CONSTRUCTION BID DOCUMENTS
PROJECT MANAGEMENT,
ARCHITECTURE/TECHNOLOGY/ELECTRICAL
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
VETERANS AFFAIRS PALO ALTO HEALTH CARE SYSTEM
(VAPAHCS)
3801 MIRANDA AVENUE
PALO ALTO, CA 94304
RADIOLOGY PATIENT SAFETY UPGRADES
640-23-101
GI-000
COVER SHEET
BBD
MRH
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
FULLY SPRINKLERED
640-23-101
17-JUL-24
100% CONSTRUCTION
BID DOCUMENTS
Radiology Patient Safety Upgrades At VA Palo Alto Health
Care System
PALO ALTO, CALIFORNIA
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
ETS
T
TA
GE
S
R I
E T EX
FO
T
CE
TI
H
AS
DER CRA
M A
RK R . HODGES
2 0 2 8 3
07/17/2024
DISCIPLINE REFERENCES
DRAWING FOR THE FOLLOWING DISCIPLINES ARE
CONTAINED IN THE DOCUMENT. THE DISCIPLINES ARE
IDENTIFIED BY THE REFERENCE WHICH IS INCORPORATED
INTO THE SHEET TITLE.
G GENERAL INFORMATION
H HAZARDOUS
V SURVEY/MAPPING
B GEOTECHNICAL
W CIVIL WORKS
C CIVIL
L LANDSCAPE
S STRUCTURAL
A ARCHITECTURAL
I INTERIORS
Q EQUIPMENT
F FIRE PROTECTION
P PLUMBING
D PROCESS
M MECHANICAL
E ELECTRICAL
T TELECOMM
SHEET NUMBER
DRAWING NUMBERING
1 BUILDING SECTION
SCALE: 1/8" = 1'-0"
EACH DRAWING IS NUMBERED ACCORDING TO IT'S
LOCATION ON THE SHEET. THE DRAWING TITLE APPEARS
ABOVE THE DEMARCATION LINE AND THE APPROPRIATE
SCALE IS LOCATED BELOW THE DEMARCATION LINE.
DRAWING REFERENCE
ARCHITECTURAL SYMBOLS
CENTER LINE
ELEVATION INDICATORXXX.XX'
CENTER LINE INDICATOR
DEMOLITION LINE
EXISTING TO REMAIN LINE
FEATURES ABOVE LINE INDICATOR
CONSTRUCTION LIMITS
BREAK, ROUND (USER DEFINES SIZE)
BREAK, STRAIGHT (SEE SECTION
INDICATORS, BUILDING BREAK
STANDARDS)
DIMENSION LINE
X'-X"
1/AS-101 INTERIOR ELEVATION
P-1
WALL OR PARTITION TYPE
ROOM NAME
ROOM NAME
ROOM NAME AND NUMBER
A
COLUMN GRID
22 KEYED NOTE
N
NORTH ARROW
REVISIONS
EXTENT OF
CURRENT
REVISION
REVISION
NUMBER
REFER TO REVISION HISTORY ON TITLE BLOCK OF EACH
SHEET.
DETAIL INDICATOR
BUILDING SECTION INDICATOR
101 DOOR NUMBER
A WINDOW INDICATOR
GENERAL NOTES
1. UNLESS NOTED AS EXISTING, ALL MATERIALS, EQUIPMENT,
MANUFACTURED ITEMS AND ASSEMBLIES INCORPORATED
INTO THE WORK SHALL BE NEW.
2. UNLESS NOTED TO BE REMOVED AND DISPOSED, ALL
EXISTING ITEMS ARE TO REMAIN. THEY SHALL BE
PROTECTED FROM DAMAGE DUE TO CONSTRUCTION
ACTIVITIES. ANY EXISTING ITEMS TO REMAIN THAT
BECOME DAMAGED DUE TO CONSTRUCTION ACTIVITIES
SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING
AT NO ADDITIONAL COST TO THE OWNER.
3. NOTATIONS FOR ITEMS OF WORK APPLY TO EACH
GRAPHICAL INDICATION SHOWN ON THE DRAWINGS,
WHETHER OR NOT NOTED.
4. ALL ITEMS NOTED TO HAVE PAINT FINISH SHALL BE
CLEANED AND PREPARED IN ACCORDANCE WITH THE
SPECIFICATIONS PRIOR TO THE APPLICATION OF PRIMER
AND PAINT.
5. THE CONTRACTOR SHALL FAMILIARIZE THEMSELF WITH
THE ARCHITECTURAL, STRUCTURAL, MECHANICAL,
ELECTRICAL, PLUMBING, TECHNOLOGY, ETC. WORK
SCOPE AND SATISFY THAT ALL REQUIREMENTS FOR
SUPPORT, FLOOR, WALL AND ROOF OPENINGS, FLASHINGS
AND CURBS, ETC. ARE IMPLEMENTED. THE ARCHITECT
SHALL BE NOTIFIED OF CONFLICTS OR DISCREPANCIES
PRIOR TO COMMENCEMENT OF CONSTRUCTION.
6. CONTRACTOR TO REPLACE AND ACCURATELY LOCATE
ALL EXISTING SIGNAGE AND LABELS NOTING RATED WALL
ASSEMBLIES AND SMOKE PARTITIONS.
7. THE GENERAL CONTRACTOR SHALL VISIT THE SITE,
VERIFY FIELD CONDITIONS AND COMPARE SUCH FIELD
CONDITIONS AND OTHER INFORMATION KNOWN TO THE
CONTRACTOR WITH CONTRACT DOCUMENTS.
8. THE GENERAL CONTRACTOR SHALL REPORT ANY
UNFORESEEN FIELD CONDITIONS, ERRORS,
INCONSISTENCIES, OR OMISSIONS DISCOVERED AT ANY
TIME DURING THE WORK. UPON SUCH DISCOVERY, THE
CONTRACTOR SHALL CONTACT THE CONTRACT OFFICER
FOR CLARIFICATION BEFORE PROCEEDING OR
CONTINUING WITH THAT PORTION OF THE WORK OR ANY
PORTION RELATED THERE TO.
9. ALL WORK SHALL CONFORM TO MOST CURRENT VERSION
OF APPLICABLE CODES AND STANDARDS INCLUDING THE
INTERNATIONAL BUILDING CODE, VA MASTER
SPECIFICATIONS, AND LATEST ADOPTED NFPA.
10. THE GENERAL CONTRACTOR SHALL NOTIFY THE
CONTRACT OFFICER, CONTRACTING OFFICER'S
REPRESENTATIVE, AND ARCHITECT OF ANY
DISCREPANCIES BETWEEN THE DRAWINGS, NOTES, AND
ACTUAL FIELD CONDITIONS BEFORE BIDDING AND
COMMENCING ANY WORK, AND REQUEST CLARIFICATION
IN WRITING.
11. WHEN UNANTICIPATED ARCHITECTURAL, STRUCTURAL,
MECHANICAL, ELECTRICAL, PLUMBING, TECHNOLOGY, ETC.
ELEMENTS CONFLICTING WITH THE INTENDED FUNCTION
OR DESIGN ARE ENCOUNTERED, INVESTIGATE AND
MEASURE THE CONFLICTS NATURE AND EXTENT. SUBMIT
A WRITTEN REPORT TO THE CONTRACT OFFICER.
12. WHERE MOUNTING HEIGHTS ARE NOT INDICATED, INSTALL
COMPONENTS USING MANUFACTURER'S OR INDUSTRY
STANDARDS. WHERE STANDARDS DO NOT EXIST, NOTIFY
THE ARCHITECT FOR CLARIFICATION.
13. CONTRACTOR SHALL NOT BARRICADE/BARRIER
EMERGENCY EGRESS TO OR FROM THIS AREA.
CONTRACTOR SHALL MAINTAIN EXIT TO EXTERIOR DURING
THE WORK PROGRESS.
14. PROVIDE ACCESS TO THE WORK AS DIRECTED BY THE
CONTRACTING OFFICER REPRESENTATIVE. SECURE
ACCESS POINT AS SPECIFIED AND DIRECTED BY THE
CONTRACTING OFFICER REPRESENTATIVE PROJECT
ENGINEER. PROVIDE WALK-OFF MATS TO MEET FACILITY
INFECTION CONTROL GUIDELINES AT EACH REQUIRED
ACCESS POINT.
