36C26319B0010 437-14-112 Replace Boiler Plant Mechanical Drawings (28 pages).pdf

View the file

Other files

File Type Posted
36C26319C0205-000.docx DOCX document
36C26319B0010-0004000.docx DOCX document
36C26319B0010-0003000.docx DOCX document
36C26319B0010-0003001.pdf PDF
36C26319B0010-0003002.pdf PDF
36C26319B0010-0002000.docx DOCX document
36C26319B0010-0002001.pdf PDF
36C26319B0010-0001001.pdf PDF
36C26319B0010-0001000.docx DOCX document
36C26319B0010-012.pdf PDF
36C26319B0010-004.pdf PDF
36C26319B0010-011.pdf PDF
36C26319B0010-001.docx DOCX document
36C26319B0010-008.pdf PDF
36C26319B0010-005.pdf PDF
36C26319B0010-002.pdf PDF
36C26319B0010-007.pdf PDF
36C26319B0010-006.pdf PDF
36C26319B0010-003.pdf PDF
36C26319B0010-009.pdf PDF
36C26319B0010-000.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AV

S

T

H

M-1

M-1 x

S-1

8x8

COMPRESSED AIR

FEEDWATER PUMP SUCTION

CONDENSATE PUMP DISCHARGE

FEEDWATER PUMP DISCHARGE

INTERRUPTIBLE NATURAL GAS

FIRM NATURAL GAS

NATURAL GAS

FUEL OIL SUPPLY

FUEL OIL RETURN

FUEL OIL VENT

PUMPED CONDENSATE

REFRIGERANT DISCHARGE

REFRIGERANT SUCTION

REFRIGERANT LIQUID

HOT GAS BYPASS

PROPANE

CONDENSATE DRAIN

LOW PRESSURE STEAM

MEDIUM PRESSURE STEAM

FG

AIR

IG

LPG

G

FOS

FOR

FOV

RD

HGB

PC

RL

RS

D

LPS

MPS

HPS

M

ROUND DUCT

DUCT UP THROUGH FLOOR ABOVE OR ROOF

DUCT WITH ACOUSTICAL LINING

DIMENSION IS SIDE SHOWN

RECTANGULAR DUCT, FIRST

DUCT SECTION, NEGATIVE PRESSURE

DUCT SECTION, POSITIVE PRESSURE

DOMESTIC COLD WATER

SANITARY VENT

DOMESTIC HOT WATER

CHILLED WATER RETURN

CHILLED WATER SUPPLY

HEATING WATER RETURN

HEATING WATER SUPPLY

STORM DRAIN BELOW GRADE

SANITARY SEWER ABOVE GRADE

RAIN LEADER

SANITARY SEWER BELOW GRADE

GLYCOL HEATING RETURN

DOMESTIC RECIRCULATING HOT WATER

GLYCOL HEATING SUPPLY

SD

CHWS

CHWR

GHWS

GHWR

HWS

HWR

RL

20x12

20x12

20ø

NEG

DN

POS

UP

MECHANICAL SYMBOLS

DNUP

SUPPLY AIR OUTLET

RETURN OR EXHAUST AIR INLET

BALL VALVE INDICATOR

HEAT PUMP WATER RETURN

HEAT PUMP WATER SUPPLYHPWS

HPWR

HIGH PRESSURE STEAM

* ALL SYMBOLS AND ABBREVIATIONS DO NOT NECESSARILY APPEAR ON DRAWINGS

CONNECT NEW TO EXISTING, VERIFY SIZE

REVISION NOTE REFERENCE

CO DETECTOR

THERMOSTAT

SHEET NOTE REFERENCE

FLOW SWITCH

RPZ BACKFLOW PREVENTOR ASSEMBLY

THERMOSTATIC STEAM TRAP

INLINE PUMP

PRESSURE GAUGE

SENSOR WELL

THERMOMETER

VARIABLE AIR VOLUME BOX REFERENCE

SYMBOL WITH GPM SHOWN (1.5) REFER

TO SCHEDULE

VOLUME DAMPER

SMOKE DAMPER

FIRE DAMPER

COMBINATION FIRE/SMOKE DAMPER

SQUARE ELBOW WITH TURNING VANES

SIDEWALL SUPPLY REGISTER

MOTORIZED DAMPER

CEILING MOUNTED GRILLE OR

WITH SIZE INDICATED

FLEXIBLE DUCT FROM MAIN

ROUND NECK CEILING DIFFUSER,

SIDEWALL EXHAUST OR RETURN GRILLE

SCHEDULE FOR MORE INFORMATION

WITH TYPE AND AIRFLOW INDICATED,

(TYPE S-1, 100 CFM), REFER TO

NEW DIFFUSER, GRILLE, OR REGISTER

ECG-CRATE GRILLE

MAIN WITH SIZE INDICATED

REGISTER. RIGID DUCT FROM

STRAINER

AUTOMATIC AIR VENT

PRESSURE REDUCING VALVE

SOLENOID VALVE

2-WAY CONTROL VALVE

3-WAY CONTROL VALVE

FLOW MEASURING DEVICE (LIQUID)

GLOBE VALVE

GLOBE ANGLE VALVE

GATE ANGLE VALVE

GATE VALVE

BUTTERFLY VALVE

BALANCING VALVES

SAFETY RELIEF VALVE

CHECK VALVE

AND LOCATION OF EXISTING

PRESSURE REGULATOR VALVE

AQUASTAT

CONDENSATE TRANSFER PUMP SUCTION

CONDENSATE TRANSFER PUMP DISCHARGE

DETAIL NOTE REFERENCE

WITH DRAWING NUMBER SHOWN (1) AND

SHEET NUMBER SHOWN (M-1)

ELEVATION/ SECTION NOTE REFERENCE

WITH DRAWING NUMBER SHOWN (1) AND

SHEET NUMBER SHOWN (M-1)

FLOW METER

COMPRESSESD AIR OUTLET

HATCHING INDICATE ITEMS TO BE

REMOVED.

ORL OVERFLOW RAIN LEADER

FD

SD

F/SD

HUMIDISTAT

MECHANICAL ABBREVIATIONS

HOT WATER

IN JOIST SPACE

IN WEB SPACE

KILOWATT

LEAVING AIR TEMPERATURE

LAVATORY

POUNDS PER HOUR

LEAVING WATER TEMPERATURE

MAKEUP AIR

MAKEUP AIR HANDLING UNIT

ONE THOUSAND BTU PER HOUR

MINIMUM CIRCUIT AMPACITY

MECHANICAL

MAXIMUM FUSE SIZE

MISCELLANEOUS

MOTOR OPERATED DAMPER

NOT APPLICABLE

NORMALLY CLOSED

NOT IN CONTRACT

NORMALLY OPEN

NOT TO SCALE

OUTSIDE AIR

OVERFLOW ROOF DRAIN

OVERFLOW RAIN LEADER

PHASE

PRESSURE REDUCING VALVE

POUNDS PER SQUARE INCH

POWER VENTILATOR

RETURN AIR

ROOF DRAIN

ROOF HOOD

RECIRCULATING HOT WATER

RAIN LEADER

REVOLUTIONS PER MINUTE

ROOFTOP AIR HANDLING UNIT

SUPPLY AIR

SOFTENED COLD WATER

STORM DRAIN

SEASONAL ENERGY EFFICIENCY RATIO

SPECIFICATION

TRANSFER AIR

TEMPERATURE RISE

TOTAL STATIC PRESSURE

TYPICAL

UNIT HEATER

SANITARY VENT

VOLUME DAMPER (MANUAL OPPOSED BLADE)

VERIFY SIZE AND LOCATION

VARIABLE AIR VOLUME

VENT THROUGH ROOF

SANITARY WASTE

WITH

WET BULB TEMPERATURE

WALL CLEANOUT

WATER HEATER

WITHOUT

HW

I.J.S

I.W.S.

KW

LAT

LAV

LB/HR

LWT

MA

MAU

MBH

MCA

MECH

MFS

MISC

MOD

N/A

NC

NIC

NO

NTS

OA

ORD

ORL

PH

PRV

PSI

PV

RA

RD

RH

RHW

RL

RPM

RTU

SA

SCW

SD

SEER

SPEC

TA

TR

TSP

TYP

UH

V

VD

(VER)

VAV

VTR

W

W/

WB

WCO

WH

W/O

AT

AIR COOLED CONDENSING UNIT

ABOVE FINISHED FLOOR

AIRFLOW MEASURING DEVICE

AIR HANDLING UNIT

ARCHITECT, ARCHITECTURAL

AUTOMATIC TEMPERATURE CONTROLS

BACKDRAFT DAMPER

BUILDING

BRITISH THERMAL UNITS PER HOUR

BALL VALVE INDICATOR

COMBUSTION AIR

COOLING COIL

CUBIC FEET PER MINUTE

CIRCULATING

FLOOR CLEANOUT

CONCRETE

CONDENSATE

CONNECTION

CABINET UNIT HEATER

COLD WATER

DECIBELS

DRY BULB TEMPERATURE

DEMOLISH, DEMOLITION

DIAMETER

DIVISION

DOWN

DRAWING

EXISTING

EXHAUST AIR

ENTERING AIR TEMPERATURE

ENERGY EFFICIENCY RATIO

EXHAUST FAN

ELECTRIC, ELECTRICAL

EXTERNAL STATIC PRESSURE

ENTERING WATER TEMPERATURE

EXHAUST

EXISTING

DEGREES FAHRENHEIT

COMBINATION FIRE/ SMOKE DAMPER

FIRE DAMPER

FLOOR DRAIN

FLEXIBLE

FULL LOAD AMPERAGE

FLOW MEASURING DEVICE (LIQUID)

FEET PER MINUTE

FINNED TUBE RADIATION

GALVANIZED

GRADE CLEANOUT

GALLONS PER HOUR

GALLONS PER MINUTE

HOSE BIBB

HEATING COIL

HORSE POWER

HOUR

HEATING, VENTILATION, AND AIR

CONDITIONING

ACCU

AFF

AFMD

AHU

ARCH

ATC

BDD

BLDG

BTUH

BVI

CA

CC

CFM

CIRC

CO

CONC

COND

CONN

CUH

CW

dB

DB

DEMO

DIA

DIV

DN

DWG

(E)

EA

EAT

EER

EF

ELEC

ESP

EWT

EXH

EXIST

F

F/SD

FD

FD

FLEX

FLA

FMD

FPM

FTR

GALV

GCO

GPH

GPM

HB

HC

HP

HR

HVAC

8ø x

V-x-x,

1.5 GPM

FS

S

P

D DANGEROUS GAS DETECTOR

FWPD

FWPS

CTPD

CTPS

CPD

BOILER BLOWOFFBO

CONTINUOUS BLOWDOWNCBD

CHEMICAL FEEDCF

SOFT COLD WATERSCW

BALL VALVES

PLUG VALVE

INVERTED BUCKET STEAM TRAP ASSEMBLY

CLOSED FLOAT THERMOSTATIC STEAM

TRAP ASSEMBLY

KEY PLAN

Fargo, ND 58102

2101 Elm Street

Medical Center

Dept. of Veterans Affairs

Building No.

VA Project No.

Drawing Title

Contract No.

V e te ra n s A ff a ir s

Location

Drawn ByChecked ByDesigned By

Project Title

Drawing No.

