36C26219R0026-011.docx
DOCX document Posted
- Solicitation number
- 36C26219R0026
About this file
This document outlines a Quality Assurance Surveillance Plan (QASP) for outpatient site of care services at community based outpatient clinics. The contractor will be evaluated on core teamlet staffing ratios of at least 3 FTEs per primary care provider, and completing new primary care appointments within 20 days of the create date. Surveillance will be conducted through periodic sampling of electronic report data, with performance standards determining the level of contractor performance and ratings. Acceptable quality levels will be set at or better than national VA averages. The government will administer various surveillance methods including direct observation, inspection, complaints, sampling, and automated data to monitor performance.
This related federal contract opportunity notice is for primary care and space/administrative support services at five proposed community based outpatient clinics in Corona, Murrieta, Rancho Cucamonga, Victorville, and Palm Desert, California. The Department of Veterans Affairs intends to make a single award for all locations under an indefinite delivery/indefinite quantity contract for a base year plus nine one-year options. The anticipated solicitation will post on May 6, 2019 to FedBizOpps, and prospective offerors must register in the System for Award Management.
36C26219R0026 D1 QASP.docx
View the file
Other files
Show 40 more
Latest 50 of 85 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP) Outpatient Site of Care Service The contractor shall be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and/or revise it on a regular basis at a minimum of annually. The acceptable quality levels will be set at or better than the national VHA average. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Chelsea Black Organization or Agency: Department of Veterans Affairs, Loma Linda VA Medical Center
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall ensure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Dave R Greer Sr
c. CBOC Coordinator – The Coordinator has the program oversight of the CBOCs, to ensure compliance with all VHA policies and directives and external regulatory standards.
Assigned CBOC Coordinator: Erin Pope, MSN, RN, AGCNS-BC
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
Primary:
Alternate:
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined.
* To be paid the full capitated rate on the schedule, the contractor must provide services as required in the entire contract and to meet or exceed the acceptable quality level outlined in this section/sub-sections. If any portion of the requirement is not met and/or the acceptable quality level in any of the elements in this section/subsection are not maintained, the contractor will be notified by the contracting officer for response outlining the contractor’s proposed remedy. The Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming services per FAR 52.212-4.
Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards. The Contractor is responsible for ongoing monitoring and surveillance of these performance standards. If the acceptable quality level is not met, the Contractor shall submit a corrective action plan by a defined date established by the COR/CO.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR can use the following surveillance methods in the administration of this QASP: Direct observation, periodic inspection, validated user/customer complaints, random sampling, contractor provided information and VA automated electronic data. Specific surveillance methods are defined in the PWS table below.
6. MEASURES
PACT CBOC QASP
Task
| PWS Para |
| Performance Requirement |
| Standard |
| Acceptable Quality Level |
Method of Surveillance
PERCENT OF TEAMS WITH CORE TEAMLET STAFFING RATIO >=3
| 33.20 |
| Contractor shall provide core teamlet staffing at a ratio of >=3 FTE core teamlet members (RN Care Manager, Clinical Associate and Administrative Associate) for each PCP FTE. |
| 100 % of Contractor’s primary care teams shall a core teamlet staffing ratio of >=3. |
100 % of Contractor’s primary care teams shall a core teamlet staffing ratio of >=3.
Periodic Sampling COR will monitor monthly using Electronic report data from the Performance Measure Report, PACT Compass.
| NEW PC APPOINTMENTS COMPLETED WITHIN 20 DAYS OF CREATE DATE (PC18) |
| 33.6 |
| Contractor shall provide completed appointments for new PC patients <=20 days from the create date |
| Contractor shall provide completed appointments for new PC patients <=20 days from the create date no less than 76% of the time. |
| Contractor shall provide completed appointments for new PC patients <=20 days from the create date no less than 73% of the time. |
| Periodic Sampling COR will monitor performance monthly using Electronic reports and data from the VSSC, Performance Measure Report, EHR system. |
| ESTABLISHED PC APPOINTMENTS COMPLETED WITHIN 20 DAYS OF PATIENT INDICATED DATED (PC17) |
| 33.7 |
| Contractor shall provide completed appointments for established PC patients <=20 days from the Patient Indicated date. |
| Contractor shall provide completed appointments for established PC patients <=20 days from the Patient Indicated date no less than 97% of the time. |
| Contractor shall provide completed appointments for established PC patients <=20 days from the Patient Indicated date no less than 94% of the time. |
| Periodic Sampling COR will monitor performance monthly using Electronic reports and data from the VSSC, Performance Measure Report, EHR system |
| SAME DAY APPOINTMENTS WITH PRIMARY CARE PROVIDER (PCP) |
| 33.8 |
| Contractor shall provide same day appointments with PCP |
| 60% completion of same day primary care appointments with PCP |
| 60% completion of same day primary care appointments with PCP |
| Periodic Inspection audit of VHA Performance Measure Report and PACT COMPASS |
COR will monitor and report progress monthly
PROGRESS NOTES AND PATIENT CARE ENCOUNTER (PCE) MODULE DOCUMENTATION
[Local Reports]
| 33.23 |
| Contractor shall complete workload and encounter documentation as defined in the PWS within 2 business days. Progress notes must be connected to correct visit/encounter and location, entered in EHR on the same day as the visit/encounter, meet CMS guidelines and include content as defined in PWS. |
| Contractor shall properly complete documentation for each patient encounter 100% |
of the time.
