Price Breakdown 36C26127Q0026_2 B650 3rd and 2nd Flooring.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- 36C26127Q0026
About this file
This is a Price Breakdown file for a flooring replacement project at the Sacramento Veterans Affairs Medical Center. The solicitation number is 36C26127Q0026, and the project (612A4-27-018) involves replacing flooring, resilient base, stainless steel corner guards, and paint on the 3rd and 2nd floors of Building 650. The contractor must furnish all labor and materials for demolition, replacement, and installation work. The work location is Sacramento VA Medical Center, 10535 Hospital Way, Mather, CA 95655. Work must be performed outside normal business hours (7:30 AM to 4:00 PM, Monday through Friday), with no weekend or holiday work unless approved by the Contracting Officer. The contractor is responsible for site cleanup, equipment and trash disposal, compliance with VA infection control procedures, and adherence to all site-specific protocols. No contractor employee parking is permitted in patient parking areas. The facility does not provide staging areas, though the Contracting Officer Representative may authorize temporary staging based on availability.
The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 is the procuring agency. Bidders are strongly encouraged to schedule preliminary site visits by appointment with the Contracting Officer or Contracting Officer Representative to assess project conditions and scope. This solicitation requires contractors to provide detailed pricing information in the Price Breakdown template, which aligns with the project's specific materials and labor requirements for the flooring replacement work.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A - Price Breakdown 36C26127Q0026_2 - Project # 612A4-27-018, Replace B650 3rd and 2nd Flooring Attachment A - PRICE BREAKDOWN Description Material Equipment Labor Total
| Project Manager/QC |
| Superintendent/Safety |
| Mobilization |
| Division 01 - General Requirements |
| General Requirements |
| Shop Drawings, Product Data, and Samples |
| Safety Requirements |
| Reference Standards |
| Quality Control |
| Construction Waste Management |
| Sustainable Construction Requirement |
| Division 02 - Existing Conditions |
| Demolition |
| Division 09- Finishes |
| Subsurface Preparation for Floor Finishes |
| Schedule for Finishes |
| Gypsum Board |
| Resilient Base and Accessories |
| Resilient Sheet Flooring |
| Resilient Tile Flooring |
| Carpeting |
| Painting |
| Bonds |
| Insurance |
| Home Office Overhead |
| Profit |
SUB-TOTAL
PROJECT GRAND TOTAL
File details come from the government source that posted it. Updated .