About this file
This document is a detailed technical installation and site preparation drawing set for a GE Healthcare Signa Premier MRI system to be installed at a VA facility in Paolo Alto, California. The comprehensive set of 24 drawings provides precise specifications for equipment layout, magnetic field parameters, electrical requirements, HVAC considerations, cryogenics, RF shielding, and site readiness requirements. Key technical specifications include a magnet with dimensions of 98.1x99.2x98.4 inches weighing 16,790 lbs, requiring specific room configurations with a magnet room, equipment room, and control room. Critical installation requirements include maintaining precise magnetic field tolerances, RF shielding with 100 dB effectiveness, specific temperature and humidity ranges (15-21°C, 30-60% humidity for the magnet room), and detailed power, cooling water, and cable routing specifications. The drawings provide extensive technical guidance for preparing a site to receive and properly install this advanced medical imaging system, with meticulous attention to environmental, structural, electrical, and magnetic field considerations.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAOLO ALTO, CALIFORNIA
DON DURHAM
SIGNA PREMIER
KRB
GE Healthcare
GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete set of final issue drawing. GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings, however caused. All dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work due to scaling from these drawings. /24MRI-M026490-00B.DWG
707 330 1128
DON.DURHAM@GE.COM
APP DOC1958574
USA
1:48
4422766
13/JUL/2018
VA PAOLO ALTO
REV DATE MODIFICATIONS
A 21/SEP/2017 BASED ON REQUEST DC-29061; DRAWING 172339800: REVISED EQUIPMENT
ROOM PER 2016 DRAWING
B 13/JUL/2018 REVISION BASED ON REQUEST DC-61795: UPDATED DRAWING TO CURRENT
STANDARDS
A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.
Pre Installation documents for GE Healthcare products can be accessed on the web at: www.gehealthcare.com/siteplanning ----
Drawn by Verified by PIM Manual
SheetFormat
Concession
Scale DateFile Name
RevS.O. (GON)
A3
FINAL STUDY
01 - COVER SHEET
02 - EQUIPMENT LAYOUT
03 - MAGNETIC FRINGE FIELD
04 - TOP VIEW WITH MAGNETIC FIELD
05 - SIDE VIEW WITH MAGNETIC FIELD
06 - FRONT VIEW WITH MAGNETIC FIELD
07 - FLOOR - ELECTRICAL LAYOUT
08 - FLOOR STRUCTURAL DETAILS
09 - CEILING LAYOUT
10 - CEILING STRUCTURAL DETAILS
11 - POWER REQUIREMENTS
12 - HVAC
13 - HVAC - CHILLED WATER LAYOUT
14 - CHILLED WATER DETAILS (1)
15 - CHILLED WATER DETAILS (2)
16 - CRYOGENICS
17 - CRYOGENICS LAYOUT
18 - RF SHIELDING
19 - ENVIRONMENT
20 - DELIVERY
21 - ROOM AND EQUIPMENT DIMENSIONS (1)
22 - ROOM AND EQUIPMENT DIMENSIONS (2)
23 - INTERCONNECTIONS
24 - DISCLAIMER - SITE READINESS
EQUIPMENT LAYOUT
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Equipment Layout 021:48
LEGEND
ARCHITECTURAL ELEMENTS RF SHIELD
GE SUPPLIED 200 GAUSS
EQUIPMENT MOVEMENT 100, 50, 30, 10 GAUSS
SERVICE CLEARANCE 5 GAUSS
MAIN AXIS 3, 1, 0.5 GAUSS
DIMENSIONS CUSTOMER SUPPLIED ITEMS
EXAM ROOM HEIGHT
SLAB TO SLAB HEIGHT
FALSE CEILING HEIGHT
14'-0"
8'-9"
RF SHIELD - 100 dB ATTENUATION
ITEM DESCRIPTION
DIMENSIONS
LxWxH (in)
WEIGHT
(lb)
1 MAGNET (MAG) 98.1x99.2x98.4 16790
2 PATIENT TABLE (PT) 96.5x27.6x36.7 572
3 MAGNET RUNDOWN UNIT (MRU) 11.3x8.1x6.8 7
4 INTEGRATED SYSTEMS CABINET (ISC) 73.1x38.5x83.5 4699
5 INTEGRATED COOLING CABINET (ICC) 43.3x33.1x77.6 1353
6 MAIN DISCONNECT PANEL (MDP) (M7100AA) 25.4x36x9.25 190
7 MAGNET MONITOR (NON) 15x10.25x5 10
8 INTEGRATED COOLING CABINET SECONDARY
PENETRATION WALL (ICP) 23.6x66.9 -
9 INTEGRATED SYSTEMS CABINET PENETRATION WALL (ISP) 23.6x66.9 -
10 OPERATORS WORKSPACE (OW) - -
11 OPERATORS WORKSPACE CABINET (GOC) 27.56x15.79x23.35 122.8
12 PNEUMATIC PATIENT ALERT (PA) 4x3x2.5 0.5
13 700KVA UPS - -
14 PHANTOM STORAGE CABIENT 32.48x35x60 300
15 MR TOUCH (MRE) - -
16 MR MUSIC SYSTEM (MU) - -
8 9
MAGNET
ACCESS
9'X9'
MAGNET ROOM
(considering RF shield walls)
EQUIPMENT ROOM
CONTROL ROOM
16'-3"
9' -1
1"
8' -9
'-4
2' -2
11'-3"
'-3
13'-4"
1' -5
14'-11"
28'-3"
7'-0"
23'-8"
6'-6"
8'-5"
'-1
MAGNETIC PROXIMITY LIMITS
STEEL MASS LIMITS TO MAGNET ISOCENTER (3x3 m [10x10 ft] AREA UNDER MAGNET) Limits Of Steel Mass Distance From Magnet Isocenter Distance Below Top Surface Of Floor mm in mm in mm in 0 0 0 - 1143 0-45 0 - 76 0-3
9.8 2 1143 - 1194 45-47 76 - 127 3-5
14.7 3 1194 - 1321 47-52 127 - 254 5-10
39.2 8 1321 - 1397 52-55 254 - 330 10-13
98.0 20 1397+ 55+ 330+ 13+
The following illustrations show the idealized static magnet isogauss plot lines. The actual field strength can be affected by Magnetic shielding, Earth's magnetic field, other magnetic fields and stationary or moving metal. This information must be used to evaluate potential site interaction of GE Healthcare equipment with other non-GE Healthcare equipment. Magnetic shielding can be installed to prevent interaction between the magnet and nearby sensitive devices. The GE Healthcare Project Manager of Installation (PMI) can work with the customer to coordinate the magnetic shielding site evaluation. The customer is responsible for installation of all magnetic shielding.
The customer must provide detail defining ferrous material below the magnet to the Project Manager so the GE Healthcare MR Siting and Shielding team can review for compliance.
Gauss (mT) Limit Equipment
0.5 gauss (0.05mT) Nuclear camera
1 gauss (0.1mT) Positron Emission Tomography scanner, Linear Accelerator, Cyclotrons, Accurate measuring scale, Image intensifiers, Bone Densitometers, Video display (tube), CT scanner, Ultrasound, Lithotriptor, Electron microscope, Digital X-Ray
3 gauss (0.3mT) Power transformers, Main electrical distribution transformers 5 gauss (0.5mT) Cardiac pacemakers, Neurostimulators, Biostimulation devices
10 gauss (1mT) Magnetic computer media, Line printers, Film processor, X-ray tubes, Emergency generators, Commercial laundry equipment, Food preparation area, Water cooling equipment, HVAC equipment, Major mechanical equipment room, Credit cards, watches, and clocks, Air conditioning equipment, Fuel storage tanks, Motors greater than 5 horsepower
50 gauss (5mT) Metal detector for screening, LCD panels, Telephones
No Limit Digital Detectors
MAGNETIC FRINGE FIELD FRONT VIEW
0.5G
1G
3G
10G 5G
100G50G 30G
200 G
Magnet Isocenter 200 G Safe for ferrous parts
Trucks, Buses
Cars, ambulances
Trucks, Buses
Cars, ambulances
Y
0 m
0 m
X 1 m
2 m
3 m
4 m
5 m
6 m
1 m
2 m
6 m
5 m 4 m 3 m 2 m 1 m 1 m 2 m 3 m 4 m 5 m 6 m8 m 7 m 6 m 7 m 8 m
3 m
4 m
5 m
7 m
7 m
8 m
MAGNETIC FRINGE FIELD SIDE VIEW
Magnet Isocenter 200 G Safe for ferrous parts
Trucks, Buses
Cars, ambulances
Trucks, Buses
Cars, ambulances
Y
0 m
0 m
X 1 m
2 m
3 m
4 m
5 m
6 m
1 m
2 m
6 m
5 m 4 m 3 m 2 m 1 m 1 m 2 m 3 m 4 m 5 m 6 m8 m 7 m 6 m 7 m 8 m
3 m
4 m
5 m
7 m
7 m
8 m
9 m9 m
MAGNETIC FRINGE FIELD TOP VIEW
Magnet Isocenter 200 G Safe for ferrous parts
Trucks, Buses
Cars, ambulances
Trucks, Buses
Cars, ambulances
X
0 m
0 m
Z 1 m
2 m
3 m
4 m
5 m
6 m
1 m
2 m
6 m
5 m 4 m 3 m 2 m 1 m 1 m 2 m 3 m 4 m 5 m 6 m8 m 7 m 6 m 7 m 8 m
3 m
4 m
5 m
7 m
7 m
9 m9 m
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Magnetic Fringe Field 031:100
WARNING! 5
GAUSS LINE
OUTSIDE THE
MAGNET ROOM
LIMITS.