15. ALL EXISTING WALL MOUNTED ITEMS AND DEVICES ARE
TO BE REMOVED PRIOR TO DEMOLITION WORK, FULLY
REFURBISHED, AND REINSTALLED IN THE NEW WALL
ASSEMBLY. LOCATION TO BE VERIFIED BY CONTRACTING
OFFICER REPRESENTATIVE. ITEMS MAY INCLUDE: DOOR
STOPS, HAND SANITIZER DISPENSERS, FIRE STROBES,
SWITCHES, ELECTRIC COVER PLATES, FIRE ALARM PULL
BOXES, ELECTRIC OUTLETS, SIGNAGE, BULLETIN BOARDS,
MILLWORK, CARD READERS, CLOCK, DATA OUTLET, PUSH
BUTTON, FIRE CONTROL BOX, PHONE, ETC.
16. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
LEGAL DISPOSAL OF ALL DEBRIS.
17. OWNER SHALL HAVE THE RIGHT OF FIRST REFUSAL ON
ITEMS INDICATED TO BE SALVAGED.
18. EXISTING SPRAYED-ON FIREPROOFING SHALL BE
MAINTAINED THROUGH THE DURATION OF CONSTRUCTION
ACTIVITIES AND THE CONTRACTOR SHALL REPAIR ANY
COMPROMISE OF EXISTING FIREPROOFING.
19. BUILDINGS WILL BE OCCUPIED AT ALL TIMES THROUGH
THE DURATION OF CONSTRUCTION.
DIMENSIONING CONVENTIONS
ALIGN
DIMENSION,
WHEN OCCURS
5. WHERE OPENINGS IN WALLS (INTERIOR WINDOWS OR
DOORS) ARE NOT DIMENSIONED BUT SHOWN AS BEING
CENTERED IN A GIVEN WALL SURFACE. LOCATE OPENINGS
AS GRAPHICALLY REPRESENTED.
MATERIAL GRAPHICS
CONCRETE
EARTH
BASE COURSE
BATT INSULATION
RIGID INSULATION
CODE INFORMATION
LOCATION MAP
N
INDEX OF DRAWINGS
CODES:
2018 IBC OR LATER VERSION
DESIGN MANUALS:
- PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS
- PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES
- PG-18-5 EQUIPMENT LIST GUIDES
- PG-18-8 SEISMIC DESIGN HANDBOOK
- PG-10-10 DESIGN MANUALS
- VA ARCHITECTURAL DESIGN MANUAL
- VA MECHANICAL DESIGN MANUAL
- VA ELECTRICAL DESIGN MANUAL
- VA PLUMBING DESIGN MANUAL
- VA FIRE PROTECTION DESIGN MANUAL
APPLICABLE CODES AND REGULATIONS:
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL CURRENT APPLICABLE
CODES AND STANDARDS.
IN ADDITION TO ALL DEPARTMENT OF VETERANS AFFAIRS, LOCAL, AND STATE CODES,
ALL WORK SHALL COMPLY WITH THE ACCESSIBILITY REQUIREMENTS OF THE STATE
OF CALIFORNIA AND THE DEPARTMENT OF VETERANS AFFAIRS GUIDELINES, ABA
(ARCHITECTURAL BARRIERS ACT) ACCESSIBILITY STANDARD FOR FEDERAL
FACILITIES.
APPLICABLE CODES AND STANDARDS (LATEST EDITIONS) INCLUDE:
- ADA ACCESSIBILITY STANDARDS
- NFPA 241, "STANDARD FOR SAFEGUARDING CONSTRUCTION,
ALTERNATION, AND DEMOLITION OPERATIONS"
- INTERNATIONAL BUILDING CODE (IBC)
- PALO ALTO MUNICIPAL CODE - 2022 CALIFORNIA CODE OF REGULATIONS WITH CITY
OF PALO ALTO AMENDMENTS
- CHAPTER 15.04, CALIFORNIA FIRE CODE
- CHAPTER 16.04, CALIFORNIA BUILDING CODE
- CHAPTER 16.05 CALIFORNIA MECHANICAL CODE
- CHAPTER 16.08, CALIFORNIA PLUMBING CODE
- CHAPTER 16.16, CALIFORNIA ELECTRICAL CODE
- CHAPTER 16.17, CALIFORNIA ENERGY CODE
- CHAPTER 16.19, CALIFORNIA HISTORICAL BUILDING CODE AND CALIFORNIA
EXISTING BUILDING CODE
- CHAPTER 16.42 SEISMIC HAZARDS IDENTIFICATION PROGRAM
GI-010
GENERAL INFORMATION,
SYMBOLS, & LOCATION MAP
BBD
MRH
1/3-A-101
SHEET NUMBERDRAWING NUMBER
ON SHEET BY
LOCATION
1/3-A101
3-A-100
BUILDING
NUMBER
DISCIPLINE SHEET NUMBER
1. EXCEPT WHERE DIRECTED TO PLACE WORK ITEMS AT THE
"APPROXIMATE LOCATION SHOWN." DO NOT SCALE
DRAWINGS FOR DIMENSIONAL INFORMATION.
2. ALL ELEMENTS OF THE DOCUMENTS MAY NOT BE DRAWN
TO EXACT SCALE. DIMENSIONS REQUESTED ARE SHOWN
(OR DERIVED FROM THOSE SHOWN OR NOTED) ON FLOOR
PLANS, DETAIL PLANS, ELEVATIONS, SECTIONS,
SCHEDULES, CONFIGURATION DETAILS, AND
SPECIFICATIONS. SEE THE NOTES BELOW AND SYMBOLS
FOR DIMENSIONING CONVENTIONS.
3. EXCEPT WHERE SPECIFICALLY NOTED TO THE CONTRARY,
ALL DIMENSIONS SHOWN ON THE ARCHITECTURAL
DRAWINGS CONFORM TO THE FOLLOWING CONVENTIONS.
A. MEASURED FROM FACE OF PARTITION ASSEMBLY:
FACE OF PARTITION ASSEMBLY (EXCLUSIVE OF
APPLIED FINISHES HAVING THICKNESS WHICH MAY BE
ADDED TO SUCH WALL) AS DEFINED BY THE
PARTITION SCHEDULE. UNLESS NOTED AS "FACE OF
FINISH" OR "CLEAR" DIMENSION, DIMENSIONS ARE NOT
MEASURED TO THE FACE OF APPLIED FINISH BUT
RATHER TO THE FACE OF CORE STRUCTURE (STUD,
CMU, ETC.). REFER TO EACH PARTITION TYPES
THICKNESS.
B. DIMENSIONS UTILIZING "CENTERLINE" SYMBOL ARE
MEASURED TO:
CENTERLINE OF PARTITION ASSEMBLY (EXCLUSIVE OF
ANY APPLIED FINISHES HAVING THICKNESS WHICH
MAY BE ADDED TO SUCH WALLS) AT PARTITIONS
FRAMED WITH METAL STUDS. REFER TO "PARTITION
SCHEDULE" TO DETERMINE EACH PARTITION TYPES
THICKNESS.
CENTERLINE OF DOOR, WINDOW, OR LOUVER
OPENING.
CENTERLINE OF OTHER FEATURES AS INDICATED.
C. WHERE "EQUAL" DIMENSIONS USED ON REFLECTED
CEILING PLANS TO LOCATE CEILING GRID WORK
POINTS, MEASURE DIMENSIONS TO:
EDGE OF INDICATED CEILING AT THE FACE OF THE
ADJACENT APPLIED FINISH MEASURED AT THE
CEILING PLANE.
CAUTION: DUE TO THE POSSIBLE APPLICATION OF
APPLIED FINISHES - THICKNESS WHICH MAY VARY
BETWEEN FLOOR AND CEILING AND NOT ACCOUNTED
FOR (EXCEPT AS INDICATED BY "FACE OF FINISH" OR
"CLEAR") BY THE DIMENSION SHOWN ON FLOOR
PLANS - THE CONTRACTOR MUST ADJUST THE FLOOR
PLAN DIMENSIONS TO REFLECT ACTUAL DIMENSIONS
FOUND AT THE CEILING PLANE.
4. WHERE WALLS AND/OR PARTITIONS OF UNEQUAL
THICKNESS ABUT, ALIGN EXPOSED FACES, UNLESS
OTHERWISE NOTED.
