CONSTRUCTION BID DOCUMENTS

PROJECT MANAGEMENT,

ARCHITECTURE/TECHNOLOGY/ELECTRICAL

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com

VETERANS AFFAIRS PALO ALTO HEALTH CARE SYSTEM

(VAPAHCS)

3801 MIRANDA AVENUE

PALO ALTO, CA 94304

RADIOLOGY PATIENT SAFETY UPGRADES

640-23-101

GI-000

COVER SHEET

BBD

MRH

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com

FULLY SPRINKLERED

640-23-101

17-JUL-24

100% CONSTRUCTION

BID DOCUMENTS

Radiology Patient Safety Upgrades At VA Palo Alto Health

Care System

PALO ALTO, CALIFORNIA

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com

ETS

T

TA

GE

S

R I

E T EX

FO

T

CE

TI

H

AS

DER CRA

M A

RK R . HODGES

2 0 2 8 3

07/17/2024

DISCIPLINE REFERENCES

DRAWING FOR THE FOLLOWING DISCIPLINES ARE

CONTAINED IN THE DOCUMENT. THE DISCIPLINES ARE

IDENTIFIED BY THE REFERENCE WHICH IS INCORPORATED

INTO THE SHEET TITLE.

G GENERAL INFORMATION

H HAZARDOUS

V SURVEY/MAPPING

B GEOTECHNICAL

W CIVIL WORKS

C CIVIL

L LANDSCAPE

S STRUCTURAL

A ARCHITECTURAL

I INTERIORS

Q EQUIPMENT

F FIRE PROTECTION

P PLUMBING

D PROCESS

M MECHANICAL

E ELECTRICAL

T TELECOMM

SHEET NUMBER

DRAWING NUMBERING

1 BUILDING SECTION

SCALE: 1/8" = 1'-0"

EACH DRAWING IS NUMBERED ACCORDING TO IT'S

LOCATION ON THE SHEET. THE DRAWING TITLE APPEARS

ABOVE THE DEMARCATION LINE AND THE APPROPRIATE

SCALE IS LOCATED BELOW THE DEMARCATION LINE.

DRAWING REFERENCE

ARCHITECTURAL SYMBOLS

CENTER LINE

ELEVATION INDICATORXXX.XX'

CENTER LINE INDICATOR

DEMOLITION LINE

EXISTING TO REMAIN LINE

FEATURES ABOVE LINE INDICATOR

CONSTRUCTION LIMITS

BREAK, ROUND (USER DEFINES SIZE)

BREAK, STRAIGHT (SEE SECTION

INDICATORS, BUILDING BREAK

STANDARDS)

DIMENSION LINE

X'-X"

1/AS-101 INTERIOR ELEVATION

P-1

WALL OR PARTITION TYPE

ROOM NAME

ROOM NAME

ROOM NAME AND NUMBER

A

COLUMN GRID

22 KEYED NOTE

N

NORTH ARROW

REVISIONS

EXTENT OF

CURRENT

REVISION

REVISION

NUMBER

REFER TO REVISION HISTORY ON TITLE BLOCK OF EACH

SHEET.

DETAIL INDICATOR

BUILDING SECTION INDICATOR

101 DOOR NUMBER

A WINDOW INDICATOR

GENERAL NOTES

1. UNLESS NOTED AS EXISTING, ALL MATERIALS, EQUIPMENT,

MANUFACTURED ITEMS AND ASSEMBLIES INCORPORATED

INTO THE WORK SHALL BE NEW.

2. UNLESS NOTED TO BE REMOVED AND DISPOSED, ALL

EXISTING ITEMS ARE TO REMAIN. THEY SHALL BE

PROTECTED FROM DAMAGE DUE TO CONSTRUCTION

ACTIVITIES. ANY EXISTING ITEMS TO REMAIN THAT

BECOME DAMAGED DUE TO CONSTRUCTION ACTIVITIES

SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING

AT NO ADDITIONAL COST TO THE OWNER.

3. NOTATIONS FOR ITEMS OF WORK APPLY TO EACH

GRAPHICAL INDICATION SHOWN ON THE DRAWINGS,

WHETHER OR NOT NOTED.

4. ALL ITEMS NOTED TO HAVE PAINT FINISH SHALL BE

CLEANED AND PREPARED IN ACCORDANCE WITH THE

SPECIFICATIONS PRIOR TO THE APPLICATION OF PRIMER

AND PAINT.

5. THE CONTRACTOR SHALL FAMILIARIZE THEMSELF WITH

THE ARCHITECTURAL, STRUCTURAL, MECHANICAL,

ELECTRICAL, PLUMBING, TECHNOLOGY, ETC. WORK

SCOPE AND SATISFY THAT ALL REQUIREMENTS FOR

SUPPORT, FLOOR, WALL AND ROOF OPENINGS, FLASHINGS

AND CURBS, ETC. ARE IMPLEMENTED. THE ARCHITECT

SHALL BE NOTIFIED OF CONFLICTS OR DISCREPANCIES

PRIOR TO COMMENCEMENT OF CONSTRUCTION.

6. CONTRACTOR TO REPLACE AND ACCURATELY LOCATE

ALL EXISTING SIGNAGE AND LABELS NOTING RATED WALL

ASSEMBLIES AND SMOKE PARTITIONS.

7. THE GENERAL CONTRACTOR SHALL VISIT THE SITE,

VERIFY FIELD CONDITIONS AND COMPARE SUCH FIELD

CONDITIONS AND OTHER INFORMATION KNOWN TO THE

CONTRACTOR WITH CONTRACT DOCUMENTS.

8. THE GENERAL CONTRACTOR SHALL REPORT ANY

UNFORESEEN FIELD CONDITIONS, ERRORS,

INCONSISTENCIES, OR OMISSIONS DISCOVERED AT ANY

TIME DURING THE WORK. UPON SUCH DISCOVERY, THE

CONTRACTOR SHALL CONTACT THE CONTRACT OFFICER

FOR CLARIFICATION BEFORE PROCEEDING OR

CONTINUING WITH THAT PORTION OF THE WORK OR ANY

PORTION RELATED THERE TO.

9. ALL WORK SHALL CONFORM TO MOST CURRENT VERSION

OF APPLICABLE CODES AND STANDARDS INCLUDING THE

INTERNATIONAL BUILDING CODE, VA MASTER

SPECIFICATIONS, AND LATEST ADOPTED NFPA.

10. THE GENERAL CONTRACTOR SHALL NOTIFY THE

CONTRACT OFFICER, CONTRACTING OFFICER'S

REPRESENTATIVE, AND ARCHITECT OF ANY

DISCREPANCIES BETWEEN THE DRAWINGS, NOTES, AND

ACTUAL FIELD CONDITIONS BEFORE BIDDING AND

COMMENCING ANY WORK, AND REQUEST CLARIFICATION

IN WRITING.

11. WHEN UNANTICIPATED ARCHITECTURAL, STRUCTURAL,

MECHANICAL, ELECTRICAL, PLUMBING, TECHNOLOGY, ETC.

ELEMENTS CONFLICTING WITH THE INTENDED FUNCTION

OR DESIGN ARE ENCOUNTERED, INVESTIGATE AND

MEASURE THE CONFLICTS NATURE AND EXTENT. SUBMIT

A WRITTEN REPORT TO THE CONTRACT OFFICER.

12. WHERE MOUNTING HEIGHTS ARE NOT INDICATED, INSTALL

COMPONENTS USING MANUFACTURER'S OR INDUSTRY

STANDARDS. WHERE STANDARDS DO NOT EXIST, NOTIFY

THE ARCHITECT FOR CLARIFICATION.

13. CONTRACTOR SHALL NOT BARRICADE/BARRIER

EMERGENCY EGRESS TO OR FROM THIS AREA.

CONTRACTOR SHALL MAINTAIN EXIT TO EXTERIOR DURING

THE WORK PROGRESS.

14. PROVIDE ACCESS TO THE WORK AS DIRECTED BY THE

CONTRACTING OFFICER REPRESENTATIVE. SECURE

ACCESS POINT AS SPECIFIED AND DIRECTED BY THE

CONTRACTING OFFICER REPRESENTATIVE PROJECT

ENGINEER. PROVIDE WALK-OFF MATS TO MEET FACILITY

INFECTION CONTROL GUIDELINES AT EACH REQUIRED

ACCESS POINT.

15. ALL EXISTING WALL MOUNTED ITEMS AND DEVICES ARE

TO BE REMOVED PRIOR TO DEMOLITION WORK, FULLY

REFURBISHED, AND REINSTALLED IN THE NEW WALL

ASSEMBLY. LOCATION TO BE VERIFIED BY CONTRACTING

OFFICER REPRESENTATIVE. ITEMS MAY INCLUDE: DOOR

STOPS, HAND SANITIZER DISPENSERS, FIRE STROBES,

SWITCHES, ELECTRIC COVER PLATES, FIRE ALARM PULL

BOXES, ELECTRIC OUTLETS, SIGNAGE, BULLETIN BOARDS,

MILLWORK, CARD READERS, CLOCK, DATA OUTLET, PUSH

BUTTON, FIRE CONTROL BOX, PHONE, ETC.

16. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR

LEGAL DISPOSAL OF ALL DEBRIS.

17. OWNER SHALL HAVE THE RIGHT OF FIRST REFUSAL ON

ITEMS INDICATED TO BE SALVAGED.

18. EXISTING SPRAYED-ON FIREPROOFING SHALL BE

MAINTAINED THROUGH THE DURATION OF CONSTRUCTION

ACTIVITIES AND THE CONTRACTOR SHALL REPAIR ANY

COMPROMISE OF EXISTING FIREPROOFING.

19. BUILDINGS WILL BE OCCUPIED AT ALL TIMES THROUGH

THE DURATION OF CONSTRUCTION.

DIMENSIONING CONVENTIONS

ALIGN

DIMENSION,

WHEN OCCURS

5. WHERE OPENINGS IN WALLS (INTERIOR WINDOWS OR

DOORS) ARE NOT DIMENSIONED BUT SHOWN AS BEING

CENTERED IN A GIVEN WALL SURFACE. LOCATE OPENINGS

AS GRAPHICALLY REPRESENTED.

MATERIAL GRAPHICS

CONCRETE

EARTH

BASE COURSE

BATT INSULATION

RIGID INSULATION

CODE INFORMATION

LOCATION MAP

N

INDEX OF DRAWINGS

CODES:

2018 IBC OR LATER VERSION

DESIGN MANUALS:

- PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS

- PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES

- PG-18-5 EQUIPMENT LIST GUIDES

- PG-18-8 SEISMIC DESIGN HANDBOOK

- PG-10-10 DESIGN MANUALS

- VA ARCHITECTURAL DESIGN MANUAL

- VA MECHANICAL DESIGN MANUAL

- VA ELECTRICAL DESIGN MANUAL

- VA PLUMBING DESIGN MANUAL

- VA FIRE PROTECTION DESIGN MANUAL

APPLICABLE CODES AND REGULATIONS:

ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL CURRENT APPLICABLE

CODES AND STANDARDS.

IN ADDITION TO ALL DEPARTMENT OF VETERANS AFFAIRS, LOCAL, AND STATE CODES,

ALL WORK SHALL COMPLY WITH THE ACCESSIBILITY REQUIREMENTS OF THE STATE

OF CALIFORNIA AND THE DEPARTMENT OF VETERANS AFFAIRS GUIDELINES, ABA

(ARCHITECTURAL BARRIERS ACT) ACCESSIBILITY STANDARD FOR FEDERAL

FACILITIES.

APPLICABLE CODES AND STANDARDS (LATEST EDITIONS) INCLUDE:

- ADA ACCESSIBILITY STANDARDS

- NFPA 241, "STANDARD FOR SAFEGUARDING CONSTRUCTION,

ALTERNATION, AND DEMOLITION OPERATIONS"

- INTERNATIONAL BUILDING CODE (IBC)

- PALO ALTO MUNICIPAL CODE - 2022 CALIFORNIA CODE OF REGULATIONS WITH CITY

OF PALO ALTO AMENDMENTS

- CHAPTER 15.04, CALIFORNIA FIRE CODE

- CHAPTER 16.04, CALIFORNIA BUILDING CODE

- CHAPTER 16.05 CALIFORNIA MECHANICAL CODE

- CHAPTER 16.08, CALIFORNIA PLUMBING CODE

- CHAPTER 16.16, CALIFORNIA ELECTRICAL CODE

- CHAPTER 16.17, CALIFORNIA ENERGY CODE

- CHAPTER 16.19, CALIFORNIA HISTORICAL BUILDING CODE AND CALIFORNIA

EXISTING BUILDING CODE

- CHAPTER 16.42 SEISMIC HAZARDS IDENTIFICATION PROGRAM

GI-010

GENERAL INFORMATION,

SYMBOLS, & LOCATION MAP

BBD

MRH

1/3-A-101

SHEET NUMBERDRAWING NUMBER

ON SHEET BY

LOCATION

1/3-A101

3-A-100

BUILDING

NUMBER

DISCIPLINE SHEET NUMBER

1. EXCEPT WHERE DIRECTED TO PLACE WORK ITEMS AT THE

"APPROXIMATE LOCATION SHOWN." DO NOT SCALE

DRAWINGS FOR DIMENSIONAL INFORMATION.

2. ALL ELEMENTS OF THE DOCUMENTS MAY NOT BE DRAWN

TO EXACT SCALE. DIMENSIONS REQUESTED ARE SHOWN

(OR DERIVED FROM THOSE SHOWN OR NOTED) ON FLOOR

PLANS, DETAIL PLANS, ELEVATIONS, SECTIONS,

SCHEDULES, CONFIGURATION DETAILS, AND

SPECIFICATIONS. SEE THE NOTES BELOW AND SYMBOLS

FOR DIMENSIONING CONVENTIONS.

3. EXCEPT WHERE SPECIFICALLY NOTED TO THE CONTRARY,

ALL DIMENSIONS SHOWN ON THE ARCHITECTURAL

DRAWINGS CONFORM TO THE FOLLOWING CONVENTIONS.

A. MEASURED FROM FACE OF PARTITION ASSEMBLY:

FACE OF PARTITION ASSEMBLY (EXCLUSIVE OF

APPLIED FINISHES HAVING THICKNESS WHICH MAY BE

ADDED TO SUCH WALL) AS DEFINED BY THE

PARTITION SCHEDULE. UNLESS NOTED AS "FACE OF

FINISH" OR "CLEAR" DIMENSION, DIMENSIONS ARE NOT

MEASURED TO THE FACE OF APPLIED FINISH BUT

RATHER TO THE FACE OF CORE STRUCTURE (STUD,

CMU, ETC.). REFER TO EACH PARTITION TYPES

THICKNESS.

B. DIMENSIONS UTILIZING "CENTERLINE" SYMBOL ARE

MEASURED TO:

CENTERLINE OF PARTITION ASSEMBLY (EXCLUSIVE OF

ANY APPLIED FINISHES HAVING THICKNESS WHICH

MAY BE ADDED TO SUCH WALLS) AT PARTITIONS

FRAMED WITH METAL STUDS. REFER TO "PARTITION

SCHEDULE" TO DETERMINE EACH PARTITION TYPES

THICKNESS.

CENTERLINE OF DOOR, WINDOW, OR LOUVER

OPENING.

CENTERLINE OF OTHER FEATURES AS INDICATED.

C. WHERE "EQUAL" DIMENSIONS USED ON REFLECTED

CEILING PLANS TO LOCATE CEILING GRID WORK

POINTS, MEASURE DIMENSIONS TO:

EDGE OF INDICATED CEILING AT THE FACE OF THE

ADJACENT APPLIED FINISH MEASURED AT THE

CEILING PLANE.

CAUTION: DUE TO THE POSSIBLE APPLICATION OF

APPLIED FINISHES - THICKNESS WHICH MAY VARY

BETWEEN FLOOR AND CEILING AND NOT ACCOUNTED

FOR (EXCEPT AS INDICATED BY "FACE OF FINISH" OR

"CLEAR") BY THE DIMENSION SHOWN ON FLOOR

PLANS - THE CONTRACTOR MUST ADJUST THE FLOOR

PLAN DIMENSIONS TO REFLECT ACTUAL DIMENSIONS

FOUND AT THE CEILING PLANE.

4. WHERE WALLS AND/OR PARTITIONS OF UNEQUAL

THICKNESS ABUT, ALIGN EXPOSED FACES, UNLESS

OTHERWISE NOTED.