Date

Scale:

D e p a rt m e n t o f

Dwg. of 6910 - BOILER PLANT

FARGO VA HEALTH CARE SYSTEM

FARGO, NORTH DAKOTA

VA263-P-1218

AH/KS AH/KS/JN DP/JK

VA263

Project Phase www.jlgarchitects.com copyright © 2015

Fargo 214 Broadway

Fargo, ND 58102 phone 7 0 1.3 6 4.0 2 3 7 facsimile 7 0 1.3 6 4.0 2 2 8

Elec. dwg name:

Submittal Date

S.D. 1 SUBMITTAL 12/30/2015

D.D. 1 SUBMITTAL (PRELIM.) 02/16/2016

D.D. 1 (35%) SUBMITTAL 09/30/2016

D.D. 2 (50%) SUBMITTAL 03/03/2017

D.D. 3 (99%) SUBMITTAL 10/20/2017

C.D. 4 (100%) SUBMITTAL 06/01/2018

/2

/2

:2 :4

P

M

1/8" = 1'-0"

P00 437-14-112

REPLACE BOILER PLANT 10.26.2018

MECHANICAL TITLE SHEET

100% CONSTRUCTION DOCUMENT

P00.dwg

MECHANICAL SHEET INDEX

P00 MECHANICAL TITLE SHEET

P1 FOUNDATION LEVEL PLUMBING PLAN -

DEMOLITION

P2 MAIN LEVEL PLUMBING DEMOLITION PLAN

P3 FOUNDATION LEVEL PLUMBING PLAN

P4 MAIN LEVEL PLUMBING PLAN

P5 UPPER LEVEL PLUMBING PLAN

F1 MAIN LEVEL FIRE PROTECTION PLAN

F2 UPPER LEVEL FIRE PROTECTION PLAN

H1 PARTIAL MECH SITE PLAN - TEMPORARY

BOILERS

H2 MAIN LEVEL TEMPORARY STEAM PIPING PLAN

H3 MAIN LEVEL STEAM & HVAC PIPING

DEMOLITION PLAN

H4 UPPER LEVEL STEAM & HVAC PIPING

DEMOLITION PLAN

H5 MECHANICAL ROOF DEMOLITION PLAN

H6 MAIN LEVEL STEAM & HVAC PIPING PLAN

H7 UPPER LEVEL STEAM & HVAC PIPING PLAN

H8 MAIN LEVEL HVAC PIPING PLAN

H9 UPPER LEVEL HVAC PIPING PLAN

H10 MAIN LEVEL VENTILATION PLAN

H11 UPPER LEVEL VENTILATION PLAN

H12 MECHANICAL ROOF PLAN

H13 MECHANICAL SECTIONS

H14 MECHANICAL SECTIONS

H15 PIPING SCHEMATICS

H16 PIPING SCHEMATICS

H17 MECHANICAL DETAILS

H18 MECHANICAL DETAILS

H19 CONTROLS DIAGRAMS

H20 MECHANICAL SCHEDULES

10-26-18

NOTE:

ALL UNDERGROUND WASTE PIPING

TO BE CLEANED AND PREPARED

FOR INSTALLATION OF INTERNAL

EPOXY BASED HIGH TEMPERATURE

LINER PER LINER MANUFACTURER'S

RECOMMENDATIONS (TYP.).

EXIST. 4" UP

TO VENT

EXIST. 4" UP

TO VENT

(E) 4" UP TO

OPEN SITE DRAIN

(E) 4" UP TO

OPEN SITE DRAIN

(E) 4" UP TO FD

(E) 2" UP TO FD

(E) 4" UP TO FD

(E) 4" UP TO CO

(E) 4" UP TO OPEN

SITE DRAIN

(E) 4" UP TO

FUNNEL DRAIN

(E) 4" UP TO

OPEN SITE

DRAIN

(E) 4" SANITARY MAIN

(E) 2" UP

TO SINK

(E) 2" UP TO

SHOWER DRAIN

4"

(E) 4" UP TO

FUNNEL DRAIN

(E) 4" UP TO

FUNNEL DRAIN

(E) 4" UP TO

FUNNEL DRAIN

(E) 4" UP TO FD

(E) 4" UP TO FD

(E) 4" UP TO FD

OUTLINE OF

EXISTING PIPE

TRENCH

OUTLINE OF

EXISTING PIPE

TRENCH

(E) 4" UP

TO FD

(E) 4" UP

TO FD

(E) 4" UP

TO FD

(E) 4" UP

TO FD

(E) 4" UP

TO FD

(E) 4" UP TO OPEN

SITE DRAIN

(E) 2" UP

TO SINK

(E) 2" UP

TO EWC

(E) 2" UP

TO VENT

(E) 4" UP

TO WC

REMOVE

EXISTING FD

(E) 4" UP TO FD

(E) 4" VENT UP

THROUGH ROOF

(E) 4" STORM SEWER MAIN

(E) 4" STORM SEWER IN

FLOOR UP TO NEW ABOVE

FLOOR PIPING. SEE MAIN

LEVEL PLUMBING PLAN FOR

CONTINUATION

DISCONNECT AND REMOVE

EXISTING WASTE PIPING IN ITS

ENTIRETY. REFER TO

REMODELED FOUNDATION

PLUMBING PLAN FOR NEW

WORK IN THIS AREA.

(E) 2" UP

TO URINAL

(E) 2" UP

TO SINK

REMOVE & REPLACE

EXISTING FD

REMOVE

EXISTING FD

REMOVE

EXISTING FD

REMOVE

EXISTING

FUNNEL

DRAIN

MODIFY EXISTING

WASTE TO

ACCOMMODATE NEW

MOP SINK ABOVE.

CUT & PATCH FLOOR

AS REQUIRED.

REMOVE EXISTING WASTE TO FLOOR

DRAIN. MODIFY REMAINING WASTE TO

PROVIDE NEW FLOOR DRAIN ON

REMAINING LINE. CUT & PATCH FLOOR

AS REQUIRED. REFER TO REMODELED

PLUMBING PLANS FOR RECONNECTION.

DISCONNECT AND REMOVE

EXISTING WASTE PIPING IN ITS

ENTIRETY. REFER TO REMODELED

FOUNDATION PLUMBING PLAN FOR

NEW WORK IN THIS AREA.

REMOVE 4" STORM SEWER

PIPING UP. CAP AND

ABANDON ASSOCIATED

PIPING BELOW FLOOR

CAP

REMOVE EXISTING WASTE PIPING

TO POINT 5'-0" OUTSIDE OF

BUILDING. REFER TO REMODELED

PLUMBING PLAN FOR NEW WASTE

PIPE BEING INSTALL IN THIS AREA.

REMOVE & REPLACE

EXISTING SUMP

PUMPS IN PIT

(E) 2" UP

TO FD

(E) 4" STORM SEWER IN FLOOR

UP TO NEW ABOVE FLOOR

PIPING. SEE MAIN LEVEL

PLUMBING PLAN FOR

CONTINUATION

NOTE:

ALL UNDERGROUND WASTE PIPING

TO BE CLEANED AND PREPARED

FOR INSTALLATION OF INTERNAL

EPOXY BASED HIGH TEMPERATURE

LINER PER LINER MANUFACTURER'S

RECOMMENDATIONS (TYP.).

(E) 4" UP TO

FLOOR DRAIN

REMOVE EXISTING WATER

SERVICE PIPING TO POINT

5'-0" OUTSIDE OF BUILDING.

REFER TO REMODELED

PLUMBING PLAN FOR NEW

WATER SERVICE PIPE BEING

INSTALL IN THIS AREA.

KEY PLAN

Fargo, ND 58102

2101 Elm Street

Medical Center

Dept. of Veterans Affairs

Building No.

VA Project No.

Drawing Title

Contract No.

V e te ra n s A ff a ir s

Location

Drawn ByChecked ByDesigned By

Project Title

Drawing No.

Date

Scale:

D e p a rt m e n t o f

Dwg. of 6910 - BOILER PLANT

FARGO VA HEALTH CARE SYSTEM

FARGO, NORTH DAKOTA

VA263-P-1218

AH/KS AH/KS/JN DP/JK

VA263

Project Phase www.jlgarchitects.com copyright © 2015

Fargo 214 Broadway

Fargo, ND 58102 phone 7 0 1.3 6 4.0 2 3 7 facsimile 7 0 1.3 6 4.0 2 2 8

Elec. dwg name:

Submittal Date

S.D. 1 SUBMITTAL 12/30/2015

D.D. 1 SUBMITTAL (PRELIM.) 02/16/2016

D.D. 1 (35%) SUBMITTAL 09/30/2016

D.D. 2 (50%) SUBMITTAL 03/03/2017

D.D. 3 (99%) SUBMITTAL 10/20/2017

C.D. 4 (100%) SUBMITTAL 06/01/2018

/2

/2

:2 :4

P

M

1/4" = 1'-0"

P1 437-14-112

REPLACE BOILER PLANT 10.26.2018

FOUNDATION LEVEL PLUMBING

PLAN - DEMOLITION

100% CONSTRUCTION DOCUMENT

P1.dwg

NORTH

1/4" = 1'-0"P1

1 FOUNDATION LEVEL PLUMBING PLAN - DEMOLITION

MECHANICAL SHEET INDEX

P00 MECHANICAL TITLE SHEET

P1 FOUNDATION LEVEL PLUMBING PLAN -

DEMOLITION

P2 MAIN LEVEL PLUMBING DEMOLITION PLAN

P3 FOUNDATION LEVEL PLUMBING PLAN

P4 MAIN LEVEL PLUMBING PLAN

P5 UPPER LEVEL PLUMBING PLAN

F1 MAIN LEVEL FIRE PROTECTION PLAN

F2 UPPER LEVEL FIRE PROTECTION PLAN

H1 PARTIAL MECH SITE PLAN - TEMPORARY

BOILERS

H2 MAIN LEVEL TEMPORARY STEAM PIPING PLAN

H3 MAIN LEVEL STEAM & HVAC PIPING

DEMOLITION PLAN

H4 UPPER LEVEL STEAM & HVAC PIPING

DEMOLITION PLAN

H5 MECHANICAL ROOF DEMOLITION PLAN

H6 MAIN LEVEL STEAM & HVAC PIPING PLAN

H7 UPPER LEVEL STEAM & HVAC PIPING PLAN

H8 MAIN LEVEL HVAC PIPING PLAN

H9 UPPER LEVEL HVAC PIPING PLAN

H10 MAIN LEVEL VENTILATION PLAN

H11 UPPER LEVEL VENTILATION PLAN

H12 MECHANICAL ROOF PLAN

H13 MECHANICAL SECTIONS

H14 MECHANICAL SECTIONS

H15 PIPING SCHEMATICS

H16 PIPING SCHEMATICS

H17 MECHANICAL DETAILS

H18 MECHANICAL DETAILS

H19 CONTROLS DIAGRAMS

H20 MECHANICAL SCHEDULES

REMOVE EXISTING EMERGENCY

SHOWER AND ASSOCIATED CW

PIPING BACK TO MAIN.

EXIST. FD

TO REMAIN

EXIST. FD

TO REMAIN

EXIST. PIPE TRENCH

TO REMAINEXIST. FD

TO REMAIN

EXIST. FUNNEL

DRAIN TO REMAIN

EXIST. FUNNEL

DRAIN TO REMAIN

EXIST. FD

TO REMAIN

EXIST. FD

TO REMAIN

EXIST. FD

TO REMAIN

EXIST. FD

TO REMAIN

EXIST. C.O.

TO REMAIN

EXIST. FD

TO REMAIN

4EXIST. FD

TO REMAIN

EXIST. FD

TO REMAIN

EXIST. FD

TO REMAIN

EXIST. FD

TO REMAIN

EXIST. OPEN

SITE DRAIN TO

REMAIN

EXIST. FD

TO REMAIN

EXIST. FD

TO REMAIN

EXIST. FD

TO REMAIN

EXIST. OPEN SITE

DRAIN TO REMAIN

REMOVE EXIST.

CONCRETE BLOW

DOWN SUMP PIT

EXIST. EMERGENCY

DOMESTIC WATER

STORAGE TANK FOR

HOSPITAL SHALL

REMAIN

REMOVE EXISTING DOMESTIC

WATER BOOSTER PUMP SKID

FOR FLOOR REPLACEMENT.