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Top View With Magnetic Field 041:48
EQUIPMENT LAYOUT TOP VIEW
WITH MAGNETIC FIELD
LEGEND
ARCHITECTURAL ELEMENTS RF SHIELD
GE SUPPLIED 200 GAUSS
EQUIPMENT MOVEMENT 100, 50, 30, 10 GAUSS
SERVICE CLEARANCE 5 GAUSS
MAIN AXIS 3, 1, 0.5 GAUSS
DIMENSIONS CUSTOMER SUPPLIED ITEMS
EXAM ROOM HEIGHT
SLAB TO SLAB HEIGHT
FALSE CEILING HEIGHT
14'-0"
8'-9"
RF SHIELD - 100 dB ATTENUATION
ITEM DESCRIPTION
DIMENSIONS
LxWxH (in)
WEIGHT
(lb)
1 MAGNET (MAG) 98.1x99.2x98.4 16790
2 PATIENT TABLE (PT) 96.5x27.6x36.7 572
3 MAGNET RUNDOWN UNIT (MRU) 11.3x8.1x6.8 7
4 INTEGRATED SYSTEMS CABINET (ISC) 73.1x38.5x83.5 4699
5 INTEGRATED COOLING CABINET (ICC) 43.3x33.1x77.6 1353
6 MAIN DISCONNECT PANEL (MDP) (M7100AA) 25.4x36x9.25 190
7 MAGNET MONITOR (NON) 15x10.25x5 10
8 INTEGRATED COOLING CABINET SECONDARY
PENETRATION WALL (ICP) 23.6x66.9 -
9 INTEGRATED SYSTEMS CABINET PENETRATION WALL (ISP) 23.6x66.9 -
10 OPERATORS WORKSPACE (OW) - -
11 OPERATORS WORKSPACE CABINET (GOC) 27.56x15.79x23.35 122.8
12 PNEUMATIC PATIENT ALERT (PA) 4x3x2.5 0.5
13 700KVA UPS - -
14 PHANTOM STORAGE CABIENT 32.48x35x60 300
15 MR TOUCH (MRE) - -
16 MR MUSIC SYSTEM (MU) - -
8 9
MAGNET
ACCESS
9'X9'
MAGNET ROOM
(considering RF shield walls)
EQUIPMENT ROOM
CONTROL ROOM
16'-3" 9'
-1 1"
8' -9
'-4
2' -2
11'-3"
'-3
13'-4"
1' -5
14'-11"
28'-3"
7'-0"
23'-8"
6'-6"
8'-5"
'-1
200 G
1 G 3 G
10 G 30 G
50 G 100 G
5 G
0.5 G
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Side View With Magnetic Field 051:48
EQUIPMENT LAYOUT SIDE VIEW
WITH MAGNETIC FIELD (A-A')
NOTE: DEFINE RF SHIELD'S INSET ACCORDING TO
PROVISIONS MADE BY THE RF SHIELD VENDOR.
WARNING! 5 GAUSS
LINE OUTSIDE THE
MAGNET ROOM
LIMITS.
MAGNET ROOM
CONTROL ROOM
11'-3"
3' -6
ITEM DESCRIPTION
DIMENSIONS
LxWxH (in)
WEIGHT
(lb)
1 MAGNET (MAG) 98.1x99.2x98.4 16790
2 PATIENT TABLE (PT) 96.5x27.6x36.7 572
3 MAGNET RUNDOWN UNIT (MRU) 11.3x8.1x6.8 7
4 INTEGRATED SYSTEMS CABINET (ISC) 73.1x38.5x83.5 4699
5 INTEGRATED COOLING CABINET (ICC) 43.3x33.1x77.6 1353
6 MAIN DISCONNECT PANEL (MDP) (M7100AA) 25.4x36x9.25 190
7 MAGNET MONITOR (NON) 15x10.25x5 10
8 INTEGRATED COOLING CABINET SECONDARY
PENETRATION WALL (ICP) 23.6x66.9 -
9 INTEGRATED SYSTEMS CABINET PENETRATION WALL (ISP) 23.6x66.9 -
10 OPERATORS WORKSPACE (OW) - -
11 OPERATORS WORKSPACE CABINET (GOC) 27.56x15.79x23.35 122.8
12 PNEUMATIC PATIENT ALERT (PA) 4x3x2.5 0.5
13 700KVA UPS - -
14 PHANTOM STORAGE CABIENT 32.48x35x60 300
15 MR TOUCH (MRE) - -
16 MR MUSIC SYSTEM (MU) - -
1G
3G
10G
5G
100G 50G
30G
200 G
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Front View With Magnetic Field 061:48
EQUIPMENT LAYOUT FRONT VIEW
WITH MAGNETIC FIELD (B-B')
NOTE: DEFINE RF SHIELD'S INSET ACCORDING TO
PROVISIONS MADE BY THE RF SHIELD VENDOR.
WARNING! 5 GAUSS
LINE OUTSIDE THE
MAGNET ROOM
LIMITS.
MAGNET ROOM
ITEM DESCRIPTION
DIMENSIONS
LxWxH (in)
WEIGHT
(lb)
1 MAGNET (MAG) 98.1x99.2x98.4 16790
2 PATIENT TABLE (PT) 96.5x27.6x36.7 572
3 MAGNET RUNDOWN UNIT (MRU) 11.3x8.1x6.8 7
4 INTEGRATED SYSTEMS CABINET (ISC) 73.1x38.5x83.5 4699
5 INTEGRATED COOLING CABINET (ICC) 43.3x33.1x77.6 1353
6 MAIN DISCONNECT PANEL (MDP) (M7100AA) 25.4x36x9.25 190
7 MAGNET MONITOR (NON) 15x10.25x5 10
8 INTEGRATED COOLING CABINET SECONDARY
PENETRATION WALL (ICP) 23.6x66.9 -
9 INTEGRATED SYSTEMS CABINET PENETRATION WALL (ISP) 23.6x66.9 -
10 OPERATORS WORKSPACE (OW) - -
11 OPERATORS WORKSPACE CABINET (GOC) 27.56x15.79x23.35 122.8
12 PNEUMATIC PATIENT ALERT (PA) 4x3x2.5 0.5
13 700KVA UPS - -
14 PHANTOM STORAGE CABIENT 32.48x35x60 300
15 MR TOUCH (MRE) - -
16 MR MUSIC SYSTEM (MU) - -
7'-4"
3' -7
FLOOR - ELECTRICAL LAYOUT
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Floor - Electrical Layout 071:48
8' -9
11'-3"
4' -1
0"
ITEM QTY DESCRIPTION
1 2 VIBROACOUSTIC DAMPENING KIT (SEE FLOOR STRUCTURAL DETAIL)
2 1 INTEGRATED COOLING CABINET (ICC)
3 1 INTEGRATED SYSTEM CABINET (ISC)
4 1 HORIZONTAL DUCT 6" X 3 1/2" ON CENTER AT 7" A.F.F.
