This document is a submittal package for a Department of Veterans Affairs (VA) Radiology Consolidation project at the Palo Alto Medical Center. The project involves installing static control resilient flooring from Nora Systems, specifically the Noraplan Sentica ED 1702 flooring in Sand Box color (6509), with a 2.0mm thickness. The submittal (No. 096536.01) includes product data, manufacturer's literature, test reports, maintenance information, shop drawings, and 6"x6" samples of the flooring and welding heat rod.
The project details include Contract No. VA101F-14-C-0003, with S.J. Amoroso Construction as the contractor and SmithGroup as the architect. The flooring is intended for the VA Palo Alto Radiology Level 1 Area A ADDM 1 space, located at 3801 Miranda Avenue. The submittal was transmitted on 12/9/2015 and includes samples sent to both the VA OCFM Resident Engineer and SmithGroup for review and approval. The flooring is specified for a healthcare environment and comes with specific installation, maintenance, and warranty guidelines, including a 5-10 year warranty depending on the traffic conditions.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs
RETURN OF SUBMITTAL
Title or Description
Submittal 096536.01 RC Static Control Resilient Flooring Date
01/06/2016
Contractor's Name and Address
S.J. Amoroso
390 Bridge Parkway
Redwood, CA 94063
Contract No.
VA101F-14-C-0003
Project No.
640-424-Palo Alto, CA - Phase 1 Pkng Garage, Polytrauma - Phase II Rec Therapy
Submittal Items Acted Upon Submittal Item Review Status
5186 Static Control Resilient Flooring Approved
Product Data Notes/Comments
PROJECT NAME: ARCHITECT
VA Medical Center SmithGroup Radiology Consolidation, PS2 & LRSU
VA101F-14-C-0003
SJA Project #751
Name: Name: Amoroso Construction Co., Inc.
Address: Address: 390 Bridge Parkway Redwood City, CA 94065
Contact: Contact:
REMARKS: REVIEWER'S STAMP:
RESUBMITTAL NOT REQUIRED
MAKE CORRECTIONS NOTED (MCN) &
NOT REVIEWED. NO ACTION TAKEN (NAT)
REJECTED (REJ)
CONTENTS:
MAKE CORRECTIONS NOTED (MCN) &
RESUBMIT ONLY SPECIFIC ITEMS INDICATED (SSI)
REVISE AND RESUBMIT (RR)
DATE TO RE OFFICE:SPECIFICATION
SECTION:
SUBMITTAL TRANSMITTAL SUBMITTAL NO.
APPROVED. NO EXCEPTIONS TAKEN (NET)
SUBMITTAL REVIEW:
SUBCONTRACTOR/VENDOR: CONTRACTOR:
rjimenez Submittal Stamp
SJA Construction Inc.
SUBMITTAL REVIEWED
JOB NAME: VA Medical Center Radiology Consolidation PS2 &
LRSU VA101F-14-C-0003
JOB#: 751
SUBMITTAL #:
BY: BJC DATE:
Static Control Resilient Flooring per Section 09 65 36
12/9/2015 096536.01
Static Control Resilient Flooring, WSF (SD) -1
WSF (SD)-1
Section 1.5, B
Section 1.5, B
Section 1.5, G
Section 1.5, H
Palo Alto Radiology Level 1 Area A ADDM 1 3801 Miranda Ave
Palo Alto Ca 01 October 2015 : Palo Alto Radiology Level 1 Area A ADDM 1
Architet: Smith Group Plan date: 02 01 13
Addedndum: 5 Plans: CCBE/McCarthy
Estimator: Miguel
Summary Report