C
1/AS-101
L
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
FULLY SPRINKLERED
640-23-101
17-JUL-24
100% CONSTRUCTION
BID DOCUMENTS
Radiology Patient Safety Upgrades At VA Palo Alto Health
Care System
PALO ALTO, CALIFORNIA
GENERAL
GI-000 COVER SHEET
GI-010 GENERAL INFORMATION, SYMBOLS, AND LOCATION MAP
GI-030 ARCHITECTURAL ABBREVIATIONS
ARCHITECTURAL
AD-201 DEMOLITION PLAN - AREA F&G BASEMENT & LEVEL 1
AD-202 DEMOLITION - ENLARGED FLOOR PLANS
A-201 FLOOR PLAN - AREA F&G BASEMENT & LEVEL 1
A-202 ENLARGED FLOOR PLANS
A-203 DOOR AND ANCHORING DETAILS
ELECTRICAL
EG-1 ELECTRICAL LEGENDS AND ABBREVIATIONS - I
EG-2 ELECTRICAL LEGENDS AND ABBREVIATIONS - II
EG-3 ELECTRICAL GENERAL NOTES
E-201 FLOOR PLAN - AREA F&G BASEMENT & LEVEL 1
EP-202 ENLARGED ELEC POWER PLAN - BASEMENT AREA G
EP-203 ENLARGED ELEC POWER PLAN - LEVEL 1 AREA F&G
EP-204 ENLARGED FLOOR PLANS - MRI SUITE, & ELEC ROOMS
TECHNOLOGY
T-001 GENERAL INFORMATION
100-TY-201.B BLDG. 100, BASEMENT SECURITY - G WING
100-TY-202.1 BLDG. 100, FIRST FLOOR SECURITY - G WING
100-TY-203.1 BLDG. 100, FIRST FLOOR SECURITY - F WING
100-TY-400 ENLARGED TELECOM ROOMS
TY-500 SECURITY DETAIL
TY-501 TYPICAL DETAILS
TY-700 SCHEDULES
SITE ADDRESS
3801 MIRANDA AVENUE
PALO ALTO, CA 94304
u
Donkeys 99 Barron ParkATM <29r
ICO Software Inc | ndQ Q
9 Lot 101 4Co,9 0 4 4 -04 a
-U lll=lll=lll— I — 11
9 —Palo Alto VA Medical Ctr
ID
Co, Mir, Lot 100 West co9 0 99•*
9Rita Patel, Ph a rm D
9 9 L(
-$ II
C 0 M P A N
VA
Building 4 Palo Alto Va Health Care System
United States Postal Service
VA Palo Alto Health Care System - Palo...
(P ro
Whistle Stop Child Development
O I n.
O ft o O -D d z
Ro
&r snG) (8 r o
%‘O velocloud, now Dart of VMware a A
Lot 7 o
9Fisher House I & II
P‘o
Lot 51
Building 7
Debus Katherine E
Polytrauma & Blind Rehabilitation Center
ETS
T
TA
GE
S
R I
E T EX
FO
T
CE
TI
H
AS
DER CRA
M A
RK R . HODGES
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL
MANUFACTURERS ASSOCIATION
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR
ASPHALTIC CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACM ASBESTOS CONTAINING
MATERIAL
ACP ACRYLIC GLAZING
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES
ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION
AGC ASSOCIATED GENERAL
CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING
JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZED
ANSI AMERICAN NATIONAL
STANDARDS INSTITUTE
ANT ANTENNA
APA AMERICAN PLYWOOD
ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL
INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING
INSTITUTE
AWPA AMERICAN WOOD PRESERVERS'
ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEV BEVEL
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
ARCHITECTURAL ABBREVIATIONS
C CELSIUS CHANNEL
C CHANNEL CELSIUS
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
CAB CABINET
CAC CEILING ATTENUATION CLASS
CB CATCH BASIN OR CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS OR
CONTRACT DOCUMENTS
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR
FURNISHED/CONTRACTOR
INSTALLED
CF/OI CONTRACTOR
FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY OR CORNER
GUARD
CGSFU CERAMIC GLAZED STRUCTURAL
FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR
CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
cm SQUARE CENTIMETER cm CUBIC CENTIMETER
CM CONSTRUCTION MANAGEMENT
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE,
CERTIFICATE OF OCCUPANCY,
CLEANOUT, OR COMPANY
CO2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING STEEL
INSTITUTE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION SPECIFICATIONS
INSTITUTE
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM
DIAG DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING
ROOM, OR DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E EAST
E LABEL CLASS E DOOR
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEC DR OP ELECTRIC DOOR OPENER
ELEV ELEVATOR
EMER EMERGENCY
EMER SHR EMERGENCY SHOWER
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPDM ETHYLENE PROPYLENE DIENE
MOMOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE
BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
ESMT EASEMENT
ESP ESPECIALLY
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXST GR EXISTING GRADE
EXT EXTERIOR, EXTERNAL, OR
EXTINGUISHER
EXT GR EXTERIOR GRADE
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FAS BD FASCIA BOARD
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND
EQUIPMENT
FH FLAT HEAD OR FLAT HEAD
SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIN WD FINISH WOOD
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FLUOR FLUORESCENT
FLUOR FIX FLUORESCENT FIXTURE
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE
OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT,
OR FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER
OR
FIBERGLASS REINFORCED
PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FWC FABRIC WALLCOVERING
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED
CONCRETE
GFRG GLASS-FIBER-REINFORCED
GYPSUM
GFRP GLASS-FIBER-REINFORCED
PLASTIC
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLOCK
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H HIGH
H PLAM HIGH PRESSURE PLASTIC
LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE
AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HM HECTOMETER
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND
FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR
HORSEPOWER
HQ HEADQUARTERS
HS HEAT-STRENGTHENED (GLASS)
OR HIGH STRENGTH
HSE HOUSE
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR
CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I INTERSTATE (HIGHWAY) OR
MOMENT OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER, OR INTERIOR DESIGN
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRAME
ASSEMBLY
IWH INSTANTANEOUS WATER
HEATER
JAN JANITOR
J-BOX JUNCTION BOX
KD KILN DRIED OR KNOCKED
DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE
LHR LEFT HAND REVERSE LATENT
HEAT RATION
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKERWASHER
LL LEAD LINED
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATION
CONCRETE
LYR LAYER
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION
SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM
MED MEDIUM MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S
RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM MINUTE
MIN MINUTE MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR
OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
N NORTH
NA NOT APPLICABLE
NAAMM NATIONAL ASSOCIATION OF
ARCHITECTURAL METAL
MANUFACTURERS
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEUT NEUTRAL
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDCTION COEFFICIENT
NRCA NATIONAL ROOFING
CONTRACTORS ASSOCIATION
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OUTSIDE
DIMENSION
OD OUTSIDE DIMENSION OUTSIDE