Contractor shall properly complete documentation for each patient encounter 95% of the time.
COR will monitor using monthly Electronic report using data from VA EHR system and other local customized reports.
COR will send these monthly reports to the contractor to notify them to their current performance.
NON-FORMULARY AND RESTRICTED DRUG REQUESTS
| 33.9 |
| Contractor shall submit a non-formulary and restricted drug request into EHR using the PBM consult option. |
| Contractor shall submit a non-formulary and restricted drug request into EHR using the PBM consult option 100% of the time. (Zero disapproval ratings for non-formulary and restricted drug requests quarterly). |
| Contractor shall submit a non-formulary and restricted drug request into EHR using the PBM consult option 90% of the time. (no more than 10% disapproval ratings for non-formulary and restricted drug requests quarterly). |
| Random Sampling COR will monitor using Electronic report using data from VA EHR system |
VA will monitor progress quarterly thru automated reports. VA will send status reports to the contractor to notify them to their current performance.
| PHARMACY NEW DRUG ORDER REQUESTS |
| 33.10 |
| Contractor shall submit new drug orders through EHR to VA standards |
| Contractor shall ensure that 95% of all new drug order requests follow VA prescribing guidelines. This is including but not limited to ensuring all appropriate labs have been previously ordered and that the order is not a non-formulary drug. |
| Contractor shall ensure that 90% of all new drug order requests follow VA prescribing guidelines. This is including but not limited to ensuring all appropriate labs have been previously ordered and that the order is not a non-formulary drug. |
| Random Sampling COR will monitor using Electronic report using data from VA EHR system |
VA will monitor progress quarterly thru automated reports. COR will send status reports to the contractor to notify them to their current performance.
| PRIMARY CARE PATIENTS IN MENTAL HEALTH INTEGRATION (PCMHI) [PACT 15] |
| 33.12 |
| Contractor shall involve PCMHI staff in the care of patients with Mental Health needs. |
Contractor shall meet or exceed 8% of enrolled patients in PCMHI.
| Contractor to maintain at least 6% of enrolled patients in PCMHI. |
| COR will monitor using Electronic report using data from Performance Measure Report: T21, Quality and PACT Compass. COR will monitor progress monthly (non-cumulative) thru automated reports. |
Task
| PWS Para |
| Performance Requirement |
| Standard |
| Acceptable Quality Level |
Method of Surveillance
| RATIO OF NON-TRADITIONAL ENCOUNTERS |
| 33.13 |
| Contractor shall provide telephone encounters, group encounters and secure messaging. |
Contractor shall meet or exceed at least 25% in the appropriate ratio of non-traditional encounters.
Contractor shall maintain at least 20% in the appropriate ratio of non-traditional encounters.
COR will monitor using Electronic report using data from Performance Measure Report: T21, Quality and PACT Compass. COR will monitor progress monthly (non-cumulative) thru automated reports
| POST DISCHARGE CONTACT BY PACT TEAM |
| 33.14 |
| Contractor ‘s PACT teamlets shall contact their assigned patients within 2 business days of discharge from any VA facility. |
| Contractor assigned PACT Team member shall contact at least 60% of patients within two business days of discharge. |
Contractor assigned PACT Team member shall contact at least 55% of patients within two business days of discharge.
COR will monitor using Electronic report using data from Performance Measure Report: T21, Quality and PACT Compass. COR will monitor progress monthly (non-cumulative) thru automated reports.