Cpt-3 Shaw Overlay #59598 Layered 95761 Ecoworx Tgile ECP-1 Entrance Carpet WSF-3 Nora Noraplan Environcare Article 1463 Sandbar Willow #2963 WSF-5 Nora Noraplan Environcare Article 1463 Beacon Silver #2781 WSF-8 Nora Noraplan Sentica 1701 Sand Box 6509 WSF-SD-1 Nora Noraplan Sentica ED 1702 Sand Box 6509 LN-2 Armstrong Granette W/Naturcote LP170 Pollen LVT-1 Armstrong Natural Creations Mystix TP780 Aria Natural LVT-3 Armstrong Natural Creations Mystix TP781 Stream Natural LVT-11 Armstrong Natural Creations Arbor TP071 Fruitwood Natural RB-1 Johnsonite 6" Tighlock TCBR 179 Steel at RESILIENT RB-2 Johnsonite 6" Tightlock TCB 179 Steel at CPT RB-3 Johnsonite Tightlock 4" Johnsonite TCBR 179 Steel at RESILIENT RB-4 Johnsonite Tightlock TCB 179 Steel at CPT Self Cove 6" TR-1 Carpet to Resilient TR-2 Resilient to Concrete Ramping
Scale 1:500 (original drawing scale 1:96)
1' 0"
'0
'1 0"
3'
6"
3'
6"
3'
6"
28'9"
29'7"
29'7"
29'7"
21'4"
8'7"
29'
29'10"
29'10"
29'10"
29'10"
13'6"
13'6"
11'11"
11'11"
3'
7"
3'
7"
3'
7"
29'
29'
19'1"
2'
17'6"
25'2"
25'2"
25'2"
25'2"
25'4"
25'5"
2'4"
5'
6"
5'
6"
5'
6"
5'
6"
5'
6"
25'2"
25'2"
25'2"
25'2"
25'2"
25'2"
2'1"
18'8"
18'8"
18'8"
6'
6'
6'
6'
6'
6"
6'
9"
6'
9"
1'
'1
'9
3'
'9
0' 5"
17'7"
17'7"
17'7"
4'
5"
4'
5"
1'
4"
WSF
(SD)-1
WSF
(SD)-1
WSF
(SD)-1
WSF
(SD)-1
WSF
(SD)-1
Section 1.5, C
S.J. AMOROSO CONSTRUCTION CO., INC.
390 Bridge Parkway
Redwood City, CA 94065 DATE: SJA Job #751
650-654-1900 ATTN: Martin Pabian
Project Email: job751@sjamoroso.com
REF. VA101F-14-C-0003VA101F-14-C-0003VA101F-14-C-0003VA101F-14-C-0003
TO: VA OCFM, RE Trailer Radiology Consolidation, PS2 & LRSURadiology Consolidation, PS2 & LRSURadiology Consolidation, PS2 & LRSURadiology Consolidation, PS2 & LRSU 3801 Miranda Ave Palo Alto, CAPalo Alto, CAPalo Alto, CAPalo Alto, CA Palo Alto, CA 94304
We are sending you:We are sending you:We are sending you:We are sending you:
Attached Under separate cover via the following items:
Shop Drawings Prints Plans XXXX Samples
Copy of Letter Change Order Keys
Copies No.
RADIOLOGY CONSOLIDATION SUBMITTALRADIOLOGY CONSOLIDATION SUBMITTALRADIOLOGY CONSOLIDATION SUBMITTALRADIOLOGY CONSOLIDATION SUBMITTAL 1 ea 096536.01 6"x6" sample of WSF (SD)-1 per Section 1.5 (E.1) 1 ea 096536.01 Welding Heat Rod to match WSF (SD)-1 per Section 1.5 (E.2)
These are transmitted as checked below:These are transmitted as checked below:These are transmitted as checked below:These are transmitted as checked below:
XXXX For approval Approved as submitted Revise & Resubmit
XXXX For your use Approved as noted XXXX For review & comment
As requested Returned for corrections
REMARKS:REMARKS:REMARKS:REMARKS:
Please retain samples for Submittal 096536.01 per Section 1.5, E of the specifications. Duplicate samples have been sent to SmithGroup for review and approval.
Copies: Signed: Billy-Joel Celeste, Project Engineer
Date
LETTER OF TRANSMITTAL
Description
S.J. AMOROSO CONSTRUCTION CO., INC.