DIAMETER
OF/CI OWNER
FURNISHED/CONTRACTOR
INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER
INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE
RADIUS
ORD ORDNANCE OR OVERFLOW ROOF
DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OSHA OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION
OUT OUTLET
OZ OUNCE
PAR PARALLEL OR PARAPET
PARA PARAGRAPH
PART PARTIAL
PAT PATTERN
PB PUSH BUTTON
PBD PARTICLE BOARD
PC PIECE, POLYCARBONATE OR
PORTLAND CEMENT
PCA PORTLAND CEMENT
ASSOCIATION
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE OR PENETRATION
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHAR PHARMACY
PHOTO PHOTOGRAPH
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
PO POST OFFICE PURCHASE ORDER
PO PURCHASE ORDER POST OFFICE
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, OR
PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER
BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REMOTE CONTROL
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION
REFR REFRIGERATION REFRACTORY
REG REGISTER
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE
CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID
CORE
SCH SCHOOL
SCHED SCHEDULE
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE
DETECTOR, OR SOAP DISPENSER
SDG SIDING
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SJI STEEL JOIST INSTITUTE
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING
WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SND SANITARY NAPKIN
DISPENSER
SND INS SOUND INSULATION
SNDU SANITARY NAPKIN
DISPOSAL UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR
SERVICE SINK
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION
CLASS
STD STANDARD
STIF STIFFENER
STL JST STEEL JOIST
STL LNTL STEEL LINTEL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STL TR STEEL TRUSS
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
STRUCT STL STRUCTURAL STEEL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPEND
SUSP CLG SUSPENDED CEILING
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMBOL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL
BAR
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL
PANEL TEMPERATURE OR
TRAFFIC CONTROL PLAN
TD TOWEL DISPENSOR
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR
TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TMPD TEMPERED
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TO TOP OF ___
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK
TRANS TRANSOM
TRANS WD FIN TRANSPARENT WOOD
FINISH
TRTD TREATED
TS TENSILE STRENGTH OR
TUBE STEEL
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
U HEAT TRANSFER
COEFFICIENT
UC UNDERCUT
UCD UNDERCUT DOOR
UGND UNDERGROUND
UL UNDERWRITERS
LABORATORIES
ULT ULTIMATE
UNFIN UNFINISH
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER
SUPPLY
UR URINAL
UTIL UTILITY
UV ULTRAVIOLET
V VOLT
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE
VITRIFIED CLAY TILE
VEH VEHICLE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFAT VINYL FACED ACOUSTICAL
TILE
VIC VICINTY
VID VIDEO
VIF VERIFY IN FIELD
VNR VENEER
VOC VOLATILE ORGANIC
COMPOUND
VOL VOLUME
VOLT VOLTAGE
VP VENEER PLASTER
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
VWF VINYL WALL FABRIC
W WIDE OR WEST
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WC WALL COVERING OR WATER
CLOSET
WC WL HNG WATER CLOSET, WALL HUNG
WCHR WATER CHILLER
WCL WL MTD WATER COOLER, WALL HUNG
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WHSE WAREHOUSE
WLD WELDED
WM WIRE MESH
WP WATERPROOFING
WPD WATER PRESSURE DROP
WPM WATERPROOF MEMBRANE
WPR WALL PROTECTION/RAILING
WR WEATHER RESISTANT
WS WEATHERSTRIP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XPS EXTRUDED POLYSTYRENE
BOARD (INSULATION)
YD YARD
YR YEAR
GI-030
ARCHITECTURAL
ABBREVIATIONS
BBD
MRH
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
FULLY SPRINKLERED
640-23-101
17-JUL-24
100% CONSTRUCTION
BID DOCUMENTS
Radiology Patient Safety Upgrades At VA Palo Alto Health
Care System
PALO ALTO, CALIFORNIA
c 0 M P A N
VA
ETS
T
TA
GE
S
R I
E T EX
FO
T
CE
TI
H
AS
DER CRA
M A
RK R . HODGES
UP
UP
S
R
Q
P
N
M
L
K
J
H
G
F
E
T
ELEVATOR
MACHINE
ROOM104
ELEV1
ELEV3
ELEV2
AE2.1.1AAE2.1.1B
STAIR 3
STORAGE
ELEVATOR
LOBBY100
V
V
V
C
DN
DN
UP
DN
UP
MECH
SHAFT#1
MECH
SHAFT#2
FEC
FEC
FEC
FEC
LO
ADING DOCK
LO
BBY
AREA OF
WORK
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
FULLY SPRINKLERED
640-23-101
17-JUL-24
100% CONSTRUCTION
BID DOCUMENTS
Radiology Patient Safety Upgrades At VA Palo Alto Health
Care System
PALO ALTO, CALIFORNIA
AS-101
SITE PLAN
BBD
MRH
TRUE
NORTH
1 CAMPUS PLAN - ADDRESS: 3801 MIRANDA AVENUE PALO ALTO, CALIFORNIA - 94304
SCALE: NTS
as
3) 1
E
33) 3 L
ZOC & &
2AAXRKY— yY 4............WA —** 37o%8
/ C
49Y Q e* I* 0 0/ s05808
BLDG 100
RADIOLOGY
I I
MIRANDA AVENUE
3$
A O No O
0920- PR
Co% 68 oP<
BLDG 5
BLDG 6
BLDG 102
C
\ 1 1/7
L
MB-3
/i ylMB-4
X/ xlyBLDG 7
I£ BLDG 51F/
BLDG 51c (0 n —I d
FISHER HOUSE
BLDG 50
DEFENDERS LODGE L[N
. I 49 855C
O
8 /
09%9 aroo Co’ x
N
& ,(9 — kJ
488%
(eel { XK
T-7D
MB-1
MB-2
BLDG 4
POLYTRAUMA REHABILITATION
PARKING
STRUCTURE 1
FOOTHILL EXPRESSWAY
LOOP ROAD
nJ
ACUTE PSYCH
o
EXPRESSWAYFOOTHILL
BLDG 54
Q
Q
BLDG 42
BLDG 40
BLDG 43
9CO-GEN BLDG
CHILLER BLDG
o o Q
Q o o
C 0 M P A N
VA
BLDG 41
GENERATOR BLDG
XX
) ( b I
Z/
B n
.Z
ZZ
ZZ
U N
P
W X/
V
XN
W y 0a o
1E
0 4 4
3 (( r p ar
IE
XX
XX
XX
II 111111 fob I H o— O
O
ED
U
C
AT
IO
N
SI
M
U
LA
TI
O
N C
EN
TE
R
(U N
D
ER
C O
N
ST
R U
C
TI
O N
ETS
T
TA
GE
S
R I
E T EX
FO
T
CE
TI
H
AS
DER CRA
M A
RK R . HODGES
1 DEMOLITION PLAN - F & G WING LEVEL B
SCALE: 1/16" = 1'-0" 2 DEMOLITION PLAN - F & G WING LEVEL 1
SCALE: 1/16" = 1'-0"
NEW - 1/A-202
DEMO - 1/AD-202
SHHI300
UP
T
BIOMED
STAGING
GB-200
PTS
MECHANICAL
ROOM
GB-201
STAIRS
PHARMACY
PARTS
STORAGE
GB-202
LAB COATS AND
NEW UNIFORMS
STAGING
GB-108C
ELECT RM
E-0.4MECHANICAL
M-0.4
MALE
LOCKERS
GB-105 CLEAN
PICK-UP
WORKSTATION
GB-108
PHARMACY
CACHE
STORAGE
MALE
TOILETS AND
SHOWERS
GB-105A
DROP-OFF
WORKSTATION
GB-107
DONATION
STORAGE
GB-107A
DRESSING
GB-108B
IT
DEPLOYMENT
STORAGE
GB-103
PT PERSONAL
ITEMS
STORAGE
GB-107B
PT
VALUABLE
STORAGE
GB-107C
SOILED
LINEN
CART
GB-106
FEMALE
LOCKERS
GB-104
STAFF
LOUNGE
GB-102 ELECT RM
E-0.5
FEMALE
TOILETS AND
SHOWERS
GB-104A
CLEAN
LINEN PICK-UP
WORKSTATION
CLEAN LINEN
STAGING
GB-101
SHARED
CONF. ROOM
GB-100
LIGHTWELL
STER/NON
STER STOR
EB-300
CORR
FB-C05
F LKR
FB-100
F T
FB-100A
EO CYL STOR
EB-310
HAC
FB-300A
M T
FB-110A
TEL EQUIP
FB-370
TEL
BATTERY
FB-370A
STORAGE
SUP&
EQUIP
FB-210
M LKR
FB-110
EO AER
EB-314
CORR
FB-C04
PREP ASSM
STER
EB-312
A
R 32B
M LKR
EB-332
VEST
FB-C30
F LKR
EB-330
F T
EB-330A
CORR
FB-C03
UNAS
FB-130
AUTOVALET
FB-140
SUPV/
CLER TECH
FB-200
SILVER COLL
FB-250
HAC
FB-240
TRASH COLL
FB-230
CORR
FB-C20
CORR
FB-C02
SUPV
FB-300A
S LIN COLL
FB-298
OFFICE OF
THE SERVICE
CHIEF
FB-300
SIMULATION
ROOM
FB-310
CONTROL
ROOM
FB-320
CONF. OFFICE
ELEV LOBBY
FB-C01
COPIER/STOR.