5 1 VERTICAL DUCT 6" X 3 1/2"
6 1 PATIENT TABLE ANCHORING
7 1 MAIN DISCONNECT PANEL (MDP) (REFER TO LOCAL ELECTRICAL CODES TO
DETERMINE HEIGHT)
8 1 MAGNET RUNDOWN UNIT (MRU) (4" X 4" X 2" BOX 5'-3" FLOOR TO CENTER)
2 SYSTEM EMERGENCY OFF (SEO) (4" X 4" BOX 4'-0" FLOOR TO CENTER)
2 EMERGENCY EXHAUST FAN SWITCH (4" X 4" BOX 4'-0" FLOOR TO CENTER)
1 DOOR INTERLOCK SWITCH
2 T100 NETWORK WITH RJ45 CONNECTOR
1 120-V EMERGENCY, SINGLE PHASE POWER, 2A
1 HOSPITAL GRADE, DEDICATED WALL OUTLET 120-V, SINGLE PHASE POWER
2 DUPLEX HOSPITAL GRADE, DEDICATED OUTLET 120-V, SINGLE PHASE OUTLET
ROUTED THROUGH RF FILTER
1 DEDICATED TELEPHONE LINES/NETWORK CONNECTION
WALL DUCT
3'-6"
CEILING OPENING FOR CABLE CONCEALMENT
NOT TO SCALE
[8.3 in]
[32.7 in]
MAGNET ON VIBROACOUSTIC DAMPENING KIT "VIBROMAT"
NOT TO SCALE
Vibromat п Ȅ qоуƳƳ όмΦр ƛƴύ Seismic Anchor holes
2'-2"
4'-5"
4'-5" 2'-0"
1'-7"
1'-10"
VibroAcoustic Mat weight: 116 kg[255lbs] (each)
Vibromat
VIBRATIONS
The maximum steady state vibration transmitted through the floor should not exceed the following:
Machinery and rotating equipment located near the magnet's proximity (e.g.: electrical motors, pumps, compressors), which are sensitive to vibrations above these levels must be isolated appropriately from the building structure containing the operating magnet.
MAGNET ROOM FLOOR SPECIFICATIONS
Magnet, Enclosure, and Patient Table areas must be flat and level within 3 mm (0.125 in) within the shaded area shown ср ҡƎ ŦƻNJ лπт IȊ тл ҡƎ ŦƻNJ тπнр IȊ млл ҡƎ ŦƻNJ нрπнф IȊ олл ҡƎ ŦƻNJ нфπоо IȊ рлл ҡƎ ŦƻNJ ооπоф IȊ трл ҡƎ ŦƻNJ офπпр IȊ
[109 in]
[40 in]
[59.8 in]
FEMALE ANCHOR METHOD
(CUTAWAY SIDE VIEW)
Female Anchor Insert
BOLTED METHOD
(CUTAWAY SIDE VIEW)
Removable Anchor Rod
(Male insert) Dock
Clamp bracket
Finished Floor
Filler Board or Grout
RF Shield
Conductive Fibrous Washer (RF seal)
Concrete
TABLE FRAME ANCHOR MOUNTING REQUIREMENTS
NOT TO SCALE
1. The RF Shield vendor must design and install the table frame anchor bolt
2. The table frame anchor hole must be drilled after the Magnet is delivered
3. The table frame anchor must not contact floor rebar or other structural steel
4. The table frame anchor must electrically contact the RF shield at point of entry
5. The table frame anchors must have the following properties:
a. Anchors must be two-part assembly (male/female)
b. Female side must be expansion- or epoxy-type
c. Male side must be a bolt or threaded rod with appropriate-sized nut (bolt or rod must be removable - not epoxied or cemented in place)
d. Anchors must be electrically conductive
e. Anchors must be non-magnetic
f. Anchors must not induce galvanic corrosion with the RF shield
g. Anchors must be commercially procured
h. The anchor rod hole clearance in the table anchor base is 11 mm (0.43 in). The anchor rod diameter must be sized appropriately
i. Anchors must meet the following clamping force: 2669 N (600 lbs)
j. ¢ƘŜ ŀƴŎƘƻNJ NJƻŘ Ƴdzǎǘ ŜȄǘŜƴŘ пл ƳƳ ҕ мо ƳƳ όмΦрт ƛƴ ҕлΦр ƛƴύ ŀōƻǾŜ ǘƘŜ ŦƛƴƛǎƘŜŘ ŦƭƻƻNJ
k. The anchor rod must be less than 152 mm (152 in) in total length (length above the floor plus embedded length)
6. The RF shield vendor must perform a pull test on the anchor (equal to the clamping force). Results must be provided to the GE Healthcare Project Manager of Installation (PMI).
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Floor Struct Details 081:48
CEILING LAYOUT
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Ceiling Layout 091:48
8' -9
11'-3"
ITEM DESCRIPTION
1 HE EXHAUST PIPE (SEE CRYOGENICS LAYOUT FOR DETAILS)
2 MAGNET CABLE DELIVERY OPENING IN CEILING
3 CABLE TRAY 18" X 6" @ MAX 10'-2" A.F.F. FROM BOTTOM OF TRAY
4 NON-FERROUS CABLE TRAY 18" X 6" @ MAX 10'-2" A.F.F. FROM BOTTOM OF TRAY
5 VERTICAL DUCT 6" X 3 1/2" UP TO BOX ABOVE CEILING SIZE PER CODE
6 ONE 2" CONDUIT ABOVE RF SCREEN
7 ONE 3" CONDUIT ABOVE RF SCREEN
Additional Conduit Runs (Contractor Supplied and Installed)
From To Qty Size
MAIN DISCONNECT PANEL FACILITY POWER 1 CND AS REQ'D
MAIN DISCONNECT PANEL INTEGRATED SYSTEMS CABINET 2 CND AS REQ'D
MAIN DISCONNECT PANEL INTEGRATED COOLING CABINET 1 CND AS REQ'D
MAIN DISCONNECT PANEL SYSTEM EMERGENCY OFF 1 1/2" CND.
SYSTEM EMERGENCY OFF COOLING PENETRATION PANEL 1 1/2" CND.
DOOR SWITCH INTEGRATED SYSTEMS CABINET 1 3/4" CND.
SYSTEM EMERGENCY OFF COOLING PENETRATION PANEL 1 3/4" CND.
MAGNET RUNDOWN UNIT MAGNET 1 1" CND.
MAGNET RUNDOWN UNIT RF FILTER 1 CND AS REQ'D
RF FILTER мнлπ± мq th²9w 1 CND AS REQ'D
ROOM LIGHT RF FILTER 1 CND AS REQ'D
RF FILTER FACILITY EMERGENCY POWER 1 CND AS REQ'D
CABLE TRAYS REQUIREMENTS IN MAGNET ROOM
330 mm [13 in] Min bend radius
1 - Ceiling 2 - Finished Floor 3 - Magnet isocenter 4 - Minimum cable tray height required at back of Magnet: 2581 mm [101.5 in].
Tray height may be lower at other points to avoid obstructions.
5 - Maximum height from floor to top of tray (anywhere in Magnet room): 3251 mm [128 in].
6 - Minimum distance from top of cable tray to ceiling: 254 mm [10 in].
Minimum distance on either side of an obstruction: 254 mm [10 in], minimum distance from top of cable tray to Obstruction: 178 mm [7 in].
т π ¢NJŀȅ ŜƴŘ ǘƻ ƛǎƻŎŜƴǘŜNJΥ мнпр ҕмн ƳƳ ώпф ҕлΦр ƛƴϐΦ у π hǘƘŜNJ ŎŀōƭŜ ǘŜNJƳƛƴŀǘƛƻƴ ǘƻ ƛǎƻŎŜƴǘŜNJΥ усп ҕмн ƳƳ ώоп ҕлΦр ƛƴϐΦ 9 - Minimum distance between trays: 12 mm [0.5 in].
10 - Non-ferrous cable support мм π ¢ƘŜ ŎŜƴǘŜNJ ƻŦ ǘƘŜ ƎNJŀŘƛŜƴǘ ŎŀōƭŜ ƎNJƻdzLJ ƛǎ уф ƳƳ ώоΦр ƛƴϐ ŦNJƻƳ ǘƘŜ ƛƴǎƛŘŜ ŜŘƎŜ ƻŦ ǘƘŜ ǘNJŀȅΣ ƛƴ ƭƛƴŜ ǿƛǘƘ ǘƘŜ ƳŀƎƴŜǘ center.
Cable Tray Requirements (Side-By-Side)
330 mm [13 in] Min bend radius
MINIMUM MAGNET CEILING HEIGHT (TOP VIEW)
Shaded area within solid lines indicates floor to ceiling minimum height of 2500 mm [101.5 in. This drawing is only valid if the quench pipe is leaving vertically from the magnet. If not, the minimum height is 2667 mm [105 in].
NOT TO SCALE
FRONT OF MAGNET
MAGNET
GEOMETRIC
ISOCENTER
[54 in]
[54 in]
[109 in]
CABLE TRAYS IN EQUIPMENT ROOM
CABLE TRAY DETAIL
NOT TO SCALE
Integrated Cabinets
Penetration Panels
Minimum
[18 in]
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Ceiling Struct Details 10
POWER REQUIREMENTS
INTRODUCTION
The system requires two independent power inputs:
main power supply uninterrupted power supply
SPECIFICATIONS OF MAIN POWER INPUT
Power input must be separated from any others which may generate transients (elevators, air conditioning, radiology rooms equipped with high speed film changers...).
Total harmonic distortion less than 2.5%.
Phase imbalance must not exceed 2%.