C

1/AS-101

L

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com

FULLY SPRINKLERED

640-23-101

17-JUL-24

100% CONSTRUCTION

BID DOCUMENTS

Radiology Patient Safety Upgrades At VA Palo Alto Health

Care System

PALO ALTO, CALIFORNIA

GENERAL

GI-000 COVER SHEET

GI-010 GENERAL INFORMATION, SYMBOLS, AND LOCATION MAP

GI-030 ARCHITECTURAL ABBREVIATIONS

ARCHITECTURAL

AD-201 DEMOLITION PLAN - AREA F&G BASEMENT & LEVEL 1

AD-202 DEMOLITION - ENLARGED FLOOR PLANS

A-201 FLOOR PLAN - AREA F&G BASEMENT & LEVEL 1

A-202 ENLARGED FLOOR PLANS

A-203 DOOR AND ANCHORING DETAILS

ELECTRICAL

EG-1 ELECTRICAL LEGENDS AND ABBREVIATIONS - I

EG-2 ELECTRICAL LEGENDS AND ABBREVIATIONS - II

EG-3 ELECTRICAL GENERAL NOTES

E-201 FLOOR PLAN - AREA F&G BASEMENT & LEVEL 1

EP-202 ENLARGED ELEC POWER PLAN - BASEMENT AREA G

EP-203 ENLARGED ELEC POWER PLAN - LEVEL 1 AREA F&G

EP-204 ENLARGED FLOOR PLANS - MRI SUITE, & ELEC ROOMS

TECHNOLOGY

T-001 GENERAL INFORMATION

100-TY-201.B BLDG. 100, BASEMENT SECURITY - G WING

100-TY-202.1 BLDG. 100, FIRST FLOOR SECURITY - G WING

100-TY-203.1 BLDG. 100, FIRST FLOOR SECURITY - F WING

100-TY-400 ENLARGED TELECOM ROOMS

TY-500 SECURITY DETAIL

TY-501 TYPICAL DETAILS

TY-700 SCHEDULES

SITE ADDRESS

3801 MIRANDA AVENUE

PALO ALTO, CA 94304

u

Donkeys 99 Barron ParkATM <29r

ICO Software Inc | ndQ Q

9 Lot 101 4Co,9 0 4 4 -04 a

-U lll=lll=lll— I — 11

9 —Palo Alto VA Medical Ctr

ID

Co, Mir, Lot 100 West co9 0 99•*

9Rita Patel, Ph a rm D

9 9 L(

-$ II

C 0 M P A N

VA

Building 4 Palo Alto Va Health Care System

United States Postal Service

VA Palo Alto Health Care System - Palo...

(P ro

Whistle Stop Child Development

O I n.

O ft o O -D d z

Ro

&r snG) (8 r o

%‘O velocloud, now Dart of VMware a A

Lot 7 o

9Fisher House I & II

P‘o

Lot 51

Building 7

Debus Katherine E

Polytrauma & Blind Rehabilitation Center

ETS

T

TA

GE

S

R I

E T EX

FO

T

CE

TI

H

AS

DER CRA

M A

RK R . HODGES

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAMA AMERICAN ARCHITECTURAL

MANUFACTURERS ASSOCIATION

AB ANCHOR BOLT

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR

ASPHALTIC CONCRETE

ACI AMERICAN CONCRETE INSTITUTE

ACM ASBESTOS CONTAINING

MATERIAL

ACP ACRYLIC GLAZING

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES

ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

ADB AUTOMATIC DOOR BOTTOM

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGA AMERICAN GAS ASSOCIATION

AGC ASSOCIATED GENERAL

CONTRACTORS

AGGR AGGREGATE

AHJ AUTHORITY HAVING

JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZED

ANSI AMERICAN NATIONAL

STANDARDS INSTITUTE

ANT ANTENNA

APA AMERICAN PLYWOOD

ASSOCIATION

APPD APPROVED

APPROX APPROXIMATE

APT APARTMENT

AR AS REQUIRED

ARCH ARCHITECT

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL

INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ASTM AMERICAN SOCIETY FOR TESTING

AND MATERIALS

ATCH ATTACHMENT

ATM AUTOMATIC TELLER MACHINE

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVE AVENUE

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING

INSTITUTE

AWPA AMERICAN WOOD PRESERVERS'

ASSOCIATION

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B LABEL CLASS B DOOR

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BD FT BOARD FEET (FOOT)

BEV BEVEL

BHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATION

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKT BLANKET

BLVD BOULEVARD

BM BEAM OR BENCHMARK

BOT BOTTOM

BR BEDROOM

BRCG BRACING

BRDG BRIDGING

BRDG JST BRIDGING JOIST

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BU BUSHEL

BUR BUILT-UP ROOFING

ARCHITECTURAL ABBREVIATIONS

C CELSIUS CHANNEL

C CHANNEL CELSIUS

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

C TO C CENTER TO CENTER

CAB CABINET

CAC CEILING ATTENUATION CLASS

CB CATCH BASIN OR CORNER BEAD

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS OR

CONTRACT DOCUMENTS

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR

FURNISHED/CONTRACTOR

INSTALLED

CF/OI CONTRACTOR

FURNISHED/OWNER INSTALLED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CENTER OF GRAVITY OR CORNER

GUARD

CGSFU CERAMIC GLAZED STRUCTURAL

FACING UNITS

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CHK CHECK

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR

CONTROL JOINT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

cm SQUARE CENTIMETER cm CUBIC CENTIMETER

CM CONSTRUCTION MANAGEMENT

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE,

CERTIFICATE OF OCCUPANCY,

CLEANOUT, OR COMPANY

CO2 CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

CONC FLR CONCRETE FLOOR

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECT

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CORR CORRIDOR

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CRS COLD ROLLED STEEL

CRSI CONCRETE REINFORCING STEEL

INSTITUTE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSI CONSTRUCTION SPECIFICATIONS

INSTITUTE

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

CTR CENTER CONTOUR

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CYL CYLINDER

CYL L CYLINDER LOCK

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL DIAGRAM

DIAG DIAGRAM DIAGONAL

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DOC DOCUMENT

DOUG FIR DOUGLAS FIR

DOZ DOZEN

DR DOOR, DRAIN, DRESSING

ROOM, OR DRIVE

DR CL DOOR CLOSER

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DS DOWNSPOUT

DSGN DESIGN

DW DISHWASHER

DWG DRAWING

DWTR DUMBWAITER

E EAST

E LABEL CLASS E DOOR

EA EACH

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EIFS EXTERIOR INSULATION AND

FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC

ELEC DR OP ELECTRIC DOOR OPENER

ELEV ELEVATOR

EMER EMERGENCY

EMER SHR EMERGENCY SHOWER

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPDM ETHYLENE PROPYLENE DIENE

MOMOMER

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE

BOARD (INSULATION)

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

ESMT EASEMENT

ESP ESPECIALLY

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXP BT EXPANSION BOLT

EXST GR EXISTING GRADE

EXT EXTERIOR, EXTERNAL, OR

EXTINGUISHER

EXT GR EXTERIOR GRADE

F FAHRENHEIT OR FEMALE

FA FIRE ALARM

FAB FABRIC

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FAS BD FASCIA BOARD

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND

EQUIPMENT

FH FLAT HEAD OR FLAT HEAD

SCREWS

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHP FULL HEIGHT PARTITION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIL FILLET

FIN FINISH

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIN WD FINISH WOOD

FIXT FIXTURE

FL FLOORLINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLR FIN FLOOR FINISH

FLR SK FLOOR SINK

FLUOR FLUORESCENT

FLUOR FIX FLUORESCENT FIXTURE

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISHED OPENING

FOC FACE OF CONCRETE OR FACE

OF CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF STUD

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR FIREPROOF

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT,

OR FRAME

FR SNK FLUSHING RIM SINK

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER

OR

FIBERGLASS REINFORCED

PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUTURE

FWC FABRIC WALLCOVERING

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFRC GLASS-FIBER-REINFORCED

CONCRETE

GFRG GLASS-FIBER-REINFORCED

GYPSUM

GFRP GLASS-FIBER-REINFORCED

PLASTIC

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED WOOD

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H HIGH

H PLAM HIGH PRESSURE PLASTIC

LAMINATE

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIB

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD DOOR

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE

AIR (FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGER

HM HECTOMETER

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND

FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE OR

HORSEPOWER

HQ HEADQUARTERS

HS HEAT-STRENGTHENED (GLASS)

OR HIGH STRENGTH

HSE HOUSE

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR

CONDITIONING

HVY HEAVY

HW HOT WATER

HYD HYDRANT

HYDR HYDRAULIC

I INTERSTATE (HIGHWAY) OR

MOMENT OF INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE

DIAMETER, OR INTERIOR DESIGN

ID NO IDENTIFICATION NUMBER

ILLUM ILLUMINATION

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

IRMA INVERTED ROOF MEMBRAME

ASSEMBLY

IWH INSTANTANEOUS WATER

HEATER

JAN JANITOR

J-BOX JUNCTION BOX

KD KILN DRIED OR KNOCKED

DOWN

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

L ANGLE

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LH LEFT HAND

LHR LEFT HAND REVERSE

LHR LEFT HAND REVERSE LATENT

HEAT RATION

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKERWASHER

LL LEAD LINED

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATION

CONCRETE

LYR LAYER

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MAN MANUAL

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION

SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL MEDIUM

MED MEDIUM MEDICAL

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMB MEMBRANE

MEMO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S

RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM MINUTE

MIN MINUTE MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLWK MILLWORK

mm MILLIMETER

MO MASONRY OPENING OR MOTOR

OPERATED

MOD MODEL, MODIFY OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

N NORTH

NA NOT APPLICABLE

NAAMM NATIONAL ASSOCIATION OF

ARCHITECTURAL METAL

MANUFACTURERS

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NEUT NEUTRAL

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NRC NOISE REDCTION COEFFICIENT

NRCA NATIONAL ROOFING

CONTRACTORS ASSOCIATION

NRP NONREMOVABLE

NS NARROW STILE

NUM NUMERAL

O/O OUT TO OUT

O OXYGEN

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OUTSIDE

DIMENSION

OD OUTSIDE DIMENSION OUTSIDE

DIAMETER

OF/CI OWNER

FURNISHED/CONTRACTOR

INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OF/OI OWNER FURNISHED/OWNER