PCMH SHEP ACCESS COMPOSITE [SHEP Q3]
| 33.15 |
| Composite % Based on 3 Questions: 1) Get an urgent care appointment as soon as needed, 2) Get a routine care appointment as soon as needed. 3) Get same day answer to your medical question. |
| Contractor shall meet or exceed 51% |
| Contractor shall meet or exceed 51% |
COR will monitor progress quarterly (non-cumulative) thru automated reports. VA. VHA SAIL and Patient Experience Reports [SHEP] reports.
| PACT PATIENTS ENROLLED IN HOME TELEHEALTH (HT) [PACT 13] |
| 33.11 |
| Contractor shall offer and refer enrolled patients to Home Telehealth (HT) |
Contractor shall enroll at least 1.6% of PC assigned patients in Home Telehealth (HT).
| Contractor shall enroll a minimum 1.2% of PC assigned patients in Home Telehealth (HT) |
| COR will monitor monthly using Electronic report using data from Performance Measure Report, PACT Compass monthly. |
| APPOINTMENT CANCELLATIONS |
| 33.16 |
| Contractor shall not unnecessarily cancel patient appointments and will reschedule cancelled appointments in a timely manner. |
| Contractor rate of appointments cancelled by clinic shall not exceed 9%. |
| Contractor rate of appointments cancelled by clinic shall be at a minimum of 10%. |
| Random Sampling COR will monitor using Electronic report using data from VA EHR system. COR will monitor progress through monthly audits using automated reports. Contractor can check the status of their performance by running reports in EHR system. |
PRIMARY CARE PROVIDER CONTINUITY
| 33.17 |
| Patients see same PCP for appointments |
| 77% of appointments provided with assigned PCP |
| 75% of appointments provided with assigned PCP |
COR will monitor using Electronic report using data from Performance Measure Report: T21, Quality and PACT Compass. COR will monitor progress monthly (non-cumulative) thru automated reports.
| SHEP QUESTION 7 |
| 33.18 |
| Contractor shall provide timely appointments when patients need care right away. Weighted number of outpatients responding “yes” to SHEP question 7 |
| At least 41% of patients respond “yes” to SHEP question 7. |
| At least 41% of patients respond “yes” to SHEP question 7. |
| COR will monitor progress quarterly (non-cumulative) thru automated reports. VHA SAIL and Patient Experience Reports [SHEP] reports. |
| VETERAN SATISFACTION (Q32) |
| 33.19 |
| Contractor’s PCP shall provide care that Veterans rate as a 9 or 10 on question 32 of the SHEP/PCMH survey. |
| Contractor’s shall meet or exceed a score of 69% on SHEP question 32 of the SHEP/PCMH survey. |
| Contractor’s shall meet or exceed a score of 69% on SHEP question 32 of the SHEP/PCMH survey. |
| COR will monitor progress quarterly (non-cumulative) thru automated reports. VHA SAIL and Patient Experience Reports [SHEP] reports. |
| PERCENT OF WOMEN ASSIGNED TO WOMEN’S HEALTH PACT OR DESIGNATED WOMEN’S HEALTH PROVIDER (WH) |
| 33.21 |
| Contractor shall ensure that an appropriate number of WH-PACT or WH-PCPs are available at sites of care to ensure that all VHA access goals are met for women Veterans who choose to be seen by designated women’s health providers. |
| Contractor’s percent of women assigned to a Women’s Health PACT or Designated Women’s Health Provider shall meet or exceed 77% |
| Contractor’s percent of women assigned to a Women’s Health PACT or Designated Women’s Health Provider shall meet or exceed 73% |
| COR will monitor using Electronic report using data from Performance Measure Report: T21, Quality and PACT Compass. COR will monitor progress monthly (non-cumulative) thru automated reports. |
| PERCENTAGE OF DEFICIENCIES IDENTIFIED DURING EOC ROUNDS THAT ARE CLOSED TIMELY (E5E0C1) |
| 33.22 |
| Contractor shall address deficiencies identified on EOC rounds within 14 business days or have a documented Plan of Action. |
| Contractor’s rate of EOC deficiencies that are closed within 14 business days or have a PFA shall meet or exceed 85% compliance. |
| Contractor’s rate of EOC deficiencies that are closed within 14 business days or have a PFA shall meet or exceed 80% compliance. |
| COR will monitor quarterly using Electronic report using data from Performance Measure Report, VSSC: COR will monitor progress (non-cumulative) thru automated reports. |
| COMPOSITE DIABETES |
| 33.1 |
| Contractor shall manage patients with diabetes in accordance with VA standards: |
-dmg27H_EC DM: BP LT 140/90 (eMeasure) -dmg34H_ec DM: Medical attention for nephropathy -Renal Testing (OP) (eMeasure) -statn7_ec Statin therapy for patients with diabetes (eMeasure).