SPECIFICATIONS OF EMERGENCY POWER REQUIREMENT
CABLES
Power and cable installation must comply with the distribution diagram.
Size of the MDP power input cable is determined by the customer, taking its length and admissible voltage drops into consideration.
All cables must be isolated and flexible, cable color codes must comply with standards for electrical installation.
The cables from signaling and remote control (Y,EO#,L...) will go to MDP with a pigtail length of 1.5m, and will be connected during installation.
Each conductor will be identified and isolated (screw connector).
GROUND SYSTEM
The equipotential link will be by means of an equipotential bar.
The grounding point of MDP is directly connected to the building's ground by an isolated copper cable.
CABLEWAYS
The general rules for laying cableways should meet the conditions laid down in current standards and regulations, with regard to:
Protecting cables against water (cableways should be waterproof) Protecting cables against abnormal temperatures (proximity to heating pipes or ducts) Protecting cables against temperature shocks Replacing cables (cableways should be large enough for cables to be replaced) Only GE cables are running inside cableways Metal cableways should be grounded
Magnet Monitor
POWER INPUT EMERGENCY LIFE-SAFETY POWER, SINGLE PHASE + G
POWER DEMAND 0.7kVA VOLTAGE ммлǾ ҕ мл҈ FREQUENCY рлκслIȊ ҕ оIȊ
Shield Cryocooler Compressor
POWER INPUT !/ оулΣ пллΣ пмрΣ пслΣ пул оq
POWER DEMAND Minimum 9kVA FREQUENCY рлκслIȊ ҕ оIȊ
POWER SUPPLY 380/400/415/480V +/-10%, THREE-PHASE + G
FREQUENCIES рлκслIȊ ҕ оIȊ MAXIMUM INPUT POWER (50 msec MAX) 349kVA INSTALLED LOAD 181kVA STAND-BY POWER < 17 kVA
POWER DISTRIBUTION
MDP
ICC
MRU
E-OFF
CONTROL ROOM
MAGNET ROOM
RF
SHIELD
OM2
E-OFF
MON
OXY
EQUIPMENT
ROOM
E-OFF
ISC
(3 phases + G)
115/ 230V 16A
115/ 230V 10A
110/ 220V
1A όо Ȅ мΦр ƳƳчύ όо Ȅ мΦр ƳƳчύ
480V 250A
480V 200A όо Ȅ мΦр ƳƳчύ
480V 30A
480V 60A
110/ 220V
2A όо Ȅ мΦр ƳƳчύ 3-No. 14 awg
3-No. 14 awg
3-No. 14 awg
3-No. 14 awg
MAIN SUPPLY
3 phases
Electrical outlet
Lights
Power supply single phase + N + G
Ground
(NORMALLY
ON MDP)
Cable SUPPLIED BY CUSTOMER
Equipment SUPPLIED BY GE
Equipment SUPPLIED BY CUSTOMER
MDP Main Disconnect Panel ISC Integrated System Cabinet ICC Integrated Cooling Cabinet MON Magnet Monitor MRU Magnet Rundown Unit E-OFF Emergency off, near access door (one in magnet room, one in either control or equipment room) ISP Integrated Systems Cabinet Penetration Wall ICP Integrated Cooling Cabinet Secondary Penetration Wall OXY Oxygen Monitor (Optional) OM2 Remote Oxygen Sensor (Optional)
Equipment CAN BE ORDERED FROM GE
MAIN FEEDER CALCULATION
Irms = Continuous Power
Vph-ph * Ҟо
FLA = Irms * 1.25
Ipk = Peak Power Vph-ph * Ҟо
Vloss = Vph-ph * 4%
Rtotal = Vloss
Ipk * Ҟо
Cable Resistance =
Rtotal Cable length
SHIELD COOLERGRADIENTSSYSTEM
όо Ȅ мΦр ƳƳчύ 3-No. 14 awg
(3 phases + G)(3 phases + G)
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Power Req 11
EQUIPMENT HEAT OUTPUT SPECIFICATIONS
Component Room Max kW Max
BTU/hr Magnet (MAG) and Patient Table (PT) Magnet 2.95 10060 Primary Pen Wal Magnet 0 0
Secondary Pen Wall Magnet 0.3 1023
Equipment 0.3 1023 Integrated System Cabinet (ISC) Equipment 11.5 39215 Integrated Cooling Cabinet (ICC) Equipment 1.0 3410 Main Disconnect Panel (MDP) Equipment 0.28 972 Magnet Monitor (MON) Equipment 0.24 818 Cryocooler Compressor (CRY) Equipment 0.5 1705 Operator Workspace equipment (OW) Control 1.45 4945
OPTIONS
MR Elastography (MRE) Equipment 0.48 141
EMERGENCY EXHAUST VENT
Vent to outside environment
Exhaust Fan
To Facility Air Handler
AC Power (rated as required for operation of Motorized Damper and Exhaust Fan) Ground secondary of low voltage transformer to RF Room Common Ground Stud
RF Shield
Dielectric Isolator
Room ceiling Motorized Damper
Exhaust Intake Vent
MAGNET ROOM CONTROL ROOM
RF Filter
ON/OFFManual fan switches in parallel
Forced Extraction Ductwork
MAGNET ROOM VENTING REQUIREMENTS
HVAC VENT REQUIREMENTS
HVAC vendor must comply with Magnet room temperature and humidity specifications and RF shielding specifications.
RF Shield vendor must install open pipe or honeycomb HVAC waveguides.
All serviceable parts in the Magnet room (e.g.: diffusers) must be non-magnetic.
Waveguides must be nonmagnetic and electrically isolated.
Incoming air must contain at least 5% air from outside the Magnet room (inside or outside the facility) to displace residual helium.
EMERGENCY VENT REQUIREMENT
Exhaust vent system is supplied by the customer.
All items within the RF enclosure must be non-magnetic.
The exhaust vent system must be tested and operational before the magnet is installed.
The exhaust intake vent must be located near the magnet cryogenic vent at the highest point on the finished or drop ceiling.
Any space between finished ceiling and the RF ceiling must contain an additional exhaust intake vent (to prevent helium from pooling above the finished ceiling) If there is no space between the RF ceiling and finished ceiling, the intake vent may be located on a side wall (must be on the coldhead side of the magnet, near the coldhead, with the top edge of the vent flush to the finished ceiling) NOTE: If used, vent diffusers must not extend beyond the vent opening to prevent helium from pooling between the edge of the diffuser and the ceiling.
¢ƘŜ aŀƎƴŜǘ NJƻƻƳ ŜȄƘŀdzǎǘ Ŧŀƴ ŀƴŘ ŜȄƘŀdzǎǘ ƛƴǘŀƪŜ ǾŜƴǘ Ƴdzǎǘ ƘŀǾŜ ŀ ŎŀLJŀŎƛǘȅ ƻŦ ŀǘ ƭŜŀǎǘ оп ƳшκƳƛƴ (1200 CFM) with a minimum of 12 room air exchanges per hour.
The exhaust fan must be installed outside of the RF shield and must remain fully functional in the magnetic field per the fan specification sheet The exhaust fan must have appropriate waveguides and di-electric break to maintain the RF shield requirements (see RF Shielded Room Requirements) The system must have a manual exhaust fan switch near the Operator Workspace (OW) and in the Magnet room near the door (the switches must be connected in parallel) NOTE: If the Magnet room contains an optional oxygen monitor, the Magnet room switch is not required.
All system components must be accessible for customer inspection, cleaning and maintenance Electromechanical fire dampers must not be used. Fusible link fire dampers may be used (with annual inspection)
PRESSURE VENT REQUIREMENT
A pressure equalizing vent is required in the magnet room ceiling or in the wall.
The vent minimum size must be (610 mm x 610 mm [24 in x 24 in]) or equivalent.
The pressure equalization vent must be located so any Helium gas is not vented into occupied areas.
Note: Location may affect acoustic noise transmission into occupied spaces.
TEMPERATURE AND HUMIDITY SPECIFICATIONS
Room Temperature Humidity
Range /ƘŀƴƎŜ ц Range %RH /ƘŀƴƎŜ ҈wIκINJ ч ϲ/ ϲC ϲ/κINJ ϲCκINJ
Equipment room (at inlet to Equipment room) 15-32 ш 59-89.6 ш 3 5 30-75 5
Magnet Room 15-21 59-69.8 3 5 30-60 5 Operator Room 15-32 59-89.6 3 5 30-75 5
NOTE
In case of using air conditioning systems that have a risk of water leakage it is recommended not to install it above electric equipment or to take measures to protect the equipment from dropping water.
AIR RENEWAL
According to local standards.