INSTALLED

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM OR OUTSIDE

RADIUS

ORD ORDNANCE OR OVERFLOW ROOF

DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OSHA OCCUPATIONAL SAFETY AND

HEALTH ADMINISTRATION

OUT OUTLET

OZ OUNCE

PAR PARALLEL OR PARAPET

PARA PARAGRAPH

PART PARTIAL

PAT PATTERN

PB PUSH BUTTON

PBD PARTICLE BOARD

PC PIECE, POLYCARBONATE OR

PORTLAND CEMENT

PCA PORTLAND CEMENT

ASSOCIATION

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PED PEDESTAL

PEN PENETRATE OR PENETRATION

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHAR PHARMACY

PHOTO PHOTOGRAPH

PHS PHILLIPS HEAD SCREW

PKG PACKAGE

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

PO POST OFFICE PURCHASE ORDER

PO PURCHASE ORDER POST OFFICE

POLY POLYETHYLENE (PLASTIC)

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMATIC TUBE, OR

PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

PWR POWER

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QRY QUARRY

QT QUARRY TILE

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R RADIUS OR RISER

RA RETURN AIR

RAD RADIATOR

RB RESILIENT BASE OR RUBBER

BASE

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REMOTE CONTROL

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REFR REFRACTORY REFRIGERATION

REFR REFRIGERATION REFRACTORY

REG REGISTER

REINF REINFORCE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RF RADIO FREQUENCY

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RT RIGHT

RV ROOF VENT

RVS REVERSE

RWD REDWOOD

RWL RAIN WATER LEADER

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE

CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR SOLID

CORE

SCH SCHOOL

SCHED SCHEDULE

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE

DETECTOR, OR SOAP DISPENSER

SDG SIDING

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGD SLIDING GLASS DOOR

SGL SINGLE

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SJI STEEL JOIST INSTITUTE

SK SKETCH

SKLT SKYLIGHT

SLD WDW HORIZONTAL SLIDING

WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMK SMOKE

SND SANITARY NAPKIN

DISPENSER

SND INS SOUND INSULATION

SNDU SANITARY NAPKIN

DISPOSAL UNIT

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPLY SUPPY

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SANITARY SEWER OR

SERVICE SINK

SST STAINLESS STEEL

ST STAIRS OR STREET

STC SOUND TRANSMISSION

CLASS

STD STANDARD

STIF STIFFENER

STL JST STEEL JOIST

STL LNTL STEEL LINTEL

STL PL STEEL PLATE

STL RF DK STEEL ROOF DECK

STL TB STEEL TUBE

STL TR STEEL TRUSS

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

STRUCT STL STRUCTURAL STEEL

SUB SUBSTITUTE

SURF SURFACE

SUSP SUSPEND

SUSP CLG SUSPENDED CEILING

SV SHEET VINYL

SW SWITCH

SWDR SWING DOOR

SYM SYMBOL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR TOWEL

BAR

TCA TILE COUNCIL OF AMERICA

TCP TELEPHONE CONTROL

PANEL TEMPERATURE OR

TRAFFIC CONTROL PLAN

TD TOWEL DISPENSOR

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR

TEMPORARY

TER TERRAZZO

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TMPD TEMPERED

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TO TOP OF ___

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TR TOWEL RACK

TRANS TRANSOM

TRANS WD FIN TRANSPARENT WOOD

FINISH

TRTD TREATED

TS TENSILE STRENGTH OR

TUBE STEEL

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

U HEAT TRANSFER

COEFFICIENT

UC UNDERCUT

UCD UNDERCUT DOOR

UGND UNDERGROUND

UL UNDERWRITERS

LABORATORIES

ULT ULTIMATE

UNFIN UNFINISH

UNO UNLESS NOTED OTHERWISE

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER

SUPPLY

UR URINAL

UTIL UTILITY

UV ULTRAVIOLET

V VOLT

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITION TILE

VITRIFIED CLAY TILE

VEH VEHICLE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED ACOUSTICAL

TILE

VIC VICINTY

VID VIDEO

VIF VERIFY IN FIELD

VNR VENEER

VOC VOLATILE ORGANIC

COMPOUND

VOL VOLUME

VOLT VOLTAGE

VP VENEER PLASTER

VR VAPOR RETARDER

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

VWF VINYL WALL FABRIC

W WIDE OR WEST

W/ WITH

W/O WITHOUT

WARR WARRANTY

WBL WOOD BLOCKING

WC WALL COVERING OR WATER

CLOSET

WC WL HNG WATER CLOSET, WALL HUNG

WCHR WATER CHILLER

WCL WL MTD WATER COOLER, WALL HUNG

WD WOOD

WDW WINDOW

WF WIDE FLANGE

WFAB WALL FABRIC

WFR WOOD FRAME

WFS WOOD FURRING STRIPS

WH WATER HEATER

WHSE WAREHOUSE

WLD WELDED

WM WIRE MESH

WP WATERPROOFING

WPD WATER PRESSURE DROP

WPM WATERPROOF MEMBRANE

WPR WALL PROTECTION/RAILING

WR WEATHER RESISTANT

WS WEATHERSTRIP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

X BRACE CROSS BRACE

XPS EXTRUDED POLYSTYRENE

BOARD (INSULATION)

YD YARD

YR YEAR

GI-030

ARCHITECTURAL

ABBREVIATIONS

BBD

MRH

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com

FULLY SPRINKLERED

640-23-101

17-JUL-24

100% CONSTRUCTION

BID DOCUMENTS

Radiology Patient Safety Upgrades At VA Palo Alto Health

Care System

PALO ALTO, CALIFORNIA

c 0 M P A N

VA

ETS

T

TA

GE

S

R I

E T EX

FO

T

CE

TI

H

AS

DER CRA

M A

RK R . HODGES

UP

UP

S

R

Q

P

N

M

L

K

J

H

G

F

E

T

ELEVATOR

MACHINE

ROOM104

ELEV1

ELEV3

ELEV2

AE2.1.1AAE2.1.1B

STAIR 3

STORAGE

ELEVATOR

LOBBY100

V

V

V

C

DN

DN

UP

DN

UP

MECH

SHAFT#1

MECH

SHAFT#2

FEC

FEC

FEC

FEC

LO

ADING DOCK

LO

BBY

AREA OF

WORK

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com

FULLY SPRINKLERED

640-23-101

17-JUL-24

100% CONSTRUCTION

BID DOCUMENTS

Radiology Patient Safety Upgrades At VA Palo Alto Health

Care System

PALO ALTO, CALIFORNIA

AS-101

SITE PLAN

BBD

MRH

TRUE

NORTH

1 CAMPUS PLAN - ADDRESS: 3801 MIRANDA AVENUE PALO ALTO, CALIFORNIA - 94304

SCALE: NTS

as

3) 1

E

33) 3 L

ZOC & &

2AAXRKY— yY 4............WA —** 37o%8

/ C

49Y Q e* I* 0 0/ s05808

BLDG 100

RADIOLOGY

I I

MIRANDA AVENUE

3$

A O No O

0920- PR

Co% 68 oP<

BLDG 5

BLDG 6

BLDG 102

C

\ 1 1/7

L

MB-3

/i ylMB-4

X/ xlyBLDG 7

I£ BLDG 51F/

BLDG 51c (0 n —I d

FISHER HOUSE

BLDG 50

DEFENDERS LODGE L[N

. I 49 855C

O

8 /

09%9 aroo Co’ x

N

& ,(9 — kJ

488%

(eel { XK

T-7D

MB-1

MB-2

BLDG 4

POLYTRAUMA REHABILITATION

PARKING

STRUCTURE 1

FOOTHILL EXPRESSWAY

LOOP ROAD

nJ

ACUTE PSYCH

o

EXPRESSWAYFOOTHILL

BLDG 54

Q

Q

BLDG 42

BLDG 40

BLDG 43

9CO-GEN BLDG

CHILLER BLDG

o o Q

Q o o

C 0 M P A N

VA

BLDG 41

GENERATOR BLDG

XX

) ( b I

Z/

B n

.Z

ZZ

ZZ

U N

P

W X/

V

XN

W y 0a o

1E

0 4 4

3 (( r p ar

IE

XX

XX

XX

II 111111 fob I H o— O

O

ED

U

C

AT

IO

N

SI

M

U

LA

TI

O

N C

EN

TE

R

(U N

D

ER

C O

N

ST

R U

C

TI

O N

ETS

T

TA

GE

S

R I

E T EX

FO

T

CE

TI

H

AS

DER CRA

M A

RK R . HODGES

1 DEMOLITION PLAN - F & G WING LEVEL B

SCALE: 1/16" = 1'-0" 2 DEMOLITION PLAN - F & G WING LEVEL 1

SCALE: 1/16" = 1'-0"

NEW - 1/A-202

DEMO - 1/AD-202

SHHI300

UP

T

BIOMED

STAGING

GB-200

PTS

MECHANICAL

ROOM

GB-201

STAIRS

PHARMACY

PARTS

STORAGE

GB-202

LAB COATS AND

NEW UNIFORMS

STAGING

GB-108C

ELECT RM

E-0.4MECHANICAL

M-0.4

MALE

LOCKERS

GB-105 CLEAN

PICK-UP

WORKSTATION

GB-108

PHARMACY

CACHE

STORAGE

MALE

TOILETS AND

SHOWERS

GB-105A

DROP-OFF

WORKSTATION

GB-107

DONATION

STORAGE

GB-107A

DRESSING

GB-108B

IT

DEPLOYMENT

STORAGE

GB-103

PT PERSONAL

ITEMS

STORAGE

GB-107B

PT

VALUABLE

STORAGE

GB-107C

SOILED

LINEN

CART

GB-106

FEMALE

LOCKERS

GB-104

STAFF

LOUNGE

GB-102 ELECT RM

E-0.5

FEMALE

TOILETS AND

SHOWERS

GB-104A

CLEAN

LINEN PICK-UP

WORKSTATION

CLEAN LINEN

STAGING

GB-101

SHARED

CONF. ROOM

GB-100

LIGHTWELL

STER/NON

STER STOR

EB-300

CORR

FB-C05

F LKR

FB-100

F T

FB-100A

EO CYL STOR

EB-310

HAC

FB-300A

M T

FB-110A

TEL EQUIP

FB-370

TEL

BATTERY

FB-370A

STORAGE

SUP&

EQUIP

FB-210

M LKR

FB-110

EO AER

EB-314

CORR

FB-C04

PREP ASSM

STER

EB-312

A

R 32B

M LKR

EB-332

VEST

FB-C30

F LKR

EB-330

F T

EB-330A

CORR

FB-C03

UNAS

FB-130

AUTOVALET

FB-140

SUPV/

CLER TECH

FB-200

SILVER COLL

FB-250

HAC

FB-240

TRASH COLL

FB-230

CORR

FB-C20

CORR

FB-C02

SUPV

FB-300A

S LIN COLL

FB-298

OFFICE OF

THE SERVICE

CHIEF

FB-300

SIMULATION

ROOM

FB-310

CONTROL

ROOM

FB-320

CONF. OFFICE

ELEV LOBBY

FB-C01

COPIER/STOR.

LAB

OFFICE

TECH

OFFICE

XEROX

STORAGE

FB-335

IDF CLOSET

HVAC

CORR

FB-C10

STORAGE

FB-361

TEMP

STORAGE

FB-365

EMS EQPT

STORAGE

FB-364

VA SUPPLY

STORAGE

FB-363

1EMS

SUPERVISORS

WORKSTATION

FB-362NSF CHIEF

OFC

FB-360A

COPY/

STORAGE

FB-360B

NFS ADMIN

WORKSTATION

FB-360

TELECOM

STORAGE

FB-330

OFFICE

BMS STOR

FB-210A

F SHR

EB-330B

STORAGE CUSTOMER

SUPPORT

STORAGE

FB-336

CORR

FB-C13

EO STER

EB-316 LNG

FB-120

DN

UP

T

T

T

F1-283

(E) SIGNAL

RM

(E) ELECT

RM

(E) ELECT

RM

F1-289 F1-287 F1-285

(E) GENERAL

PURPOSE

RADIOLOGY

ROOM

F1-211

(E) GENERAL

PURPOSE

RADIOLOGY

ROOM F1-209

(E) REMOTE

F1-207

(E) R/F RM

F1-205

(E) R/F RM

F1-201

(E) R/F CONTROL ROOM

F1-203

(E) SOILED

UTILITY

F1-202

(E)

TELECOM

(E) COPY

ROOM

F1-200

F1-185

(E) IR

CONTROL

ROOM

F1-175

(E) IR

PROCEDURE

ROOM

F1-165

F1-155 F1-153

F1-175B

F1-175A

F1-217

F1-281

(E) STAFF

WORK AREA

F1-205A F1-201A

(E) SHAFT

(E) CORR

F1-C10F1-291

(E)

CONTROL

(E) PET CT

(E) CORR

F1-C14

OFFICE

F1-130

(E)

CONFERENCE

ROOM

F1-215

(E)

ELEVATOR

(E)

ELEVATOR

(E)

ELEVATOR

G1-100G

ELECT RM

E-1.7

MRI EQUIP

RM

G1-104

G1-105DMRI

SCANNING

ROOM

G1-105A

MRI

CONTROL

ROOM

G1-105B

MRI

SCANNING

ROOM

G1-105C

MRI EQUIP

RM

G1-106

TELECOM

T-1.7

G1-207G1-203G1-202 G1-209

G1-100EG1-100B

G1-100F

READING

ROOM

G1-200

PATIENT HOLDING BAY

G1-101

G1-107

G1-303

G1-307

G1-305

G1-102

G1-100J

G1-201

G1-103

G1-211G1-204 G1-206

G1-306

G1-100C

G1-208

G1-403G1-401G1-400 G1-402

G1-308

G1-100A

E1-272 E1-280

(E) EDUC

OFF

F1-100 F1-110

(E) ELEV

LOBBY

A1-C15

(E) CORR

C1-C06

(E) CORR

F1-C13

F1-120B

(E) SPEC T

F1-121

(E) CORR

F1-C01

SHAFT

STAIRS

ST-8

(E) CHEST

RM

F1-225

F1-229

G1-400A G1-402A G1-404

SHAFT

G1-302

G1-302A

G1-212

G1-309

G1-101B

F1-142

F1-144C F1-144D

RECEPTION

F1-144A

F1-160

LEARNING

CENTER

F1-254

STAFF

LOUNGE

F1-240

WORKSTATIONS

F1-284

F1-272

F1-286

F1-268

(E) OFFICE

C1-280

G1-304

G1-100A

MAIN

WAITING

F1-144

G1-205 G1-210

F1-144BF1-235 F1-140

G1-100D

CORRIDOR

G1-C10

CORRIDOR

G1-C11

CORRIDOR

G1-C40

CORRIDOR

G1-C20

CORRIDOR

G1-C31

CORRIDOR

G1-C30

E-1.7A

G1-301

G1-300

MRI

VESTIBULE

G1-105

(E) STAIRS

STAFF WORK AREA

G1-100H

F1-264

(E) CORR

F1-C13

(E) CORR

F1-C02

F1-170 F1-204

STAFF WORK

F1-144J

F1-290 F1-288 F1-270

F1-260F1-266 F1-262

F1-236 F1-238

F1-110A F1-110C F1-120D

F1-227

D1

D1

D1

D1

D1

D3

D7

D1

D1

D1

D1

D1

D2

D1

D4

D1

D6 D6 D6 D6 D6 D6 D6 D6

D6 D6

D6

D8

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com

FULLY SPRINKLERED

640-23-101

17-JUL-24

100% CONSTRUCTION

BID DOCUMENTS

Radiology Patient Safety Upgrades At VA Palo Alto Health

Care System

PALO ALTO, CALIFORNIA

AD-201

DEMOLITION PLAN - AREA F&G

BASEMENT & LEVEL 1

BBD

MRH

F

G

MAIN

ENTRANCE

TRUE

NORTH

KEYED NOTES

REMOVE EXISTING DOOR HARDWARE, AS

REQUIRED, IN PREPARATION FOR NEW DOOR

FUNCTION. COORDINATE DOOR HARDWARE

TO BE REMOVED WITH SECURITY/TECH

DRAWINGS. COORDINATE WITH VA COR FOR

RETURN OF REMOVED HARDWARE.

REFERENCE PLAN 2/A-201 AND

SPECIFICATIONS SECTION 08 71 00 DOOR

HARDWARE FOR NEW HARDWARE SCHEDULE

REPLACING EXISTING.

D1

D2

D3

REMOVE EXISTING SERVER RACK AND

OVERHEAD CABLE TRAY AND RETURN TO

OWNER.

REMOVE EXISTING GROUNDING BAR AND

RETURN TO OWNER.

REMOVE EXISTING WINDOW SHADE AND

RETURN TO OWNER.

D4

NOT USEDD5

REMOVE CEILING TILES TEMPORARILY FOR

NEW ACOUSTICAL TREATMENT ABOVE

CEILING.

D6

REMOVE DOORS FOR INSTALLATION OF NEW

DOOR LOUVER VENTS.

D8

REMOVE EXISTING PAIR OF WOOD DOORS

FROM FRAME AND EXISTING HARWARE FROM

FRAME PATCH HOLES IN EXISTING DOOR

FRAME AND PREP FOR REPAINT OF FRAME.

D7

KEY PLAN

GENERAL NOTES

1. CONTRACTOR TO COORDINATE WITH THE VA

REPRESENTATIVE AND THE VA'S EQUIPMENT

PROVIDER FOR WORK IN MRI SUITE. MRI

MAGNET MUST BE RAMPED DOWN PRIOR TO

ANY DEMOLITION OR NEW WORK IN MRI ROOM.

