CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx

DOCX document 14 KB Posted

Attached to
Z2DA--612A4-27-018 | Replace B650 3rd and 2nd Flooring
Solicitation number
36C26127Q00260001
Issued by

About this file

This is a Contractor Certification form regarding safety and environmental compliance for a specific federal construction project. The form applies to Project 612A4-27-018, Replace B650 3rd and 2nd Flooring, conducted by the VA Northern California Health Care System at the Sacramento Veterans Affairs Medical Center (10535 Hospital Way, Mather, CA 95655). The certification requires contractors to disclose the number of serious, willful, or repeat violations from OSHA within the last three years and the number of serious, willful, or repeat EPA violations within the same timeframe; contractors must provide written explanations for any violations identified. Contractors are disqualified if they have four serious violations, one repeat violation, or one willful violation in either OSHA or EPA categories.

The form also requires contractors to provide their current Insurance Experience Modification Rate (EMR), supported by a signed letter from their insurance carrier on official letterhead. Contractors must sign the certification and provide their typed name and title. This certification is a mandatory compliance document for bidders on Solicitation Number 36C26127Q0026 for the flooring replacement project, which involves demolition and replacement of flooring, resilient base, stainless steel corner guards, and paint on the 3rd and 2nd floors of Building 650. Work must be performed outside normal business hours (7:30 AM to 4:00 PM, Monday through Friday), and contractors are responsible for all waste disposal and compliance with VA infection control procedures.

View the file

Other files

File Type Posted
36C26127Q0026 0005.pdf PDF
Additional RFI clarification 18 Nov 26.pdf PDF
36C26127Q0026 0004.pdf PDF
RFIs 612A4-27-018 B650 3rd and 2nd Flooring 17Nov26.pdf PDF
10 26 00 - WALL AND DOOR PROTECTION.pdf PDF
Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring1.pdf PDF
RFIs 612A4-27-018 B650 3rd and 2nd Flooring.pdf PDF
Evaluation Criteria 1 - Key Personnel_ATTACHMENT A.docx DOCX document
36C26127Q0026 0003.pdf PDF
Wage Determination CA20260007 dated 20260903.pdf PDF
Attachment C Price Breakdown 36C26127Q0026_2 B650 3rd and 2nd Flooring.xlsx XLSX spreadsheet
36C26127Q0026 0002.pdf PDF
612A4-27-018 Pre-Bid Sign in Shts.pdf PDF
36C26127Q0026 0001 Replace B650 Flooring.pdf PDF
RFI Form - 36C26127Q0026_2 B650 3rd and 2nd Flooring.docx DOCX document
Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement.xlsx XLSX spreadsheet
Attachment 3 - NorCal Paint Standards 2025.pdf PDF
Evaluation Criteria 1 - Key Personnel_ATTACHMENT A.docx DOCX document
Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring.pdf PDF
Price Breakdown 36C26127Q0026_2 B650 3rd and 2nd Flooring.xlsx XLSX spreadsheet
PPQ ATTACHMENT B.docx DOCX document
Wage Determination CA20260019 dated 20260903.pdf PDF
Attachment 4 - Stainless Steel Corner Guards_Technical Data_3716_Rev_15.pdf PDF
Attachment 2 - NorCal Flooring Standards 2026.pdf PDF
36C26127Q0026_2.docx DOCX document
Specifications - 612A4-27-018 Replace B650 3rd and 2nd Flooring REV1.pdf PDF
Evaluation Criteria 2- Prior Experience.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL

Contractor Certification: Project 612A4-27-018, Replace B650 3rd and 2nd Flooring

2023
2024
2025
2026

Number of serious, willful, or repeat violations from OSHA within the last 3 years. Please attach explanation for any violations.

Number of serious, willful, or repeat EPA violations within the last 3 years. Please attach explanation for any violations.

(Four serious, one repeat, or one willful violation disqualifies the contractor.)

Company’s Current Insurance Experience Modification Rate (EMR) = _____________ (Note: Contractor must support the EMR with a signed letter from Insurance Carrier on their letterhead.)

Signature: ______________________________________________

Typed Name: ______________________________________________________

Title: ______________________________________________________

File details come from the government source that posted it. Updated .