| Contractor shall maintain a diabetes composite score of at least 79% |
| Contractor shall maintain a diabetes composite score of at least 77% |
| Random Sampling (auditing) COR will monitor using Electronic report using data from VA EHR system, EPRP Reviews, CBOC Report. COR will monitor progress quarterly thru automated reports. COR will send these monthly reports to the contractor to notify them to their current performance. |
| COMPOSITE BEHAVIORAL HEALTH SCREENING |
| 33.2 |
| Contractor shall complete all behavioral health screenings and follow-up evaluations and proper documentation upon completion of all clinical reminders as they appear during a patient’s visit in accordance with VA standards: |
-mdd40 – Vets screened annually for major depression dx -ptsd51 – PTSD screening using the PC-PTSD tool at required times -sa17 – Vets screened annually for alcohol misuse w/score GE-5 w/timely brief counseling.
-sa7 – Vets screened annually for alcohol misuse -Sre1 – (mdd41 and ptsd52) aggregated scores for timely suicide evaluations.
| Contractor shall maintain a behavioral health composite score of at least 95% or higher. |
| Contractor shall maintain a minimum score of 90% completion of clinical reminders each month. |
| Random Sampling (auditing) COR will monitor using Electronic report using data from VA EHR system, EPRP Reviews, CBOC Report. COR will monitor progress quarterly thru automated reports. COR will send these monthly reports to the contractor to notify them to their current performance. |
| COMPOSITE ISCHEMIC HEART |
| 33.3 |
| Contractor shall manage patients with Ischemic Heart Disease in accordance with VA standards: |
-ihd53_ec -statn 1_ec -Statin Therapy for patients with cardiovascular disease (eMeasure)
| Contractor shall maintain an Ischemic Heart composite score of at least 78% |
| Contractor shall achieve a minimum Ischemic Heart composite score of at least 77% |
| Random Sampling (auditing) COR will monitor using Electronic report using data from VA EHR system, EPRP Reviews, CBOC Report. COR will monitor progress quarterly thru automated reports. COR will send these monthly reports to the contractor to notify them to their current performance |
| COMPOSITE PREVENTION |
| 33.4 |
| Contractor shall provide preventive health care in accordance with VA standards: |
-dmg31h DM: Retinal exam timely by disease (OP) -p61h Colorectal Cancer Screening Ages 50-75 -p42 Cervical Cancer screening women age 30-64 -Pvc11h Pneumococcal Immunizations (OP) EPRP Sample -p32 Breast Cancer Screening including tomography for women 50-74 (OP) HEDIS
| Contractor shall maintain a prevention composite score of at least 80% |
| Contractor shall achieve a minimum prevention composite score of at least 78% |
| Random Sampling (auditing) COR will monitor using Electronic report using data from VA EHR system, EPRP Reviews, CBOC Report. COR will monitor progress quarterly thru automated reports. COR will send these monthly reports to the contractor to notify them to their current performance |
| COMPOSITE TOBACCO |
| 33.5 |
| Contractor shall provide tobacco counseling and care in accordance with VA standards: |
-smg8 Pts using tobacco provided w/counsel (OP) -smg9 Pts using tobacco offered referral (OP) -smg10 Pts using tobacco offered meds (OP) -p43h Cervical Cancer screening women age 30-64 -pvc11h Pneumococcal Immunization (OP) EPRP Sample -p32 Breast Cancer screening including tomography for women 50-74 (OP) HEDIS.
| Contractor shall maintain a tobacco score of at least 94%. |
| Contractor shall achieve a minimum tobacco score of at least 92%. |
| Random Sampling (auditing) COR will monitor using Electronic report using data from VA EHR system, EPRP Reviews, CBOC Report. COR will monitor progress quarterly thru automated reports. COR will send these monthly reports to the contractor to notify them to their current performance |
7. Ratings:
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:
| EXCEPTIONAL: |
| Performance meets contractual requirements and exceeds many to the |
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
| VERY GOOD: |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.
| SATISFACTORY: |
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.
| MARGINAL: | |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. | |
| Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the | contractual deficiency (e.g., Management, Quality, Safety or Environmental Deficiency Report or letter). |
| UNSATISFACTORY: | |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective. | |
| Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or | Environmental Deficiency Reports, or letters). |
| 8. | DOCUMENTING PERFORMANCE: |
| a. | The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR). |
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines, formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor must present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Reporting.
The COR shall communicate with the Contractor and will provide written reports to the Contracting Officer quarterly (or as outlined in the contract or COR delegation) to review Contractor performance.
10. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
COR NAME/TITLE DATE
SIGNED:
CONTRACTOR NAME/TITLE DATE
File details come from the government source that posted it. Updated .