2. PRIOR TO ANY DEMOLITION WORK IN MRI

ROOM AND SUITE, CONTRACTOR MUST

SECURE AND CONTRACT WITH A CERTIFIED RF

SHIELDING SPECIALIST FOR MONITORING ANY

WORK PENETRATING OR AFFECTING THE

EXISTING RF SHIELDING ROOM ENCLOSURE, A

FINAL CERTIFICATION ON RF SHIELDING

ENCLOSURE MUST BE PROVIDED, UPON

COMPLETION.

3. CONTRACTOR MUST SCHEDULE A

PRE-CONSTRUCTION/PRE-DEMO

COORDINATION MEETING WITH OWNER (VA),

OWNERS EQUIPMENT REPRESENTATIVES (GE

MEDICAL, INSIGHTEC, & BOSTON SCIENTIFIC)

AT MINIMUM OF 45 DAYS PRIOR TO

COMMENCEMENT OF WORK IN MRI ROOM AND

SUITE. ARCHITECT MUST BE NOTIFIED AT

LEAST TWO WEEKS PRIOR TO COORDINATION

MEETING, AND INCLUDED IN MEETING, IN

PERSON, OR VIA "TEAMS" VIDEO

CONFERENCING. CONTRACTOR MUST

DOCUMENT MEETING AND DISTRIBUTE NOTES

AND MUST PROVIDE OWNER AND ARCHITECT A

WRITTEN PLAN OF ACTION, FOR REVIEW AND

APPROVAL PRIOR TO WORK COMMENCEMENT.

4. NEW PENETRATIONS REQUIRED BY (VA)

OWNER'S EQUIPMENT VENDORS MUST BE

COORDINATED WITH VENDORS PRIOR TO

DEMOLITION AND A NEW PENETRATION PANEL

WITH VENDOR SPECIFIC CONNECTIONS PLATE

PROVIDED BY OWNER'S EQUIPMENT VENDOR.

5. ALL DOOR HARDWARE REMOVED (AND NOT

REUSED) IS TO BE RETURNED TO (VA) OWNER.

6. CONTRACTOR IS RESPONSIBLE FOR

RESTORING AREAS IN WHICH WORK IS BEING

PERFORMED PER CONTRACT TO A COMPLETE

AND FINISHED STATE UPON COMPLETION OF

WORK.

7. CONTRACTOR IS RESPONSIBLE FOR ENSURING

ALL AREAS WHERE CONTRACTED WORK IS

BEING PERFORMED IS PROTECTED FROM

PUBLIC AND STAFF DURING WORK BEING DONE

AND AFTER WORK HAS TERMINATED FOR THE

DAY. ALL DEBRIS, TOOLS, AND EQUIPMENT ARE

TO BE CLEANED AND REMOVED FROM THE

SITE AND WORK AREA IN A CLEAN AND TIDY

CONDITION UNTIL WORK COMMENCES THE

NEXT DAY.

8. PATCH AND REPAIR EXISTING WALLS AT AREAS

OF INSTALLATION OF NEW DOOR OPERATION

DEVICES AND MATCH EXISTING FINISHES

LEGEND

PIV

ADO

- PERSONAL IDENTITY VERIFICATION -

REF. TECH DRAWINGS

- AUTOMATIC DOOR OPENER - REF. TECH

DRAWINGS & SHEET A-203 DETAILS.

tTi! I l

J 1 r c o M P A N

VA

ETS

T

TA

GE

S

R I

E T EX

FO

T

CE

TI

H

AS

DER CRA

M A

RK R . HODGES

1 ENLARGED DEMO PLAN - MRI SUITE FLOOR PLAN

SCALE: 1/4" = 1'-0"

ELECT RM

E-1.7

MRI EQUIP

RM

G1-104

TOILET

G1-105D

MRI

SCANNING

ROOM

G1-105A

MRI

CONTROL

ROOM

G1-105B

MRI

SCANNING

ROOM

G1-105C

MRI EQUIP

RM

G1-106

TELECOM

T-1.7

HAC

G1-212

COR

G1-

MRI

VESTIBULE

G1-105

T

T

D3

D1

D7

D3

D3

D3

D4

ABOVE CEILING

ABOVE CEILING

D2

D8

D8

1 ENLARGED DEMO PLAN - MRI SUITE REFLECTED CEILING PLAN

SCALE: 1/4" = 1'-0"

T

T

NO RCP DEMO IN THIS ROOM

D5

D6

D6

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com

FULLY SPRINKLERED

640-23-101

17-JUL-24

100% CONSTRUCTION

BID DOCUMENTS

Radiology Patient Safety Upgrades At VA Palo Alto Health

Care System

PALO ALTO, CALIFORNIA

AD-202

DEMOLITION - ENLARGED

FLOOR PLANS

BBD

MRH

KEYED NOTES

D1 CONTRACTOR TO COORDINATE WITH

OWNER'S EQUIPMENT VENDOR FOR REMOVAL

OF EXISTING MRI TABLE. REMOVE EXISTING

MRI TABLE ANCHORING IN FLOOR. PATCH

CONCRETE AFTER REMOVAL OF EXISTING

ANCHORING AND HAVE CERTIFIED BY AN RF

SHIELDING CONTRACTOR.

D2 REMOVE PORTION OF EXISTING SHEET

FLOORING AND SUBFLOORING FOR NEW MRI

TABLE ANCHOR LOCATIONS. CUT EXISTING

FLOORING IN TABLE AREA AS REQUIRED TO

ACCOMMODATE NEW TABLE ANCHORS.

CENTER A RECTANGULAR CUT WITH CUTS

PARALLEL AND PERPENDICULAR TO ROOM

WALLS AND SYMMETRICAL TO THE TABLE.

D3 REMOVE PORTION OF EXISTING WALL IN

LOCATION OF NEW PENETRATION PANEL FOR

NEW MRI ROOM EQUIPMENT. COORDINATE

WITH VA CONTRACTED VENDORS.

D4 REMOVE PORTION OF EXISTING WALL FOR

NEW EQUIPMENT COORDINATE AS REQUIRED

BY VA EQUIPMENT VENDORS.

D5 CONTRACTOR TO TEMPORARILY REMOVE AND

REPLACE CEILING TILES NECESSARY TO

INSTALL CABLE TRAY FOR EXOBLATE

EQUIPMENT.

D6 REMOVE CEILING TILES TEMPORARILY FOR

NEW ACOUSTICAL TREATMENT ABOVE

CEILING.

D7 REMOVE AND REPLACE EXISTING OXYGEN

MONITORING SYSTEM

D8 REMOVE APPROXIMATELY 12"H X 12"W

PORTION OF EXISTING WALL IN LOCATION OF

NEW PENETRATION PANEL

GENERAL NOTES

1. CONTRACTOR TO COORDINATE WITH THE VA

REPRESENTATIVE AND THE VA'S EQUIPMENT

PROVIDER FOR WORK IN MRI SUITE. MRI

MAGNET MUST BE RAMPED DOWN PRIOR TO

ANY DEMOLITION OR NEW WORK IN MRI ROOM.

2. PRIOR TO ANY DEMOLITION WORK IN MRI

ROOM AND SUITE, CONTRACTOR MUST

SECURE AND CONTRACT WITH A CERTIFIED RF

SHIELDING SPECIALIST FOR MONITORING ANY

WORK PENETRATING OR AFFECTING THE

EXISTING RF SHIELDING ROOM ENCLOSURE, A

FINAL CERTIFICATION ON RF SHIELDING

ENCLOSURE MUST BE PROVIDED, UPON

COMPLETION.

3. CONTRACTOR MUST SCHEDULE A

PRE-CONSTRUCTION/PRE-DEMO

COORDINATION MEETING WITH OWNER (VA),

OWNERS EQUIPMENT REPRESENTATIVES (GE

MEDICAL, INSIGHTEC, & BOSTON SCIENTIFIC)

AT MINIMUM OF 45 DAYS PRIOR TO

COMMENCEMENT OF WORK IN MRI ROOM AND

SUITE. ARCHITECT MUST BE NOTIFIED AT

LEAST TWO WEEKS PRIOR TO COORDINATION

MEETING, AND INCLUDED IN MEETING, IN

PERSON, OR VIA "TEAMS" VIDEO

CONFERENCING. CONTRACTOR MUST

DOCUMENT MEETING AND DISTRIBUTE NOTES

AND MUST PROVIDE OWNER AND ARCHITECT A

WRITTEN PLAN OF ACTION, FOR REVIEW AND

APPROVAL PRIOR TO WORK COMMENCEMENT.

4. NEW PENETRATIONS REQUIRED BY (VA)

OWNER'S EQUIPMENT VENDORS MUST BE

COORDINATED WITH VENDORS PRIOR TO

DEMOLITION AND A NEW PENETRATION PANEL

WITH VENDOR SPECIFIC CONNECTIONS PLATE

PROVIDED BY OWNER'S EQUIPMENT VENDOR.