INSTALL TEMPORARY 4"

BYPASS PIPING IN WATER LINE.

RE-INSTALL PUMP SKID AFTER

NEW FLOOR IS INSTALLED.

EXIST. HOSPITAL WATER

SOFTENER TO REMAIN.

SEE NOTE #7.

EXIST. HOSPITAL WATER

SOFTENER SALT TANK TO

REMAIN. SEE NOTE #7.

EXIST. WATER

SOFTENER SHALL

REMAIN. SEE NOTE #7.

EXIST. TRANSFER

PUMPS AND PIPING FOR

EMERGENCY DOMESTIC

WATER SHALL REMAIN.

SEE NOTE #7.

EXIST. PIPING

TO EMERGENCY

DOMESTIC

WATER TANK

SHALL REMAIN

EXIST. WATER SOFTENER

SALT TANK TO REMAIN.

SEE NOTE #7.

(E) 4" WATER SERVICE AND

METER LOCATION.

REPLACE EXIST.

DOMESTIC WATER

HEATER LOCATED

UNDER COUNTER

WITH NEW.

LOWER LEVEL SLAB WILL BE REMOVED

AND REPLACED. COORDINATE

REMOVAL AND INSTALLATION OF PIPING

AND DRAINS WITH THIS WORK. REFER

TO ARCHITECTURAL PLANS FOR

EXTENT OF FLOOR REPLACEMENT. SEE

NOTE #7.

EXISTING STEAM TUNNEL

REMOVE EXISTING

FUNNEL DRAIN

REMOVE AND REPLACE

EXISTING FLOOR

DRAIN IN TRENCH

REMOVE EXISTING WALL

HYDRANT & ASSOCIATED

PIPING BACK TO MAIN. PATCH

WALL PER ARCHITECT'S

SPECIFICATIONS.

REMOVE EXISTING

EMERGENCY EYE WASH AND

ASSOCIATED H.W. & C.W.

PIPING BACK TO MAINS.

REMOVE EXISTING HOSE

BIBB AND REPLACE WITH

NEW AT THIS LOCATION

EXIST.FUNNEL

DRAIN TO REMAIN

EXIST. FUNNEL

DRAIN TO REMAIN

EXIST. PIPE TRENCH

TO REMAIN

REMOVE EXISTING FLOOR

DRAIN AND MODIFY WASTE

PIPING TO PROVIDE NEW FD IN

THIS AREA. REFER TO

REMODELED PLUMBING PLANS

FOR MORE INFORMATION.

(E) WALL HYDRANT

TO REMAIN

REMOVE

EXISTING

CW PIPING

2(E) 2" V.

(E) 3/4" H.W.

(E) 3/4" H.W.

(E) 1" C.W.

(E) 3/4" H.W.

(E) 3/4" C.W.

(E) 1-1/2" V.

REMOVE EXISTING

FD DRAIN IN

TRENCH

REMOVE EXISTING

FLOOR DRAIN

EXIST. 4" VENT UP

THROUGH ROOF

TO REMAIN

EXIST. FD

TO REMAIN

REMOVE EXISTING

CW PIPING

REMOVE EXISTING

CW PIPING

REMOVE

EXISTING

CW PIPING

REMOVE EXISTING CW

PIPING TO THIS POINT.

PREPARE REMAINING FOR

CONNECTION TO NEW

REMOVE EXISTING

CW PIPING

REMOVE EXISTING

CW PIPING

REMOVE

EXISTING

CW PIPING

REMOVE

EXISTING

CW PIPING

EXISTING CW PIPING

TO REMAIN

REMOVE EXISTING FD

DRAIN IN TRENCH

(E) 1-1/2" V.

(E) 1/2" CW

(E) 1-1/2" V.

REMOVE AND REPLACE

EXISTING RAIN LEADER

PIPING FROM ROOF

DRAIN TO FLOOR.

REMOVE AND REPLACE

EXISTING RAIN LEADER

PIPING FROM ROOF

DRAIN TO FLOOR.(E) VENT STACK

UP & DN. TO

REMAIN

(E) 1/2" CW &

1/2" H.W. TO

SINK

EXIST. SHOWER

DRAIN TO REMAIN

DEMOLITION NOTES:

DISCONNECT AND REMOVE EXISTING SHOWER VALVE

AND SHOWER HEAD AND REPLACE WITH NEW. REFER

TO REMODELED PLUMBING PLANS FOR ADDITIONAL

INFORMATION.

DISCONNECT AND REMOVE EXISTING SINK FIXTURE.

PREPARE EXISTING REMAINING WASTE, VENT, AND

WATER PIPING FOR CONNECTION TO NEW FIXTURE IN

THIS LOCATION. REFER TO REMODELED PLUMBING PLAN

FOR NEW WORK.

DISCONNECT AND REMOVE EXISTING SERVICE SINK.

REVISE WASTE, VENT, AND WATER PIPING AS REQUIRED

FOR CONNECTION TO NEW MOP BASIN AT THIS

LOCATION. REFER TO REMODELED PLUMBING PLANS

FOR ADDITIONAL INFORMATION.

DISCONNECT AND REMOVE EXISTING WATER COOLER

AND REPLACE WITH NEW. REFER TO REMODELED

PLUMBING PLANS FOR ADDITIONAL INFORMATION.

DISCONNECT AND REMOVE EXISTING URINAL FIXTURE.

PREPARE EXISTING REMAINING WASTE, VENT, AND

WATER PIPING FOR CONNECTION TO NEW FIXTURE IN

THIS LOCATION. REFER TO REMODELED PLUMBING PLAN

FOR NEW WORK.

DISCONNECT AND REMOVE EXISTING WATER CLOSET

FIXTURE. PREPARE EXISTING REMAINING WASTE, VENT,

AND WATER PIPING FOR CONNECTION TO NEW FIXTURE

IN THIS LOCATION. REFER TO REMODELED PLUMBING

PLAN FOR NEW WORK.

UNDER BASE BID: ALL EQUIPMENT THAT IS FLOOR SET IN

THE LOWER LEVEL OF THE BOILER PLANT SHALL BE

TEMPORARILY REMOVED FOR SLAB REMOVAL AND RE-

INSTALLATION. RE-INSTALL ALL REMOVED EQUIPMENT

ONCE NEW FLOOR SLAB AND EQUIPMENT PADS ARE

INSTALLED.

THE HOSPITAL WATER SOFTENER MUST REMAIN IN

OPERATION DURING FLOOR SLAB REPLACEMENT.

CONTRACTOR TO PROVIDE PROVISIONS FOR

TEMPORARILY RELOCATING THE HOSPITAL SOFTENING

EQUIPMENT WHILE MAINTAINING ITS OPERATION DURING

THE FLOOR SLAB REPLACEMENT.

THE EMERGENCY DOMESTIC WATER TRANSFER PUMPS

AND EMERGENCY BOOSTER PUMP SKID MUST REMAIN IN

OPERATION DURING FLOOR SLAB REPLACEMENT.

CONTRACTOR TO PROVIDE PROVISIONS FOR

TEMPORARILY RELOCATING THE PUMPS WHILE

MAINTAINING THEIR OPERATION DURING THE FLOOR

SLAB REPLACEMENT.

UNDER ALTERNATE BID 03: THE EXISTING FLOOR SLAB

WOULD NOT BE REMOVED IN ITS ENTIRETY AND THIS

CONTRACTOR SHALL CUT AND PATCH THE EXISTING

FLOOR AS REQUIRED FOR REMOVAL OF EXISTING

BELOW FLOOR PIPING AND INSTALLATION OF NEW

UNDERFLOOR PIPING.

GENERAL NOTES:

1. CONTRACTOR SHALL PATCH ANY WALL OR FLOOR

PENETRATIONS THAT ARE LEFT AFTER DEMOLITION AND

INSTALLATION OF NEW. SEE ARCHITECTURAL FOR WALL

AND FLOOR SYSTEM TYPES AND PATCHING

REQUIREMENTS.

DISCONNECT AND REMOVE

EXISTING PLUMBING FIXTURE

AND REPLACE WITH NEW.

REFER TO REMODELED

PLUMBING PLANS FOR MORE

INFORMATION

REMOVE EXISTING HW

PIPING DN. REFER TO

REMODELED PLUMBING

PLAN FOR RECONNECTION

TO NEW.

HW

C W

H W

3/4"

(E) 3/4" CW DN.

KEY PLAN

Fargo, ND 58102

2101 Elm Street

Medical Center

Dept. of Veterans Affairs

Building No.

VA Project No.

Drawing Title

Contract No.

V e te ra n s A ff a ir s

Location

Drawn ByChecked ByDesigned By

Project Title

Drawing No.

Date

Scale:

D e p a rt m e n t o f

Dwg. of 6910 - BOILER PLANT

FARGO VA HEALTH CARE SYSTEM

FARGO, NORTH DAKOTA

VA263-P-1218

AH/KS AH/KS/JN DP/JK

VA263

Project Phase www.jlgarchitects.com copyright © 2015

Fargo 214 Broadway

Fargo, ND 58102 phone 7 0 1.3 6 4.0 2 3 7 facsimile 7 0 1.3 6 4.0 2 2 8

Elec. dwg name:

Submittal Date

S.D. 1 SUBMITTAL 12/30/2015

D.D. 1 SUBMITTAL (PRELIM.) 02/16/2016

D.D. 1 (35%) SUBMITTAL 09/30/2016

D.D. 2 (50%) SUBMITTAL 03/03/2017

D.D. 3 (99%) SUBMITTAL 10/20/2017

C.D. 4 (100%) SUBMITTAL 06/01/2018

/2

/2

:2 :5

P

M

As indicated

P2 437-14-112

REPLACE BOILER PLANT 10.26.2018

MAIN LEVEL PLUMBING

DEMOLITION PLAN

100% CONSTRUCTION DOCUMENT

P2.dwg

NORTH

1/4" = 1'-0"P2

1 PLUMBING DEMOLITION PLAN

MECHANICAL SHEET INDEX

P00 MECHANICAL TITLE SHEET

P1 FOUNDATION LEVEL PLUMBING PLAN -

DEMOLITION

P2 MAIN LEVEL PLUMBING DEMOLITION PLAN

P3 FOUNDATION LEVEL PLUMBING PLAN

P4 MAIN LEVEL PLUMBING PLAN

P5 UPPER LEVEL PLUMBING PLAN

F1 MAIN LEVEL FIRE PROTECTION PLAN

F2 UPPER LEVEL FIRE PROTECTION PLAN

H1 PARTIAL MECH SITE PLAN - TEMPORARY

BOILERS

H2 MAIN LEVEL TEMPORARY STEAM PIPING PLAN

H3 MAIN LEVEL STEAM & HVAC PIPING

DEMOLITION PLAN

H4 UPPER LEVEL STEAM & HVAC PIPING

DEMOLITION PLAN

H5 MECHANICAL ROOF DEMOLITION PLAN

H6 MAIN LEVEL STEAM & HVAC PIPING PLAN

H7 UPPER LEVEL STEAM & HVAC PIPING PLAN

H8 MAIN LEVEL HVAC PIPING PLAN

H9 UPPER LEVEL HVAC PIPING PLAN

H10 MAIN LEVEL VENTILATION PLAN

H11 UPPER LEVEL VENTILATION PLAN

H12 MECHANICAL ROOF PLAN

H13 MECHANICAL SECTIONS

H14 MECHANICAL SECTIONS

H15 PIPING SCHEMATICS

H16 PIPING SCHEMATICS

H17 MECHANICAL DETAILS

H18 MECHANICAL DETAILS

H19 CONTROLS DIAGRAMS

H20 MECHANICAL SCHEDULES

NORTH

1/4" = 1'-0"P2

2 PARTIAL UPPER LEVEL PLUMBING DEMOLITION PLAN

NOTE:

CONTRACTOR SHALL PROVIDE DRAIN PIPE CLEANING AND

TRENCHLESS, CAST IN PLACE RE-LINING OF ALL EXISTING

DRAIN PIPING TO REMAIN. RE-LINING SHALL BE

COMPLETED WITH A HIGH TEMPERATURE EPOXY LINER

CAPABLE OF WITHSTANDING TEMPERATURES UP TO 200

DEGREES F. PROVIDE 'NU FLOW' PIPING SYSTEM OR

APPROVED EQUAL. CONTRACTOR SHALL INSTALL AS PER

MANUFACTURER'S INSTRUCTIONS.