LAB
OFFICE
TECH
OFFICE
XEROX
STORAGE
FB-335
IDF CLOSET
HVAC
CORR
FB-C10
STORAGE
FB-361
TEMP
STORAGE
FB-365
EMS EQPT
STORAGE
FB-364
VA SUPPLY
STORAGE
FB-363
1EMS
SUPERVISORS
WORKSTATION
FB-362NSF CHIEF
OFC
FB-360A
COPY/
STORAGE
FB-360B
NFS ADMIN
WORKSTATION
FB-360
TELECOM
STORAGE
FB-330
OFFICE
BMS STOR
FB-210A
F SHR
EB-330B
STORAGE CUSTOMER
SUPPORT
STORAGE
FB-336
CORR
FB-C13
EO STER
EB-316 LNG
FB-120
DN
UP
T
T
T
F1-283
(E) SIGNAL
RM
(E) ELECT
RM
(E) ELECT
RM
F1-289 F1-287 F1-285
(E) GENERAL
PURPOSE
RADIOLOGY
ROOM
F1-211
(E) GENERAL
PURPOSE
RADIOLOGY
ROOM F1-209
(E) REMOTE
F1-207
(E) R/F RM
F1-205
(E) R/F RM
F1-201
(E) R/F CONTROL ROOM
F1-203
(E) SOILED
UTILITY
F1-202
(E)
TELECOM
(E) COPY
ROOM
F1-200
F1-185
(E) IR
CONTROL
ROOM
F1-175
(E) IR
PROCEDURE
ROOM
F1-165
F1-155 F1-153
F1-175B
F1-175A
F1-217
F1-281
(E) STAFF
WORK AREA
F1-205A F1-201A
(E) SHAFT
(E) CORR
F1-C10F1-291
(E)
CONTROL
(E) PET CT
(E) CORR
F1-C14
OFFICE
F1-130
(E)
CONFERENCE
ROOM
F1-215
(E)
ELEVATOR
(E)
ELEVATOR
(E)
ELEVATOR
G1-100G
ELECT RM
E-1.7
MRI EQUIP
RM
G1-104
G1-105DMRI
SCANNING
ROOM
G1-105A
MRI
CONTROL
ROOM
G1-105B
MRI
SCANNING
ROOM
G1-105C
MRI EQUIP
RM
G1-106
TELECOM
T-1.7
G1-207G1-203G1-202 G1-209
G1-100EG1-100B
G1-100F
READING
ROOM
G1-200
PATIENT HOLDING BAY
G1-101
G1-107
G1-303
G1-307
G1-305
G1-102
G1-100J
G1-201
G1-103
G1-211G1-204 G1-206
G1-306
G1-100C
G1-208
G1-403G1-401G1-400 G1-402
G1-308
G1-100A
E1-272 E1-280
(E) EDUC
OFF
F1-100 F1-110
(E) ELEV
LOBBY
A1-C15
(E) CORR
C1-C06
(E) CORR
F1-C13
F1-120B
(E) SPEC T
F1-121
(E) CORR
F1-C01
SHAFT
STAIRS
ST-8
(E) CHEST
RM
F1-225
F1-229
G1-400A G1-402A G1-404
SHAFT
G1-302
G1-302A
G1-212
G1-309
G1-101B
F1-142
F1-144C F1-144D
RECEPTION
F1-144A
F1-160
LEARNING
CENTER
F1-254
STAFF
LOUNGE
F1-240
WORKSTATIONS
F1-284
F1-272
F1-286
F1-268
(E) OFFICE
C1-280
G1-304
G1-100A
MAIN
WAITING
F1-144
G1-205 G1-210
F1-144BF1-235 F1-140
G1-100D
CORRIDOR
G1-C10
CORRIDOR
G1-C11
CORRIDOR
G1-C40
CORRIDOR
G1-C20
CORRIDOR
G1-C31
CORRIDOR
G1-C30
E-1.7A
G1-301
G1-300
MRI
VESTIBULE
G1-105
(E) STAIRS
STAFF WORK AREA
G1-100H
F1-264
(E) CORR
F1-C13
(E) CORR
F1-C02
F1-170 F1-204
STAFF WORK
F1-144J
F1-290 F1-288 F1-270
F1-260F1-266 F1-262
F1-236 F1-238
F1-110A F1-110C F1-120D
F1-227
D1
D1
D1
D1
D1
D3
D7
D1
D1
D1
D1
D1
D2
D1
D4
D1
D6 D6 D6 D6 D6 D6 D6 D6
D6 D6
D6
D8
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
FULLY SPRINKLERED
640-23-101
17-JUL-24
100% CONSTRUCTION
BID DOCUMENTS
Radiology Patient Safety Upgrades At VA Palo Alto Health
Care System
PALO ALTO, CALIFORNIA
AD-201
DEMOLITION PLAN - AREA F&G
BASEMENT & LEVEL 1
BBD
MRH
F
G
MAIN
ENTRANCE
TRUE
NORTH
KEYED NOTES
REMOVE EXISTING DOOR HARDWARE, AS
REQUIRED, IN PREPARATION FOR NEW DOOR
FUNCTION. COORDINATE DOOR HARDWARE
TO BE REMOVED WITH SECURITY/TECH
DRAWINGS. COORDINATE WITH VA COR FOR
RETURN OF REMOVED HARDWARE.
REFERENCE PLAN 2/A-201 AND
SPECIFICATIONS SECTION 08 71 00 DOOR
HARDWARE FOR NEW HARDWARE SCHEDULE
REPLACING EXISTING.
D1
D2
D3
REMOVE EXISTING SERVER RACK AND
OVERHEAD CABLE TRAY AND RETURN TO
OWNER.
REMOVE EXISTING GROUNDING BAR AND
RETURN TO OWNER.
REMOVE EXISTING WINDOW SHADE AND
RETURN TO OWNER.
D4
NOT USEDD5
REMOVE CEILING TILES TEMPORARILY FOR
NEW ACOUSTICAL TREATMENT ABOVE
CEILING.
D6
REMOVE DOORS FOR INSTALLATION OF NEW
DOOR LOUVER VENTS.
D8
REMOVE EXISTING PAIR OF WOOD DOORS
FROM FRAME AND EXISTING HARWARE FROM
FRAME PATCH HOLES IN EXISTING DOOR
FRAME AND PREP FOR REPAINT OF FRAME.
D7
KEY PLAN
GENERAL NOTES
1. CONTRACTOR TO COORDINATE WITH THE VA
REPRESENTATIVE AND THE VA'S EQUIPMENT
PROVIDER FOR WORK IN MRI SUITE. MRI
MAGNET MUST BE RAMPED DOWN PRIOR TO
ANY DEMOLITION OR NEW WORK IN MRI ROOM.
2. PRIOR TO ANY DEMOLITION WORK IN MRI
ROOM AND SUITE, CONTRACTOR MUST
SECURE AND CONTRACT WITH A CERTIFIED RF
SHIELDING SPECIALIST FOR MONITORING ANY
WORK PENETRATING OR AFFECTING THE
EXISTING RF SHIELDING ROOM ENCLOSURE, A
FINAL CERTIFICATION ON RF SHIELDING
ENCLOSURE MUST BE PROVIDED, UPON
COMPLETION.
3. CONTRACTOR MUST SCHEDULE A
PRE-CONSTRUCTION/PRE-DEMO
COORDINATION MEETING WITH OWNER (VA),
OWNERS EQUIPMENT REPRESENTATIVES (GE
MEDICAL, INSIGHTEC, & BOSTON SCIENTIFIC)
AT MINIMUM OF 45 DAYS PRIOR TO
COMMENCEMENT OF WORK IN MRI ROOM AND
SUITE. ARCHITECT MUST BE NOTIFIED AT
LEAST TWO WEEKS PRIOR TO COORDINATION
MEETING, AND INCLUDED IN MEETING, IN
PERSON, OR VIA "TEAMS" VIDEO
CONFERENCING. CONTRACTOR MUST
DOCUMENT MEETING AND DISTRIBUTE NOTES
AND MUST PROVIDE OWNER AND ARCHITECT A
WRITTEN PLAN OF ACTION, FOR REVIEW AND
APPROVAL PRIOR TO WORK COMMENCEMENT.
4. NEW PENETRATIONS REQUIRED BY (VA)
OWNER'S EQUIPMENT VENDORS MUST BE
COORDINATED WITH VENDORS PRIOR TO
DEMOLITION AND A NEW PENETRATION PANEL
WITH VENDOR SPECIFIC CONNECTIONS PLATE
PROVIDED BY OWNER'S EQUIPMENT VENDOR.