NOTE
1. hLJŜNJŀǘƛƴƎ ǘŜƳLJŜNJŀǘdzNJŜ ƎNJŀŘƛŜƴǘ ƭƛƳƛǘǎ ǎƘŀƭƭ ōŜ ōŜǘǿŜŜƴ πрϲβ CκINJ όπоϲβ /κINJύ ŀƴŘ рϲβ CκINJ όоϲβ /κINJύΣ ǿƘŜƴ averaged over 1 hour
2. Operating humidity gradient limits shall be between -5% RH/hour and 5% RH/hour, when averaged over 1 hour
3. aŀȄƛƳdzƳ ŀƳōƛŜƴǘ ǘŜƳLJŜNJŀǘdzNJŜ ƛǎ ŘŜNJŀǘŜŘ ōȅ мϲ / όооΦуϲCύ LJŜNJ мтр Ƴ όртп Ŧǘύ ŀōƻǾŜ фрл Ƴ όоммт Ŧǘύ όƴƻǘ ǘƻ exceed 2600 m [8530 ft])
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO HVAC 12
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO HVAC - Chilled Water Layout 131:48
HVAC - CHILLED WATER LAYOUT
8' -9
11'-3"
3'-6"
8'-0"
ITEM DESCRIPTION
1 PRESSURE EQUALIZER WAVEGUIDE 24" X 24" (POSITION TO BE DEFINED)
2 EMERGENCY AIR EXHAUST FAN 24" X 24" (POSITION TO BE DEFINED)
3 INTEGRATED COOLING CABINET (ICC)
4 FLOOR DRAIN
5 STRUCTURAL WALL SUPPORT FOR MDP-FOLLOW LOCAL REGULATIONS FOR HEIGHT
PLACEMENT
6 STRUCTURAL WALL SUPPORT FOR MRU-60" AFF
CHILLED WATER SYNOPTIC (EXAMPLE)
PUMP
THERMOMETER
FLOWMETER
PRESSURE MEASUREMENT
VALVE
BALANCING VALVE
FILTER
Equipment supplied by GE
Equipment supplied by customer
Customer / GE limitEquipment room entry
Chilled water 7.5kW
Backup for compressor
Filter with bypass
Regulation valve
Heat exchanger Buffer
CRY
City water
City water
Chilled water 94kW Balancing valve
DEDICATED
CHILLER
OR
CUSTOMER
CHILLED
WATER
ICC
GE components
CHILLED WATER BLOCK DIAGRAM
*FLOWMETER
*FILTER
MAGNET ROOM
Integrated System Cabinet
(ISC)
FACILITY
WATER
EQUIPMENT ROOM
* CUSTOMER SUPPLIED
Water Cooling Water Cooling
Return
Supply
Magnet
(MAG)
Gradient Coil
RF Shield
Integrated Cooling Cabinet
(ICC)
Water Cooling Water Cooling
Water Cooling Water Cooling
Penetration Panels
(PP1/PP2)
CCU GCU CRY
Supply Drain
EMERGENCY
WATER
COOLING
BACKUP
SUPPLY
CHILLED WATER SPECIFICATIONS
PARAMETER REQUIREMENTS
Chiller size Minimum 94 kW Inlet temperature р ǘƻ мнϲ/ όпм ǘƻ рпϲCύ ƳŜŀǎdzNJŜŘ ŀǘ ǘƘŜ ƛƴƭŜǘ ǘƻ ǘƘŜ ICC
Minimum Flow 114L/min (30 gpm)
Maximum Flow 132 L/min (35 gpm) Availability Continuous
Antifreeze no more than 50% propylene (PGW) or ethylene (EGW) glycol-water
Maximum pressure drop in ICC at minimum flow нΦн ōŀNJ όон LJǎƛύ ǿƛǘƘ рл҈ tD²Σ млсл ƪƎκƳш όссΦн ƭōǎκŦǘшύ ŘŜƴǎƛǘȅ Maximum pressure drop in ICC at maximum flow нΦф ōŀNJ όпн LJǎƛύ ǿƛǘƘ рл҈ tD²Σ млсл ƪƎκƳш όссΦн ƭōǎκŦǘшύ ŘŜƴǎƛǘȅ Temperature rise at Minimum Flow мпϲ/ όнрϲCύ ǿƛǘƘ рл҈ tD²Τ оопс WκόƪƎ Yύ ǎLJŜŎƛŦƛŎ ƘŜŀǘΤ млсл ƪƎκƳш ŘŜƴǎƛǘȅ Temperature rise at Maximum Flow мнϲ/ όннϲCύ ǿƛǘƘ рл҈ tD²Τ оопс WκόƪƎ Yύ ǎLJŜŎƛŦƛŎ ƘŜŀǘΤ млсл ƪƎκƳш ŘŜƴǎƛǘȅ Maximum inlet pressure to ICC 6 bar (87 psi)
Minimum continuous heat load 7.5 kW Hoses to be provided by customer 38.1 mm (1.5 inch) minimum hose inside diameter pH level сΦр ǘƻ уΦн ŀǘ нрϲ/ όттϲCύ
Total hardness Less than 200 ppm
Chloride Less than 200 ppm
Sulfate Less than 200 ppm
Silica Less than 50 ppm
Iron Less than 1 ppm
Ammonium Less than 1 ppm
Suspended matter Less than 10 ppm and less than 100 micron particle size
Particle size 100 micron or smaller with a field-changeable filter
Condensation protection Facility plumbing to the ICC must be properly routed and insulated to prevent equipment damage or safety hazards
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Chilled water details (1) 14
MAGNET CRYOGENIC VENT SYSTEM PRESSURE DROP MATRIX
Outer dia.
of pipe (D)
Distance of vent system component from magnet
Pressure drop for straight pipe
Std sweep 45ǯ elbow
Long sweep прϲ elbow
Std sweep 90ǯ elbow
Long sweep 90ǯ elbow
90ǯ miter bend ft m psi/ft kPa/m psi kPa psi kPa psi kPa psi kPa psi kPa
8 in.
(200mm)
0- 10 0.00-3.05 0.14 3.22 1.12 7.70 0.74 5.13 2.09 14.43 1.40 9.62 4.19 28.86
10-20 3.05-6.10 0.24 5.49 1.83 12.63 1.22 8.42 3.43 23.67 2.29 15.78 6.87 47.34
20- 30 6.10-9.15 0.36 8.23 2.49 17.20 1.66 11.45 4.67 32.21 3.11 21.48 9.34 64.43
30- 40 9.15-12.2 0.47 10.65 3.11 21.42 2.07 14.26 5.82 40.11 3.88 26.74 11.64 80.23
40- 50 12.20-15.25 0.57 12.80 3.67 25.32 2.45 16.86 6.88 47.42 4.58 31.61 13.75 94.84
50- 60 15.25-18.30 0.65 14.68 4.20 28.93 2.79 19.26 7.86 54.17 5.24 36.11 15.71 108.33
60- 80 18.29-24.39 0.77 17.44 5.13 35.35 3.41 23.53 9.60 66.16 6.40 44.11 19.19 132.33
10 in.
(250mm)
0-20 0.00-6.10 0.06 1.280 0.62 4.29 0.41 2.86 1.17 8.04 0.78 5.36 2.33 16.07
20-40 6.10-12.22 0.12 2.725 1.05 7.25 0.70 4.83 1.97 13.58 1.31 9.05 3.94 27.16
40-60 12.22-18.29 0.17 3.904 1.43 9.86 0.95 6.56 2.67 18.44 1.78 12.29 5.35 36.88
60-80 18.29-24.39 0.21 4.859 1.76 12.14 1.17 8.07 3.29 22.70 2.19 15.13 6.58 45.40
80-100 24.39-30.49 0.25 5.626 2.05 14.14 1.36 9.40 3.83 26.43 2.56 17.62 7.67 52.86
12 in.
(300mm)
0-20 0.00-6.10 0.020 0.441 0.26 1.78 0.17 1.19 0.48 3.34 0.32 2.22 0.97 6.67
20-40 6.10-12.22 0.041 0.937 0.43 3.00 0.29 1.99 0.81 5.61 0.54 3.74 1.63 11.22
40-60 12.22-18.29 0.060 1.353 0.59 4.08 0.39 2.72 1.11 7.64 0.74 5.09 2.22 15.27
60-80 18.29-24.39 0.075 1.702 0.73 5.06 0.49 3.36 1.37 9.45 0.91 6.30 2.74 18.89
80-100 24.39-30.49 0.088 1.991 0.86 5.20 0.57 3.93 1.60 11.06 1.07 7.37 3.21 22.12
14 in.