EXIST. 4" UP

TO VENT

NEW 4" DOMESTIC

WATER SERVICE

EXIST. 4" UP

TO VENT

(E) 4" UP TO

OPEN SITE

DRAIN

(E) 4" UP TO

OPEN SITE DRAIN

(E) 4" UP TO FD

(E) 2" UP TO FD

4" UP TO FD

(E) 4" UP TO FD

(E) 4" UP TO CO

(E) 4" UP TO OPEN

SITE DRAIN

(E) 4" UP TO

FUNNEL DRAIN

(E) 4" UP TO

OPEN SITE

DRAIN

(E) 4" SANITARY MAIN

(E) 2" UP

TO SINK

(E) 2" UP TO

SHOWER DRAIN

4"

(E) 4" UP TO

FUNNEL DRAIN

(E) 4" UP TO

FUNNEL DRAIN

(E) 4" UP TO

FUNNEL DRAIN

(E) 4" UP TO FD

(E) 4" UP TO FD (E) 4" UP TO FD

OUTLINE OF

EXISTING TRENCH

OUTLINE OF

EXISTING

TRENCH

(E) 4" UP

TO FD

(E) 4" UP

TO FD

(E) 4" UP

TO FD

(E) 4" UP

TO FD

(E) 4" UP

TO FD

(E) 4" UP TO OPEN

SITE DRAIN

(E) 2" UP

TO SINK

(E) 2" UP

TO EWC

(E) 2" UP

TO VENT

(E) 4" UP

TO WC

3" UP TO FD IN

EXISTING TRENCH

4" C.W. UP

(E) 4" UP TO FD

(E) 4" VENT UP

THROUGH ROOF

NEW 6" FIRE

PROTECTION WATER

SERVICE TO 5'-0"

OUTSIDE OF BUILDING

6" STORM SEWER (E) 4" STORM SEWER

4" CAST IRON WASTE

STUBBED TO 5'-0" OUTSIDE OF

BUILDING. FINAL CONNECTION

BY THIS CONTRACTOR.

6 C.W. UP TO

FIRE RISER

(E) 4" STORM SEWER IN

FLOOR UP TO NEW ABOVE

FLOOR PIPING. SEE MAIN

LEVEL PLUMBING PLAN FOR

CONTINUATION

6" STORM UP

(E) 2" UP

TO URINAL

(E) 2" UP

TO SINK

NOTE:

CONTRACTOR SHALL PROVIDE DRAIN PIPE

CLEANING AND TRENCHLESS, CAST IN PLACE

RE-LINING OF ALL EXISTING DRAIN PIPING TO

REMAIN. RE-LINING SHALL BE COMPLETED

WITH A HIGH TEMPERATURE EPOXY LINER

CAPABLE OF WITHSTANDING TEMPERATURES

UP TO 200 DEGREES F. PROVIDE 'NU FLOW'

PIPING SYSTEM OR APPROVED EQUAL.

CONTRACTOR SHALL INSTALL AS PER

MANUFACTURER'S INSTRUCTIONS.

MODIFY EXISTING WASTE

PIPING TO PROVIDE NEW

FLOOR DRAIN

4" UP

TO VENT

4"

4" 4"

4" W. UP TO

TRENCH DRAIN

4" W. UP TO

FLOOR SINK

2" UP TO VENT

ALL NEW WASTE

PIPING SHALL BE

CAST IRON PIPE

2" W. UP TO

TRENCH DRAIN

2" W. UP TO

TRENCH DRAIN

2"

2"

4"

3"3" VENT UP

3"

4"

SP-1

EXTEND TRENCH

TO BACK OF

BOILER (BY G.C.)

EXTEND TRENCH TO

BACK OF BOILER

(BY G.C.)

EXTEND TRENCH

TO BACK OF

BOILER (BY G.C.)

3" UP TO

MB

2" UP TO V.

CUT & PATCH

EXISTING FLOOR AS

REQ'D. FOR NEW

PIPING

(E) 4" STORM SEWER IN

FLOOR UP TO NEW ABOVE

FLOOR PIPING. SEE MAIN

LEVEL PLUMBING PLAN FOR

CONTINUATION

INSTALL SUMP PUMP IN PIT

AND ROUTE DISCHARGE

PIPE TO TRENCH DRAIN

CUT AND PATCH FLOOR AS

REQUIRED FOR INSTALLATION

OF NEW FLOOR DRAIN.

(E) 4" UP TO FD

CUT AND PATCH FLOOR AS

REQUIRED FOR INSTALLATION

OF NEW STORM PIPING

CUT AND PATCH FLOOR AS

REQUIRED FOR INSTALLATION

OF NEW STORM PIPING

CUT AND PATCH FLOOR AS

REQUIRED FOR INSTALLATION

OF NEW STORM PIPING

(E) 2" UP TO FD

1. MECHANICAL CONTRACTOR SHALL INSPECT ALL EXISTING

PLUMBING DRAINS AND UNDERFLOOR PIPING. SCOPE AND

CLEAN ALL EXISTING WASTE PIPING TO MAIN EXITING

BUILDING.

PLUMBING

SHEET NOTES:

1 THE DOMESTIC WATER SERVICE MAIN WAS REPLACED

IN PREVIOUS PROJECT TO A POINT APPROXIMATELY

5'-0" OUTSIDE OF BUILDING. UNDER THE SCOPE OF

WORK FOR THIS PROJECT, THE CONTRACTOR SHALL

CONNECT TO NEW SERVICE PIPING OUTSIDE OF

BUILDING AND EXTEND INTO BASEMENT AS INDICATED

ON PLAN. PROVIDE TEMPORARY WATER CONNECTIONS

AS REQUIRED DURING TIE-IN.

UNDER THE SCOPE OF A PREVIOUS PROJECT, A NEW

6" FIRE PROTECTION WATER SERVICE LINE WAS

INSTALLED TO A POINT APPROXIMATELY 5'-0" OUTSIDE

OF THE BUILDING. UNDER THE SCOPE OF WORK FOR

THIS PROJECT, THE CONTRACTOR SHALL CONNECT TO

NEW SERVICE PIPING OUTSIDE OF BUILDING AND

EXTEND INTO BASEMENT AS INDICATED ON PLAN.

UNDER THE SCOPE OF A PREVIOUS PROJECT, A NEW

6" STORM SEWER LINE WAS INSTALLED TO A POINT

APPROXIMATELY 5'-0" OUTSIDE OF THE BUILDING.

UNDER THE SCOPE OF WORK FOR THIS PROJECT, THE

CONTRACTOR SHALL CONNECT TO NEW SERVICE

PIPING OUTSIDE OF BUILDING AND EXTEND INTO

BUILDING AS INDICATED ON PLAN.

KEY PLAN

Fargo, ND 58102

2101 Elm Street

Medical Center

Dept. of Veterans Affairs

Building No.

VA Project No.

Drawing Title

Contract No.

V e te ra n s A ff a ir s

Location

Drawn ByChecked ByDesigned By

Project Title

Drawing No.

Date

Scale:

D e p a rt m e n t o f

Dwg. of 6910 - BOILER PLANT

FARGO VA HEALTH CARE SYSTEM

FARGO, NORTH DAKOTA

VA263-P-1218

AH/KS AH/KS/JN DP/JK

VA263

Project Phase www.jlgarchitects.com copyright © 2015

Fargo 214 Broadway

Fargo, ND 58102 phone 7 0 1.3 6 4.0 2 3 7 facsimile 7 0 1.3 6 4.0 2 2 8

Elec. dwg name:

Submittal Date

S.D. 1 SUBMITTAL 12/30/2015

D.D. 1 SUBMITTAL (PRELIM.) 02/16/2016

D.D. 1 (35%) SUBMITTAL 09/30/2016

D.D. 2 (50%) SUBMITTAL 03/03/2017

D.D. 3 (99%) SUBMITTAL 10/20/2017

C.D. 4 (100%) SUBMITTAL 06/01/2018

/2

/2

:2 :5

P

M

As indicated

P3 437-14-112

REPLACE BOILER PLANT 10.26.2018

FOUNDATION LEVEL PLUMBING

PLAN

100% CONSTRUCTION DOCUMENT

P3.dwg

NORTH

1/4" = 1'-0"P3

1 FOUNDATION LEVEL PLUMBING PLAN

MECHANICAL SHEET INDEX

P00 MECHANICAL TITLE SHEET

P1 FOUNDATION LEVEL PLUMBING PLAN -

DEMOLITION

P2 MAIN LEVEL PLUMBING DEMOLITION PLAN

P3 FOUNDATION LEVEL PLUMBING PLAN

P4 MAIN LEVEL PLUMBING PLAN

P5 UPPER LEVEL PLUMBING PLAN

F1 MAIN LEVEL FIRE PROTECTION PLAN

F2 UPPER LEVEL FIRE PROTECTION PLAN

H1 PARTIAL MECH SITE PLAN - TEMPORARY

BOILERS

H2 MAIN LEVEL TEMPORARY STEAM PIPING PLAN

H3 MAIN LEVEL STEAM & HVAC PIPING

DEMOLITION PLAN

H4 UPPER LEVEL STEAM & HVAC PIPING

DEMOLITION PLAN

H5 MECHANICAL ROOF DEMOLITION PLAN

H6 MAIN LEVEL STEAM & HVAC PIPING PLAN

H7 UPPER LEVEL STEAM & HVAC PIPING PLAN

H8 MAIN LEVEL HVAC PIPING PLAN

H9 UPPER LEVEL HVAC PIPING PLAN

H10 MAIN LEVEL VENTILATION PLAN

H11 UPPER LEVEL VENTILATION PLAN

H12 MECHANICAL ROOF PLAN

H13 MECHANICAL SECTIONS

H14 MECHANICAL SECTIONS

H15 PIPING SCHEMATICS

H16 PIPING SCHEMATICS

H17 MECHANICAL DETAILS

H18 MECHANICAL DETAILS

H19 CONTROLS DIAGRAMS

H20 MECHANICAL SCHEDULES

(E) FD(E) FD

(E) OPEN SITE

DRAIN

(E) OPEN SITE

DRAIN

(E) FD

(E) FD

(E) FD

(E) FD

(E) FD

FD

(E) FD

(E) FD

(E) FD

(E) FUNNEL

DRAIN

(E) OPEN

SITE DRAIN

(E) FUNNEL

DRAIN

(E) OPEN SITE

DRAIN

(E) FUNNEL

DRAIN

(E) FD

(E) FD)

CONNECT 3" V.

TO EXISTING 4"

VENT STACK

(E) 4" WASTE DN. TO BELOW

FLOOR AND 4" VENT STACK

UP THROUGH ROOF.