390 Bridge Parkway
Redwood City, CA 94065 DATE: SJA Job #751
650-654-1900 ATTN: Rosanna Jimenez
Project Email: job751@sjamoroso.com
REF. VA101F-14-C-0003VA101F-14-C-0003VA101F-14-C-0003VA101F-14-C-0003
TO: SmithGroup JJR Radiology Consolidation, PS2 & LRSURadiology Consolidation, PS2 & LRSURadiology Consolidation, PS2 & LRSURadiology Consolidation, PS2 & LRSU 301 Battery Street, 7th Floor Palo Alto, CAPalo Alto, CAPalo Alto, CAPalo Alto, CA San Francisco, CA 94111
We are sending you:We are sending you:We are sending you:We are sending you:
Attached Under separate cover via the following items:
Shop Drawings Prints Plans Samples
Copy of Letter Change Order Keys
Copies No.
RADIOLOGY CONSOLIDATION SUBMITTALRADIOLOGY CONSOLIDATION SUBMITTALRADIOLOGY CONSOLIDATION SUBMITTALRADIOLOGY CONSOLIDATION SUBMITTAL 1 ea 096536.01 6"x6" sample of WSF (SD)-1 per Section 1.5 (E.1) 1 ea 096536.01 Welding Heat Rod to match WSF (SD)-1 per Section 1.5 (E.2)
These are transmitted as checked below:These are transmitted as checked below:These are transmitted as checked below:These are transmitted as checked below:
XXXX For approval Approved as submitted Revise & Resubmit
XXXX For your use Approved as noted XXXX For review & comment
As requested Returned for corrections
REMARKS:REMARKS:REMARKS:REMARKS:
Please review and retain samples for Submittal 096536.01 per Section 1.5, E of the specifications for approval.
Duplicate samples have been sent to the RE of VA OCFM for records and reference.
Copies: Signed: Billy-Joel Celeste, Project Engineer
Date
LETTER OF TRANSMITTAL
Description
| DFS Cover |
| adhesives for LVT |
| cover page |
| combined |
| Palo Alto Radiology Level B Area A ADDM 1 |
| Palo Alto Radiology Level B Area B ADDM 1 |
| Palo Alto Radiology Level 1 Area A ADDM 1 |
| Palo Alto Radiology Level 1 Area B ADDM 1 |
| ECK |
| LVT's |
| lvt 10 |
| 096519.01 (CFM) |
| 096519.01 (SGJJR) |
| Pages from VA PALO ALTO RADIOLOGY |
| DFS Cover |
| 20150813105323256 |
| WSF (SD)-1 |
| Transmittal Template (CFM) |
| Transmittal Template (SGJJR) |
| undefined: 09 65 36 |
| undefined_2: 12/09/15 |
| REVIEWERS STAMP: |
| REMARKS:, Row 1: |
| SUBMITTAL REVIEW: |
| APPROVED NO EXCEPTIONS TAKEN NET: On |
| MAKE CORRECTIONS NOTED MCN: Off |
| MAKE CORRECTIONS NOTED MCN_2: Off |
| REVISE AND RESUBMIT RR: Off |
| REJECTED REJ: Off |
| NOT REVIEWED NO ACTION TAKEN NAT: Off |
| Text2: DFS Flooring |
| Text3: 4688 W. Jennifer Avenue, Suite #101 |
Fresno, CA 93722
| Text4: Teri. A. Krummel |
| Combo Box5: [Billy-Joel Celeste, Project Engineer] |
| Combo Box6: [RADIOLOGY CONSOLIDATION] |
| Text7: 1) Per Section 1.5, B Manufacturers Literature & Data for WSF (SD)-1: |
- Noraplan Sentica (Color: 6509, Sand Box). 2.0mm thick
- Nora 685 adhesive
2) Per Section 1.5, G Product Test Reports
3) Per Section 1.5, H Maintenance Data
4) Per Section 1.5, C Shop Drawings
5) Per Section 1.5, E Samples
- 6"x6" tile sample of Noraplan Sentica (Color: 6509, Sand Box). 2.0mm thick
- 9" Heat Welding Bead to match Nora Sentica Color: 6509, Sand box
Note: LEED Submittals per Section 1.2, A to follow under separate cover
| Text8: 096536.01 |
| Text1: STATIC CONTROL RESILIENT FLOORING |
File details come from the government source that posted it. Updated .