36C26319B0007-0008009.docx
DOCX document 12 KB Posted
- Attached to
- PN: 568-18-102, Upgrade NFS HVAC System (FM)
- Solicitation number
- 36C26319B0007
About this file
36C26319B0007 0008 S06_Attachment Question and Answers 7-31-19.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26319C0199-000.docx | DOCX document | |
| 36C26319B0007-0008008.docx | DOCX document | |
| 36C26319B0007-0007001.pdf | ||
| 36C26319B0007-0007000.docx | DOCX document | |
| 36C26319B0007-0006000.docx | DOCX document | |
| 36C26319B0007-0006001.docx | DOCX document | |
| 36C26319B0007-0005000.docx | DOCX document | |
| 36C26319B0007-0004000.docx | DOCX document | |
| 36C26319B0007-0004001.docx | DOCX document | |
| 36C26319B0007-0003000.docx | DOCX document | |
| 36C26319B0007-0002002.pdf | ||
| 36C26319B0007-0002001.docx | DOCX document | |
| 36C26319B0007-0002000.docx | DOCX document | |
| 36C26319B0007-0001001.docx | DOCX document | |
| 36C26319B0007-0001000.docx | DOCX document | |
| 36C26319B0007-003.pdf | ||
| 36C26319B0007-004.docx | DOCX document | |
| 36C26319B0007-002.pdf | ||
| 36C26319B0007-001.docx | DOCX document | |
| 36C26319B0007-000.docx | DOCX document | |
| 36C26319B0007-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question and Answers
Q1. Addendum #7 says “Provide 208V, 60A/3P breaker to match manufacturer in existing bucket. Talking to the supplier this doesn’t appear to be possible. Would it be acceptable to bypass the controls in the existing bucket and fuse the circuit at 60A?
A1: The proposed solution for item 1 is acceptable. The Electrical Contractor can provide a 60A/3P fused disconnect in lieu of the 60A/3P breaker.
Q2.The MC is supplying a new SF-1 motor according to addendum #4. Can they supply the VFD for this motor since they will know the exact requirement of the VFD?
A2: Yes, it does not matter who supplies the VFD as long as it meets requirements in the Electrical Division of the Specifications and is provided by the GC or any of its subcontractors/suppliers.
Clarification: MC to me means “Mechanical Contractor.” There’s a possibility they meant “Medical Center”, which is entirely incorrect that the Medical Center would be supplying the new SF-1 motor.