(E) PIPE TRENCH

PROVIDE AND INSTALL

NEW SHOWER VALVE

AND SHOWER HEAD

WHERE EXISTING WAS

REMOVED. P-307

PROVIDE & INSTALL

NEW EMERGENCY

SHOWER/ EYEWASH

STATION P-707

PROVIDE AND INSTALL NEW

WATER COOLER WHERE

EXISTING WATER COOLER WAS

REMOVED. P-604

PROVIDE AND INSTALL NEW

SINK WHERE EXISTING SINK

WAS REMOVED. P-501

PROVIDE AND INSTALL

NEW SINK WHERE

EXISTING SINK WAS

REMOVED. P-528

(E) OPEN SITE

DRAIN (E) OPEN SITE

DRAIN

PROVIDE AND INSTALL NEW MOP

BASIN WHERE EXISTING SERVICE

SINK WAS REMOVED. P-1001

(E) 4" V. DN. FOR EXISTING

FLOOR DRAINS & 4" V. UP

TO 4" VENT THROUGH

ROOF

4" RL UP TO

ROOF DRAIN

4" RL DN. CONNECT

TO EXISTING PIPING

BELOW FLOOR

4" RL UP TO

ROOF DRAIN

4" RL DN. CONNECT

TO EXISTING PIPING

BELOW FLOOR

6" RL UP & DN. PROVIDE

CLEANOUT AT BASE OF

STACK

2" C.W. UP TO NEAR ROOF.

SEE UPPER LEVEL PLUMBING

PLAN FOR CONTINUATION

(E) 2" V. UP

TO (E) 4" VTR

EXIST. HOSPITAL WATER

SOFTENER. SHALL

REMAIN. SEE NOTE #5.

(E) HOSPITAL WATER

SOFTENER SALT TANK

TO REMAIN. SEE

NOTE #5.

(E) WATER SOFTENER TO

REMAIN. SEE NOTE #5.

(E) TRANSFER PUMPS &

PIPING FOR EMERGENCY

DOMESTIC WATER SHALL

REMAIN. SEE NOTE #5.

(E) WATER SOFTENER

SALT TANK TO REMAIN.

SEE NOTE #5.

(E) WALL HYDRANT 3/4" C.W. UP TO MAIN

AT UPPER LEVEL

PROVIDE AND INSTALL

NEW CW HOSEBIBB @

36" A.F.F. P-804

3/4" CW UP. RECONNECT

CW TO EXISTING WALL

HYDRANT

1" C.W. UP TO

UPPER LEVEL

PROVIDE AND INSTALL

NEW URINAL WHERE

EXISTING URINAL WAS

REMOVED. P-201

PROVIDE AND INSTALL

NEW SINK WHERE

EXISTING SINK WAS

REMOVED. P-530

PROVIDE AND INSTALL

NEW WC WHERE

EXISTING WC WAS

REMOVED. P-103

PROVIDE & INSTALL NEW FLOOR

DRAIN. MODIFY EXISTING

WASTE PIPING WERE EXISTING

FLOOR DRAIN WAS REMOVED

AS REQUIRED.

PROVIDE & INSTALL

NEW EMERGENCY

SHOWER/

EYEWASH STATION

P-707.

(E) PIPE TRENCH

(E) HW & CW PIPING

DN. TO BELOW WORK

COUNTER TO WH-2

(E) FD

(E) C.O.

2" V. DN. FOR

MOP BASIN.

2"

(E) FD

FLOOR SINK

2" V. DN. FOR

FLOOR SINK 2" V

4" V. DN. w/ C.O.

NEAR BASE OF

STACK

4" V4" DOMESTIC WATER

SERVICE. REFER TO

FOUNDATION PLUMBING

PLAN FOR ADDITIONAL

INFORMATION

3" V. DN.

PROVIDE & INSTALL NEW

WALL HYDRANT P-801

3" V

(E) 1-1/4" CW UP TO

UPPER LEVEL

3/4" CW FOR

SAMPLE COOLER

UP TO UPPER

LEVEL

3/4" CW FOR

SAMPLE COOLER

UP TO UPPER

LEVEL

3/4" CW FOR

SAMPLE COOLER UP

TO UPPER LEVEL

1-1/2" CW DN. TO

BLOWDOWN SEPARATOR

C W

C W

B-1 B-2

B-3

3/4" CW UP

1-1/4" CW UP & DN. TO

WH-3 FOR EMERGENCY

SHOWER/EYE WASH

STATION.

1-1/4" CW DN. TO WH-4 FOR

EMERGENCY SHOWER/EYE

WASH STATION. MOUNT

WH-4 @ 9'-0" A.F.F.

1-1/4" CW UP

CW

CW

HW

H W

C W

HW

CW

DA-1

ST-1

TRENCH DRAIN

TRENCH

DRAIN

EXTEND TRENCH

TO BACK OF

BOILER (BY G.C.)

EXTEND TRENCH

TO BACK OF

BOILER (BY G.C.)

EXTEND TRENCH

TO BACK OF

BOILER (BY G.C.)

PROVIDE AND INSTALL

NEW CW HOSEBIBB @

36" A.F.F. P-804

3/4" COMPRESSED AIR UP

TO UPPER LEVEL

A

IRA

IR

A

IR

1-1/4" COMPRESSED AIR

FROM COMPRESSOR/

AIR DRYER UP TO

UPPER LEVEL

1" COMPRESSED AIR

UP TO UPPER LEVEL

1" COMPRESSED AIR

UP TO UPPER LEVEL

1" COMPRESSED AIR

UP TO UPPER LEVEL

1" COMPRESSED AIR

DN. TO BOILER FOR

FUEL ATOMIZATION

PER DETAIL 1/H16

1" COMPRESSED AIR

DN. TO BOILER FOR

FUEL ATOMIZATION

PER DETAIL 1/H16

3/4", 75' SPRING

RETURN HOSE REEL

@ 10'-0" A.F.F.

BD-1

(E) 4" W AND 2"

V UP FOR

TOILET ABOVE

2" SCW

UP

2" CW(E) 3" CW

(E) 1-1/2" CW

(E) 4" W 4" V

(E) 2" SCW

2" EMERGENCY MAKE-UP

WATER UP TO UPPER LEVEL

EMERGENCY MAKE-

UP WATER

STORAGE TANKS

AND PUMPS. SEE

PIPING DETAIL 1/H17

2" CW UP

2" SCW UP

(E) 2" W UP

TO MB

(E) 2" V UP

2" W UP

TO SINK

CONTROL PANEL FOR SUMP

PUMP SP-1 INSTALLED ON

WALL BELOW WINDOW.

ROUTE CONTROL WIRING

TO PUMP VIA OVERHEAD

CONDUIT. (REFER TO

FOUNDATION LEVEL PLAN

FOR LOCATION OF PUMP)

CONNECT 4" V.

TO EXISTING 4"

VENT STACK

3/4", 75' SPRING RETURN

HOSE REEL @ 8'-6" A.F.F.

1" COMPRESSED

AIR UP TO UPPER

LEVEL

OFFSET COMPRESSED

AIR AROUND

STRUCTURE

(E) 2" V.

(E) 3/4" H.W.

(E) 3/4" H.W.

(E) 1" C.W.

(E) 3/4" H.W.

(E) 3/4" C.W.

(E) 1-1/2" V.

(E) 1-1/2" V.

(E) 1-1/2" V.

(E) 4" CW MAIN

(E) 3" CW

TO PLANT

(E) 2" SCW

BYPASS

3/4" CW DN. FOR

SAMPLE COOLER

PER DETAIL 1/H18

3/4" CW LINE UP TO MAIN

AT UPPER LEVEL

RELOCATED FUEL OIL

PUMPS. REFER TO SHEET

H6 FOR ASSOCIATED

PIPING.

CONTROL PANEL FOR

EMERGENCY MAKE-UP

WATER PUMPS.

RELOCATED DISCONNECTS

FOR EMERGENCY MAKE-UP

WATER PUMPS.

CW

C W

CW

PROVIDE ISOLATION

VALVE & PRESSURE

REGULATOR PRIOR TO

HOSE REEL

PROVIDE ISOLATION VALVE

& PRESSURE REGULATOR

PRIOR TO HOSE REEL

(E) AIR

COMPRESSOR

1 1/2" CW

1 1/2" SCW

MAKE-UP WATER FOR

CONDENSATE STORAGE

TANK UP

3/4" CW

(E) SCW TO

PIPE TUNNEL

(E) EMERGENCY DOMESTIC

WATER BOOSTER PUMP SKID

& PIPING FOR EMERGENCY

DOMESTIC WATER SHALL

REMAIN. SEE NOTE #5.

HTP-01

3/4" CW TO HEAT TRANSFER

SKID. SEE DETAIL 6/H16 FOR

CONNECTION LOCATION

PLUMBING SHEET NOTES:

PROVIDE NEW WH-2 WHERE EXISTING WATER HEATER

WAS REMOVED. RECONNECT TO EXISTING HW & CW

PIPING BELOW COUNTER.

CUT AND PATCH FLOOR AS REQUIRED TO INSTALL NEW

WASTE AND VENT PIPING FOR MOP BASIN. CUT AND

PATCH WALL AS REQUIRED TO MODIFY EXISTING HW AND

CW PIPING FOR NEW FAUCET FOR MOP BASIN.

CUT AND PATCH WALL AS REQUIRED TO MODIFY

EXISTING HW, CW, WASTE, AND VENT PIPING FOR NEW

WATER COOLER.

INSTALL CONTROL VALVE ASSEMBLIES FOR THE

NORMAL SOFT COLD WATER MAKE-UP WATER AND THE

EMERGENCY COLD WATER MAKE-UP WATER FOR THE

CONDENSATE STORAGE TANK AT THE END OF THE TANK

SUPPORT STAND. INSTALL PIPING PER DETAIL 4/H15.

UNDER BASE BID: ALL EQUIPMENT THAT IS FLOOR SET IN

THE LOWER LEVEL OF THE BOILER PLANT SHALL BE

TEMPORARILY REMOVED FOR SLAB REMOVAL AND

RE-INSTALLATION. RE-INSTALL ALL REMOVED

EQUIPMENT ONCE NEW FLOOR SLAB AND EQUIPMENT

PADS ARE INSTALLED.

THE HOSPITAL WATER SOFTENER MUST REMAIN IN

OPERATION DURING FLOOR SLAB REPLACEMENT.

CONTRACTOR TO PROVIDE PROVISIONS FOR

TEMPORARILY RELOCATING THE HOSPITAL SOFTENING

EQUIPMENT WHILE MAINTAINING ITS OPERATION DURING

THE FLOOR SLAB REPLACEMENT.

THE EMERGENCY DOMESTIC WATER TRANSFER PUMPS

AND EMERGENCY BOOSTER PUMP SKID MUST REMAIN IN

OPERATION DURING FLOOR SLAB REPLACEMENT.

CONTRACTOR TO PROVIDE PROVISIONS FOR

TEMPORARILY RELOCATING THE PUMPS WHILE

MAINTAINING THEIR OPERATION DURING THE FLOOR

SLAB REPLACEMENT.

UNDER ALTERNATE BID 03: THE EXISTING FLOOR SLAB

WOULD NOT BE REMOVED IN ITS ENTIRETY AND THIS

CONTRACTOR SHALL CUT AND PATCH THE EXISTING

FLOOR AS REQUIRED FOR REMOVAL OF EXISTING

BELOW FLOOR PIPING AND INSTALLATION OF NEW

UNDERFLOOR PIPING.

PROVIDE AND INSTALL NEW

WATER COOLER WHERE

EXISTING WATER COOLER

WAS REMOVED. P-604

PROVIDE AND INSTALL NEW MOP

BASIN AND FAUCET WHERE

EXISTING SERVICE SINK WAS

REMOVED. P-1001

3" W

PROVIDE AND INSTALL NEW

SINK WHERE EXISTING SINK

WAS REMOVED. P-501

2" V

CONNECT 3" W.

TO EXIST. 3" W.

PROVIDE AND INSTALL NEW

URINAL WHERE EXISTING

URINAL WAS REMOVED. P-201

PROVIDE AND INSTALL NEW

WC WHERE EXISTING WC WAS

REMOVED. P-103

PROVIDE AND INSTALL NEW

SINK WHERE EXISTING SINK

WAS REMOVED. P-530

PROVIDE AND INSTALL NEW

WATER HEATER WHERE

EXISTING WATER HEATER WAS

REMOVED. WH-2

(E) C.O.