5. ALL DOOR HARDWARE REMOVED (AND NOT
REUSED) IS TO BE RETURNED TO (VA) OWNER.
6. CONTRACTOR IS RESPONSIBLE FOR
RESTORING AREAS IN WHICH WORK IS BEING
PERFORMED PER CONTRACT TO A COMPLETE
AND FINISHED STATE UPON COMPLETION OF
WORK.
7. CONTRACTOR IS RESPONSIBLE FOR ENSURING
ALL AREAS WHERE CONTRACTED WORK IS
BEING PERFORMED IS PROTECTED FROM
PUBLIC AND STAFF DURING WORK BEING DONE
AND AFTER WORK HAS TERMINATED FOR THE
DAY. ALL DEBRIS, TOOLS, AND EQUIPMENT ARE
TO BE CLEANED AND REMOVED FROM THE
SITE AND WORK AREA IN A CLEAN AND TIDY
CONDITION UNTIL WORK COMMENCES THE
NEXT DAY.
8. PATCH AND REPAIR EXISTING WALLS AT AREAS
OF INSTALLATION OF NEW DOOR OPERATION
DEVICES AND MATCH EXISTING FINISHES
LEGEND
PIV
ADO
- PERSONAL IDENTITY VERIFICATION -
REF. TECH DRAWINGS
- AUTOMATIC DOOR OPENER - REF. TECH
DRAWINGS & SHEET A-203 DETAILS.
tTi! I l
J 1 r c o M P A N
VA
ETS
T
TA
GE
S
R I
E T EX
FO
T
CE
TI
H
AS
DER CRA
M A
RK R . HODGES
1 ENLARGED DEMO PLAN - MRI SUITE FLOOR PLAN
SCALE: 1/4" = 1'-0"
ELECT RM
E-1.7
MRI EQUIP
RM
G1-104
TOILET
G1-105D
MRI
SCANNING
ROOM
G1-105A
MRI
CONTROL
ROOM
G1-105B
MRI
SCANNING
ROOM
G1-105C
MRI EQUIP
RM
G1-106
TELECOM
T-1.7
HAC
G1-212
COR
G1-
MRI
VESTIBULE
G1-105
T
T
D3
D1
D7
D3
D3
D3
D4
ABOVE CEILING
ABOVE CEILING
D2
D8
D8
1 ENLARGED DEMO PLAN - MRI SUITE REFLECTED CEILING PLAN
SCALE: 1/4" = 1'-0"
T
T
NO RCP DEMO IN THIS ROOM
D5
D6
D6
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
FULLY SPRINKLERED
640-23-101
17-JUL-24
100% CONSTRUCTION
BID DOCUMENTS
Radiology Patient Safety Upgrades At VA Palo Alto Health
Care System
PALO ALTO, CALIFORNIA
AD-202
DEMOLITION - ENLARGED
FLOOR PLANS
BBD
MRH
KEYED NOTES
D1 CONTRACTOR TO COORDINATE WITH
OWNER'S EQUIPMENT VENDOR FOR REMOVAL
OF EXISTING MRI TABLE. REMOVE EXISTING
MRI TABLE ANCHORING IN FLOOR. PATCH
CONCRETE AFTER REMOVAL OF EXISTING
ANCHORING AND HAVE CERTIFIED BY AN RF
SHIELDING CONTRACTOR.
D2 REMOVE PORTION OF EXISTING SHEET
FLOORING AND SUBFLOORING FOR NEW MRI
TABLE ANCHOR LOCATIONS. CUT EXISTING
FLOORING IN TABLE AREA AS REQUIRED TO
ACCOMMODATE NEW TABLE ANCHORS.
CENTER A RECTANGULAR CUT WITH CUTS
PARALLEL AND PERPENDICULAR TO ROOM
WALLS AND SYMMETRICAL TO THE TABLE.
D3 REMOVE PORTION OF EXISTING WALL IN
LOCATION OF NEW PENETRATION PANEL FOR
NEW MRI ROOM EQUIPMENT. COORDINATE
WITH VA CONTRACTED VENDORS.
D4 REMOVE PORTION OF EXISTING WALL FOR
NEW EQUIPMENT COORDINATE AS REQUIRED
BY VA EQUIPMENT VENDORS.
D5 CONTRACTOR TO TEMPORARILY REMOVE AND
REPLACE CEILING TILES NECESSARY TO
INSTALL CABLE TRAY FOR EXOBLATE
EQUIPMENT.
D6 REMOVE CEILING TILES TEMPORARILY FOR
NEW ACOUSTICAL TREATMENT ABOVE
CEILING.
D7 REMOVE AND REPLACE EXISTING OXYGEN
MONITORING SYSTEM
D8 REMOVE APPROXIMATELY 12"H X 12"W
PORTION OF EXISTING WALL IN LOCATION OF
NEW PENETRATION PANEL
GENERAL NOTES
1. CONTRACTOR TO COORDINATE WITH THE VA
REPRESENTATIVE AND THE VA'S EQUIPMENT
PROVIDER FOR WORK IN MRI SUITE. MRI
MAGNET MUST BE RAMPED DOWN PRIOR TO
ANY DEMOLITION OR NEW WORK IN MRI ROOM.
2. PRIOR TO ANY DEMOLITION WORK IN MRI
ROOM AND SUITE, CONTRACTOR MUST
SECURE AND CONTRACT WITH A CERTIFIED RF
SHIELDING SPECIALIST FOR MONITORING ANY
WORK PENETRATING OR AFFECTING THE
EXISTING RF SHIELDING ROOM ENCLOSURE, A
FINAL CERTIFICATION ON RF SHIELDING
ENCLOSURE MUST BE PROVIDED, UPON
COMPLETION.
3. CONTRACTOR MUST SCHEDULE A
PRE-CONSTRUCTION/PRE-DEMO
COORDINATION MEETING WITH OWNER (VA),
OWNERS EQUIPMENT REPRESENTATIVES (GE
MEDICAL, INSIGHTEC, & BOSTON SCIENTIFIC)
AT MINIMUM OF 45 DAYS PRIOR TO
COMMENCEMENT OF WORK IN MRI ROOM AND
SUITE. ARCHITECT MUST BE NOTIFIED AT
LEAST TWO WEEKS PRIOR TO COORDINATION
MEETING, AND INCLUDED IN MEETING, IN
PERSON, OR VIA "TEAMS" VIDEO
CONFERENCING. CONTRACTOR MUST
DOCUMENT MEETING AND DISTRIBUTE NOTES
AND MUST PROVIDE OWNER AND ARCHITECT A
WRITTEN PLAN OF ACTION, FOR REVIEW AND
APPROVAL PRIOR TO WORK COMMENCEMENT.
4. NEW PENETRATIONS REQUIRED BY (VA)
OWNER'S EQUIPMENT VENDORS MUST BE
COORDINATED WITH VENDORS PRIOR TO
DEMOLITION AND A NEW PENETRATION PANEL
WITH VENDOR SPECIFIC CONNECTIONS PLATE
PROVIDED BY OWNER'S EQUIPMENT VENDOR.
5. ALL DOOR HARDWARE REMOVED (AND NOT
REUSED) IS TO BE RETURNED TO (VA) OWNER.
6. CONTRACTOR IS RESPONSIBLE FOR
RESTORING AREAS IN WHICH WORK IS BEING
PERFORMED PER CONTRACT TO A COMPLETE
AND FINISHED STATE UPON COMPLETION OF
WORK.
7. CONTRACTOR IS RESPONSIBLE FOR ENSURING
ALL AREAS WHERE CONTRACTED WORK IS
BEING PERFORMED IS PROTECTED FROM
PUBLIC AND STAFF DURING WORK BEING DONE
AND AFTER WORK HAS TERMINATED FOR THE
DAY. ALL DEBRIS, TOOLS, AND EQUIPMENT ARE
TO BE CLEANED AND REMOVED FROM THE
SITE AND WORK AREA IN A CLEAN AND TIDY
CONDITION UNTIL WORK COMMENCES THE
NEXT DAY.
