36C26319B0007-0008009.docx

DOCX document 12 KB Posted

Attached to
PN: 568-18-102, Upgrade NFS HVAC System (FM)
Solicitation number
36C26319B0007
Issued by

About this file

36C26319B0007 0008 S06_Attachment Question and Answers 7-31-19.docx

View the file

Other files

File Type Posted
36C26319C0199-000.docx DOCX document
36C26319B0007-0008008.docx DOCX document
36C26319B0007-0007001.pdf PDF
36C26319B0007-0007000.docx DOCX document
36C26319B0007-0006000.docx DOCX document
36C26319B0007-0006001.docx DOCX document
36C26319B0007-0005000.docx DOCX document
36C26319B0007-0004000.docx DOCX document
36C26319B0007-0004001.docx DOCX document
36C26319B0007-0003000.docx DOCX document
36C26319B0007-0002002.pdf PDF
36C26319B0007-0002001.docx DOCX document
36C26319B0007-0002000.docx DOCX document
36C26319B0007-0001001.docx DOCX document
36C26319B0007-0001000.docx DOCX document
36C26319B0007-003.pdf PDF
36C26319B0007-004.docx DOCX document
36C26319B0007-002.pdf PDF
36C26319B0007-001.docx DOCX document
36C26319B0007-000.docx DOCX document
36C26319B0007-000.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answers

Q1. Addendum #7 says “Provide 208V, 60A/3P breaker to match manufacturer in existing bucket. Talking to the supplier this doesn’t appear to be possible. Would it be acceptable to bypass the controls in the existing bucket and fuse the circuit at 60A?

A1: The proposed solution for item 1 is acceptable. The Electrical Contractor can provide a 60A/3P fused disconnect in lieu of the 60A/3P breaker.

Q2.The MC is supplying a new SF-1 motor according to addendum #4. Can they supply the VFD for this motor since they will know the exact requirement of the VFD?

A2: Yes, it does not matter who supplies the VFD as long as it meets requirements in the Electrical Division of the Specifications and is provided by the GC or any of its subcontractors/suppliers.

Clarification: MC to me means “Mechanical Contractor.” There’s a possibility they meant “Medical Center”, which is entirely incorrect that the Medical Center would be supplying the new SF-1 motor.