(350mm)
0-20 0.00-6.10 0.008 0.180 0.123 0.85 0.082 0.57 0.231 1.59 0.154 1.06 0.462 3.18
20-40 6.10-12.22 0.017 0.380 0.206 1.42 0.137 0.95 0.386 2.66 0.257 1.77 0.771 5.32
40-60 12.22-18.29 0.024 0.552 0.281 1.94 0.187 1.29 0.525 3.62 0.350 2.42 1.051 7.25
60-80 18.29-24.39 0.031 0.699 0.349 2.41 0.232 1.60 0.652 4.50 0.435 3.00 1.304 8.99
80-100 24.39-30.49 0.036 0.824 0.411 2.83 0.272 1.88 0.766 5.28 0.511 3.52 1.533 10.57
16 in.
(400mm)
0-20 0.00-6.10 0.004 0.083 0.065 0.45 0.043 0.30 0.122 0.84 0.081 0.56 0.244 1.68
20-40 6.10-12.22 0.008 0.174 0.108 0.75 0.072 0.50 0.202 1.39 0.135 0.93 0.404 2.79
40-60 12.22-18.29 0.011 0.253 0.148 1.02 0.098 0.68 0.275 1.90 0.184 1.27 0.551 3.80
60-80 18.29-24.39 0.014 0.323 0.184 1.27 0.122 0.84 0.342 2.36 0.228 1.57 0.685 4.72
80-100 24.39-30.49 0.017 0.383 0.022 1.49 0.144 0.99 0.404 2.78 0.269 1.86 0.807 5.57
Notes
1. Elbows with angles greater than 90 deg must not be used
2. Data in Table 2 is based on the following facts and assumptions:
a. Initial flow conditions at magnet interface
b. EM energy (13MJ) is dumped to He during quench and rises He temperature to 10 Kelvin
c. Gas temperature starting at 10 Kelvin and increase with length determined by thermal energy balance
d. 90% He is assumed to be evacuated within 30 sec. None left after quench.
e. Absolute roughness is assumed to be 0.25 mm.
f. R/D = 1.0 for standard sweep elbows, R/D = 1.5 for long sweep elbows where D = outer diameter of pipe; R = radius of bend
3. The total pressure drop of the entire cryogenic vent system must be less than 20 psi (138 kPa). The calculation starts at the magnet vent interface and ends at the termination point outside the building.
INLET WATER FLOW/TEMPERATURE FOR CRYOCOOLER COMPRESSOR
*RECOMMENDED TEMPERATURE AND WATER FLOW TO CRY ENTRY
CITY WATER BACKUP SPECIFICATIONS FOR COMPRESSOR
0.5
1.0
1.5
2.0
2.5
3.0
30 40 50 60 70 9080 ϲC
MIN MAX
INLET TEMP
офΦнϲC όпϲ/ύ унΦпϲC όнуϲ/ύ
INLET FLOW
1.0 gpm (4 l/min)
2.6 gpm (10 l/min)
TEMP RISE
уфΦсϲC ŀǘ мΦл ƎLJƳ όонϲ/ ŀǘ п ƭκƳƛƴ flow) роΦсϲC ŀǘ нΦс ƎLJƳ όмнϲ/ ŀǘ мл ƭκƳƛƴ flow) HEAT DISSIPATION (kW) 7.2 kW
PRESSURE DROP 8.7 psi at 2.1 gpm flow (60 kPa at 8 l/min flow)
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Chilled water details (2) 15
CRYOGENIC VENTING ( EXTERIOR )
GROUND
VENT CAP
(customer supplied)
OUTSIDE WALL
ROOF
VENT CAP
(customer supplied)
NOT TO SCALE
Exclusion area
Warning signEXHAUST AREA 10.7m x 4.6m [35ft x 15ft] (LxW)
EXHAUST AREA
10.7m x 4.6m [35ft x 15ft] (LxW)
TYPICAL CRYOGENIC VENT PIPE DETAIL
MAGNET VENT ADAPTER
Do not remove or modify the vent adaptor bolted to the magnet.
VENT PIPE
610 mm [24 in], may be cut to a minimum of 100 mm [4 in].
VENTGLAS
CONNECTOR
WAVEGUIDE
Additional pipe/tubing
.ƛNJŘ ǎŎNJŜŜƴ мнΦт ƳƳ [0.5 in] mesh
DIELECTRIC
BREAK
TYPICAL CRYOGEN SIDE WALL EXIT
KEY COMPONENTS:
RF waveguide extended from wall to magnet adapter Must be all same material and all welded Support system must withstand 8229 N GE ventglas must be installed in vertical section directly over magnet
Mesh screen
38mm (1.5in) insulation rigid support
203mm [8in] ventglas outside RF room
Sweep elbow R = D of pipe
RF WAVEGUIDE EXTENDED
OUTSIDE
нрҕс ώм ƛƴҕΦнп ƛƴϐ
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Cryogenics 16
CRYOGENICS TOP VIEW CRYOGENICS FRONT VIEW (B-B')
CRYOGENICS SIDE VIEW (A-A')
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Cryogenics Layout 171:48
HE EXHAUST POSITION
TO BE DEFINED BY CUSTOMER
HE EXHAUST POSITION
TO BE DEFINED BY CUSTOMER
q нло ώу ƛƴϐ q нло ώу ƛƴϐ
MAGNET ROOM
MAGNET ROOM
8' -9
11'-3"
13.76"
.9
8"
PENETRATION PANEL WALL OPENINGS
псуƳƳ ҕрƳƳ ώмуΦпƛƴ ҕΦнƛƴ ϐ
[7.8 in]
[2.4 in]
Finished wall
RF OVERLAY
Finished wall
RF Shield
Magnet room side
Equipment room
Magnet room
PENETRATION
PANELS (PP1/PP2)
FLOOR
RF SHIELDED ROOM REQUIREMENTS
The RF Shielded room is critical to the proper MR system operation. RF shielding reduces the interaction of external RF electromagnetic fields with MR system operation. Special care must be used when installing all fixtures penetrating the RF shield (e.g.: vents, electrical conduit, penetration panels, etc.) to ensure the integrity of the RF shield is maintained.
It is customer responsibility to contract with an RF Shielding Enclosure vendor to design, install, test the RF shielded room. As well as maintenance and repair of the RF shielded room to include, but not limited to, shielding effectiveness, door threshold and door seal, pressure equalization vent operation for the life of the MR System.
RF SHIELD REQUIREMENTS
The RF shielded room must provide a minimum of 100 dB of shielding effectiveness for the entire room at the following frequencies:
мнтΦтн ҕ лΦр aIȊ млнΦнл ҕ лΦр aIȊ мроΦол ҕ лΦр aIȊ NOTE:The final shielding effectiveness performance of the RF shielded room is determined based on the lowest measurement of all test point locations.
The RF shielded room must be isolated from earth ground by more than 1000 ohms DC resistance during construction (before electrical installation).
The RF shielded room must be grounded to the RF common ground stud (which is grounded back to the Power Distribution Unit in the Integrated System Cabinet).
RF shielded room installation materials must meet steel mass limits listed in Magnet Room Structural Requirements to keep magnetic field homogeneity.
Any moving part (such as doors) must not contain magnetic materials.
DOORS AND MAGNET ACCESS OPENINGS
The finished opening of the Magnet room main door must be at least 1092 mm (43 in) wide to allow for helium dewars and patient tables Threshold height must not exceed 25 mm (1 in) ƻƴ ōƻǘƘ ǎƛŘŜǎ ƻŦ ǘƘŜ ŘƻƻNJ ǿƛǘƘ ŀ ƳŀȄƛƳdzƳ млϲ ǘƘNJŜǎƘƻƭŘ inclination Patient viewing windows recommended dimensions are 1219 mm x 1067 mm (48 in x 42 in) and 1829 mm (72
in) above finished floor The magnet delivery requires opening into the room to allow access for the magnet delivery, rigging, and personnel access.
MAGNET ROOM FLOORS
The finished floor must support the weight of all components throughout operation and service life The finished floor must be water resistant to protect the subfloor and shielding from water damage The customer is responsible for providing flooring to prevent the buildup to 8 kV
RF SHIELDING EFFECTIVENESS AND GROUND ISOLATION TESTING
RFI site surveys are to be performed by cycling through the preceding frequency bands and a broad band range up ǘƻ мпр aIȊ ҕ мл aIȊΦ {LJŜŎƛŀƭ ŜƳLJƘŀǎƛǎΣ ƘƻǿŜǾŜNJΣ ǎƘƻdzƭŘ ōŜ LJƭŀŎŜŘ ƻƴ ǘƘŜ 1H band since this is used in proton imaging.
ACOUSTIC DESIGN GUIDELINES
The preferred wall would have an ASTM Sound Transmission Coefficient (STC) 50 construction RF windows should be purchased as window/frame units with an STC rating obtained from laboratory testing per ASTM standards. STC 50 to 60 windows are needed. The installation must include proper sealing to avoid sound leaks.
