36C26319B0007 0003 36C26319B0007 0003.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26319C0199-000.docx | DOCX document | |
| 36C26319B0007-0008009.docx | DOCX document | |
| 36C26319B0007-0008008.docx | DOCX document | |
| 36C26319B0007-0007001.pdf | ||
| 36C26319B0007-0007000.docx | DOCX document | |
| 36C26319B0007-0006000.docx | DOCX document | |
| 36C26319B0007-0006001.docx | DOCX document | |
| 36C26319B0007-0005000.docx | DOCX document | |
| 36C26319B0007-0004000.docx | DOCX document | |
| 36C26319B0007-0004001.docx | DOCX document | |
| 36C26319B0007-0002002.pdf | ||
| 36C26319B0007-0002001.docx | DOCX document | |
| 36C26319B0007-0002000.docx | DOCX document | |
| 36C26319B0007-0001001.docx | DOCX document | |
| 36C26319B0007-0001000.docx | DOCX document | |
| 36C26319B0007-003.pdf | ||
| 36C26319B0007-004.docx | DOCX document | |
| 36C26319B0007-002.pdf | ||
| 36C26319B0007-001.docx | DOCX document | |
| 36C26319B0007-000.docx | DOCX document | |
| 36C26319B0007-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 07-17-2019 568-19-4-9967-0054 568-18-102 36C263 Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 111 South 18th Plaza, Suite C38 Omaha
NE
68102-2077 36C263 Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 111 South 18th Plaza, Suite C38 Omaha
NE
68102-2077 To all Offerors/Bidders
36C26319B0007 06-12-2019
X X X
X PN: 568-18-102, Upgrade NFS HVAC System, Fort Meade VA Medical Center Fort Meade SD 57741 VA Contracting POC: Patricia Pennington, Email: Patricia.Pennington@va.gov
The purpose of this amendment is to answer a question which requires a change to Spec Sction 23 09 23.
The due date and time of proposals remains 7/24/19 at 2:00 PM (CT). The Public Bid Opening will still be held at the Hruska Federal Courthouse, 111 South 18th Plaza, Omaha, NE 68102, Concourse C, Conference Room C125.
Please arrive early due to limited parking.
(Continued on next page) Cynda Rosa NCO 23 Contracting Officer
VA VHA SAOC 2018 A8CA4E75
QUESTION: The specifications call for digital scroll compressors in Section 23 81 00 (page 4), but the schedule calls for 4 stages of operation. Additionally, the drawing shows NO hot gas bypass lines. Note 1 on the schedule calls for modulating hot gas bypass. But, that is NOT in the spec. If we can use digital scroll, we DO NOT need hot gas bypass.
ANSWER: The condensing unit has dual refrigeration circuits. Each circuit has two scroll compressors. The condensing unit has four capacity stages as stated on the schedule. Condenser modulation is achieved by turning compressors on and off in sequence.
Although the manufacturer offers Hot Gas Bypass as an option, the VA has indicated that Hot Gas Bypass is not needed for the level of control desired for the kitchen operation. Hot Gas Bypass can be added in the future should the need arise. The addition of Hot Gas Bypass would provide more precise control at low capacity.
Consequently, the following addendum to Specification Section 23 09 23 – 23 is issued:
Specification Section 23 09 23 page 23, Paragraph 2.10 Final Control Elements and Operators, Item F. 3., Change to the following.
3. Required control operation.
AIR HANDLING UNIT S-1
DX Coil and Condenser Cycle the four (4) compressors which each have digital control modulation, to maintain the room set point by (resetting the discharge air set point) (allowing the discharge air to float between 50F and 75F adjustable).