAIN. SEE NOTE #5.
(E) WATER SOFTENER
SALT TANK TO REMAIN.
SEE NOTE #5.
(E) WALL HYDRANT 3/4" C.W. UP TO MAIN
AT UPPER LEVEL
PROVIDE AND INSTALL
NEW CW HOSEBIBB @
36" A.F.F. P-804
3/4" CW UP. RECONNECT
CW TO EXISTING WALL
HYDRANT
1" C.W. UP TO
UPPER LEVEL
PROVIDE AND INSTALL
NEW URINAL WHERE
EXISTING URINAL WAS
REMOVED. P-201
PROVIDE AND INSTALL
NEW SINK WHERE
EXISTING SINK WAS
REMOVED. P-530
PROVIDE AND INSTALL
NEW WC WHERE
EXISTING WC WAS
REMOVED. P-103
PROVIDE & INSTALL NEW FLOOR
DRAIN. MODIFY EXISTING
WASTE PIPING WERE EXISTING
FLOOR DRAIN WAS REMOVED
AS REQUIRED.
PROVIDE & INSTALL
NEW EMERGENCY
SHOWER/
EYEWASH STATION
P-707.
(E) PIPE TRENCH
(E) HW & CW PIPING
DN. TO BELOW WORK
COUNTER TO WH-2
(E) FD
(E) C.O.
2" V. DN. FOR
MOP BASIN.
2"
(E) FD
FLOOR SINK
2" V. DN. FOR
FLOOR SINK 2" V
4" V. DN. w/ C.O.
NEAR BASE OF
STACK
4" V4" DOMESTIC WATER
SERVICE. REFER TO
FOUNDATION PLUMBING
PLAN FOR ADDITIONAL
INFORMATION
3" V. DN.
PROVIDE & INSTALL NEW
WALL HYDRANT P-801
3" V
(E) 1-1/4" CW UP TO
UPPER LEVEL
3/4" CW FOR
SAMPLE COOLER
UP TO UPPER
LEVEL
3/4" CW FOR
SAMPLE COOLER
UP TO UPPER
LEVEL
3/4" CW FOR
SAMPLE COOLER UP
TO UPPER LEVEL
1-1/2" CW DN. TO
BLOWDOWN SEPARATOR
C W
C W
B-1 B-2
B-3
3/4" CW UP
1-1/4" CW UP & DN. TO
WH-3 FOR EMERGENCY
SHOWER/EYE WASH
STATION.
1-1/4" CW DN. TO WH-4 FOR
EMERGENCY SHOWER/EYE
WASH STATION. MOUNT
WH-4 @ 9'-0" A.F.F.
1-1/4" CW UP
CW
CW
HW
H W
C W
HW
CW
DA-1
ST-1
TRENCH DRAIN
TRENCH
DRAIN
EXTEND TRENCH
TO BACK OF
BOILER (BY G.C.)
EXTEND TRENCH
TO BACK OF
BOILER (BY G.C.)
EXTEND TRENCH
TO BACK OF
BOILER (BY G.C.)
PROVIDE AND INSTALL
NEW CW HOSEBIBB @
36" A.F.F. P-804
3/4" COMPRESSED AIR UP
TO UPPER LEVEL
A
IRA
IR
A
IR
1-1/4" COMPRESSED AIR
FROM COMPRESSOR/
AIR DRYER UP TO
UPPER LEVEL
1" COMPRESSED AIR
UP TO UPPER LEVEL
1" COMPRESSED AIR
UP TO UPPER LEVEL
1" COMPRESSED AIR
UP TO UPPER LEVEL
1" COMPRESSED AIR
DN. TO BOILER FOR
FUEL ATOMIZATION
PER DETAIL 1/H16
1" COMPRESSED AIR
DN. TO BOILER FOR
FUEL ATOMIZATION
PER DETAIL 1/H16
3/4", 75' SPRING
RETURN HOSE REEL
@ 10'-0" A.F.F.
BD-1
(E) 4" W AND 2"
V UP FOR
TOILET ABOVE
2" SCW
UP
2" CW(E) 3" CW
(E) 1-1/2" CW
(E) 4" W 4" V
(E) 2" SCW
2" EMERGENCY MAKE-UP
WATER UP TO UPPER LEVEL
EMERGENCY MAKE-
UP WATER
STORAGE TANKS
AND PUMPS. SEE
PIPING DETAIL 1/H17
2" CW UP
2" SCW UP
(E) 2" W UP
TO MB
(E) 2" V UP
2" W UP
TO SINK
CONTROL PANEL FOR SUMP
PUMP SP-1 INSTALLED ON
WALL BELOW WINDOW.
ROUTE CONTROL WIRING
TO PUMP VIA OVERHEAD
CONDUIT. (REFER TO
FOUNDATION LEVEL PLAN
FOR LOCATION OF PUMP)
CONNECT 4" V.
TO EXISTING 4"
VENT STACK
3/4", 75' SPRING RETURN
HOSE REEL @ 8'-6" A.F.F.
1" COMPRESSED
AIR UP TO UPPER
LEVEL
OFFSET COMPRESSED
AIR AROUND
STRUCTURE
(E) 2" V.
(E) 3/4" H.W.
(E) 3/4" H.W.
(E) 1" C.W.
(E) 3/4" H.W.
(E) 3/4" C.W.
(E) 1-1/2" V.
(E) 1-1/2" V.
(E) 1-1/2" V.
(E) 4" CW MAIN
(E) 3" CW
TO PLANT
(E) 2" SCW
BYPASS
3/4" CW DN. FOR
SAMPLE COOLER
PER DETAIL 1/H18
3/4" CW LINE UP TO MAIN
AT UPPER LEVEL
RELOCATED FUEL OIL
PUMPS. REFER TO SHEET
H6 FOR ASSOCIATED
PIPING.
CONTROL PANEL FOR
EMERGENCY MAKE-UP
WATER PUMPS.
RELOCATED DISCONNECTS
FOR EMERGENCY MAKE-UP
WATER PUMPS.
CW
C W
CW
PROVIDE ISOLATION
VALVE & PRESSURE
REGULATOR PRIOR TO
HOSE REEL
PROVIDE ISOLATION VALVE
& PRESSURE REGULATOR
PRIOR TO HOSE REEL
(E) AIR
COMPRESSOR
1 1/2" CW
1 1/2" SCW
MAKE-UP WATER FOR
CONDENSATE STORAGE
TANK UP
3/4" CW
(E) SCW TO
PIPE TUNNEL
(E) EMERGENCY DOMESTIC
WATER BOOSTER PUMP SKID
& PIPING FOR EMERGENCY
DOMESTIC WATER SHALL
REMAIN. SEE NOTE #5.
HTP-01
3/4" CW TO HEAT TRANSFER
SKID. SEE DETAIL 6/H16 FOR
CONNECTION LOCATION
PLUMBING SHEET NOTES:
PROVIDE NEW WH-2 WHERE EXISTING WATER HEATER
WAS REMOVED. RECONNECT TO EXISTING HW & CW
PIPING BELOW COUNTER.
CUT AND PATCH FLOOR AS REQUIRED TO INSTALL NEW
WASTE AND VENT PIPING FOR MOP BASIN. CUT AND
PATCH WALL AS REQUIRED TO MODIFY EXISTING HW AND
CW PIPING FOR NEW FAUCET FOR MOP BASIN.
CUT AND PATCH WALL AS REQUIRED TO MODIFY
EXISTING HW, CW, WASTE, AND VENT PIPING FOR NEW
WATER COOLER.
INSTALL CONTROL VALVE ASSEMBLIES FOR THE
NORMAL SOFT COLD WATER MAKE-UP WATER AND THE
EMERGENCY COLD WATER MAKE-UP WATER FOR THE
CONDENSATE STORAGE TANK AT THE END OF THE TANK
SUPPORT STAND. INSTALL PIPING PER DETAIL 4/H15.
UNDER BASE BID: ALL EQUIPMENT THAT IS FLOOR SET IN
THE LOWER LEVEL OF THE BOILER PLANT SHALL BE
TEMPORARILY REMOVED FOR SLAB REMOVAL AND
RE-INSTALLATION. RE-INSTALL ALL REMOVED
EQUIPMENT ONCE NEW FLOOR SLAB AND EQUIPMENT
PADS ARE INSTALLED.
THE HOSPITAL WATER SOFTENER MUST REMAIN IN
OPERATION DURING FLOOR SLAB REPLACEMENT.
CONTRACTOR TO PROVIDE PROVISIONS FOR
TEMPORARILY RELOCATING THE HOSPITAL SOFTENING
EQUIPMENT WHILE MAINTAINING ITS OPERATION DURING
THE FLOOR SLAB REPLACEMENT.
THE EMERGENCY DOMESTIC WATER TRANSFER PUMPS
AND EMERGENCY BOOSTER PUMP SKID MUST REMAIN IN
OPERATION DURING FLOOR SLAB REPLACEMENT.
CONTRACTOR TO PROVIDE PROVISIONS FOR
TEMPORARILY RELOCATING THE PUMPS WHILE
MAINTAINING THEIR OPERATION DURING THE FLOOR
SLAB REPLACEMENT.
UNDER ALTERNATE BID 03: THE EXISTING FLOOR SLAB
WOULD NOT BE REMOVED IN ITS ENTIRETY AND THIS
CONTRACTOR SHALL CUT AND PATCH THE EXISTING
FLOOR AS REQUIRED FOR REMOVAL OF EXISTING
BELOW FLOOR PIPING AND INSTALLATION OF NEW
UNDERFLOOR PIPING.
PROVIDE AND INSTALL NEW
WATER COOLER WHERE
EXISTING WATER COOLER
WAS REMOVED. P-604
PROVIDE AND INSTALL NEW MOP
BASIN AND FAUCET WHERE
EXISTING SERVICE SINK WAS
REMOVED. P-1001
3" W
PROVIDE AND INSTALL NEW
SINK WHERE EXISTING SINK
WAS REMOVED. P-501
2" V
CONNECT 3" W.
TO EXIST. 3" W.
PROVIDE AND INSTALL NEW
URINAL WHERE EXISTING
URINAL WAS REMOVED. P-201
PROVIDE AND INSTALL NEW
WC WHERE EXISTING WC WAS
REMOVED. P-103
PROVIDE AND INSTALL NEW
SINK WHERE EXISTING SINK
WAS REMOVED. P-530
PROVIDE AND INSTALL NEW
WATER HEATER WHERE
EXISTING WATER HEATER WAS
REMOVED. WH-2
(E) C.O.
(E) 4" W.
(E) 4" W.
(E) 3" W.
(E) 2" W.
PROVIDE AND INSTALL NEW
SINK WHERE EXISTING SINK
WAS REMOVED. P-528
(E) SHOWER DRAIN
(E) 2" W.
1 1/4" CW1-1/4" CW UP TO MAIN
AT UPPER LEVEL
(E) VENT
THROUGH ROOF
INSTANTANEOUS WATER
HEATER WH-4 FOR EMERGENCY
SHOWER/ EYEWASH STATION
(E) 2" V.
(E) 3/4" HW &
CW TO WH-2
(E) 1/2" CW & 1-1/2" V. TO EWC
(E) 2" V.
(E) 1-1/4" CW UP TO MAIN
AT UPPER LEVEL
PROVIDE & INSTALL NEW
EMERGENCY SHOWER/
EYEWASH STATION P-707
(E) 1/2" HW & CW AND
1-1/2" V. TO SINK (TYP.)
PROVIDE AND INSTALL NEW
SHOWER VALVE AND SHOWER
HEAD WHERE EXISTING WAS
REMOVED. P-307
(E) 4" W.
(E) 4" W.(E) 4" W.
(E) 4" W.
1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK AND NOTIFY THE
ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-BUILT" CONDITIONS AND THESE DRAWINGS.
2. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION, VENTILATION, AND
ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS HIGH AS POSSIBLE. PROVIDE ALL
NECESSARY OFFSETS (DROPS AND RISES) TO KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR
DUCTWORK ABOVE. OFFSET PLUMBING PIPING TO AVOID BEAMS.
3. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING TYPES, HEIGHTS, SOFFIT
AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC.
4. CONTRACTOR SHALL PATCH ANY WALL OR FLOOR PENETRATIONS THAT ARE LEFT AFTER DEMOLITION
AND INSTALLATION OF NEW. SEE ARCHITECTURAL FOR WALL AND FLOOR SYSTEM TYPES AND PATCHING
REQUIREMENTS.
5. A SHUT-OFF VALVE SHALL BE INSTALLED ON ALL PLUMBING SERVICES SHOWN ON THIS SHEET PRIOR
TO CONNECTION TO FIXTURE. SHUT-OFF VALVES SHALL BE INSTALLED NO HIGHER THAN 5'-0" ABOVE
BOILER ROOM FINISHED FLOOR AND SHALL BE EASILY ACCESSIBLE. SHUT-OFF VALVES SHALL NOT BE
INSTALLED BEHIND EQUIPMENT, INTERIOR TO WALLS OR OTHER LOCATIONS WHERE THEY ARE NOT EASILY
ACCESSIBLE. THE VA AND A/E RESERVES THE RIGHT TO APPROVE THE LOCATION OF ALL SHUT-OFF VALVES
PRIOR TO INSTALLATIONS AND MAY REQUIRE THE CONTRACTOR TO RELOCATE ANY VALVES DEEMED
INACCESSIBLE.
6. PLUMBING FIXTURES ARE TAGGED WITH A FIXTURE NUMBER. REFER TO THE PROJECT SPECIFICATIONS
FOR FIXTURE SELECTIONS, FIXTURE STOP VALVE, AND CONNECTION REQUIREMENTS.
7. PRIOR TO INSTALLATION, THE VA AND A/E RESERVE THE RIGHT TO APPROVE THE LOCATION OF ALL
FIELD INSTALLED EQUIPMENT, VALVES, SENSORS, INSTRUMENTS, GAUGES, STRAINERS, ETC FOR
ACCESSIBILITY. ALL ITEMS SUCH AS THESE MUST BE ACCESSIBLE FROM A FINISHED FLOOR, PLATFORM, MEZZANINE, OR CATWALK. ITEMS WHICH CAN ONLY BE ACCESSED BY A PORTABLE LADDER WILL BE DEEMED
INACCESSIBLE. ITEMS WHICH ARE LOCATED IN TIGHT SPACES, BEHIND OTHER EQUIPMENT, OR ARE NOT
SAFELY IN REACH FROM AN ELEVATED PLATFORM WILL ALSO BE DEEMED INACCESSIBLE. INSTALLATION OF
THESE ITEMS MUST ALSO NOT BLOCK WALKING PATHS IN THE BOILER PLANT OR ACCESS TO OTHER
INSTALLED EQUIPMENT. THE VA AND/OR A/E MAY REQUIRE THE CONTRACTOR TO RELOCATE OR PROVIDE
PERMANENT ACCESS TO ANY ITEMS INSTALLED WITHOUT PRIOR APPROVAL IF THEY ARE DEEMED
INACCESSIBLE BY THE VA AND/OR A/E. TO AVOID ANY CONFLICTS, IT IS RECOMMENDED THE CONTRACTOR
DOES NOT PROCEED WITH INSTALLATIONS UNTIL A WALK THROUGH IS HELD WITH THE VA AND A/E TEAM TO
AGREE UPON THE INSTALLED LOCATION OF THESE ITEMS. IT IS RECOMMENDED THIS IS DONE WEEKLY AT
CONSTRUCTION MEETINGS.
8. THE ENTIRE SCOPE OF THE TEMPORARY BOILER PLANT SUPPLY SHALL BE SUPPLIED WITH THE
NECESSARY FITTINGS, VALVES, INSTRUMENTS, GAUGES, ETC., REQUIRED TO CONDUCT SAFETY DEVICE
TESTING PER THE LATEST EDITION OF THE VETERAN ADMINISTRATION'S SAFETY DEVICE TESTING MANUAL.
THERE ARE ALSO SPECIFIC REQUIREMENTS FOR EQUIPMENT CONSTRUCTION, WIRING, AND CONTROLS, THAT
MUST BE MET. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR READING AND UNDERSTANDING THE
INSTALLED REQUIREMENTS FOR THE TEMPORARY PLANT TO ENSURE THEIR SUPPLY MEETS ALL PROJECT
REQUIREMENTS. NO CHANGE ORDERS WILL BE ISSUED DUE TO A FAILURE TO MEET ALL REQUIREMENTS. A
COPY OF THE SAFETY DEVICE TESTING MANUAL AT THE END OF THE DIVISION 23 SPECIFICATIONS. THE
GENERAL CONTRACTOR SHALL HIRE A THIRD PARTY TESTING AGENCY TO PERFORM VERIFICATION THAT ALL
SAFETY DEVICES MEET THE TESTING REQUIREMENTS OF THE SAFETY DEVICE TESTING MANUAL BEFORE THE
V.A. WILL ACCEPT THE TEMPORARY BOILER INSTALLATION. THE THIRD PARTY AGENCY MUST HAVE
COMPLETED A MINIMUM OF THREE (3) PAST V.A. BOILER PLANT TESTS.
GENERAL NOTES:
PLUMBING FIXTURE ROUGH-IN
CONNECTION SCHEDULE
FIXTURE WASTE VENT CW HW
WALL HYDRANT
CLEAN OUT
FLOOR DRAIN
LAVATORY
WATER CLOSET (FT)
URINAL
SINK
EWC
MIXING VALVE
MOP BASIN
HOSE BIBB
WASH MACHINE TRIM
NOTES:
1. SIZES SHALL BE AS SCHEDULED UNLESS OTHERWISE
NOTED ON DRAWINGS.
- - 3/4" -
4" - - -
2" 1-1/2" - -
2" 1-1/2" 1/2" 1/2"
4" 2" 1/2" -
1-1/2" -
1-1/2"
1-1/2"
1-1/2"
1-1/2"
3"
2"
2"
2"
2"
3/4"
1/2"
3/4"
3/4"
3/4"
3/4"
1/2"
1/2"
3/4"
3/4"
3/4"
FLOOR SINK 2" 1-1/2" - -
EMERG. EYE WASH/SHOWER 1-1/2"2" 1-1/4"
SHOWER 1-1/2"2" 3/4"3/4"
1-1/4"
KEY PLAN
Fargo, ND 58102
2101 Elm Street
Medical Center
Dept. of Veterans Affairs
Building No.
VA Project No.
Drawing Title
Contract No.
V e te ra n s A ff a ir s
Location
Drawn ByChecked ByDesigned By
Project Title
Drawing No.
Date
Scale:
D e p a rt m e n t o f
Dwg. of 6910 - BOILER PLANT
FARGO VA HEALTH CARE SYSTEM
FARGO, NORTH DAKOTA
VA263-P-1218
AH/KS AH/KS/JN DP/JK
VA263
Project Phase www.jlgarchitects.com copyright © 2015
Fargo 214 Broadway
Fargo, ND 58102 phone 7 0 1.3 6 4.0 2 3 7 facsimile 7 0 1.3 6 4.0 2 2 8
Elec. dwg name:
Submittal Date
S.D. 1 SUBMITTAL 12/30/2015
D.D. 1 SUBMITTAL (PRELIM.) 02/16/2016
D.D. 1 (35%) SUBMITTAL 09/30/2016
D.D. 2 (50%) SUBMITTAL 03/03/2017
D.D. 3 (99%) SUBMITTAL 10/20/2017
C.D. 4 (100%) SUBMITTAL 06/01/2018
/2
/2
:2 :0
P
M
As indicated
P4 437-14-112
REPLACE BOILER PLANT 10.26.2018
MAIN LEVEL PLUMBING PLAN
100% CONSTRUCTION DOCUMENT
P4.dwg
MECHANICAL SHEET INDEX
P00 MECHANICAL TITLE SHEET
P1 FOUNDATION LEVEL PLUMBING PLAN -
DEMOLITION
P2 MAIN LEVEL PLUMBING DEMOLITION PLAN
P3 FOUNDATION LEVEL PLUMBING PLAN
P4 MAIN LEVEL PLUMBING PLAN
P5 UPPER LEVEL PLUMBING PLAN
F1 MAIN LEVEL FIRE PROTECTION PLAN
F2 UPPER LEVEL FIRE PROTECTION PLAN
H1 PARTIAL MECH SITE PLAN - TEMPORARY
BOILERS
H2 MAIN LEVEL TEMPORARY STEAM PIPING PLAN
H3 MAIN LEVEL STEAM & HVAC PIPING
DEMOLITION PLAN
H4 UPPER LEVEL STEAM & HVAC PIPING
DEMOLITION PLAN
H5 MECHANICAL ROOF DEMOLITION PLAN
H6 MAIN LEVEL STEAM & HVAC PIPING PLAN
H7 UPPER LEVEL STEAM & HVAC PIPING PLAN
H8 MAIN LEVEL HVAC PIPING PLAN
H9 UPPER LEVEL HVAC PIPING PLAN
H10 MAIN LEVEL VENTILATION PLAN
H11 UPPER LEVEL VENTILATION PLAN
H12 MECHANICAL ROOF PLAN
H13 MECHANICAL SECTIONS
H14 MECHANICAL SECTIONS
H15 PIPING SCHEMATICS
H16 PIPING SCHEMATICS
H17 MECHANICAL DETAILS
H18 MECHANICAL DETAILS
H19 CONTROLS DIAGRAMS
H20 MECHANICAL SCHEDULES
NORTH
1/4" = 1'-0"P4
1 MAIN LEVEL PLUMBING PLAN
P4
3 PLUMBING RISER DIAGRAM - LOCKER/TOILET
4" RL UP TO
ROOF DRAIN
4" RL UP TO
ROOF DRAIN
4" RL UP TO
ROOF DRAIN
4" RL
ROUTE RAINLEADER PIPING
AS HIGH AS POSSIBLE
6" RL PIPING DN. REFER
TO MAIN LEVEL PLUMBING
PLAN FOR CONTINUATION
ROOF - REFER TO
MECHANICAL ROOF PLAN
FOR WORK IN THIS AREA
WATER
HEATER
WH-1.
(E) 4" V. DN.
4" V. UP
THROUGH ROOF
6" RL
3/4" C.W.
3/4" C.W. DN. TO
EXISTING WALL
HYDRANT.
1" C.W.
1" C.W. DN. TO
MAIN LEVEL
2" C.W. DN. TO
MAIN LEVEL
(E) 1-1/4" C.W. DN.
TO MAIN LEVEL
1 1/2" CW
3/4" C.W. DN. TO
WALL HYDRANT.
(E) 4" VENT UP
THROUGH ROOF &
DN. TO LOWER LEVEL
2" C.W. @ 16'-0"
ABOVE FLOOR
(BELOW RL PIPING)
1 1/2" CW
RE-SERVE (E) 3/4" HW
SERVING (E) TOILET
ROOM FROM NEW
WATER HEATER WH-1
3/4" CW
2" C.W. @ 16'-0"
ABOVE FLOOR
(BELOW RL PIPING)
2" C.W. @ 16'-0"
ABOVE FLOOR
(BELOW RL PIPING)
3/4" CW DN. TO
WALL HYDRANT
1-1/2" CW DN. FOR
EMERGENCY SHOWER/
EYEWASH STATION
3/4" CW DOWN TO
SAMPLE COOLER AT
REAR OF BOILER
3/4" CW DOWN TO
SAMPLE COOLER AT
REAR OF BOILER
3/4" CW DOWN TO
SAMPLE COOLER AT
REAR OF BOILER.
OFFSET BELOW
CATWALK AS REQUIRED.
3/4" C.W. DN. TO
WALL HYDRANT.
3/4" CW
3/4" CW
3/4" CW
3/4" CW
3/4" HW
1" COMPRESSED AIR
DOWN TO BOILER FOR
FUEL ATOMIZATION PER
DETAIL 1/H16.
A
IR
A
IR
AIR AIR
A
IR
A
IR
1" COMPRESSED AIR
DOWN TO BOILER FOR
FUEL ATOMIZATION
PER DETAIL 1/H16.
1" COMPRESSED AIR
DN. TO HOSE REEL
AIR AIR
A
IR
1-1/4" COMPRESSED AIR
DOWN TO COMPRESSOR/
AIR DRYER
1 1/4"
1" AIR 1 1/4" AIR1" AIR
AIR
P-530
P-101
1" AIR1" AIR
1" AIR
1" AIR
1" AIR
2" EMERGENCY SCW
MAKE-UP TO DA-1 PER
DETAIL 3/H15
2" CW DN. TO EMERGENCY MAKE-
UP WATER STORAGE TANKS.
2" SCW DN. TO EMERGENCY MAKE-
UP WATER STORAGE TANKS.
2" SCW
SCW
2" EMERGENCY MAKE-UP
WATER DN TO PUMPS
C W
CW CW
SCW
1" COMPRESSED AIR
DN. TO HOSE REEL
3/4" CW DOWN TO
SAMPLE COOLER
AT DA TANK
2" EMERGENCY MAKE-
UP WATER TO DA TANK
PER DETAIL 3/H15.
2" EMERGENCY
MAKE-UP WATER C
W
C W
RECONNECT TO
EXISTING 1-1/4" CW DN.
1-1/4" CW DN.
2" SOFT CW DN. TO
MAIN LEVEL
2" EMERGENCY DA MAKE-UP WATER
CONTROL VALVE ASSEMBLY PER DETAIL
3/H15 ACCESSIBLE FROM CATWALK
CV-3
2" SCW
1-1/2" MAKE-UP
WATER DN. TO
LOVER LEVEL.
1-1/2" MAKE-UP WATER TO CONDENSATE
STORAGE TANK PER DETAIL 4/H15.
RACK CW PIPING TO WALL
ABOVE WINDOWS
1" COMPRESSED AIR
DOWN TO BOILER FOR
FUEL ATOMIZATION
PER DETAIL 1/H16.
B-1 B-2 B-3
(E) FILL LINE FOR
EMERGENCY WATER
TANK
(E) EMERGENCY
WATER STORAGE
TANK
3/4" CW DN. TO HEAT
TRANSFER SKID. SEE
DETAIL 6/H16 FOR
CONNECTION LOCATION.
(E) 3/4" HW
(E) 3/4" CW DN.
TO LOWER
LEVEL
MECHANICAL CONTRACTOR SHALL PROVIDE STEEL
ANGLE IRON SUPPORTS AS REQUIRED TO SUPPORT
WATER HEATER OFF THE EXISTING WALL STRUCTURE.
MOUNT APPROX. 36" ABOVE ROOF OF OFFICE.
PROVIDE AND INSTALL NEW PLUMBING FIXTURE WHERE
EXISTING FIXTURE WAS REMOVED. RECONNECT TO
EXISTING WATER, WASTE AND VENT PIPING AS
REQUIRED.
PLUMBING SHEET NOTES:
1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK AND NOTIFY THE
ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-BUILT" CONDITIONS AND THESE DRAWINGS.
2. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION, VENTILATION, AND
ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS HIGH AS POSSIBLE. PROVIDE ALL
NECESSARY OFFSETS (DROPS AND RISES) TO KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR
DUCTWORK ABOVE. OFFSET PLUMBING PIPING TO AVOID BEAMS.
3. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING TYPES, HEIGHTS, SOFFIT
AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC.
4. CONTRACTOR SHALL PATCH ANY WALL OR FLOOR PENETRATIONS THAT ARE LEFT AFTER DEMOLITION
AND INSTALLATION OF NEW. SEE ARCHITECTURAL FOR WALL AND FLOOR SYSTEM TYPES AND PATCHING
REQUIREMENTS.