RF doors should be selected to provide an STC 50 to 60 to quell the noise. RF door seals must be selected to prevent small gaps around the door perimeter and at the door threshold.
Pipes (gas or water) and electrical conduit or Magnet Room signal cables must be sealed where they penetrate the walls or ceiling.
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO RF shielding 181:480
LIGHTING REQUIREMENTS
All lighting fixtures and associated components must meet all RF shielded room and RF grounding requirements (e.g., track lighting is not recommended due to possible RF noise).
All lighting must use direct current (the DC must have less than 5% ripple).
300 lux must be provided at the front of the magnet for patient access and above the magnet for servicing.
Fluorescent lighting must not be used in the magnet room.
Lighting must be adjusted using a discrete switch or a variable DC lighting controller.
SCR dimmers or rheostats must not be used.
DC LED lighting may be used if the power source is located outside the magnet room RF.
Battery chargers (e.g., used for emergency lighting) must be located outside the magnet RF room.
Short filament length bulbs are recommended.
Linear lamps are not recommended due to the high burnout rate.
CONNECTIVITY REQUIREMENTS
Broadband Connections are necessary during the installation process and going forward to ensure full support from the Engineering Teams for the customers system. Maximum performance and availability for the customers system is maintained and closely monitored during the lifetime of the system. Proactive and reactive maintenance is available utilizing the wide range of digital tools using the connectivity solutions listed below:
Site-to-Site VPN/GE Solution Site-to-Site VPN/Customer Solution Connection through Dedicated Service Network Internet Access - connectivity for InSite 2.0
The requirements for these connectivity solutions are explained in the broadband solutions catalogue (separate document).
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Environment 19
DELIVERY
ROUTING
The customer is solely liable for routing of components from dock to final site.
GE must be able to move system components in or out with no need to uncrate or disassemble any of the components. The entire passageway must be cleared, adequately lighted and free from dust.
The floor and its surfacing must be able to withstand the live load of components and handling equipment.
Floor surfacing must be continuous.
The customer must protect any fragile flooring surfaces.
MINIMUM SPECIFICATIONS FOR MAGNET ROUTING
Floor must be able to withstand a moving load of 7804 daN Height: 2.5m (8.2 ft), width: 2.4m (7.8 ft)
STRAIGHT PATH
(Rigging wheels required)
PATH WITH 90 DEGREE TURN
INSTALLATION AND DELIVERY ACCEPTANCE
A survey of the site established by the customer and GE will make the decision for the delivery time.
This survey of the site (a form is made available by GE) is only to check if the apparent conditions of the site allow the equipment to be delivered.
If the site is not ready, GE can delay the delivery time.
Recommended minimum opening for side (wall) delivery : 2700 (w) x 2700 (h) [108 (w) x 108 (h)]
FRONT VIEW OF MAGNET RIGHT SIDE VIEW OF MAGNET
[92 in]
[100 in]
2291.3 [90.2 in]
[94 in]
[84 in]
DIMENSIONS OF THE MAIN REPLACEMENT PARTS
HEADER
DIMENSION
LxWxH WIEGHT NOTE mm in kg lbs
Split Bridge 546x1963x178 21.5x77.3x7 18 40 Gradient Cooling Unit 920x605x1445 36.2x23.8x56.9 144.5 318.6 Cabinet Cooling Unit 920x705x1550 36.2x27.8x61 195.5 431
Replacement RF Body Coil 873x896x1861 34.4x35.3x72.5 116 255 Replacement coil is shipped in a protective case.
Weight & dimensions are for coil & case.
Replacement HRMw gradient coil assembly on a shipping cradle/cart 991x2536x1499 39x99.84x59 1449 3194
Initial gradient coil assembly is shipped installed in the magnet. Shipping/installation cart is used to install re-placement coil assembly only.
Gradient Coil Replacement Tool Kit Crate 762x2184x711 30x86x28 340 750
Gradient Coil Assembly and shipping cart dimensions are with cart in lowest position. Cart can be adjusted to maximum height of 61.88 in.
(1572 mm).
< 910 [35.8 in]
[99.8 in]
The weight bearing structure of the site should support any additional weight of the main replacement parts occurring during maintenance of the magnet, throughout the whole lifecycle of the MR.
Transfer line of liquid helium
TYPICAL DEWAR WEIGHT & DIMENSIONS
Weight Size kg lbs mm in 100 liter helium dewar qумо qон 250 liter helium dewar 236 520 qфмпȄмснс qосȄсп 500 liter helium dewar 369 814 qмлстȄмтмр qпнȄсу
The volume in the magnet vessel is 1950 liters [515.14 gallons].
9ȄLJŀƴǎƛƻƴΥ м ƭƛǘŜNJ ƻŦ ƭƛljdzƛŘ IŜ Ґ лΦтрт Ƴш ώм Ǝŀƭƭƻƴ ƻŦ ƭƛljdzƛŘ IŜ Ґ нсΦт ŦǘшϐƻŦ IŜ Ǝŀǎ ŀǘ aŀƎƴŜǘ ¢ŜƳLJŜNJŀǘdzNJŜΦ IŜƭƛdzƳ Ǝŀǎ ŘŜƴǎƛǘȅ ŀǘ ŀƳōƛŜƴǘ ǘŜƳLJŜNJŀǘdzNJŜ όнлϲ/ώсуϲCϐύΥ лΦмссп ƪƎκƳш ώлΦлмло ƭōǎκŦǘш
The magnet cryostat refilling is done by using liquid helium dewars with a transfer line with stingers. See below typical dewars weight and dimensions: A delivery path to the magnet room is necessary for he refill.
GASEOUS
HELIUM
HELIUM FILLING
TRANSFER LINE OF
LIQUID HELIUM
FINISHED FLOOR
DEWAR
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Delivery 201:48
GLOBAL OPERATOR CABINET (GOC)
Center of Gravity
SCALE 1:10
TOP VIEW
FRONT VIEWSIDE VIEW
[7.64 in]
[15.79 in]755
[29.71 in]
[12.13 in]
[27.56 in]
377.5 [14.86 in]
NOT TO SCALE
[99.2 in]
Center of gravity
Note:
Center of gravity is approximate and includes the GE Healthcare supplied VibroAcoustic Dampening Kit, but does not include cryogens, gradient assembly, side mounted electronics, or enclosures.
MAGNET ENCLOSURE SIGNA PREMIER
[44.5 in]
[2 in]
[98.1 in]
[38.3 in]
[1.2 in]
[15.7 in]
Front View Side View
MAIN DISCONNECT PANEL
TOP VIEWFRONT VIEWSIDE VIEW
NOT TO SCALE
Center of gravity
[3.7 in]
[9.2 in] 492
[19.4 in]
[12.4 in]
[25.4 in]
Service clearance
(4) 13mm (0.5 in) Hilti KB-TZ Expansion Anchors (Minimum Embedment: 82.5mm (3.25 in)
[96.5 in]
[22 in]
[18.5 in]
558.8 [22 in]
469.9 [18.5 in]
[22 in]
[18.5 in]
PATIENT TABLE (PT)
NOT TO SCALE
SIDE VIEW
TOP VIEW
Center of gravity
TOP VIEW SEISMIC
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Room & Eq Dim (1) 211:48
INTEGRATED SYSTEMS CABINET PENETRATION WALL
TOP VIEWFRONT VIEWSIDE VIEW
NOT TO SCALE
[23.6 in]
[5.7 in]
[5.7 in]
[23.6 in]
INTEGRATED SYSTEMS CABINET
TOP VIEWFRONT VIEWSIDE VIEW
NOT TO SCALE
Center of gravity
Air flow clearance
Service clearance
[73.1 in]
[30.5 in]
[73.1 in]
Service clearance
[38.5 in]
[15 in]
INTEGRATED COOLING CABINET
TOP VIEWFRONT VIEWSIDE VIEW
NOT TO SCALE
[49.3 in]
Service clearance
[43.3 in]
[16.3 in]
Service clearance Service clearance
[20.7 in]
Center of gravity
INTEGRATED COOLING CABINET SECONDARY PENETRATION WALL
TOP VIEWFRONT VIEWSIDE VIEW
NOT TO SCALE
[23.6 in]
[10.2 in]
[7.3 in]
[23.6 in]
SERVICE
CLEARANCE
SERVICE
CLEARANCE
CABLE
ACCESS
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Room & Eq Dim (2) 221:48
MON
CRY
MDP
MRU
PT+MAG
GOC
EO1
EO2
EO3
RMRU (can be ordered as an option)
ISC
PW
ICC
PW
ICC
ISC
OM2 (can be ordered as an option)
DS
Facility Power
INTERCONNECTIONS
CABLES ROUTING
Configuration Equipment Room Magnet Room
A Short Short B Long Short C Short Long
CABLES ROUTING FOR OPTIONS
OPTION FROM TO
CABLE LENGTH
m (ft)
MRE
MRE Magnet Isocenter Nominal: 7.31 (24) Maximum: 10.06 (33)
MRE ISC cabinet 15.24 (50)
MRE Ethernet Hub in ISC 15.24 (50)
MRE Customer Supplied Outlet 60Hz: 6.10 (20) 50Hz: 7.62 (25)
EQUIPMENT ROOM
MAGNET ROOM CONTROL ROOM
Customer supplied
37.5m 123ft
5.25/9.25m 17.2/30.3ft
24.70m 81.0ft
30m 98.4ft
7.14/9m 23.4/29.5ft
15.5m 50.8ft
9m 29.5ft
25m 82ft
9/16m 29.5/52.5ft
17.5m 57.4ft
28.5m 93.5ft
10/20m 32.8/65.6ft7.5m
24.6ft
8.25/14.6m 27/47.9ft
10/16m 32.8/52.5ft
8.5/15.5m 27.9/50.85ft
28.5m 93.5ft
17m 55.8ft
30m 98.4ft
RF
common ground stud
2.8m 9.2ft
DateRev /24MRI-M026490-00B.DWG B 13/JUL/2018SIGNA PREMIERVA PAOLO ALTO Interconnections 23
Customer Name: PMI Name:
GON/SO Number: Field Service Name:
Equipment: Country/City or City/State:
Required site assessment milestones Date of completion (dd/mm/yyyy)
1) Check site before Magnet Delivery
2) Check site before installation start
Place an "X" in either Y or N column
Site Ready Checks at Installation Y N General Site Planning
Room dimensions, including ceiling height, for all Exam, Equipment/Technical & Control rooms meets GE specifications.