(E) 4" W.

(E) 4" W.

(E) 3" W.

(E) 2" W.

PROVIDE AND INSTALL NEW

SINK WHERE EXISTING SINK

WAS REMOVED. P-528

(E) SHOWER DRAIN

(E) 2" W.

1 1/4" CW1-1/4" CW UP TO MAIN

AT UPPER LEVEL

(E) VENT

THROUGH ROOF

INSTANTANEOUS WATER

HEATER WH-4 FOR EMERGENCY

SHOWER/ EYEWASH STATION

(E) 2" V.

(E) 3/4" HW &

CW TO WH-2

(E) 1/2" CW & 1-1/2" V. TO EWC

(E) 2" V.

(E) 1-1/4" CW UP TO MAIN

AT UPPER LEVEL

PROVIDE & INSTALL NEW

EMERGENCY SHOWER/

EYEWASH STATION P-707

(E) 1/2" HW & CW AND

1-1/2" V. TO SINK (TYP.)

PROVIDE AND INSTALL NEW

SHOWER VALVE AND SHOWER

HEAD WHERE EXISTING WAS

REMOVED. P-307

(E) 4" W.

(E) 4" W.(E) 4" W.

(E) 4" W.

1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK AND NOTIFY THE

ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-BUILT" CONDITIONS AND THESE DRAWINGS.

2. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION, VENTILATION, AND

ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS HIGH AS POSSIBLE. PROVIDE ALL

NECESSARY OFFSETS (DROPS AND RISES) TO KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR

DUCTWORK ABOVE. OFFSET PLUMBING PIPING TO AVOID BEAMS.

3. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING TYPES, HEIGHTS, SOFFIT

AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC.

4. CONTRACTOR SHALL PATCH ANY WALL OR FLOOR PENETRATIONS THAT ARE LEFT AFTER DEMOLITION

AND INSTALLATION OF NEW. SEE ARCHITECTURAL FOR WALL AND FLOOR SYSTEM TYPES AND PATCHING

REQUIREMENTS.

5. A SHUT-OFF VALVE SHALL BE INSTALLED ON ALL PLUMBING SERVICES SHOWN ON THIS SHEET PRIOR

TO CONNECTION TO FIXTURE. SHUT-OFF VALVES SHALL BE INSTALLED NO HIGHER THAN 5'-0" ABOVE

BOILER ROOM FINISHED FLOOR AND SHALL BE EASILY ACCESSIBLE. SHUT-OFF VALVES SHALL NOT BE

INSTALLED BEHIND EQUIPMENT, INTERIOR TO WALLS OR OTHER LOCATIONS WHERE THEY ARE NOT EASILY

ACCESSIBLE. THE VA AND A/E RESERVES THE RIGHT TO APPROVE THE LOCATION OF ALL SHUT-OFF VALVES

PRIOR TO INSTALLATIONS AND MAY REQUIRE THE CONTRACTOR TO RELOCATE ANY VALVES DEEMED

INACCESSIBLE.

6. PLUMBING FIXTURES ARE TAGGED WITH A FIXTURE NUMBER. REFER TO THE PROJECT SPECIFICATIONS

FOR FIXTURE SELECTIONS, FIXTURE STOP VALVE, AND CONNECTION REQUIREMENTS.

7. PRIOR TO INSTALLATION, THE VA AND A/E RESERVE THE RIGHT TO APPROVE THE LOCATION OF ALL

FIELD INSTALLED EQUIPMENT, VALVES, SENSORS, INSTRUMENTS, GAUGES, STRAINERS, ETC FOR

ACCESSIBILITY. ALL ITEMS SUCH AS THESE MUST BE ACCESSIBLE FROM A FINISHED FLOOR, PLATFORM, MEZZANINE, OR CATWALK. ITEMS WHICH CAN ONLY BE ACCESSED BY A PORTABLE LADDER WILL BE DEEMED

INACCESSIBLE. ITEMS WHICH ARE LOCATED IN TIGHT SPACES, BEHIND OTHER EQUIPMENT, OR ARE NOT

SAFELY IN REACH FROM AN ELEVATED PLATFORM WILL ALSO BE DEEMED INACCESSIBLE. INSTALLATION OF

THESE ITEMS MUST ALSO NOT BLOCK WALKING PATHS IN THE BOILER PLANT OR ACCESS TO OTHER

INSTALLED EQUIPMENT. THE VA AND/OR A/E MAY REQUIRE THE CONTRACTOR TO RELOCATE OR PROVIDE

PERMANENT ACCESS TO ANY ITEMS INSTALLED WITHOUT PRIOR APPROVAL IF THEY ARE DEEMED

INACCESSIBLE BY THE VA AND/OR A/E. TO AVOID ANY CONFLICTS, IT IS RECOMMENDED THE CONTRACTOR

DOES NOT PROCEED WITH INSTALLATIONS UNTIL A WALK THROUGH IS HELD WITH THE VA AND A/E TEAM TO

AGREE UPON THE INSTALLED LOCATION OF THESE ITEMS. IT IS RECOMMENDED THIS IS DONE WEEKLY AT

CONSTRUCTION MEETINGS.

8. THE ENTIRE SCOPE OF THE TEMPORARY BOILER PLANT SUPPLY SHALL BE SUPPLIED WITH THE

NECESSARY FITTINGS, VALVES, INSTRUMENTS, GAUGES, ETC., REQUIRED TO CONDUCT SAFETY DEVICE

TESTING PER THE LATEST EDITION OF THE VETERAN ADMINISTRATION'S SAFETY DEVICE TESTING MANUAL.

THERE ARE ALSO SPECIFIC REQUIREMENTS FOR EQUIPMENT CONSTRUCTION, WIRING, AND CONTROLS, THAT

MUST BE MET. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR READING AND UNDERSTANDING THE

INSTALLED REQUIREMENTS FOR THE TEMPORARY PLANT TO ENSURE THEIR SUPPLY MEETS ALL PROJECT

REQUIREMENTS. NO CHANGE ORDERS WILL BE ISSUED DUE TO A FAILURE TO MEET ALL REQUIREMENTS. A

COPY OF THE SAFETY DEVICE TESTING MANUAL AT THE END OF THE DIVISION 23 SPECIFICATIONS. THE

GENERAL CONTRACTOR SHALL HIRE A THIRD PARTY TESTING AGENCY TO PERFORM VERIFICATION THAT ALL

SAFETY DEVICES MEET THE TESTING REQUIREMENTS OF THE SAFETY DEVICE TESTING MANUAL BEFORE THE

V.A. WILL ACCEPT THE TEMPORARY BOILER INSTALLATION. THE THIRD PARTY AGENCY MUST HAVE

COMPLETED A MINIMUM OF THREE (3) PAST V.A. BOILER PLANT TESTS.

GENERAL NOTES:

PLUMBING FIXTURE ROUGH-IN

CONNECTION SCHEDULE

FIXTURE WASTE VENT CW HW

WALL HYDRANT

CLEAN OUT

FLOOR DRAIN

LAVATORY

WATER CLOSET (FT)

URINAL

SINK

EWC

MIXING VALVE

MOP BASIN

HOSE BIBB

WASH MACHINE TRIM

NOTES:

1. SIZES SHALL BE AS SCHEDULED UNLESS OTHERWISE

NOTED ON DRAWINGS.

- - 3/4" -

4" - - -

2" 1-1/2" - -

2" 1-1/2" 1/2" 1/2"

4" 2" 1/2" -

1-1/2" -

1-1/2"

1-1/2"

1-1/2"

1-1/2"

3"

2"

2"

2"

2"

3/4"

1/2"

3/4"

3/4"

3/4"

3/4"

1/2"

1/2"

3/4"

3/4"

3/4"

FLOOR SINK 2" 1-1/2" - -

EMERG. EYE WASH/SHOWER 1-1/2"2" 1-1/4"

SHOWER 1-1/2"2" 3/4"3/4"

1-1/4"

KEY PLAN

Fargo, ND 58102

2101 Elm Street

Medical Center

Dept. of Veterans Affairs

Building No.

VA Project No.

Drawing Title

Contract No.

V e te ra n s A ff a ir s

Location

Drawn ByChecked ByDesigned By

Project Title

Drawing No.

Date

Scale:

D e p a rt m e n t o f

Dwg. of 6910 - BOILER PLANT

FARGO VA HEALTH CARE SYSTEM

FARGO, NORTH DAKOTA

VA263-P-1218

AH/KS AH/KS/JN DP/JK

VA263

Project Phase www.jlgarchitects.com copyright © 2015

Fargo 214 Broadway

Fargo, ND 58102 phone 7 0 1.3 6 4.0 2 3 7 facsimile 7 0 1.3 6 4.0 2 2 8

Elec. dwg name:

Submittal Date

S.D. 1 SUBMITTAL 12/30/2015

D.D. 1 SUBMITTAL (PRELIM.) 02/16/2016

D.D. 1 (35%) SUBMITTAL 09/30/2016

D.D. 2 (50%) SUBMITTAL 03/03/2017

D.D. 3 (99%) SUBMITTAL 10/20/2017

C.D. 4 (100%) SUBMITTAL 06/01/2018

/2

/2

:2 :0

P

M

As indicated

P4 437-14-112

REPLACE BOILER PLANT 10.26.2018

MAIN LEVEL PLUMBING PLAN

100% CONSTRUCTION DOCUMENT

P4.dwg

MECHANICAL SHEET INDEX

P00 MECHANICAL TITLE SHEET

P1 FOUNDATION LEVEL PLUMBING PLAN -

DEMOLITION

P2 MAIN LEVEL PLUMBING DEMOLITION PLAN

P3 FOUNDATION LEVEL PLUMBING PLAN

P4 MAIN LEVEL PLUMBING PLAN

P5 UPPER LEVEL PLUMBING PLAN

F1 MAIN LEVEL FIRE PROTECTION PLAN

F2 UPPER LEVEL FIRE PROTECTION PLAN

H1 PARTIAL MECH SITE PLAN - TEMPORARY

BOILERS

H2 MAIN LEVEL TEMPORARY STEAM PIPING PLAN

H3 MAIN LEVEL STEAM & HVAC PIPING

DEMOLITION PLAN

H4 UPPER LEVEL STEAM & HVAC PIPING

DEMOLITION PLAN

H5 MECHANICAL ROOF DEMOLITION PLAN

H6 MAIN LEVEL STEAM & HVAC PIPING PLAN

H7 UPPER LEVEL STEAM & HVAC PIPING PLAN

H8 MAIN LEVEL HVAC PIPING PLAN

H9 UPPER LEVEL HVAC PIPING PLAN

H10 MAIN LEVEL VENTILATION PLAN

H11 UPPER LEVEL VENTILATION PLAN

H12 MECHANICAL ROOF PLAN

H13 MECHANICAL SECTIONS

H14 MECHANICAL SECTIONS

H15 PIPING SCHEMATICS

H16 PIPING SCHEMATICS

H17 MECHANICAL DETAILS

H18 MECHANICAL DETAILS

H19 CONTROLS DIAGRAMS

H20 MECHANICAL SCHEDULES

NORTH

1/4" = 1'-0"P4

1 MAIN LEVEL PLUMBING PLAN

P4

3 PLUMBING RISER DIAGRAM - LOCKER/TOILET

4" RL UP TO

ROOF DRAIN

4" RL UP TO

ROOF DRAIN

4" RL UP TO

ROOF DRAIN

4" RL

ROUTE RAINLEADER PIPING

AS HIGH AS POSSIBLE

6" RL PIPING DN. REFER

TO MAIN LEVEL PLUMBING

PLAN FOR CONTINUATION

ROOF - REFER TO

MECHANICAL ROOF PLAN

FOR WORK IN THIS AREA

WATER

HEATER

WH-1.

(E) 4" V. DN.

4" V. UP

THROUGH ROOF

6" RL

3/4" C.W.

3/4" C.W. DN. TO

EXISTING WALL

HYDRANT.

1" C.W.

1" C.W. DN. TO

MAIN LEVEL

2" C.W. DN. TO

MAIN LEVEL

(E) 1-1/4" C.W. DN.

TO MAIN LEVEL

1 1/2" CW

3/4" C.W. DN. TO

WALL HYDRANT.

(E) 4" VENT UP

THROUGH ROOF &

DN. TO LOWER LEVEL

2" C.W. @ 16'-0"

ABOVE FLOOR

(BELOW RL PIPING)

1 1/2" CW

RE-SERVE (E) 3/4" HW

SERVING (E) TOILET

ROOM FROM NEW

WATER HEATER WH-1

3/4" CW

2" C.W. @ 16'-0"

ABOVE FLOOR

(BELOW RL PIPING)

2" C.W. @ 16'-0"

ABOVE FLOOR

(BELOW RL PIPING)

3/4" CW DN. TO

WALL HYDRANT

1-1/2" CW DN. FOR

EMERGENCY SHOWER/

EYEWASH STATION

3/4" CW DOWN TO

SAMPLE COOLER AT

REAR OF BOILER

3/4" CW DOWN TO

SAMPLE COOLER AT

REAR OF BOILER

3/4" CW DOWN TO

SAMPLE COOLER AT

REAR OF BOILER.

OFFSET BELOW

CATWALK AS REQUIRED.

3/4" C.W. DN. TO

WALL HYDRANT.

3/4" CW

3/4" CW

3/4" CW

3/4" CW

3/4" HW

1" COMPRESSED AIR

DOWN TO BOILER FOR

FUEL ATOMIZATION PER

DETAIL 1/H16.

A

IR

A

IR

AIR AIR

A

IR

A

IR

1" COMPRESSED AIR

DOWN TO BOILER FOR

FUEL ATOMIZATION

PER DETAIL 1/H16.

1" COMPRESSED AIR

DN. TO HOSE REEL

AIR AIR

A

IR

1-1/4" COMPRESSED AIR

DOWN TO COMPRESSOR/

AIR DRYER

1 1/4"

1" AIR 1 1/4" AIR1" AIR

AIR

P-530

P-101

1" AIR1" AIR

1" AIR

1" AIR

1" AIR

2" EMERGENCY SCW

MAKE-UP TO DA-1 PER

DETAIL 3/H15

2" CW DN. TO EMERGENCY MAKE-

UP WATER STORAGE TANKS.

2" SCW DN. TO EMERGENCY MAKE-

UP WATER STORAGE TANKS.

2" SCW

SCW

2" EMERGENCY MAKE-UP

WATER DN TO PUMPS

C W

CW CW

SCW

1" COMPRESSED AIR

DN. TO HOSE REEL

3/4" CW DOWN TO

SAMPLE COOLER

AT DA TANK

2" EMERGENCY MAKE-

UP WATER TO DA TANK

PER DETAIL 3/H15.

2" EMERGENCY

MAKE-UP WATER C

W

C W

RECONNECT TO

EXISTING 1-1/4" CW DN.

1-1/4" CW DN.

2" SOFT CW DN. TO

MAIN LEVEL

2" EMERGENCY DA MAKE-UP WATER

CONTROL VALVE ASSEMBLY PER DETAIL

3/H15 ACCESSIBLE FROM CATWALK

CV-3

2" SCW

1-1/2" MAKE-UP

WATER DN. TO

LOVER LEVEL.

1-1/2" MAKE-UP WATER TO CONDENSATE

STORAGE TANK PER DETAIL 4/H15.

RACK CW PIPING TO WALL

ABOVE WINDOWS

1" COMPRESSED AIR

DOWN TO BOILER FOR

FUEL ATOMIZATION

PER DETAIL 1/H16.

B-1 B-2 B-3

(E) FILL LINE FOR

EMERGENCY WATER

TANK

(E) EMERGENCY

WATER STORAGE

TANK

3/4" CW DN. TO HEAT

TRANSFER SKID. SEE

DETAIL 6/H16 FOR

CONNECTION LOCATION.

(E) 3/4" HW

(E) 3/4" CW DN.

TO LOWER

LEVEL

MECHANICAL CONTRACTOR SHALL PROVIDE STEEL

ANGLE IRON SUPPORTS AS REQUIRED TO SUPPORT

WATER HEATER OFF THE EXISTING WALL STRUCTURE.

MOUNT APPROX. 36" ABOVE ROOF OF OFFICE.

PROVIDE AND INSTALL NEW PLUMBING FIXTURE WHERE

EXISTING FIXTURE WAS REMOVED. RECONNECT TO

EXISTING WATER, WASTE AND VENT PIPING AS

REQUIRED.

PLUMBING SHEET NOTES:

1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK AND NOTIFY THE

ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN THE "AS-BUILT" CONDITIONS AND THESE DRAWINGS.

2. COORDINATE ALL PLUMBING INSTALLATION WITH GENERAL, FIRE PROTECTION, VENTILATION, AND

ELECTRICAL CONTRACTORS. INSTALL ALL PLUMBING PIPING AS HIGH AS POSSIBLE. PROVIDE ALL

NECESSARY OFFSETS (DROPS AND RISES) TO KEEP PLUMBING PIPING TIGHT TO THE STRUCTURE OR

DUCTWORK ABOVE. OFFSET PLUMBING PIPING TO AVOID BEAMS.

3. REFER TO AND COORDINATE WITH THE ARCHITECTURAL PLANS FOR CEILING TYPES, HEIGHTS, SOFFIT

AREAS, AND ELEVATIONS FOR INSTALLATION OF NEW PLUMBING PIPING, EQUIPMENT, ETC.

4. CONTRACTOR SHALL PATCH ANY WALL OR FLOOR PENETRATIONS THAT ARE LEFT AFTER DEMOLITION

AND INSTALLATION OF NEW. SEE ARCHITECTURAL FOR WALL AND FLOOR SYSTEM TYPES AND PATCHING

REQUIREMENTS.

5. A SHUT-OFF VALVE SHALL BE INSTALLED ON ALL PLUMBING SERVICES SHOWN ON THIS SHEET PRIOR

TO CONNECTION TO FIXTURE. SHUT-OFF VALVES SHALL BE INSTALLED NO HIGHER THAN 5'-0" ABOVE

BOILER ROOM FINISHED FLOOR AND SHALL BE EASILY ACCESSIBLE. SHUT-OFF VALVES SHALL NOT BE

INSTALLED BEHIND EQUIPMENT, INTERIOR TO WALLS OR OTHER LOCATIONS WHERE THEY ARE NOT EASILY

ACCESSIBLE. THE VA AND A/E RESERVES THE RIGHT TO APPROVE THE LOCATION OF ALL SHUT-OFF VALVES

PRIOR TO INSTALLATIONS AND MAY REQUIRE THE CONTRACTOR TO RELOCATE ANY VALVES DEEMED

INACCESSIBLE.

6. PLUMBING FIXTURES ARE TAGGED WITH A FIXTURE NUMBER. REFER TO THE PROJECT SPECIFICATIONS

FOR FIXTURE SELECTIONS, FIXTURE STOP VALVE, AND CONNECTION REQUIREMENTS.

7. PRIOR TO INSTALLATION, THE VA AND A/E RESERVE THE RIGHT TO APPROVE THE LOCATION OF ALL

FIELD INSTALLED EQUIPMENT, VALVES, SENSORS, INSTRUMENTS, GAUGES, STRAINERS, ETC FOR

ACCESSIBILITY. ALL ITEMS SUCH AS THESE MUST BE ACCESSIBLE FROM A FINISHED FLOOR, PLATFORM, MEZZANINE, OR CATWALK. ITEMS WHICH CAN ONLY BE ACCESSED BY A PORTABLE LADDER WILL BE DEEMED

INACCESSIBLE. ITEMS WHICH ARE LOCATED IN TIGHT SPACES, BEHIND OTHER EQUIPMENT, OR ARE NOT

SAFELY IN REACH FROM AN ELEVATED PLATFORM WILL ALSO BE DEEMED INACCESSIBLE. INSTALLATION OF

THESE ITEMS MUST ALSO NOT BLOCK WALKING PATHS IN THE BOILER PLANT OR ACCESS TO OTHER

INSTALLED EQUIPMENT. THE VA AND/OR A/E MAY REQUIRE THE CONTRACTOR TO RELOCATE OR PROVIDE

PERMANENT ACCESS TO ANY ITEMS INSTALLED WITHOUT PRIOR APPROVAL IF THEY ARE DEEMED

INACCESSIBLE BY THE VA AND/OR A/E. TO AVOID ANY CONFLICTS, IT IS RECOMMENDED THE CONTRACTOR

DOES NOT PROCEED WITH INSTALLATIONS UNTIL A WALK THROUGH IS HELD WITH THE VA AND A/E TEAM TO

AGREE UPON THE INSTALLED LOCATION OF THESE ITEMS. IT IS RECOMMENDED THIS IS DONE WEEKLY AT

CONSTRUCTION MEETINGS.

8. THE ENTIRE SCOPE OF THE TEMPORARY BOILER PLANT SUPPLY SHALL BE SUPPLIED WITH THE

NECESSARY FITTINGS, VALVES, INSTRUMENTS, GAUGES, ETC., REQUIRED TO CONDUCT SAFETY DEVICE

TESTING PER THE LATEST EDITION OF THE VETERAN ADMINISTRATION'S SAFETY DEVICE TESTING MANUAL.

THERE ARE ALSO SPECIFIC REQUIREMENTS FOR EQUIPMENT CONSTRUCTION, WIRING, AND CONTROLS, THAT

MUST BE MET. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR READING AND UNDERSTANDING THE

INSTALLED REQUIREMENTS FOR THE TEMPORARY PLANT TO ENSURE THEIR SUPPLY MEETS ALL PROJECT

REQUIREMENTS. NO CHANGE ORDERS WILL BE ISSUED DUE TO A FAILURE TO MEET ALL REQUIREMENTS. A

COPY OF THE SAFETY DEVICE TESTING MANUAL AT THE END OF THE DIVISION 23 SPECIFICATIONS. THE

GENERAL CONTRACTOR SHALL HIRE A THIRD PARTY TESTING AGENCY TO PERFORM VERIFICATION THAT ALL

SAFETY DEVICES MEET THE TESTING REQUIREMENTS OF THE SAFETY DEVICE TESTING MANUAL BEFORE THE

V.A. WILL ACCEPT THE TEMPORARY BOILER INSTALLATION. THE THIRD PARTY AGENCY MUST HAVE

COMPLETED A MINIMUM OF THREE (3) PAST V.A. BOILER PLANT TESTS.

GENERAL NOTES:

PLUMBING FIXTURE ROUGH-IN

CONNECTION SCHEDULE

FIXTURE WASTE VENT CW HW

WALL HYDRANT

CLEAN OUT

FLOOR DRAIN

LAVATORY

WATER CLOSET (FT)

URINAL

SINK

EWC

MIXING VALVE

MOP BASIN

HOSE BIBB

WASH MACHINE TRIM

NOTES:

1. SIZES SHALL BE AS SCHEDULED UNLESS OTHERWISE

NOTED ON DRAWINGS.