8. PATCH AND REPAIR EXISTING WALLS AT AREAS
OF INSTALLATION OF NEW DOOR OPERATION
DEVICES AND MATCH EXISTING FINISHES
LEGEND
PIV
ADO
- PERSONAL IDENTITY VERIFICATION -
REF. TECH DRAWINGS
- AUTOMATIC DOOR OPENER - REF. TECH
DRAWINGS & SHEET A-203 DETAILS.
r " i 1
Po I________ I
L
C 0 M P A N
VA
r i i
ETS
T
TA
GE
S
R I
E T EX
FO
T
CE
TI
H
AS
DER CRA
M A
RK R . HODGES
1 FLOOR PLAN - F & G WING LEVEL B
SCALE: 1/16" = 1'-0" 2 FLOOR PLAN - F & G WING LEVEL 1
SCALE: 1/16" = 1'-0"
NEW - 1/A-202
DEMO - 1/AD-202
SHHI300
UP
ADO
PIV
PIV
PIV
PIV
PIV
T
BIOMED
STAGING
GB-200
PTS
MECHANICAL
ROOM
GB-201
STAIRS
PHARMACY
PARTS
STORAGE
GB-202
LAB COATS AND
NEW UNIFORMS
STAGING
GB-108C
ELECT RM
E-0.4MECHANICAL
M-0.4
MALE
LOCKERS
GB-105 CLEAN
PICK-UP
WORKSTATION
GB-108
PHARMACY
CACHE
STORAGE
MALE
TOILETS AND
SHOWERS
GB-105A
DROP-OFF
WORKSTATION
GB-107
DONATION
STORAGE
GB-107A
DRESSING
GB-108B
IT
DEPLOYMENT
STORAGE
GB-103
PT PERSONAL
ITEMS
STORAGE
GB-107B
PT
VALUABLE
STORAGE
GB-107C
SOILED
LINEN
CART
GB-106
FEMALE
LOCKERS
GB-104
STAFF
LOUNGE
GB-102 ELECT RM
E-0.5
FEMALE
TOILETS AND
SHOWERS
GB-104A
CLEAN
LINEN PICK-UP
WORKSTATION
CLEAN LINEN
STAGING
GB-101
SHARED
CONF. ROOM
GB-100
LIGHTWELL
STER/NON
STER STOR
EB-300
CORR
FB-C05
F LKR
FB-100
F T
FB-100A
EO CYL STOR
EB-310
HAC
FB-300A
M T
FB-110A
TEL EQUIP
FB-370
TEL
BATTERY
FB-370A
STORAGE
SUP&
EQUIP
FB-210
M LKR
FB-110
EO AER
EB-314
CORR
FB-C04
PREP ASSM
STER
EB-312
A
R 2B
M LKR
EB-332
VEST
FB-C30
F LKR
EB-330
F T
EB-330A
CORR
FB-C03
UNAS
FB-130
AUTOVALET
FB-140
SUPV/
CLER TECH
FB-200
SILVER COLL
FB-250
HAC
FB-240
TRASH COLL
FB-230
CORR
FB-C20
CORR
FB-C02
SUPV
FB-300A
S LIN COLL
FB-298
OFFICE OF
THE SERVICE
CHIEF
FB-300
SIMULATION
ROOM
FB-310
CONTROL
ROOM
FB-320
CONF. OFFICE
ELEV LOBBY
FB-C01
COPIER/STOR.
LAB
OFFICE
TECH
OFFICE
XEROX
STORAGE
FB-335
IDF CLOSET
HVAC
CORR
FB-C10
STORAGE
FB-361
TEMP
STORAGE
FB-365
EMS EQPT
STORAGE
FB-364
VA SUPPLY
STORAGE
FB-363
1EMS
SUPERVISORS
WORKSTATION
FB-362NSF CHIEF
OFC
FB-360A
COPY/
STORAGE
FB-360B
NFS ADMIN
WORKSTATION
FB-360
TELECOM
STORAGE
FB-330
OFFICE
BMS STOR
FB-210A
F SHR
EB-330B
STORAGE CUSTOMER
SUPPORT
STORAGE
FB-336
CORR
FB-C13
EO STER
EB-316 LNG
FB-120
DN
UP
PIV
PIV
PIV
ADO ADO
ADO
ADO
ADO
PIV
C
C
ADO
T
T
T
Insightec Pen Panel
SER
VIC
E
AR
EA
Insightec Equipm ent C abinet
Insightec C hiller
Insightec Helmet System & Table
Insightec Front End
Junction Box
Boston Scientific Console
Boston Scientific Mobile
Connection Panel
ADO
ADO
F1-283
(E) SIGNAL
RM
(E) ELECT
RM
(E) ELECT
RM
F1-289 F1-287 F1-285
(E) GENERAL
PURPOSE
RADIOLOGY
ROOM
F1-211
(E) GENERAL
PURPOSE
RADIOLOGY
ROOM F1-209
(E) REMOTE
F1-207
(E) R/F RM
F1-205
(E) R/F RM
F1-201
(E) R/F CONTROL ROOM
F1-203
(E) SOILED
UTILITY
F1-202
(E)
TELECOM
(E) COPY
ROOM
F1-200
F1-185
(E) IR
CONTROL
ROOM
F1-175
(E) IR
PROCEDURE
ROOM
F1-165
F1-155 F1-153
F1-175B
F1-175A
F1-217
F1-281
(E) STAFF
WORK AREA
F1-205A F1-201A
(E) SHAFT
(E) CORR
F1-C10F1-291
(E)
CONTROL
(E) PET CT
(E) CORR
F1-C14
OFFICE
F1-130
(E)
CONFERENCE
ROOM
F1-215
(E)
ELEVATOR
(E)
ELEVATOR
(E)
ELEVATOR
G1-100G
ELECT RM
E-1.7
MRI EQUIP
RM
G1-104
G1-105DMRI
SCANNING
ROOM
G1-105A
MRI
CONTROL
ROOM
G1-105B
MRI
SCANNING
ROOM
G1-105C
MRI EQUIP
RM
G1-106
TELECOM
T-1.7
G1-207G1-203G1-202 G1-209
G1-100EG1-100B
G1-100F
READING
ROOM
G1-200
PATIENT HOLDING BAY
G1-101
G1-107
G1-303
G1-307
G1-305
G1-102
G1-100J
G1-201
G1-103
G1-211G1-204 G1-206
G1-306
G1-100C
G1-208
G1-403G1-401G1-400 G1-402
G1-308
G1-100A
-270
E1-272 E1-280
(E) EDUC
OFF
F1-100 F1-110
(E) ELEV
LOBBY
A1-C15
(E) CORR
C1-C06
(E) CORR
F1-C13
F1-120B
(E) SPEC T
F1-121
(E) CORR
F1-C01
SHAFT
STAIRS
ST-8
(E) CHEST
RM
F1-225
F1-229
G1-400A G1-402A G1-404
SHAFT
G1-302
G1-302A
G1-212
G1-309
G1-101B
F1-142
F1-144C F1-144D
RECEPTION
F1-144A
F1-160
LEARNING
CENTER
F1-254
STAFF
LOUNGE
F1-240
WORKSTATIONS
F1-284
F1-272
F1-286
F1-268
(E) OFFICE
C1-280
G1-304
G1-100A
MAIN
WAITING
F1-144
G1-205 G1-210
F1-144BF1-235 F1-140
G1-100D
CORRIDOR
G1-C10
CORRIDOR
G1-C11
CORRIDOR
G1-C40
CORRIDOR
G1-C20
CORRIDOR
G1-C31
CORRIDOR
G1-C30
E-1.7A
G1-301
G1-300
MRI
VESTIBULE
G1-105
(E) STAIRS
STAFF WORK AREA
G1-100H
F1-264
(E) CORR
F1-C13
(E) CORR
F1-C02
F1-170 F1-204
STAFF WORK
F1-144J
F1-290 F1-288 F1-270
F1-260F1-266 F1-262
F1-236 F1-238
F1-110A F1-110C F1-120D
F1-227
UPGRADES AND
UPDATES TO
THIS MRI ROOM
8/ A-
11 11 11 11 11 11 11
11 11
GB-201
GB-108C
GB-108
GB-107
GB-106
C20-A G1-201
G1-200A
C20-B
G1-309
G1-308
F1-254
F1-C10
E0.5
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
FULLY SPRINKLERED
640-23-101
17-JUL-24
100% CONSTRUCTION
BID DOCUMENTS
Radiology Patient Safety Upgrades At VA Palo Alto Health
Care System
PALO ALTO, CALIFORNIA
TRUE
NORTH
A-201
FLOOR PLAN - AREA F&G
BASEMENT & LEVEL 1
BBD
MRH
F
G
MAIN
ENTRANCE
KEYED NOTES
REPLACE EXISTING MANUAL WINDOW SHADE
WITH MOTORIZED WINDOW SHADE -
REFERENCE ELECTRICAL DRAWINGS FOR
POWER.