Ceiling support structure, if indicated on the GE drawing, is in the correct location and at the correct height according to the hNJƛƎƛƴŀƭ 9ljdzƛLJƳŜƴǘ aŀƴdzŦŀŎǘdzNJŜNJ ǎLJŜŎƛŦƛŎŀǘƛƻƴǎΦ [ŜǾŜƭƴŜǎǎ ŀƴŘ ǎLJŀŎƛƴƎ Ƙŀǎ ōŜŜƴ ƳŜŀǎdzNJŜŘΣ ŀƴŘ ƛǎ NJŜŀŘȅ ŦƻNJ ǘƘŜ ƛƴǎǘŀƭƭŀǘƛƻƴ of any GE supplied components. Overhead support Structure has been confirmed with customer/contractor to meet required GE provided criteria.
Rooms that will contain equipment, including staging areas if applicable, are construction debris free. Precautions must be taken to prevent debris from entering rooms containing equipment.
Finished ceiling is installed. If applicable ceiling tiles installed per PMI discretion.
Adequate delivery route from truck to final place of installation has been reviewed with all stakeholders, all communications/notifications have occurred, arrangements have been made for special handling (rigging, elevator, fork lift, etc.). All floors along delivery route will support weight of the equipment, temporary reinforcements arranged if needed.
System power & grounding (PDB/MDP) is available as per GE specifications, installed at point of final connection and ready to use. Lock Out Tag Out is available.
System power and grounded audit has been scheduled to be completed during installation of equipment. (If Required) GEHC PM to confirmed if needed.
Adequate room illumination installed and working.
Cable ways (floor/wall/ceiling/Access Flooring) are available for installation of GE cables and are of correct length and diameter. Cable ways routes per GE Final drawings and cable access openings areas installed at a time determined by GEHC PM. Surface floor duct can be installed at time of system installation.
HVAC systems Installed, and the site meets minimum environmental operational system requirements.
Network outlets installed and computer network available and working.
Hospital IT/connectivity contacts have been engaged and information has been added to Project management tool. (If Required)
Floor levelness/flatness is measured and within tolerance, and there are no visible defects per GEHC specifications. Floor Strength and thickness have been discussed with customer/contractor and they have confirmed GE requirements are met.
Customer supplied countertops where GE equipment will be installed are in place.
Specific for MR
RF Shield installed with possible exception of magnet entrance. RF Shield Effectivity and Ground Isolation Test needed. If GE responsible for supplying RF shield, the RF shield Effectivity and Ground Isolation Test data is a Mandatory attachment into MyProjects.
Power and connectivity is available for magnet monitoring.
Delivery route for He dewars & gradient coil cart to the scanning room is available.
Chilled water supply for Water Cooled Compressor or Air Cooled Compressor is ready and meets GE specifications.
Water drain available in the equipment room, if applicable.
Power for MR compressor & Chiller is available.
Ensure cryogen venting system is available for magnet connection.
Exhaust fan system is installed and operational per GE requirements.
Status of work
General comments System can be delivered PMI signature
Site ready for installation FS signature: optional
GLOBAL SITE READINESS CHECKLIST (DI)
DOC1809666 Rev. 5
GENERAL SPECIFICATIONS
GE is not responsible for the installation of developers and associated equipment, lighting, cassette trays and protective screens or derivatives not mentioned in the order.
The final study contains recommendations for the location of GE equipment and associated devices, electrical wiring and room arrangements. When preparing the study, every effort has been made to consider every aspect of the actual equipment expected to be installed.
The layout of the equipment offered by GE, the dimensions given for the premises, the details provided for the pre-installation work and electrical power supply are given according to the information noted during on-site study and the wishes expressed by the customer.
The room dimensions used to create the equipment layout may originate from a previous layout and may not be accurate as they may not have been verified on site. GE cannot take any responsibility for errors due to lack of information.
Dimensions apply to finished surfaces of the room.
Actual configuration may differ from options presented in some typical views or tables.
If this set of final drawings has been approved by the customer, any subsequent modification of the site must be subject to further investigation by GE about the feasibility of installing the equipment. Any reservations must be noted.
¢ƘŜ ŜljdzƛLJƳŜƴǘ ƭŀȅƻdzǘ ƛƴŘƛŎŀǘŜǎ ǘƘŜ LJƭŀŎŜƳŜƴǘ ŀƴŘ ƛƴǘŜNJŎƻƴƴŜŎǘƛƻƴ ƻŦ ǘƘŜ ƛƴŘƛŎŀǘŜŘ ŜljdzƛLJƳŜƴǘ ŎƻƳLJƻƴŜƴǘǎΦ
¢ƘŜNJŜ Ƴŀȅ ōŜ ƭƻŎŀƭ NJŜljdzƛNJŜƳŜƴǘǎ ǘƘŀǘ ŎƻdzƭŘ ƛƳLJŀŎǘ ǘƘŜ LJƭŀŎŜƳŜƴǘ ƻŦ ǘƘŜǎŜ ŎƻƳLJƻƴŜƴǘǎΦ Lǘ NJŜƳŀƛƴǎ ǘƘŜ customer's responsibility to ensure that the site and final equipment placement complies with all applicable local requirements.
All work required to install GE equipment must be carried out in compliance with the building regulations and the safety standards of legal force in the country concerned.
These drawings are not to be used for actual construction purposes. The company cannot take responsibility for any damage resulting therefrom.
CUSTOMER RESPONSIBILITIES
It is the responsibility of the customer to prepare the site in accordance with the specifications stated in the final study. A detailed site readiness checklist is provided by GE. It is the responsibility of the customer to ensure all requirements are fulfilled and that the site conforms to all specifications defined in the checklist and Ŧƛƴŀƭ ǎǘdzŘȅΦ ¢ƘŜ D9 tNJƻƧŜŎǘ aŀƴŀƎŜNJ ƻŦ Lƴǎǘŀƭƭŀǘƛƻƴ όtaLύ ǿƛƭƭ ǿƻNJƪ ƛƴ ŎƻƻLJŜNJŀǘƛƻƴ ǿƛǘƘ ǘƘŜ ŎdzǎǘƻƳŜNJ ǘƻ Ŧƻƭƭƻǿ up and ensure that actions in the checklist are complete, and if necessary, will aid in the rescheduling of the delivery and installation date.
Prior to installation, a structrual engineer of record must ensure that the floor and ceiling is designed in such a way that the loads of the installed system can be securely borne and transferred. The layout of additional structural elements, dimensioning and the selection of appropriate installation methods are the sole responsibility of the structural engineer. Execution of load bearing structures supporting equipment on the ceiling, floor or walls are the customer's responsibility.
ALL DETAILS OF EQUIPMENT AND TECHNICAL DATA ARE SUBJECT TO CHANGE
DISCLAIMER
THE UNDERSIGNED, HEREBY CERTIFIES THAT I HAVE READ AND APPROVED THE PLANS IN THIS DOCUMENT.
DATE NAME SIGNATURE
DateRev…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .