RFIs 612A4-27-018 B650 3rd and 2nd Flooring 17Nov26.pdf
PDF 153 KB Posted
- Solicitation number
- 36C26127Q00260001
About this file
This document is a Questions and Answers (Q&A) clarification sheet for a VA construction contract. It addresses five key areas of contractor inquiry with official VA responses.
The clarifications cover: (1) corner guard specifications referenced in Attachment 1, with the VA confirming the attachment will be provided; (2) infection prevention and control requirements, clarifying that contractors must follow Level II Infection Prevention and Control Precaution standards; (3) staffing structure, confirming that the superintendent may serve dual roles as either the Safety or QC representative but cannot serve as project manager or simultaneously as both Safety and QC representatives; (4) specification section 10 26 00, which the Contracting Officer's Representative (COR) will issue as an amendment; and (5) furniture and personal item storage responsibilities, establishing that the VA will relocate personal items and notify the contractor of room assignments, the contractor shall procure off-site storage for furniture at their own expense, and the contractor bears responsibility for disposing of old furniture when the VA installs new furniture. These clarifications address apparent contradictions in earlier questions and establish clear delineation of responsibilities between the VA and contractor throughout construction phases.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.The Q&A # 40 refers to attachment #1 for Corner guards.
We did not find any green dots in the attachment A for corner guards.
VA Answer: Refer to Attachment 1 – attached.
2. Q#23 & #54 contradict each other.
Are we to follow Level 2 containment or not?
VA Answer: Yes, contractor to follow Level II Infection Prevention and Control Precaution.
3.Q#69,#72,#74,#91& #14 contradict each other.
Please confirm the super can be dual hatted and you don’t need 3 personals on site.
VA Answer: The superintendent may be dual-hatted; that is, they may also serve as the Safety or
QC representative, but not as the project manager or as both the Safety and QC representatives.
4. Q&A#80- answer- COR will provide Specification Section 10 26 00 as an amendment.
We have not received it till now. When will this be issued?
VA Answer: Yes, it will be issued.
5. Q&A #5 - Where should personal items and furniture be stored during each phase of construction?
VA - VA will relocate personal items; the contractor shall find a location outside the VA for storing furniture at their own expense. When re-installing furniture, the VA will let the contractor know if a room is getting new furniture. If new furniture is installed, the VA will install.
If VA supplies furniture, we are responsible for disposal of furniture, this is unknown at this time.
VA Answer: Correct, the contractor will be responsible for disposal of furniture if the VA installs new furniture.
File details come from the government source that posted it. Updated .