5. A SHUT-OFF VALVE SHALL BE INSTALLED ON ALL PLUMBING SERVICES SHOWN ON THIS SHEET PRIOR
TO CONNECTION TO FIXTURE. SHUT-OFF VALVES SHALL BE INSTALLED NO HIGHER THAN 5'-0" ABOVE
BOILER ROOM FINISHED FLOOR AND SHALL BE EASILY ACCESSIBLE. SHUT-OFF VALVES SHALL NOT BE
INSTALLED BEHIND EQUIPMENT, INTERIOR TO WALLS OR OTHER LOCATIONS WHERE THEY ARE NOT EASILY
ACCESSIBLE. THE VA AND A/E RESERVES THE RIGHT TO APPROVE THE LOCATION OF ALL SHUT-OFF VALVES
PRIOR TO INSTALLATIONS AND MAY REQUIRE THE CONTRACTOR TO RELOCATE ANY VALVES DEEMED
INACCESSIBLE.
6. PLUMBING FIXTURES ARE TAGGED WITH A FIXTURE NUMBER. REFER TO THE PROJECT SPECIFICATIONS
FOR FIXTURE SELECTIONS, FIXTURE STOP VALVE, AND CONNECTION REQUIREMENTS.
7. PRIOR TO INSTALLATION, THE VA AND A/E RESERVE THE RIGHT TO APPROVE THE LOCATION OF ALL
FIELD INSTALLED EQUIPMENT, VALVES, SENSORS, INSTRUMENTS, GAUGES, STRAINERS, ETC FOR
ACCESSIBILITY. ALL ITEMS SUCH AS THESE MUST BE ACCESSIBLE FROM A FINISHED FLOOR, PLATFORM, MEZZANINE, OR CATWALK. ITEMS WHICH CAN ONLY BE ACCESSED BY A PORTABLE LADDER WILL BE DEEMED
INACCESSIBLE. ITEMS WHICH ARE LOCATED IN TIGHT SPACES, BEHIND OTHER EQUIPMENT, OR ARE NOT
SAFELY IN REACH FROM AN ELEVATED PLATFORM WILL ALSO BE DEEMED INACCESSIBLE. INSTALLATION OF
THESE ITEMS MUST ALSO NOT BLOCK WALKING PATHS IN THE BOILER PLANT OR ACCESS TO OTHER
INSTALLED EQUIPMENT. THE VA AND/OR A/E MAY REQUIRE THE CONTRACTOR TO RELOCATE OR PROVIDE
PERMANENT ACCESS TO ANY ITEMS INSTALLED WITHOUT PRIOR APPROVAL IF THEY ARE DEEMED
INACCESSIBLE BY THE VA AND/OR A/E. TO AVOID ANY CONFLICTS, IT IS RECOMMENDED THE CONTRACTOR
DOES NOT PROCEED WITH INSTALLATIONS UNTIL A WALK THROUGH IS HELD WITH THE VA AND A/E TEAM TO
AGREE UPON THE INSTALLED LOCATION OF THESE ITEMS. IT IS RECOMMENDED THIS IS DONE WEEKLY AT
CONSTRUCTION MEETINGS.
8. THE ENTIRE SCOPE OF THE TEMPORARY BOILER PLANT SUPPLY SHALL BE SUPPLIED WITH THE
NECESSARY FITTINGS, VALVES, INSTRUMENTS, GAUGES, ETC., REQUIRED TO CONDUCT SAFETY DEVICE
TESTING PER THE LATEST EDITION OF THE VETERAN ADMINISTRATION'S SAFETY DEVICE TESTING MANUAL.
THERE ARE ALSO SPECIFIC REQUIREMENTS FOR EQUIPMENT CONSTRUCTION, WIRING, AND CONTROLS, THAT
MUST BE MET. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR READING AND UNDERSTANDING THE
INSTALLED REQUIREMENTS FOR THE TEMPORARY PLANT TO ENSURE THEIR SUPPLY MEETS ALL PROJECT
REQUIREMENTS. NO CHANGE ORDERS WILL BE ISSUED DUE TO A FAILURE TO MEET ALL REQUIREMENTS. A
COPY OF THE SAFETY DEVICE TESTING MANUAL AT THE END OF THE DIVISION 23 SPECIFICATIONS. THE
GENERAL CONTRACTOR SHALL HIRE A THIRD PARTY TESTING AGENCY TO PERFORM VERIFICATION THAT ALL
SAFETY DEVICES MEET THE TESTING REQUIREMENTS OF THE SAFETY DEVICE TESTING MANUAL BEFORE THE
V.A. WILL ACCEPT THE TEMPORARY BOILER INSTALLATION. THE THIRD PARTY AGENCY MUST HAVE
COMPLETED A MINIMUM OF THREE (3) PAST V.A. BOILER PLANT TESTS.
GENERAL NOTES:
PLUMBING FIXTURE ROUGH-IN
CONNECTION SCHEDULE
FIXTURE WASTE VENT CW HW
WALL HYDRANT
CLEAN OUT
FLOOR DRAIN
LAVATORY
WATER CLOSET (FT)
URINAL
SINK
EWC
MIXING VALVE
MOP BASIN
HOSE BIBB
WASH MACHINE TRIM
NOTES:
1. SIZES SHALL BE AS SCHEDULED UNLESS OTHERWISE
NOTED ON DRAWINGS.
- - 3/4" -
4" - - -
2" 1-1/2" - -
2" 1-1/2" 1/2" 1/2"
4" 2" 1/2" -
1-1/2" -
1-1/2"
1-1/2"
1-1/2"
1-1/2"
3"
2"
2"
2"
2"
3/4"
1/2"
3/4"
3/4"
3/4"
3/4"
1/2"
1/2"
3/4"
3/4"
3/4"
FLOOR SINK 2" 1-1/2" - -
EMERG. EYE WASH/SHOWER 1-1/2"2" 1-1/4"
SHOWER 1-1/2"2" 3/4"3/4"
1-1/4"
KEY PLAN
Fargo, ND 58102
2101 Elm Street
Medical Center
Dept. of Veterans Affairs
Building No.