5. ALL DOOR HARDWARE REMOVED (AND NOT

REUSED) IS TO BE RETURNED TO (VA) OWNER.

6. CONTRACTOR IS RESPONSIBLE FOR

RESTORING AREAS IN WHICH WORK IS BEING

PERFORMED PER CONTRACT TO A COMPLETE

AND FINISHED STATE UPON COMPLETION OF

WORK.

7. CONTRACTOR IS RESPONSIBLE FOR ENSURING

ALL AREAS WHERE CONTRACTED WORK IS

BEING PERFORMED IS PROTECTED FROM

PUBLIC AND STAFF DURING WORK BEING DONE

AND AFTER WORK HAS TERMINATED FOR THE

DAY. ALL DEBRIS, TOOLS, AND EQUIPMENT ARE

TO BE CLEANED AND REMOVED FROM THE

SITE AND WORK AREA IN A CLEAN AND TIDY

CONDITION UNTIL WORK COMMENCES THE

NEXT DAY.

8. PATCH AND REPAIR EXISTING WALLS AT AREAS

OF INSTALLATION OF NEW DOOR OPERATION

DEVICES AND MATCH EXISTING FINISHES

LEGEND

PIV

ADO

- PERSONAL IDENTITY VERIFICATION -

REF. TECH DRAWINGS

- AUTOMATIC DOOR OPENER - REF. TECH

DRAWINGS & SHEET A-203 DETAILS.

r " i 1

Po I________ I

L

C 0 M P A N

VA

r i i

ETS

T

TA

GE

S

R I

E T EX

FO

T

CE

TI

H

AS

DER CRA

M A

RK R . HODGES

1 FLOOR PLAN - F & G WING LEVEL B

SCALE: 1/16" = 1'-0" 2 FLOOR PLAN - F & G WING LEVEL 1

SCALE: 1/16" = 1'-0"

NEW - 1/A-202

DEMO - 1/AD-202

SHHI300

UP

ADO

PIV

PIV

PIV

PIV

PIV

T

BIOMED

STAGING

GB-200

PTS

MECHANICAL

ROOM

GB-201

STAIRS

PHARMACY

PARTS

STORAGE

GB-202

LAB COATS AND

NEW UNIFORMS

STAGING

GB-108C

ELECT RM

E-0.4MECHANICAL

M-0.4

MALE

LOCKERS

GB-105 CLEAN

PICK-UP

WORKSTATION

GB-108

PHARMACY

CACHE

STORAGE

MALE

TOILETS AND

SHOWERS

GB-105A

DROP-OFF

WORKSTATION

GB-107

DONATION

STORAGE

GB-107A

DRESSING

GB-108B

IT

DEPLOYMENT

STORAGE

GB-103

PT PERSONAL

ITEMS

STORAGE

GB-107B

PT

VALUABLE

STORAGE

GB-107C

SOILED

LINEN

CART

GB-106

FEMALE

LOCKERS

GB-104

STAFF

LOUNGE

GB-102 ELECT RM

E-0.5

FEMALE

TOILETS AND

SHOWERS

GB-104A

CLEAN

LINEN PICK-UP

WORKSTATION

CLEAN LINEN

STAGING

GB-101

SHARED

CONF. ROOM

GB-100

LIGHTWELL

STER/NON

STER STOR

EB-300

CORR

FB-C05

F LKR

FB-100

F T

FB-100A

EO CYL STOR

EB-310

HAC

FB-300A

M T

FB-110A

TEL EQUIP

FB-370

TEL

BATTERY

FB-370A

STORAGE

SUP&

EQUIP

FB-210

M LKR

FB-110

EO AER

EB-314

CORR

FB-C04

PREP ASSM

STER

EB-312

A

R 2B

M LKR

EB-332

VEST

FB-C30

F LKR

EB-330

F T

EB-330A

CORR

FB-C03

UNAS

FB-130

AUTOVALET

FB-140

SUPV/

CLER TECH

FB-200

SILVER COLL

FB-250

HAC

FB-240

TRASH COLL

FB-230

CORR

FB-C20

CORR

FB-C02

SUPV

FB-300A

S LIN COLL

FB-298

OFFICE OF

THE SERVICE

CHIEF

FB-300

SIMULATION

ROOM

FB-310

CONTROL

ROOM

FB-320

CONF. OFFICE

ELEV LOBBY

FB-C01

COPIER/STOR.

LAB

OFFICE

TECH

OFFICE

XEROX

STORAGE

FB-335

IDF CLOSET

HVAC

CORR

FB-C10

STORAGE

FB-361

TEMP

STORAGE

FB-365

EMS EQPT

STORAGE

FB-364

VA SUPPLY

STORAGE

FB-363

1EMS

SUPERVISORS

WORKSTATION

FB-362NSF CHIEF

OFC

FB-360A

COPY/

STORAGE

FB-360B

NFS ADMIN

WORKSTATION

FB-360

TELECOM

STORAGE

FB-330

OFFICE

BMS STOR

FB-210A

F SHR

EB-330B

STORAGE CUSTOMER

SUPPORT

STORAGE

FB-336

CORR

FB-C13

EO STER

EB-316 LNG

FB-120

DN

UP

PIV

PIV

PIV

ADO ADO

ADO

ADO

ADO

PIV

C

C

ADO

T

T

T

Insightec Pen Panel

SER

VIC

E

AR

EA

Insightec Equipm ent C abinet

Insightec C hiller

Insightec Helmet System & Table

Insightec Front End

Junction Box

Boston Scientific Console

Boston Scientific Mobile

Connection Panel

ADO

ADO

F1-283

(E) SIGNAL

RM

(E) ELECT

RM

(E) ELECT

RM

F1-289 F1-287 F1-285

(E) GENERAL

PURPOSE

RADIOLOGY

ROOM

F1-211

(E) GENERAL

PURPOSE

RADIOLOGY

ROOM F1-209

(E) REMOTE

F1-207

(E) R/F RM

F1-205

(E) R/F RM

F1-201

(E) R/F CONTROL ROOM

F1-203

(E) SOILED

UTILITY

F1-202

(E)

TELECOM

(E) COPY

ROOM

F1-200

F1-185

(E) IR

CONTROL

ROOM

F1-175

(E) IR

PROCEDURE

ROOM

F1-165

F1-155 F1-153

F1-175B

F1-175A

F1-217

F1-281

(E) STAFF

WORK AREA

F1-205A F1-201A

(E) SHAFT

(E) CORR

F1-C10F1-291

(E)

CONTROL

(E) PET CT

(E) CORR

F1-C14

OFFICE

F1-130

(E)

CONFERENCE

ROOM

F1-215

(E)

ELEVATOR

(E)

ELEVATOR

(E)

ELEVATOR

G1-100G

ELECT RM

E-1.7

MRI EQUIP

RM

G1-104

G1-105DMRI

SCANNING

ROOM

G1-105A

MRI

CONTROL

ROOM

G1-105B

MRI

SCANNING

ROOM

G1-105C

MRI EQUIP

RM

G1-106

TELECOM

T-1.7

G1-207G1-203G1-202 G1-209

G1-100EG1-100B

G1-100F

READING

ROOM

G1-200

PATIENT HOLDING BAY

G1-101

G1-107

G1-303

G1-307

G1-305

G1-102

G1-100J

G1-201

G1-103

G1-211G1-204 G1-206

G1-306

G1-100C

G1-208

G1-403G1-401G1-400 G1-402

G1-308

G1-100A

-270

E1-272 E1-280

(E) EDUC

OFF

F1-100 F1-110

(E) ELEV

LOBBY

A1-C15

(E) CORR

C1-C06

(E) CORR

F1-C13

F1-120B

(E) SPEC T

F1-121

(E) CORR

F1-C01

SHAFT

STAIRS

ST-8

(E) CHEST

RM

F1-225

F1-229

G1-400A G1-402A G1-404

SHAFT

G1-302

G1-302A

G1-212

G1-309

G1-101B

F1-142

F1-144C F1-144D

RECEPTION

F1-144A

F1-160

LEARNING

CENTER

F1-254

STAFF

LOUNGE

F1-240

WORKSTATIONS

F1-284

F1-272

F1-286

F1-268

(E) OFFICE

C1-280

G1-304

G1-100A

MAIN

WAITING

F1-144

G1-205 G1-210

F1-144BF1-235 F1-140

G1-100D

CORRIDOR

G1-C10

CORRIDOR

G1-C11

CORRIDOR

G1-C40

CORRIDOR

G1-C20

CORRIDOR

G1-C31

CORRIDOR

G1-C30

E-1.7A

G1-301

G1-300

MRI

VESTIBULE

G1-105

(E) STAIRS

STAFF WORK AREA

G1-100H

F1-264

(E) CORR

F1-C13

(E) CORR

F1-C02

F1-170 F1-204

STAFF WORK

F1-144J

F1-290 F1-288 F1-270

F1-260F1-266 F1-262

F1-236 F1-238

F1-110A F1-110C F1-120D

F1-227

UPGRADES AND

UPDATES TO

THIS MRI ROOM

8/ A-

11 11 11 11 11 11 11

11 11

GB-201

GB-108C

GB-108

GB-107

GB-106

C20-A G1-201

G1-200A

C20-B

G1-309

G1-308

F1-254

F1-C10

E0.5

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com

FULLY SPRINKLERED

640-23-101

17-JUL-24

100% CONSTRUCTION

BID DOCUMENTS

Radiology Patient Safety Upgrades At VA Palo Alto Health

Care System

PALO ALTO, CALIFORNIA

TRUE

NORTH

A-201

FLOOR PLAN - AREA F&G

BASEMENT & LEVEL 1

BBD

MRH

F

G

MAIN

ENTRANCE

KEYED NOTES

REPLACE EXISTING MANUAL WINDOW SHADE

WITH MOTORIZED WINDOW SHADE -

REFERENCE ELECTRICAL DRAWINGS FOR

POWER.

PROVIDE NEW FIRE SPRINKLER PROTECTION

HEAD IN ROOM. COORDINATE WITH FIRE

PROTECTION SPECIALIST. ROOM FUNCTION

CHANGING FROM TELECOM ROOM TO

STORAGE ROOM.

PROVIDE NEW PRIVACY CURTAIN & TRACK TO

BE SIMILAR TO PATIENT BED BAYS CURTAINS

IN SAME ROOM. CURTAIN TRACK TO FASTEN

TO WOOD SLAT CEILING. CURTAIN LENGTH

ABOVE FLOOR TO BE APPROXIMATELY 9 FEET

TALL (+/-) AND 4 INCHES ABOVE GROUND.

FINAL DIMENSION TO BE COORDINATED BY

TAKING FIELD DIMENSIONS PRIOR TO

ORDERING CURTAIN AND TRACK.

NOT USED

NEW PAIR OF 4' X 7' SOLID CORE WOOD

DOORS. MATCH EXISTING FINISH. DOORS TO

RECEIVE NEW PERSONAL IDENTIFICATION

VERIFICATION (PIV) READER AND DOOR

ACCESS CONTROL (ADO) TO COORDINATE

WITH AN AUTOMATIC DOOR OPENER FOR

BOTH DOORS UPON AUTHORIZATION,

COORDINATE LOCATION OF CARD READER

AND AUTOMATIC DOOR OPENER PLATE WITH

VA, WITHIN ACCESSIBILITY (ADA)

REQUIREMENTS. ADO FUNCTION - BOTH SIDES

OF DOOR. REFERENCE DOOR SCHEDULE.

EXISTING PAIR OF DOORS TO RECEIVE NEW

HARDWARE FOR PERSONAL IDENTIFICATION

VERIFICATION (PIV). PLACE CARD READER PER

ADA REQUIREMENTS, ADO FUNCTIONS TO BE

ACTIVATED FROM BOTH SIDE OF DOORS.

HARDWARE SET. REFERENCE DOOR

SCHEDULE.

EXISTING DOORS TO OFFICE G1-201 TO

RECEIVE NEW HARDWARE FOR PERSONAL

IDENTIFICATION VERIFICATION (PIV) AND

AUTOMATIC DOOR OPENER DOOR FUNCTION

TO ALLOW FOR DOOR TO BE HELD ON OPEN

POSITION UPON AUTHORIZED AND

AUTOMATED ENTRY. ADO FUNCTION TO BE

ACTIVATED FROM BOTH SIDES. REFERENCE

DOOR SCHEDULE.

EXISTING TOILET ROOM DOOR(S) TO RECEIVE

AUTOMATIC DOOR OPENERS - SENSOR PAD

ON BOTH SIDES OF DOOR - WHEN LOCKED

DOOR OPENER TO BE DISENGAGED.

REFERENCE DOOR SCHEDULE.

EXISTING ALUMINUM STOREFRONT DOOR TO

RECEIVE (PIV) PERSONAL IDENTIFICATION

VERIFICATION READER AND ACCESS

CONTROL LOCKS HARDWARE. REFERENCE

DOOR SCHEDULE.

REMOVE CEILING TILES IN THIS AREA AND

PROVIDE SOUND BATT INSULATION OVER

ENTIRE CEILING OF THIS AREA. RESET

EXISTING TILES REPLACE ANY DAMAGED

TILES. MATCH EXISTING.

REPAINT EXISTING DOOR FRAME PRIOR TO

INSTALLING NEW DOOR AND HARDWARE

PROVIDE NEW LOUVER VENTS AT BOTTOM OF

EACH EXISTING DOOR REFERENCE 10/A-203.

REINSTALL DOORS.

EXISTING DOOR(S) TO RECIEVE NEW

HARDWARE FOR PERSONAL IDENTIFICATION

VERIFICATION (PIV). PLACE CARD READER PER

ADA REQUIREMENTS. REFERENCE DOOR

SCHEDULE.

EXISTING DOOR TO RECIEVE NEW HARDWARE

FOR AUTOMATIC DOOR OPENER (ADO). ADO

FUNCTION TO BE ACTIVATED FROM BOTH

SIDES OF DOORS REFERENCE DOOR

SCHEDULE.

WAITING ROOM AREA TO RECEIVE NEW

CLOSED CIRCUIT TELEVISION SYSTEM.

REFERENCE TECHNOLOGY DRAWINGS

100-TY-203.1

KEY PLAN

GENERAL NOTES

1. CONTRACTOR TO COORDINATE WITH THE VA

REPRESENTATIVE AND THE VA'S EQUIPMENT

PROVIDER FOR WORK IN MRI SUITE. MRI

MAGNET MUST BE RAMPED DOWN PRIOR TO

ANY DEMOLITION OR NEW WORK IN MRI ROOM.

2. PRIOR TO ANY DEMOLITION WORK IN MRI

ROOM AND SUITE, CONTRACTOR MUST

SECURE AND CONTRACT WITH A CERTIFIED RF

SHIELDING SPECIALIST FOR MONITORING ANY

WORK PENETRATING OR AFFECTING THE

EXISTING RF SHIELDING ROOM ENCLOSURE, A

FINAL CERTIFICATION ON RF SHIELDING

ENCLOSURE MUST BE PROVIDED, UPON

COMPLETION.

3. CONTRACTOR MUST SCHEDULE A

PRE-CONSTRUCTION/PRE-DEMO

COORDINATION MEETING WITH OWNER (VA),

OWNERS EQUIPMENT REPRESENTATIVES (GE

MEDICAL, INSIGHTEC, & BOSTON SCIENTIFIC)

AT MINIMUM OF 45 DAYS PRIOR TO

COMMENCEMENT OF WORK IN MRI ROOM AND

SUITE. ARCHITECT MUST BE NOTIFIED AT

LEAST TWO WEEKS PRIOR TO COORDINATION

MEETING, AND INCLUDED IN MEETING, IN

PERSON, OR VIA "TEAMS" VIDEO

CONFERENCING. CONTRACTOR MUST

DOCUMENT MEETING AND DISTRIBUTE NOTES

AND MUST PROVIDE OWNER AND ARCHITECT A

WRITTEN PLAN OF ACTION, FOR REVIEW AND

APPROVAL PRIOR TO WORK COMMENCEMENT.

4. NEW PENETRATIONS REQUIRED BY (VA)

OWNER'S EQUIPMENT VENDORS MUST BE

COORDINATED WITH VENDORS PRIOR TO

DEMOLITION AND A NEW PENETRATION PANEL

WITH VENDOR SPECIFIC CONNECTIONS PLATE

PROVIDED BY OWNER'S EQUIPMENT VENDOR.

5. ALL DOOR HARDWARE REMOVED (AND NOT

REUSED) IS TO BE RETURNED TO (VA) OWNER.

6. CONTRACTOR IS RESPONSIBLE FOR

RESTORING AREAS IN WHICH WORK IS BEING

PERFORMED PER CONTRACT TO A COMPLETE

AND FINISHED STATE UPON COMPLETION OF

WORK.

7. CONTRACTOR IS RESPONSIBLE FOR ENSURING

ALL AREAS WHERE CONTRACTED WORK IS

BEING PERFORMED IS PROTECTED FROM

PUBLIC AND STAFF DURING WORK BEING DONE

AND AFTER WORK HAS TERMINATED FOR THE

DAY. ALL DEBRIS, TOOLS, AND EQUIPMENT ARE

TO BE CLEANED AND REMOVED FROM THE

SITE AND WORK AREA IN A CLEAN AND TIDY

CONDITION UNTIL WORK COMMENCES THE

NEXT DAY.

8. PATCH AND REPAIR EXISTING WALLS AT AREAS

OF INSTALLATION OF NEW DOOR OPERATION

DEVICES AND MATCH EXISTING FINISHES

LEGEND

PIV

ADO

- PERSONAL IDENTITY VERIFICATION -

REF. TECH DRAWINGS

-…