Attachment C Price Breakdown 36C26127Q0026_2 B650 3rd and 2nd Flooring.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- 36C26127Q00260001
About this file
This is a Price Breakdown attachment for a federal construction solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 for Project #612A4-27-018 at the Sacramento VA Medical Center in Mather, California.
The project scope encompasses the replacement of flooring, resilient base, stainless steel corner guards, and paint throughout Building 650, 3rd and 2nd Floors of the Sacramento Veterans Affairs Medical Center. The contractor must furnish all labor and materials for demolition, replacement, and installation work as specified. The price breakdown template categorizes costs across multiple divisions including General Requirements (encompassing project management, quality control, superintendent/safety, mobilization, shop drawings, safety requirements, quality control, and construction waste management); Division 02 for existing conditions and demolition; and Division 09 for finishes (subsurface preparation, gypsum board, resilient base and accessories, resilient sheet flooring, resilient tile flooring, carpeting, and painting). The template also includes line items for bonds, insurance, home office overhead, and profit, with columns for material, equipment, labor, and total costs, culminating in a subtotal and project grand total. All work must be performed outside normal working hours (7:30 AM to 4:00 PM, Monday through Friday), with exceptions requiring three weeks' advance planning approval. The contractor is responsible for waste disposal, site staging coordination, infection control procedures compliance, and must avoid parking in patient-designated areas.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A - Price Breakdown 36C26127Q0026_2 - Project # 612A4-27-018, Replace B650 3rd and 2nd Flooring Attachment A - PRICE BREAKDOWN Description Material Equipment Labor Total
| Project Manager/QC |
| Superintendent/Safety |
| Mobilization |
| Division 01 - General Requirements |
| General Requirements |
| Shop Drawings, Product Data, and Samples |
| Safety Requirements |
| Reference Standards |
| Quality Control |
| Construction Waste Management |
| Sustainable Construction Requirement |
| Division 02 - Existing Conditions |
| Demolition |
| Division 09- Finishes |
| Subsurface Preparation for Floor Finishes |
| Schedule for Finishes |
| Gypsum Board |
| Resilient Base and Accessories |
| Resilient Sheet Flooring |
| Resilient Tile Flooring |
| Carpeting |
| Painting |
| Bonds |
| Insurance |
| Home Office Overhead |
| Profit |
SUB-TOTAL
PROJECT GRAND TOTAL
File details come from the government source that posted it. Updated .