VA Project No.
Drawing Title
Contract No.
V e te ra n s A ff a ir s
Location
Drawn ByChecked ByDesigned By
Project Title
Drawing No.
Date
Scale:
D e p a rt m e n t o f
Dwg. of 6910 - BOILER PLANT
FARGO VA HEALTH CARE SYSTEM
FARGO, NORTH DAKOTA
VA263-P-1218
AH/KS AH/KS/JN DP/JK
VA263
Project Phase www.jlgarchitects.com copyright © 2015
Fargo 214 Broadway
Fargo, ND 58102 phone 7 0 1.3 6 4.0 2 3 7 facsimile 7 0 1.3 6 4.0 2 2 8
Elec. dwg name:
Submittal Date
S.D. 1 SUBMITTAL 12/30/2015
D.D. 1 SUBMITTAL (PRELIM.) 02/16/2016
D.D. 1 (35%) SUBMITTAL 09/30/2016
D.D. 2 (50%) SUBMITTAL 03/03/2017
D.D. 3 (99%) SUBMITTAL 10/20/2017
C.D. 4 (100%) SUBMITTAL 06/01/2018
/2
/2
:2 :0
P
M
As indicated
P5 437-14-112
REPLACE BOILER PLANT 10.26.2018
UPPER LEVEL PLUMBING PLAN
100% CONSTRUCTION DOCUMENT
P5.dwg
NORTH
1/4" = 1'-0"P5
1 UPPER LEVEL PLUMBING PIPING PLAN
MECHANICAL SHEET INDEX
P00 MECHANICAL TITLE SHEET
P1 FOUNDATION LEVEL PLUMBING PLAN -
DEMOLITION
P2 MAIN LEVEL PLUMBING DEMOLITION PLAN
P3 FOUNDATION LEVEL PLUMBING PLAN
P4 MAIN LEVEL PLUMBING PLAN
P5 UPPER LEVEL PLUMBING PLAN
F1 MAIN LEVEL FIRE PROTECTION PLAN
F2 UPPER LEVEL FIRE PROTECTION PLAN
H1 PARTIAL MECH SITE PLAN - TEMPORARY
BOILERS
H2 MAIN LEVEL TEMPORARY STEAM PIPING PLAN
H3 MAIN LEVEL STEAM & HVAC PIPING
DEMOLITION PLAN
H4 UPPER LEVEL STEAM & HVAC PIPING
DEMOLITION PLAN
H5 MECHANICAL ROOF DEMOLITION PLAN
H6 MAIN LEVEL STEAM & HVAC PIPING PLAN
H7 UPPER LEVEL STEAM & HVAC PIPING PLAN
H8 MAIN LEVEL HVAC PIPING PLAN
H9 UPPER LEVEL HVAC PIPING PLAN
H10 MAIN LEVEL VENTILATION PLAN
H11 UPPER LEVEL VENTILATION PLAN
H12 MECHANICAL ROOF PLAN
H13 MECHANICAL SECTIONS
H14 MECHANICAL SECTIONS
H15 PIPING SCHEMATICS
H16 PIPING SCHEMATICS
H17 MECHANICAL DETAILS
H18 MECHANICAL DETAILS
H19 CONTROLS DIAGRAMS
H20 MECHANICAL SCHEDULES
ELECTRICAL
LOWER LEVEL
BOILER ROOM
OFFICE/CONTROL
LOCKER ROOM
SHOP
STORAGE
CLOSET
GENERATOR
ROOM
HOUSEKEEPING
CLOSET
SHOP ALCOVE
105A
VESTIBULE
LOCATION OF FIRE PROTECTION
WATER SERVICE & FIRE RISER.
REFER TO DETAIL 2/F1 FOR
ADDITIONAL INFORMATION
INSTALL FIRE ALARM CONTROL
PANEL IN NEW ELECTRICAL ROOM.
COORDINATE PANEL LOCATION WITH
ELECTRICAL CONTRACTOR.
INSTALL INSPECTOR'S
TEST VALVE w/ DRAIN TO
OUTSIDE OF BUILDING
AT 18" ABOVE FINISHED
GRADE
PROVIDE FREEZE-
PROOF SPRINKLER
HEADS IN VESTIBULE
AS REQUIRED.
A. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS PRIOR TO BEGINNING WORK AND NOTIFY THE
ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN
THE "AS-BUILT" CONDITIONS AND THESE DRAWINGS.
B. COORDINATE ALL FIRE PROTECTION INSTALLATION
WITH GENERAL, PLUMBING, VENTILATION, AND ELECTRICAL
CONTRACTORS. INSTALL ALL FIRE PROTECTION PIPING AS
HIGH AS POSSIBLE. PROVIDE ALL NECESSARY OFFSETS
(DROPS AND RISES) TO KEEP FIRE PROTECTION PIPING
TIGHT TO THE STRUCTURE OR DUCTWORK ABOVE. OFFSET
FIRE PROTECTION PIPING TO AVOID BEAMS.
C. ALL FIRE PROTECTION WORK SHALL ADHERE TO
CURRENT NFPA 13 STANDARDS.
D. ENTIRE BUILDING SHALL BE SPRINKLED. VERIFY
WHERE MULTIPLE FLOORS AND/OR CATWALKS EXIST.
E. SPRINKLER HEADS IN LAY-IN-TILE CEILINGS SHALL BE
LOCATED IN THE CENTER OF TILE.
F. REFER TO AND COORDINATE WITH THE ARCHITECTURAL
PLANS FOR CEILING TYPES, HEIGHTS, SOFFIT AREAS, AND
ELEVATIONS FOR INSTALLATION OF NEW FIRE PROTECTION
PIPING, SPRINKLER HEADS, EQUIPMENT, ETC.
G. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL
AND RE-INSTALLING OF EXISTING CEILING TILE NOT
REMOVED BY THE GENERAL CONTRACTOR FOR THE
INSTALLATION OF NEW FIRE PROTECTION PIPING, SPRINKLER
HEADS, EQUIPMENT, ETC. VERIFY WITH ARCHITECTURAL
PLANS FOR CEILING WORK BY THE GENERAL CONTRACTOR.
ANY CEILING TILE OR GRID DAMAGED DURING
CONSTRUCTION SHALL BE REPLACED WITH NEW BY THIS
CONTRACTOR.
H. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS
AND/OR CEILINGS FOR INSTALLATION OF NEW FIRE
PROTECTION PIPING, SPRINKLER HEADS, EQUIPMENT, ETC.
AS REQUIRED. PATCH WALLS AND/OR CEILINGS TO MATCH
EXISTING.
I. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL
ELECTRICAL, CONTROL, AND ACCESS PANELS FOR
ACCESSIBILITY.
GENERAL FIRE
PROTECTION NOTES:
FIRE PROTECTION LEGEND:
LIGHT HAZARD AREA
ORDINARY HAZARD AREA
GROUP 1
GENERAL NOTES:
1. CONTRACTOR SHALL PATCH ANY WALL OR FLOOR
PENETRATIONS THAT ARE LEFT AFTER DEMOLITION AND
INSTALLATION OF NEW. SEE ARCHITECTURAL FOR WALL
AND FLOOR SYSTEM TYPES AND PATCHING
REQUIREMENTS.
ORDINARY HAZARD AREA
GROUP 2
0ss
F
LOW
SW
ITCH
KEYED NOTES:
6" WATER SUPPLY MAIN
WATER SUPPLY PRESSURE GAUGE W/PETCOCK
VALVES W/TAMPER SWITCH
INSP. TEST VALVES WITH SIGHT GLASSES (2).
4" RISER TO WET SPRINKLER SYSTEM.
3 NEW 4" BACKFLOW ASSEMBLY WITH (2) TAMPER SWITCHES
4 4" CONNECTION TO SIAMESE.
6 VANE-TYPE WATER FLOW SWITCH
9 BALL DRIP CHECK VALVE
FIRE PROTECTION
CONTRACTOR
MECHANICAL
CONTRACTOR
ALARM BELL AND LIGHT. VERIFY LOCATION w/ OWNER
2" MAIN DRAIN PIPE TO BUILDING EXTERIOR
w/ AUXILIARY DRAIN PIPED TO FLOOR DRAIN
KEY PLAN
Fargo, ND 58102
2101 Elm Street
Medical Center
Dept. of Veterans Affairs
Building No.
VA Project No.
Drawing Title
Contract No.
V e te ra n s A ff a ir s
Location
Drawn ByChecked ByDesigned By
Project Title
Drawing No.
Date
Scale:
D e p a rt m e n t o f
Dwg. of 6910 - BOILER PLANT
FARGO VA HEALTH CARE SYSTEM
FARGO, NORTH DAKOTA
VA263-P-1218
AH/KS AH/KS/JN DP/JK
VA263
Project Phase www.jlgarchitects.com copyright © 2015
Fargo 214 Broadway
Fargo, ND 58102 phone 7 0 1.3 6 4.0 2 3 7 facsimile 7 0 1.3 6 4.0 2 2 8
Elec. dwg name:
Submittal Date
S.D. 1 SUBMITTAL 12/30/2015
D.D. 1 SUBMITTAL (PRELIM.) 02/16/2016
D.D. 1 (35%) SUBMITTAL 09/30/2016
D.D. 2 (50%) SUBMITTAL 03/03/2017
D.D. 3 (99%) SUBMITTAL 10/20/2017
C.D. 4 (100%) SUBMITTAL 06/01/2018
/2
/2
:2 :2
P
M
As indicated
F1 437-14-112
REPLACE BOILER PLANT 10.26.2018
MAIN LEVEL FIRE PROTECTION
PLAN
100% CONSTRUCTION DOCUMENT
F1.dwg
NORTH
1/4" = 1'-0"F1
1 MAIN LEVEL FIRE PROTECTION PLAN
MECHANICAL SHEET INDEX
P00 MECHANICAL TITLE SHEET
P1 FOUNDATION LEVEL PLUMBING PLAN -
DEMOLITION
P2 MAIN LEVEL PLUMBING DEMOLITION PLAN
P3 FOUNDATION LEVEL PLUMBING PLAN
P4 MAIN LEVEL PLUMBING PLAN
P5 UPPER LEVEL PLUMBING PLAN
F1 MAIN LEVEL FIRE PROTECTION PLAN
F2 UPPER LEVEL FIRE PROTECTION PLAN
H1 PARTIAL MECH SITE PLAN - TEMPORARY
BOILERS
H2 MAIN LEVEL TEMPORARY STEAM PIPING PLAN
H3 MAIN LEVEL STEAM & HVAC PIPING
DEMOLITION PLAN
H4 UPPER LEVEL STEAM & HVAC PIPING
DEMOLITION PLAN
H5 MECHANICAL ROOF DEMOLITION PLAN
H6 MAIN LEVEL STEAM & HVAC PIPING PLAN
H7 UPPER LEVEL STEAM & HVAC PIPING PLAN
H8 MAIN LEVEL HVAC PIPING PLAN
H9 UPPER LEVEL HVAC PIPING PLAN
H10 MAIN LEVEL VENTILATION PLAN
H11 UPPER LEVEL VENTILATION PLAN
H12 MECHANICAL…