- - 3/4" -

4" - - -

2" 1-1/2" - -

2" 1-1/2" 1/2" 1/2"

4" 2" 1/2" -

1-1/2" -

1-1/2"

1-1/2"

1-1/2"

1-1/2"

3"

2"

2"

2"

2"

3/4"

1/2"

3/4"

3/4"

3/4"

3/4"

1/2"

1/2"

3/4"

3/4"

3/4"

FLOOR SINK 2" 1-1/2" - -

EMERG. EYE WASH/SHOWER 1-1/2"2" 1-1/4"

SHOWER 1-1/2"2" 3/4"3/4"

1-1/4"

KEY PLAN

Fargo, ND 58102

2101 Elm Street

Medical Center

Dept. of Veterans Affairs

Building No.

VA Project No.

Drawing Title

Contract No.

V e te ra n s A ff a ir s

Location

Drawn ByChecked ByDesigned By

Project Title

Drawing No.

Date

Scale:

D e p a rt m e n t o f

Dwg. of 6910 - BOILER PLANT

FARGO VA HEALTH CARE SYSTEM

FARGO, NORTH DAKOTA

VA263-P-1218

AH/KS AH/KS/JN DP/JK

VA263

Project Phase www.jlgarchitects.com copyright © 2015

Fargo 214 Broadway

Fargo, ND 58102 phone 7 0 1.3 6 4.0 2 3 7 facsimile 7 0 1.3 6 4.0 2 2 8

Elec. dwg name:

Submittal Date

S.D. 1 SUBMITTAL 12/30/2015

D.D. 1 SUBMITTAL (PRELIM.) 02/16/2016

D.D. 1 (35%) SUBMITTAL 09/30/2016

D.D. 2 (50%) SUBMITTAL 03/03/2017

D.D. 3 (99%) SUBMITTAL 10/20/2017

C.D. 4 (100%) SUBMITTAL 06/01/2018

/2

/2

:2 :0

P

M

As indicated

P5 437-14-112

REPLACE BOILER PLANT 10.26.2018

UPPER LEVEL PLUMBING PLAN

100% CONSTRUCTION DOCUMENT

P5.dwg

NORTH

1/4" = 1'-0"P5

1 UPPER LEVEL PLUMBING PIPING PLAN

MECHANICAL SHEET INDEX

P00 MECHANICAL TITLE SHEET

P1 FOUNDATION LEVEL PLUMBING PLAN -

DEMOLITION

P2 MAIN LEVEL PLUMBING DEMOLITION PLAN

P3 FOUNDATION LEVEL PLUMBING PLAN

P4 MAIN LEVEL PLUMBING PLAN

P5 UPPER LEVEL PLUMBING PLAN

F1 MAIN LEVEL FIRE PROTECTION PLAN

F2 UPPER LEVEL FIRE PROTECTION PLAN

H1 PARTIAL MECH SITE PLAN - TEMPORARY

BOILERS

H2 MAIN LEVEL TEMPORARY STEAM PIPING PLAN

H3 MAIN LEVEL STEAM & HVAC PIPING

DEMOLITION PLAN

H4 UPPER LEVEL STEAM & HVAC PIPING

DEMOLITION PLAN

H5 MECHANICAL ROOF DEMOLITION PLAN

H6 MAIN LEVEL STEAM & HVAC PIPING PLAN

H7 UPPER LEVEL STEAM & HVAC PIPING PLAN

H8 MAIN LEVEL HVAC PIPING PLAN

H9 UPPER LEVEL HVAC PIPING PLAN

H10 MAIN LEVEL VENTILATION PLAN

H11 UPPER LEVEL VENTILATION PLAN

H12 MECHANICAL ROOF PLAN

H13 MECHANICAL SECTIONS

H14 MECHANICAL SECTIONS

H15 PIPING SCHEMATICS

H16 PIPING SCHEMATICS

H17 MECHANICAL DETAILS

H18 MECHANICAL DETAILS

H19 CONTROLS DIAGRAMS

H20 MECHANICAL SCHEDULES

ELECTRICAL

LOWER LEVEL

BOILER ROOM

OFFICE/CONTROL

LOCKER ROOM

SHOP

STORAGE

CLOSET

GENERATOR

ROOM

HOUSEKEEPING

CLOSET

SHOP ALCOVE

105A

VESTIBULE

LOCATION OF FIRE PROTECTION

WATER SERVICE & FIRE RISER.

REFER TO DETAIL 2/F1 FOR

ADDITIONAL INFORMATION

INSTALL FIRE ALARM CONTROL

PANEL IN NEW ELECTRICAL ROOM.

COORDINATE PANEL LOCATION WITH

ELECTRICAL CONTRACTOR.

INSTALL INSPECTOR'S

TEST VALVE w/ DRAIN TO

OUTSIDE OF BUILDING

AT 18" ABOVE FINISHED

GRADE

PROVIDE FREEZE-

PROOF SPRINKLER

HEADS IN VESTIBULE

AS REQUIRED.

A. CONTRACTOR SHALL VERIFY ALL EXISTING

CONDITIONS PRIOR TO BEGINNING WORK AND NOTIFY THE

ARCHITECT/ ENGINEER OF ANY DISCREPANCIES BETWEEN

THE "AS-BUILT" CONDITIONS AND THESE DRAWINGS.

B. COORDINATE ALL FIRE PROTECTION INSTALLATION

WITH GENERAL, PLUMBING, VENTILATION, AND ELECTRICAL

CONTRACTORS. INSTALL ALL FIRE PROTECTION PIPING AS

HIGH AS POSSIBLE. PROVIDE ALL NECESSARY OFFSETS

(DROPS AND RISES) TO KEEP FIRE PROTECTION PIPING

TIGHT TO THE STRUCTURE OR DUCTWORK ABOVE. OFFSET

FIRE PROTECTION PIPING TO AVOID BEAMS.

C. ALL FIRE PROTECTION WORK SHALL ADHERE TO

CURRENT NFPA 13 STANDARDS.

D. ENTIRE BUILDING SHALL BE SPRINKLED. VERIFY

WHERE MULTIPLE FLOORS AND/OR CATWALKS EXIST.

E. SPRINKLER HEADS IN LAY-IN-TILE CEILINGS SHALL BE

LOCATED IN THE CENTER OF TILE.

F. REFER TO AND COORDINATE WITH THE ARCHITECTURAL

PLANS FOR CEILING TYPES, HEIGHTS, SOFFIT AREAS, AND

ELEVATIONS FOR INSTALLATION OF NEW FIRE PROTECTION

PIPING, SPRINKLER HEADS, EQUIPMENT, ETC.

G. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL

AND RE-INSTALLING OF EXISTING CEILING TILE NOT

REMOVED BY THE GENERAL CONTRACTOR FOR THE

INSTALLATION OF NEW FIRE PROTECTION PIPING, SPRINKLER

HEADS, EQUIPMENT, ETC. VERIFY WITH ARCHITECTURAL

PLANS FOR CEILING WORK BY THE GENERAL CONTRACTOR.

ANY CEILING TILE OR GRID DAMAGED DURING

CONSTRUCTION SHALL BE REPLACED WITH NEW BY THIS

CONTRACTOR.

H. THIS CONTRACTOR SHALL OPEN ALL EXISTING WALLS

AND/OR CEILINGS FOR INSTALLATION OF NEW FIRE

PROTECTION PIPING, SPRINKLER HEADS, EQUIPMENT, ETC.

AS REQUIRED. PATCH WALLS AND/OR CEILINGS TO MATCH

EXISTING.

I. MAINTAIN 3'-0" CLEAR SPACE IN FRONT OF ALL

ELECTRICAL, CONTROL, AND ACCESS PANELS FOR

ACCESSIBILITY.

GENERAL FIRE

PROTECTION NOTES:

FIRE PROTECTION LEGEND:

LIGHT HAZARD AREA

ORDINARY HAZARD AREA

GROUP 1

GENERAL NOTES:

1. CONTRACTOR SHALL PATCH ANY WALL OR FLOOR

PENETRATIONS THAT ARE LEFT AFTER DEMOLITION AND

INSTALLATION OF NEW. SEE ARCHITECTURAL FOR WALL

AND FLOOR SYSTEM TYPES AND PATCHING

REQUIREMENTS.

ORDINARY HAZARD AREA

GROUP 2

0ss

F

LOW

SW

ITCH

KEYED NOTES:

6" WATER SUPPLY MAIN

WATER SUPPLY PRESSURE GAUGE W/PETCOCK

VALVES W/TAMPER SWITCH

INSP. TEST VALVES WITH SIGHT GLASSES (2).

4" RISER TO WET SPRINKLER SYSTEM.

3 NEW 4" BACKFLOW ASSEMBLY WITH (2) TAMPER SWITCHES

4 4" CONNECTION TO SIAMESE.

6 VANE-TYPE WATER FLOW SWITCH

9 BALL DRIP CHECK VALVE

FIRE PROTECTION

CONTRACTOR

MECHANICAL

CONTRACTOR

ALARM BELL AND LIGHT. VERIFY LOCATION w/ OWNER

2" MAIN DRAIN PIPE TO BUILDING EXTERIOR

w/ AUXILIARY DRAIN PIPED TO FLOOR DRAIN

KEY PLAN

Fargo, ND 58102

2101 Elm Street

Medical Center

Dept. of Veterans Affairs

Building No.

VA Project No.

Drawing Title

Contract No.

V e te ra n s A ff a ir s

Location

Drawn ByChecked ByDesigned By

Project Title

Drawing No.

Date

Scale:

D e p a rt m e n t o f

Dwg. of 6910 - BOILER PLANT

FARGO VA HEALTH CARE SYSTEM

FARGO, NORTH DAKOTA

VA263-P-1218

AH/KS AH/KS/JN DP/JK

VA263

Project Phase www.jlgarchitects.com copyright © 2015

Fargo 214 Broadway

Fargo, ND 58102 phone 7 0 1.3 6 4.0 2 3 7 facsimile 7 0 1.3 6 4.0 2 2 8

Elec. dwg name:

Submittal Date

S.D. 1 SUBMITTAL 12/30/2015

D.D. 1 SUBMITTAL (PRELIM.) 02/16/2016

D.D. 1 (35%) SUBMITTAL 09/30/2016

D.D. 2 (50%) SUBMITTAL 03/03/2017

D.D. 3 (99%) SUBMITTAL 10/20/2017

C.D. 4 (100%) SUBMITTAL 06/01/2018

/2

/2

:2 :2

P

M

As indicated

F1 437-14-112

REPLACE BOILER PLANT 10.26.2018

MAIN LEVEL FIRE PROTECTION

PLAN

100% CONSTRUCTION DOCUMENT

F1.dwg

NORTH

1/4" = 1'-0"F1

1 MAIN LEVEL FIRE PROTECTION PLAN

MECHANICAL SHEET INDEX

P00 MECHANICAL TITLE SHEET

P1 FOUNDATION LEVEL PLUMBING PLAN -

DEMOLITION

P2 MAIN LEVEL PLUMBING DEMOLITION PLAN

P3 FOUNDATION LEVEL PLUMBING PLAN

P4 MAIN LEVEL PLUMBING PLAN

P5 UPPER LEVEL PLUMBING PLAN

F1 MAIN LEVEL FIRE PROTECTION PLAN

F2 UPPER LEVEL FIRE PROTECTION PLAN

H1 PARTIAL MECH SITE PLAN - TEMPORARY

BOILERS

H2 MAIN LEVEL TEMPORARY STEAM PIPING PLAN

H3 MAIN LEVEL STEAM & HVAC PIPING

DEMOLITION PLAN

H4 UPPER LEVEL STEAM & HVAC PIPING

DEMOLITION PLAN

H5 MECHANICAL ROOF DEMOLITION PLAN

H6 MAIN LEVEL STEAM & HVAC PIPING PLAN

H7 UPPER LEVEL STEAM & HVAC PIPING PLAN

H8 MAIN LEVEL HVAC PIPING PLAN

H9 UPPER LEVEL HVAC PIPING PLAN

H10 MAIN LEVEL VENTILATION PLAN

H11 UPPER LEVEL VENTILATION PLAN

H12 MECHANICAL…