PROVIDE NEW FIRE SPRINKLER PROTECTION
HEAD IN ROOM. COORDINATE WITH FIRE
PROTECTION SPECIALIST. ROOM FUNCTION
CHANGING FROM TELECOM ROOM TO
STORAGE ROOM.
PROVIDE NEW PRIVACY CURTAIN & TRACK TO
BE SIMILAR TO PATIENT BED BAYS CURTAINS
IN SAME ROOM. CURTAIN TRACK TO FASTEN
TO WOOD SLAT CEILING. CURTAIN LENGTH
ABOVE FLOOR TO BE APPROXIMATELY 9 FEET
TALL (+/-) AND 4 INCHES ABOVE GROUND.
FINAL DIMENSION TO BE COORDINATED BY
TAKING FIELD DIMENSIONS PRIOR TO
ORDERING CURTAIN AND TRACK.
NOT USED
NEW PAIR OF 4' X 7' SOLID CORE WOOD
DOORS. MATCH EXISTING FINISH. DOORS TO
RECEIVE NEW PERSONAL IDENTIFICATION
VERIFICATION (PIV) READER AND DOOR
ACCESS CONTROL (ADO) TO COORDINATE
WITH AN AUTOMATIC DOOR OPENER FOR
BOTH DOORS UPON AUTHORIZATION,
COORDINATE LOCATION OF CARD READER
AND AUTOMATIC DOOR OPENER PLATE WITH
VA, WITHIN ACCESSIBILITY (ADA)
REQUIREMENTS. ADO FUNCTION - BOTH SIDES
OF DOOR. REFERENCE DOOR SCHEDULE.
EXISTING PAIR OF DOORS TO RECEIVE NEW
HARDWARE FOR PERSONAL IDENTIFICATION
VERIFICATION (PIV). PLACE CARD READER PER
ADA REQUIREMENTS, ADO FUNCTIONS TO BE
ACTIVATED FROM BOTH SIDE OF DOORS.
HARDWARE SET. REFERENCE DOOR
SCHEDULE.
EXISTING DOORS TO OFFICE G1-201 TO
RECEIVE NEW HARDWARE FOR PERSONAL
IDENTIFICATION VERIFICATION (PIV) AND
AUTOMATIC DOOR OPENER DOOR FUNCTION
TO ALLOW FOR DOOR TO BE HELD ON OPEN
POSITION UPON AUTHORIZED AND
AUTOMATED ENTRY. ADO FUNCTION TO BE
ACTIVATED FROM BOTH SIDES. REFERENCE
DOOR SCHEDULE.
EXISTING TOILET ROOM DOOR(S) TO RECEIVE
AUTOMATIC DOOR OPENERS - SENSOR PAD
ON BOTH SIDES OF DOOR - WHEN LOCKED
DOOR OPENER TO BE DISENGAGED.
REFERENCE DOOR SCHEDULE.
EXISTING ALUMINUM STOREFRONT DOOR TO
RECEIVE (PIV) PERSONAL IDENTIFICATION
VERIFICATION READER AND ACCESS
CONTROL LOCKS HARDWARE. REFERENCE
DOOR SCHEDULE.
REMOVE CEILING TILES IN THIS AREA AND
PROVIDE SOUND BATT INSULATION OVER
ENTIRE CEILING OF THIS AREA. RESET
EXISTING TILES REPLACE ANY DAMAGED
TILES. MATCH EXISTING.
REPAINT EXISTING DOOR FRAME PRIOR TO
INSTALLING NEW DOOR AND HARDWARE
PROVIDE NEW LOUVER VENTS AT BOTTOM OF
EACH EXISTING DOOR REFERENCE 10/A-203.
REINSTALL DOORS.
EXISTING DOOR(S) TO RECIEVE NEW
HARDWARE FOR PERSONAL IDENTIFICATION
VERIFICATION (PIV). PLACE CARD READER PER
ADA REQUIREMENTS. REFERENCE DOOR
SCHEDULE.
EXISTING DOOR TO RECIEVE NEW HARDWARE
FOR AUTOMATIC DOOR OPENER (ADO). ADO
FUNCTION TO BE ACTIVATED FROM BOTH
SIDES OF DOORS REFERENCE DOOR
SCHEDULE.
WAITING ROOM AREA TO RECEIVE NEW
CLOSED CIRCUIT TELEVISION SYSTEM.
REFERENCE TECHNOLOGY DRAWINGS
100-TY-203.1
KEY PLAN
GENERAL NOTES
1. CONTRACTOR TO COORDINATE WITH THE VA
REPRESENTATIVE AND THE VA'S EQUIPMENT
PROVIDER FOR WORK IN MRI SUITE. MRI
MAGNET MUST BE RAMPED DOWN PRIOR TO
ANY DEMOLITION OR NEW WORK IN MRI ROOM.
2. PRIOR TO ANY DEMOLITION WORK IN MRI
ROOM AND SUITE, CONTRACTOR MUST
SECURE AND CONTRACT WITH A CERTIFIED RF
SHIELDING SPECIALIST FOR MONITORING ANY
WORK PENETRATING OR AFFECTING THE
EXISTING RF SHIELDING ROOM ENCLOSURE, A
FINAL CERTIFICATION ON RF SHIELDING
ENCLOSURE MUST BE PROVIDED, UPON
COMPLETION.
3. CONTRACTOR MUST SCHEDULE A
PRE-CONSTRUCTION/PRE-DEMO
COORDINATION MEETING WITH OWNER (VA),
OWNERS EQUIPMENT REPRESENTATIVES (GE
MEDICAL, INSIGHTEC, & BOSTON SCIENTIFIC)
AT MINIMUM OF 45 DAYS PRIOR TO
COMMENCEMENT OF WORK IN MRI ROOM AND
SUITE. ARCHITECT MUST BE NOTIFIED AT
LEAST TWO WEEKS PRIOR TO COORDINATION
MEETING, AND INCLUDED IN MEETING, IN
PERSON, OR VIA "TEAMS" VIDEO
CONFERENCING. CONTRACTOR MUST
DOCUMENT MEETING AND DISTRIBUTE NOTES
AND MUST PROVIDE OWNER AND ARCHITECT A
WRITTEN PLAN OF ACTION, FOR REVIEW AND
APPROVAL PRIOR TO WORK COMMENCEMENT.
4. NEW PENETRATIONS REQUIRED BY (VA)
OWNER'S EQUIPMENT VENDORS MUST BE
COORDINATED WITH VENDORS PRIOR TO
DEMOLITION AND A NEW PENETRATION PANEL
WITH VENDOR SPECIFIC CONNECTIONS PLATE
PROVIDED BY OWNER'S EQUIPMENT VENDOR.
5. ALL DOOR HARDWARE REMOVED (AND NOT
REUSED) IS TO BE RETURNED TO (VA) OWNER.
6. CONTRACTOR IS RESPONSIBLE FOR
RESTORING AREAS IN WHICH WORK IS BEING
PERFORMED PER CONTRACT TO A COMPLETE
AND FINISHED STATE UPON COMPLETION OF
WORK.
7. CONTRACTOR IS RESPONSIBLE FOR ENSURING
ALL AREAS WHERE CONTRACTED WORK IS
BEING PERFORMED IS PROTECTED FROM
PUBLIC AND STAFF DURING WORK BEING DONE
AND AFTER WORK HAS TERMINATED FOR THE
DAY. ALL DEBRIS, TOOLS, AND EQUIPMENT ARE
TO BE CLEANED AND REMOVED FROM THE
SITE AND WORK AREA IN A CLEAN AND TIDY
CONDITION UNTIL WORK COMMENCES THE
NEXT DAY.
8. PATCH AND REPAIR EXISTING WALLS AT AREAS
OF INSTALLATION OF NEW DOOR OPERATION
DEVICES AND MATCH EXISTING FINISHES
LEGEND
PIV
ADO
- PERSONAL IDENTITY VERIFICATION -
REF. TECH DRAWINGS
-…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .